39
Working Instruction of SMAM 2017-18 1 TG II (1) 50307/16 Directorate of Agriculture Thiruvananthapuram Dated: 18 /07/2017 CIRCULAR Sub:- Central Sector Scheme -Sub Mission on Agriculture Mechanization (SMAM) –Administrative sanction accorded -Working Instruction Issued- 2017-18– reg: Ref: 1) G.O (Rt) 666/17/AD dated 21/06/2017 2) F. No 5-1/2015-M&T (Admn) dated 17/03/2017 of Ministry of Agriculture, GoI 3) 3-1/2015-M&T (I&P) dated 01/05/2017 of Ministry of Agriculture, GoI 4) G.O (Rt) 468/17/AD dated 04/05/2017 As per reference cited 1 st Government of Kerala has conveyed approval and one time administrative sanction for the implementation of CSS Scheme “Submission on Agriculture Mechanization” valid upto 2021-2022. Vide reference 2 nd and 3rd cited above GoI has accorded administrative approval for the implementation of the scheme during 2017-18 and released the 1 st installment of an amount of Rs.489.301 for the current year. The Annual Action Plan for the year 2017-18 submitted to GoI is for 2500.0962 Lakhs in which GoI share is 1569.2819 and GoK Share is 930.8146 Lakhs. For current financial year, the sharing pattern between GoI & GoK is 60% and 40% respectively except component No 1 and 2 for which GoI share is 100%. Scheme Sub Mission on Agriculture Mechanization(SMAM) under National Mission on Agricultural Extension and Technology (NAMET) in the plan write up of 2017-18 comes under the scheme Krishi Unnathi Yojana, the expenditure shall be met under the H/A 2401-00-109-65 Plan. The detailed revised operational guideline of SMAM is available in website http://farmech.dac.gov.in/SMAM/SMAM%20(2).pdf of GoI. The

TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

  • Upload
    vannga

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

1

TG II (1) 50307/16 Directorate of Agriculture

Thiruvananthapuram

Dated: 18 /07/2017

CIRCULAR

Sub:- Central Sector Scheme -Sub Mission on Agriculture Mechanization

(SMAM) –Administrative sanction accorded -Working Instruction Issued-

2017-18– reg:

Ref:

1) G.O (Rt) 666/17/AD dated 21/06/2017

2) F. No 5-1/2015-M&T (Admn) dated 17/03/2017 of Ministry of Agriculture,

GoI

3) 3-1/2015-M&T (I&P) dated 01/05/2017 of Ministry of Agriculture, GoI

4) G.O (Rt) 468/17/AD dated 04/05/2017

As per reference cited 1st Government of Kerala has conveyed approval

and one time administrative sanction for the implementation of CSS Scheme

“Submission on Agriculture Mechanization” valid upto 2021-2022.

Vide reference 2nd and 3rd cited above GoI has accorded administrative

approval for the implementation of the scheme during 2017-18 and released

the 1st installment of an amount of Rs.489.301 for the current year. The Annual

Action Plan for the year 2017-18 submitted to GoI is for 2500.0962 Lakhs in which

GoI share is ₹ 1569.2819 and GoK Share is ₹ 930.8146 Lakhs. For current financial

year, the sharing pattern between GoI & GoK is 60% and 40% respectively

except component No 1 and 2 for which GoI share is 100%. Scheme Sub Mission

on Agriculture Mechanization(SMAM) under National Mission on Agricultural

Extension and Technology (NAMET) in the plan write up of 2017-18 comes under

the scheme Krishi Unnathi Yojana, the expenditure shall be met under the H/A

2401-00-109-65 Plan.

The detailed revised operational guideline of SMAM is available in

website http://farmech.dac.gov.in/SMAM/SMAM%20(2).pdf of GoI. The

Page 2: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

2

scheme mainly intends to promote the usage of farm mechanization and

increase the ratio of farm power to cultivable unit area.

1. Mission Objectives

The scheme envisages accomplishing the following objectives.

1. Increasing the reach of farm mechanization to small and marginal

farmers and to the regions where availability of farm power is low;

2. Promoting „Custom Hiring Centres‟ to offset the adverse economies of

scale arising due to small landholding and high cost of individual

ownership;

3. Creating hubs for hi-tech & high value farm equipments;

4. Creating awareness among stakeholders through demonstration and

capacity building activities;

2. Mission Strategy

1. Promote farm mechanization among stakeholders by way of on-field and

off-field training and demonstrations.

2. Provide financial assistance to farmers for procurement of farm machinery

and implements

3. Establish custom hiring centres location and crop specific farm machinery

and implements

4. Provide financial assistance to small and marginal farmers for hiring

machinery and implements in low mechanized regions.

3. Mission Components

i. Promotion a n d St ren gth en in g of Agricultural Mechanization

t h r o u g h Training, Testing and Demonstration: Aims to ensure

performance testing of agricultural machinery and equipment,

capacity building of farmers and end users and promoting farm

mechanization through demonstrations.

ii. Demonstration, Training and Distribution of Post-Harvest

Page 3: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

3

Technology and Management (PHTM): Aims at popularizing

technol ogy for primary process ing, v a l u e addition, low

cost scientific storage/transport and the crop by-product

management through demonstrations, capacity building of

farmers and end users. Provides financial assistance for

establishing PHT units.

iii. Financial Assistance for Procurement of Agricultural Machinery

and E q u ip m e n t : Promotes ownership of various agricultural

machinery & equipment‟s as per norms of assistance.

iv. Establish Farm Machinery Banks for Custom Hiring: Provides

suitable f inancial assistance to establish Farm Machinery Banks

for Custom Hiring for appropriate locations and crops.

v. Establish Hi-Tech, High Productive Equipment Hub for Custom

H i r i n g : Provides f i n a n c i a l assistance to set up hi-tech

machinery hubs for high value crops like sugarcane, cotton etc.

vi. Promotion of Farm Mechanization in Selected Villages: Provides

financial assistance to promote appropriate technologies and

to set up Farm Machinery Banks in identified villages in low

mechanized states.

vii. Financial Assistance for Promotion o f Mechanized

O p e r at io n s /hectare Carried out Th rough Custom Hiring

Centres: Provides financial assistance on per hectare basis to

the beneficiaries hiring machinery/equipment‟s from custom

hiring centres in low mechanized areas.

i. 100% CSS -Promotion and Strengthening of Agricultural Mechanization

through Training, Testing and Demonstration-: (Component No.1)

Under this component GoI has sanctioned Demonstrations by the

newly started Farm Machinery Banks for Custom Hiring under this scheme.

The Cropping pattern based demonstrations, new technology machines /

equipment demonstrations should be provided by the custom hiring

center established in this scheme during 2015-16 & 2016-17. The estimated

expenditure as per norms is ₹ 4000 per Hectare. The total cost is ₹ 0.40

Lakhs.

Page 4: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

4

Under this component training to newly established custom hiring

centre members should be provided. It is aimed to train 40 members from

the Custom Hiring Centers established under SMAM during 2015-16 and

2016-17 in user level courses for 2 weeks in selection operation and

maintenance of agricultural machinery. The estimated expenditure as

per norms is ₹4000 per trainee per week at a total cost of ₹3.20 Lakhs.

It is also recommended to train 40 technical persons of the 14

department owned Custom Hiring Centers in technical level courses for 4

weeks on Establishment& Management of Agricultural machinery repair

and maintenance of workshop at a cost of ₹ 6.40 Lakhs.

Improving the status of Research Testing and Training Centre (RTTC)

The institution under the Department of Agriculture, which is

providing training and testing in the field to farm mechanization is the

RTTC established at Vellayani. Thiruvananthapuram

As per the Government of India guide lines, agriculture machineries

and implements are to be tested before they are supplied through

government assisted schemes. It has to be tested and certified before

introduction. At present there is only one testing center in Kerala.

To strengthen the testing centre Rs.150 Lakhs is given under this

component.

ii. 100% CSS -Demonstration, Training and Distribution of Post-Harvest

Technology and Management (PHTM): (Component No.2)

It is aimed to conduct training in post-harvest technologies/

machineries. This will instrument for the dissemination of technology for the

popularization and adoption of improved post-harvest technologies

/machineries to farmer and other entities.

Page 5: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

5

It is proposed to conduct 14 new technology machines /

equipment demonstrations @ ₹4000 per demonstration for a financial

outlay of ₹0.56 Lakhs.

For the Establishment of PHT units for transfer of primary processing

technology, value addition, low cost scientific storage, packaging units

and technologies for by-product management in the production

catchments an assistance of 60 % of the cost limited to 1.50 Lakhs for SC,

ST, Small & Marginal farmers and Women and 50% limited to 1.25 Lakhs for

others. This financial year an amount of Rs.12.50 Lakhs is approved under

the scheme.

iii. CSS-60:40 % -Financial Assistance for Procurement of Agriculture

Machinery and Equipment: (Component No.3)

In order to bring more area under mechanized agriculture,

assistance and credit facilities should be provided to farmers/labourers for

the purchase of machinery. It is also proposed to provide assistance to

farmer‟s organizations, charitable organization, non-governmental

organization, local bodies, SC/ST societies, individual farmers/agricultural

labourers etc. Assistance as per norms will be given as back-end subsidy.

Usage of machinery both for wetland and garden land will be promoted

under this component. It should be always ensured that the machineries

are approved by the Ministry of Agriculture & Farmers Welfare

Government of India for Testing and Certifying Agricultural Machineries

and Equipment‟s as per Annexure V of GoI guidelines.

The details of machinery provided assistance under the scheme is

annexed as Annexure II(c) , Solar photovoltaic (SPV) AC-Submersible

Pump set up to 2 HP are also eligible for the assistance. A total financial

outlay of Rs.603.2792 Lakhs in which Rs. 361.96752 Lakhs of Govt of India

(GoI) share and Rs. 241.31168 Lakhs of Govt. of Kerala (GoK) Share was

Page 6: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

6

approved by GoI. The financial assistance will be provided as per the

guidelines of SMAM.

It should be ensured that the benefits under various other schemes

of DAC&FW including RKVY are not extended to the same beneficiary

twice.

iv. CSS-60:40 % Establish Farm Machinery Banks for Custom Hiring:

(Component No.4)

The vision is to serve as custom hiring of agriculture machines /

implements and skilled labour force for various agricultural operations.

Custom Hiring Centre would be the service delivery systems with

rural entrepreneurs, progressive farmers and SHG‟s managed collectively

and designed to cater various needs of the farmers.

The custom hiring centres (CHC) having the project cost more than

Rs. 25 lakh will be established under the model of credit linked back

ended financial assistance. The bank will lock the financial assistance

released to them for a period of 4 years. The beneficiary will repay the

complete bank loan within the period of not less than 4 years. The

Beneficiary will not be allowed to transfer/ sell/ mortgage the CHC to any

one before the completion of 6 years.

It is also approved to establish ten numbers of Farm Machinery

Banks for Custom Hiring@ ₹ 10 Lakhs per unit and 10 numbers of Farm

Machinery Banks for Custom Hiring@ ₹ 25 Lakhs per unit with financial

assistance limited to 40% .The estimated financial assistance of these units

are 40.00 Lakhs & 100.00 Lakhs respectively. The total estimated financial

assistance comes to Rs.140.00 Lalkhs with GoI Share of ₹84.00 Lakhs & GoK

share of ₹56.00 Lakh. The target will be allotted based on the needs from

the District.

Vide Reference 4th cited above GoK directed to provide assistance

to Thaliparamba Agro Service Centre (ASC) for the procurement of

Agriculture Machinery for custom Hiring for an amount of Rs.92.956 Lakhs.

Under this component an amount of Rs.37.1824 Lakhs (40% share) is

Page 7: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

7

earmarked for the purchase of agriculture machineries as per the norms

to Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized

for the other Agro Service Centre under this component.

v. CSS-60:40 % Establish Hi-Tech, High Productive Equipment Hub for Custom

Hiring: (Component No.5)

This component intends to provide financial assistance to set up hi-

tech machinery hubs for high value crops like sugarcane and cotton.

Under this component no item was approved during the current FY.

vi. CSS-60:40 % Promotion of Farm Mechanization in Selected Villages:

(Component No.6)

Govt. of India has sanctioned to start Farm Machinery Bank to

promote mechanized villages having high potential for mechanized

cultivation. It is proposed to establish 80 machinery banks at 80% financial

assistance limited to a maximum of 10.00 Lakhs rupees per farm

machinery bank as per norms. Thus the total estimated cost for

establishing 80 such unit @ Rs12.5 lakhs /Unit I Rs.1000.00 Lakhs with

financial assistance of Rs. 800.00 Lakhs sharing is ₹480.00 Lakhs by GoI and

GoK ₹ 320.00 Lakhs by GoK. The Target will be based on the needs from

district.

vii. CSS-60:40 %Financial Assistance for Promotion of Mechanized

Operations/hectare carried out through Custom Hiring Centers:

(Component No.7)

GoI has sanctioned financial assistance for mechanized farming in

low mechanized areas in the state. The assistance will be on per hectare

basis to the beneficiaries who are hiring machinery/equipment from

custom hiring centers established under component No. 6 during the last

FY in the poorly mechanized areas.

Page 8: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

8

It is approved to provide assistance @ ₹ 2000/ Ha as 50% of the cost

of operation /ha 6000 Ha of farming land in state for fully mechanized

farming at village level for a total cost of ₹120.00 Lakhs and the GoI Share

will be ₹72.00 Lakhs and GoK Share is 48.00 Lakhs

It is also proposed to conduct demonstration of machinery

purchased by the Custom Hiring Centers on poorly mechanized villages.

The Custom Hiring Centers will conduct demonstration in an area of 10400

Ha @ ₹ 4000/Ha. The estimated cost as per norms is ₹416.00 Lakhs in which

GoI share is₹249.60 Lakhs and GoK Share is₹166.40 Lakhs.

viii. Flexi fund:

Automation of Custom Hiring Centre- Pilot Project:

The department owned custom hiring Centre presently has a pack

of machinery including Tractors, Power tillers, Mini Tractors, Garden tiller,

Transplanter, Combine harvester, Straw baler etc.; of various make. The

service providing group members are to be engaged to operate the

machines. Hence its approved to form a service providing group in each

CHC under component no 6. The balance amount of 20% shall be met

from this component for which an amount of Rs.35.00 Lakhs is set apart.

Automation of department owned custom hiring centers is planned

for development of hardware, software and procurement of necessary

GPS, sensors and consultation charges for experts and research

programmes. A total financial outlay of ₹ 225.234 Lakhs is kept for this

component in which Rs.135.1404 Lakhs for GoI & 90.094 is GoK Share.

4. Scheme Implementation:

As per GO (MS) No. 198/14/AD dated 20/09/2014, Govt. have

constituted State Level Executive Committee (SLEC) under the

Page 9: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

9

chairmanship of Agricultural Production Commissioner. SLEC will monitor

the Scheme in State level. The management and monitoring mechanism

of the scheme at district level will be done by the District Level Executive

Committee (DLEC), comprising of District Collector (Chairman), Principal

Agricultural Officer (Convener), Executive Engineer (Agri), Project Director

ATMA, Deputy Director (C) and Assistant Executive Engineer (Agri) as

members. Representatives of line Departments, SAUs/ICAR, nominated

progressive farmers, representatives from SHG, representatives from lead

banks/NABARD may also be included in the committee. DLEC will be

responsible for carrying forward the objectives of the Mission for project

formulation, implementation and monitoring. The office of Principal

Agriculture Office shall be the district nodal agency with following

functions.

(i) Identify the areas of low ratio of farm power availability /areas with

large number of small and marginal holdings for implementation of

farm mechanization components.

(ii) Identify beneficiaries (Farmers, Self Help Groups (SHGs), User Groups,

Cooperative Societies, Farmer Producer Organizations (FPOs) and

Entrepreneurs) to avail the benefits of SMAM in transparent and time

bound manner. Identify entrepreneurs/SHGs to establish custom

hiring centres.

(iii) Tie up with the Banks for credit requirements of the beneficiaries

(iv) Ensure that the benefits under various schemes of DAC such as

RKVY, MIDH, NMOOP, NFSM etc. are not extended repeatedly to the

same beneficiary.

(v) Prepare district AAP with physical and financial targets under each

component as per Annexure VII of the Government of India

guidelines.

Page 10: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

10

(vi) Receive funds from State Nodal Department for implementing the

programmes.

(vii) Make efforts for direct transfer of financial assistance to the

farmers/beneficiary through on the basis of AADHAR No and e

payment wherever infrastructure is functional in the district.

(viii) Monitor & display details of approved programme, all activities

undertaken and name of beneficiaries, expenditure incurred etc. at

the Panchayat/prominent public place in the cluster/village level

and get it placed before the concerned Gram Sabha annually from

the point of social audit.

(ix) Study the impact on production and productivity after the

implementation of the programmes and forward the reports to the

State Nodal Department.

(x) Report the progress to State Agricultural Engineer in Annexure IX of

the Government of India guidelines.

Office of the Assistant Executive Engineers (Agri) functioning in the district

will provide technical support in formulation of the district action plan, its

implementation and monitoring. The technical staff will be sourced from

these organizations for imparting training to the farmers and extension

personnel.

i. Test certificates from RTTC Centre Vellayani, Thiruvananthapuram, State

Agriculture Universities (SAU) and designated institutes testing centers to

ensure the quality of the agricultural implements and tool costing less

than Rs. 25,000/- (Rupees Twenty Five thousand) should be ensured

before they are supplied under Government assistance programmes.

ii. Test report of any FMTTI or designated testing of DAC&FW from

manufacturer/supplier of the agricultural implements and tools costing

less than Rs. 25,000/- (Rs. Twenty-Five Thousand) or a system of self-

certification for the desired specification/ quality/ performance of

Page 11: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

11

agricultural implements and tools may be accepted from

manufacturers or supplier.

iii. The agricultural implements and tools costing less than Rs. 25,000/-

(Twenty five thousands) as at SI.No (i) above covers only hand

tools, garden tools, animal drawn/manually / tractor drawn

implements required for land preparation/ sowing and planting/ inter

cultivation/ harvesting and threshing/ transportation operations.

iv. All types of self-propelled agricultural implements/ equipment/

machinery and all types of plant protection equipment are not

covered in clause no.(i) and (iii) above.

The application received will be processed through the Agriculture

Officer /Assistant Executive Engineer (Agri) / Asst. Director of Agriculture to

Principal Agricultural Officers for selection.

The DLEC will finalize the selection for assistance by confirming the

standard of the machinery as per test certificates issued by testing

institutes as shown in Annexure V of the Government of India guidelines.

The list Combine Harvester, tractors and power tiller tested by FMTTI is

available in the website http://farmech.gov.in/LOE.htm. GoI issued

guidelines for ensuring quality of agriculture machineries and equipment‟s

supplied under Govt. programme and schemes shall also be followed for

the selection of machineries.

The assistance will be distributed through e payment with aadhaar

details of beneficiary to the Assistant Director of Agriculture at Block level

/Assistant Executive Engineer (Agri) through District Principal Agriculture

Officer.

The Assistant Executive Engineer (Agri) of the district will be the

investigating officer for procurement of machinery for custom hiring

center for demonstration purposes. They will also organize the training

programmes, demonstration, formation and supervision of activities of

service providing groups in the district. The Regional Executive Engineers

Page 12: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

12

(Agri) at Alappuzha and Kozhikode will monitor the implementation

programme at regional level and provide necessary guidance to the

engineers.

A software is developed by the department in assistance with

National Informatics Centre (NIC) named Farm Mechanization System

(FMS). Through this portal, receipt of application of the farmer to the

payment subsidy can be done. As a demo this software will be used in

Kottayam and Thiruvananthapuram Districts during the current financial

year for testing. From the next financial year onwards after making

necessary modification in this software it can used in all other districts. This

software is hosted in the website address http://fms.kerala.gov.in.

5. Financial Outlay:

The total project cost for the implementation of above components

intend mainly for imparting training, establishment of new custom hiring

centers and assistance for promotion of mechanized agricultural

operations as detailed below.

Page 13: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

13

Sl.No Component GoI Share

(₹ Lakhs)

GoK Share

(₹ Lakhs)

Total Financial

(₹ Lakhs)

1 Promotion and Strengthening

of Agricultural

Mechanization through

Training, Testing and

Demonstration: (C1)

160.00 ----- 160.00

2 Demonstration, Training of

Post-Harvest Technology and

Management (C2)

13.06 ---- 13.06

3 Financial Assistance for

Procurement of Agriculture

Machinery and Equipment

(C3)

361.96752 241.31168 603.2792

4 Establish Farm Machinery

Banks for Custom Hiring (C4)

84.00 56.00 140.00

5 Promotion of Farm

Mechanization in Selected

Villages (C6)

480.00 320.00 800.00

6 Financial Assistance for

Promotion of Mechanized

Operations/hectare Carried

out Through Custom Hiring

Centers (C7)

321.60 214.40 536.00

7 Flexi fund

Strengthening Infrastructure

of Custom Hiring Centre

135.1404 90.094 225.2344

8 Administrative Cost 13.5140 9.009 22.523

Total 1569.2819 930.8146 2500.0962

Page 14: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

14

6. Implementation Schedule

Sl.No Activity On or before

1 Calling Applications Nov 2017

2 Committee For Final Approval of Application 15th Dec 2017

3 Distribution of Assistance 30th Dec 2017

4 Submission of Reports & UC 31th Dec 2017

7. Role of Panchayat Raj Institutions (PRIs)

The DLEC, to the extent possible, will ensure active participation of the

Panchayath Raj Institutions (PRIs) in the implementation of this Mission. PRIs may

also be involved in publicizing the demonstrations and training of farm

equipment and in ensuring participation of farmers from nearby areas for

widespread dissemination of technology.

8. Monitoring and evaluation

The Deputy Director of Agriculture (Credit) of the district will be the District

level implementing officer of the scheme. The utilization certificate of fund

released and the physical and financial progress report should be submitted in

the respective formats. E payment / DBT may be effected with Aadhaar details

as early as possible on receipt of bill after executing necessary agreement with

the supplier / manufacture for Annual Maintenance Contract (AMC). Before

making e payment necessary utilization certificate and valuation should be

obtained from the officer authorized for the purpose.

The State Agricultural Engineer (SAE) will monitor the programme at State

Level.

Page 15: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Working Instruction of SMAM 2017-18

15

The financial and physical achievement of the programme will be reported to

State Agricultural Engineer before 5th of every month in through online from the

link (https://drive.google.com/open?id=0BzUOXC8FWqMTdWdCUHFrTi0zX28)

from gmail . The utilization certificate, physical and financial performance

report in Annexure VIII as given in GoI guidelines should be submitted on or

before 31st March 2018.

The expenditure will be met from the head of account H/A 2401-00-109-

65 Plan during 2017-18.

Sd/-

Director

To

All PAOs,

Copy to:

PA to Director of Agriculture

CA to State Agricultural Engineer

CA to All Additional Directors

PIO, FIB for Information

Planning Section

Executive Engineer (Agriculture), Kozhikode, Alappuzha

DDA (IT) to Publish in Dept. Website

Stock/Spare

Encl: AnnexureII (c), V, VII, VIII and IX

Page 16: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

)

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Mach

inery

* ,

$

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

p

er M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

b

en

efi

ciary

ben

efi

ciary

Tra

cto

rs

(i) T

ract

or (0

8-1

5 P

TO

HP

) Rs

. 1.0

0 la

kh

35%

Rs

. 0.7

5 la

kh

25%

(ii)

Tra

cto

r (1

5 -

20

PTO

HP

) Rs

. 1.0

0 la

kh

35%

Rs

. 0.7

5 la

kh

25%

(iii) T

ract

or (A

bo

ve 2

0-4

0 P

TO

HP

) Rs

. 1.2

5 la

kh

35%

Rs

. 1.0

0 la

kh

25%

(iv) T

ract

or (4

0-7

0 P

TO

HP

) Rs

. 1.2

5 la

kh

35%

Rs

. 1.0

0 la

kh

25%

Po

wer Tille

rs

(i) P

ow

er Tille

r (b

elo

w 8

BH

P)

Rs. 0

.50

lakh

50

%

Rs. 0

.40

lakh

. 40

%(i

i) P

ow

er Tille

r (8

BH

P &

ab

ove)

Rs. 0

.75

lakh

50

%

Rs. 0

.60

lakh

. 40

%R

ice T

ran

spla

nte

r

Self

Pro

pelled

Ric

e T

ran

spla

nte

r( 4

ro

ws)

Rs

.0.9

4 la

kh

50%

Rs

. 0.7

5 la

kh

40%

Self

Pro

pelled

Ric

e T

ran

spla

nte

r

(i) a

bove

4-8

row

s Rs

. 2.0

lakh

. 40

%

Rs. 2

.0 la

kh.

40%

(ii) a

bove

8-1

6 ro

ws

Self

Pro

pelled

Mach

inery

Self

Pro

pelled

Mach

inery

(i) R

eape

r cum

Bin

der

Rs. 1

.25

lakh

50

%

Rs. 1

.00

lakh

40

%Sp

eci

alize

d S

elf

Pro

pelled

Mach

inery

(i) R

eape

r Rs

. 0.6

3 la

kh

50%

Rs

. 0.5

0 la

kh

40%

(ii) P

ost H

ole

Dig

ger/

Augu

r(ii

i) Pn

eum

atic

/ oth

er P

lant

erSelf

Pro

pelled

Ho

rtic

ult

ura

l Mach

inery

(i)

Frui

t Plu

cker

(ii)

Tree

pru

ners

(iii)

Frui

t Har

vest

ers

(iv

) Fr

uit G

rade

rs

Rs. 1

.25

lakh

50

%

Rs. 1

.00

lakh

40

%(v

) Tr

ack T

rolle

y(v

i) N

urse

ry M

edia

Fill

ing

Mac

hine

(vii)

M

ultip

urpo

se H

ydra

ulic

Sys

tem

(v

iii)

Pow

er o

pera

ted

hort

icul

ture

tool

s for

prun

ing,

bud

ding

, gra

ting,

shea

ring

etc.

Op

era

tio

nal G

uid

elin

es

of

SM

AM

27

Op

era

tio

nal G

uid

elin

es

of

SM

AM

26 CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

Tra

cto

r/P

ow

er

Tille

r (b

elo

w 2

0 B

HP

)

dri

ven

eq

uip

men

ts.

A. Lan

d D

evelo

pm

en

t, t

illa

ge a

nd

seed

bed

pre

para

tio

n e

qu

ipm

en

ts:

(i)

MB

Plow

Rs

. 0.

15 la

kh

50%

Rs

. 0.1

2 la

kh

40%

(ii)

Dis

c Plo

w(ii

i) Cu

ltiva

tor

(iv)

Har

row

(v)

leve

ler B

lade

(vi)

Cage

whe

el(v

ii)

Furr

ow o

pene

r(v

iii)

Ridg

er(ix

) W

eed

slas

her

(x)

Lase

r Lan

d Le

velle

r(x

i) Re

vers

ible

Mec

hani

cal p

loug

h(x

ii)

Rota

vato

r Rs

.0.3

5 la

kh

50%

Rs

. 0.2

8 la

kh

40%

(xiii

) Ro

topu

ddle

r(x

iv)

Reve

rsib

le H

ydra

ulic

plo

ugh

(xv)

Fu

rrow

ope

ner

(xvi

) Bu

nd fo

rmer

(xvi

i) Cr

ust b

reak

er(x

viii)

Roto

culti

vato

r(x

ix)

Pow

er H

arro

w(x

x)

Chis

el P

loug

h Rs

. 0.0

8 la

kh

50%

Rs

. 0.0

6 la

kh

40%

Page 17: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

)

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Mach

inery

* ,

$

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

p

er M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

b

en

efi

ciary

ben

efi

ciary

Tra

cto

rs

(i) T

ract

or (0

8-1

5 P

TO

HP

) Rs

. 1.0

0 la

kh

35%

Rs

. 0.7

5 la

kh

25%

(ii)

Tra

cto

r (1

5 -

20

PTO

HP

) Rs

. 1.0

0 la

kh

35%

Rs

. 0.7

5 la

kh

25%

(iii) T

ract

or (A

bo

ve 2

0-4

0 P

TO

HP

) Rs

. 1.2

5 la

kh

35%

Rs

. 1.0

0 la

kh

25%

(iv) T

ract

or (4

0-7

0 P

TO

HP

) Rs

. 1.2

5 la

kh

35%

Rs

. 1.0

0 la

kh

25%

Po

wer Tille

rs

(i) P

ow

er Tille

r (b

elo

w 8

BH

P)

Rs. 0

.50

lakh

50

%

Rs. 0

.40

lakh

. 40

%(i

i) P

ow

er Tille

r (8

BH

P &

ab

ove)

Rs. 0

.75

lakh

50

%

Rs. 0

.60

lakh

. 40

%R

ice T

ran

spla

nte

r

Self

Pro

pelled

Ric

e T

ran

spla

nte

r( 4

ro

ws)

Rs

.0.9

4 la

kh

50%

Rs

. 0.7

5 la

kh

40%

Self

Pro

pelled

Ric

e T

ran

spla

nte

r

(i) a

bove

4-8

row

s Rs

. 2.0

lakh

. 40

%

Rs. 2

.0 la

kh.

40%

(ii) a

bove

8-1

6 ro

ws

Self

Pro

pelled

Mach

inery

Self

Pro

pelled

Mach

inery

(i) R

eape

r cum

Bin

der

Rs. 1

.25

lakh

50

%

Rs. 1

.00

lakh

40

%Sp

eci

alize

d S

elf

Pro

pelled

Mach

inery

(i) R

eape

r Rs

. 0.6

3 la

kh

50%

Rs

. 0.5

0 la

kh

40%

(ii) P

ost H

ole

Dig

ger/

Augu

r(ii

i) Pn

eum

atic

/ oth

er P

lant

erSelf

Pro

pelled

Ho

rtic

ult

ura

l Mach

inery

(i)

Frui

t Plu

cker

(ii)

Tree

pru

ners

(iii)

Frui

t Har

vest

ers

(iv

) Fr

uit G

rade

rs

Rs. 1

.25

lakh

50

%

Rs. 1

.00

lakh

40

%(v

) Tr

ack T

rolle

y(v

i) N

urse

ry M

edia

Fill

ing

Mac

hine

(vii)

M

ultip

urpo

se H

ydra

ulic

Sys

tem

(v

iii)

Pow

er o

pera

ted

hort

icul

ture

tool

s for

prun

ing,

bud

ding

, gra

ting,

shea

ring

etc.

Op

era

tio

nal G

uid

elin

es

of

SM

AM

27

Op

era

tio

nal G

uid

elin

es

of

SM

AM

26 CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

Tra

cto

r/P

ow

er

Tille

r (b

elo

w 2

0 B

HP

)

dri

ven

eq

uip

men

ts.

A. Lan

d D

evelo

pm

en

t, t

illa

ge a

nd

seed

bed

pre

para

tio

n e

qu

ipm

en

ts:

(i)

MB

Plow

Rs

. 0.

15 la

kh

50%

Rs

. 0.1

2 la

kh

40%

(ii)

Dis

c Plo

w(ii

i) Cu

ltiva

tor

(iv)

Har

row

(v)

leve

ler B

lade

(vi)

Cage

whe

el(v

ii)

Furr

ow o

pene

r(v

iii)

Ridg

er(ix

) W

eed

slas

her

(x)

Lase

r Lan

d Le

velle

r(x

i) Re

vers

ible

Mec

hani

cal p

loug

h(x

ii)

Rota

vato

r Rs

.0.3

5 la

kh

50%

Rs

. 0.2

8 la

kh

40%

(xiii

) Ro

topu

ddle

r(x

iv)

Reve

rsib

le H

ydra

ulic

plo

ugh

(xv)

Fu

rrow

ope

ner

(xvi

) Bu

nd fo

rmer

(xvi

i) Cr

ust b

reak

er(x

viii)

Roto

culti

vato

r(x

ix)

Pow

er H

arro

w(x

x)

Chis

el P

loug

h Rs

. 0.0

8 la

kh

50%

Rs

. 0.0

6 la

kh

40%

Page 18: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

B. S

ow

ing

, Pla

nti

ng

, Reap

ing

an

d

Dig

gin

g E

qu

ipm

en

ts:

(i)

Post

Hol

e di

gger

Rs

0.1

5 la

kh

50%

Rs

. 0.1

2 la

kh

40%

(ii)

Pota

to P

lant

er(ii

i) Po

tato

Dig

ger

(iv)

Grou

nd n

ut d

igge

r(v

) St

rip ti

ll dril

l(v

i) tr

acto

r dra

wn

reap

er(v

ii)

onio

n ha

rves

ter

(viii

) Ri

ce st

raw

Cho

pper

,(ix

) Ze

ro ti

ll see

d cu

m fe

rtili

zer d

rill

(x)

Rais

ed B

ed P

lant

er(x

i) Su

gar c

ane

cutt

er/S

trip

per

(xii)

pl

ante

r,(x

iii)

seed

dril

l(x

iv)

mul

ti cr

op p

lant

er(x

v)

zero

–til

l mul

ti cr

op p

lant

er(x

vi)

Ridg

e fu

rrow

pla

nter

(i)

Turb

o Se

eder

Rs

. 0.3

5 la

kh

50%

Rs

. 0.2

8 la

kh

40%

(ii)

Pneu

mat

ic P

lant

er(ii

i) Pn

eum

atic

veg

etab

le tr

ansp

lant

er,

(iv)

Pneu

mat

ic v

eget

able

seed

er(v

) H

appy

seed

er(v

i) Pl

astic

Mul

ch La

ying

Mac

hine

(vii)

Se

ed cu

m fe

rtili

zer d

rill

(viii

) Aq

ua fe

rti s

eed

drill

(ix

) Ra

ised

Bed

Pla

nter

with

incl

ined

pla

te

pl

ante

r and

sha

per a

ttac

hmen

t.(x

) M

ulch

er

(xi)

Seed

trea

ting

drum

Op

era

tio

nal G

uid

elin

es

of

SM

AM

29

Op

era

tio

nal G

uid

elin

es

of

SM

AM

28

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r/P

ow

er Tille

r (b

elo

w 2

0 B

HP

)

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

dri

ven

eq

uip

men

ts .

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

C.In

ter C

ult

ivati

on

Eq

uip

men

ts:

(i)

Gras

s Wee

d Sl

ashe

r Rs

. 0.1

5 la

kh

50%

Rs

. 0.1

2 la

kh

40%

(ii)

Rice

stra

w C

hopp

er(ii

i) Po

wer

Wee

der (

engi

ne op

erat

ed b

elow

2 bh

p)D

. Eq

uip

men

ts f

or

Resi

du

e m

an

ag

em

en

t/H

ay

an

d F

ora

ge E

qu

ipm

en

ts:

(i)

Suga

rcan

e th

rash

Cut

ter

Rs. 0

.15

lakh

50

%

Rs. 0

.12

lakh

40

%(ii

) Co

conu

t Fro

nd C

hopp

er,

(iii)

Rake

(iv)

Bale

rs.

(v)

Stra

w re

aper

(vi)

Feed

blo

ck m

achi

ne(v

ii)

Stub

ble

shav

erE. H

arv

est

ing

& T

hre

shin

g E

qu

ipm

en

ts(O

pera

ted

by

en

gin

e/e

lect

ric

mo

tor b

elo

w

3 h

p a

nd

by

po

wer ti

ller , a

nd

tra

cto

r o

f b

elo

w 2

0 B

HP

tra

cto

r ):

(i)

Grou

nd N

ut P

od S

trip

per

Rs. 0

.2 la

kh

50%

Rs

. 0.1

6 la

kh

40%

(ii)

Thre

sher

(iii)

Mul

ti cr

op T

hres

hers

(iv)

Padd

y Th

resh

er(v

) Br

ush

Cutt

er(v

i) W

inno

win

g fa

n(v

ii)

Mai

ze sh

elle

r (v

iii)

Spira

l gra

der

(ix)

Reap

er(x

) M

ower

(xi)

Flai

l Har

vest

er(x

ii)

Infie

lder

(xiii

) M

ower

Shr

edde

r (AL

L PU

RPO

SE/A

ll cro

ps)

F. C

haff

Cu

tter (O

pera

ted

by

en

gin

e/e

lect

ric

m

oto

r b

elo

w 3

hp

an

d b

y p

ow

er ti

ller an

d

Rs. 0

.2 la

kh

50%

Rs

. 0.1

6 la

kh

40%

tra

cto

r o

f b

elo

w 2

0 B

HP

tra

cto

r )

Page 19: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

B. S

ow

ing

, Pla

nti

ng

, Reap

ing

an

d

Dig

gin

g E

qu

ipm

en

ts:

(i)

Post

Hol

e di

gger

Rs

0.1

5 la

kh

50%

Rs

. 0.1

2 la

kh

40%

(ii)

Pota

to P

lant

er(ii

i) Po

tato

Dig

ger

(iv)

Grou

nd n

ut d

igge

r(v

) St

rip ti

ll dril

l(v

i) tr

acto

r dra

wn

reap

er(v

ii)

onio

n ha

rves

ter

(viii

) Ri

ce st

raw

Cho

pper

,(ix

) Ze

ro ti

ll see

d cu

m fe

rtili

zer d

rill

(x)

Rais

ed B

ed P

lant

er(x

i) Su

gar c

ane

cutt

er/S

trip

per

(xii)

pl

ante

r,(x

iii)

seed

dril

l(x

iv)

mul

ti cr

op p

lant

er(x

v)

zero

–til

l mul

ti cr

op p

lant

er(x

vi)

Ridg

e fu

rrow

pla

nter

(i)

Turb

o Se

eder

Rs

. 0.3

5 la

kh

50%

Rs

. 0.2

8 la

kh

40%

(ii)

Pneu

mat

ic P

lant

er(ii

i) Pn

eum

atic

veg

etab

le tr

ansp

lant

er,

(iv)

Pneu

mat

ic v

eget

able

seed

er(v

) H

appy

seed

er(v

i) Pl

astic

Mul

ch La

ying

Mac

hine

(vii)

Se

ed cu

m fe

rtili

zer d

rill

(viii

) Aq

ua fe

rti s

eed

drill

(ix

) Ra

ised

Bed

Pla

nter

with

incl

ined

pla

te

pl

ante

r and

sha

per a

ttac

hmen

t.(x

) M

ulch

er

(xi)

Seed

trea

ting

drum

Op

era

tio

nal G

uid

elin

es

of

SM

AM

29

Op

era

tio

nal G

uid

elin

es

of

SM

AM

28

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r/P

ow

er Tille

r (b

elo

w 2

0 B

HP

)

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

dri

ven

eq

uip

men

ts .

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

C.In

ter C

ult

ivati

on

Eq

uip

men

ts:

(i)

Gras

s Wee

d Sl

ashe

r Rs

. 0.1

5 la

kh

50%

Rs

. 0.1

2 la

kh

40%

(ii)

Rice

stra

w C

hopp

er(ii

i) Po

wer

Wee

der (

engi

ne op

erat

ed b

elow

2 bh

p)D

. Eq

uip

men

ts f

or

Resi

du

e m

an

ag

em

en

t/H

ay

an

d F

ora

ge E

qu

ipm

en

ts:

(i)

Suga

rcan

e th

rash

Cut

ter

Rs. 0

.15

lakh

50

%

Rs. 0

.12

lakh

40

%(ii

) Co

conu

t Fro

nd C

hopp

er,

(iii)

Rake

(iv)

Bale

rs.

(v)

Stra

w re

aper

(vi)

Feed

blo

ck m

achi

ne(v

ii)

Stub

ble

shav

erE. H

arv

est

ing

& T

hre

shin

g E

qu

ipm

en

ts(O

pera

ted

by

en

gin

e/e

lect

ric

mo

tor b

elo

w

3 h

p a

nd

by

po

wer ti

ller , a

nd

tra

cto

r o

f b

elo

w 2

0 B

HP

tra

cto

r ):

(i)

Grou

nd N

ut P

od S

trip

per

Rs. 0

.2 la

kh

50%

Rs

. 0.1

6 la

kh

40%

(ii)

Thre

sher

(iii)

Mul

ti cr

op T

hres

hers

(iv)

Padd

y Th

resh

er(v

) Br

ush

Cutt

er(v

i) W

inno

win

g fa

n(v

ii)

Mai

ze sh

elle

r (v

iii)

Spira

l gra

der

(ix)

Reap

er(x

) M

ower

(xi)

Flai

l Har

vest

er(x

ii)

Infie

lder

(xiii

) M

ower

Shr

edde

r (AL

L PU

RPO

SE/A

ll cro

ps)

F. C

haff

Cu

tter (O

pera

ted

by

en

gin

e/e

lect

ric

m

oto

r b

elo

w 3

hp

an

d b

y p

ow

er ti

ller an

d

Rs. 0

.2 la

kh

50%

Rs

. 0.1

6 la

kh

40%

tra

cto

r o

f b

elo

w 2

0 B

HP

tra

cto

r )

Page 20: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve20

- 35 B

HP

) dri

ven

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

eq

uip

men

ts

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

A. L

an

d D

evelo

pm

en

t ,t

illa

ge a

nd

seed

bed

pre

para

tio

n e

qu

ipm

en

ts:

(i)

MB

Plow

Rs

. 0.

19 la

kh

50%

Rs

. 0.1

5 la

kh

40%

(ii)

Dis

c Plo

w(ii

i) Cu

ltiva

tor

(iv)

Har

row

(v)

leve

ler B

lade

(vi)

cage

whe

el(v

ii)

Furr

ow o

pene

r(v

iii)

Ridg

er(ix

) W

eed

slas

her

(x)

Lase

r Lan

d Le

velle

r(x

i) Re

vers

ible

Mec

hani

cal p

loug

h(x

ii)

Rota

vato

r Rs

.0.4

4 la

kh

50%

Rs

. 0.3

5 la

kh

40%

(xiii

) Ro

topu

ddle

r(x

vi)

Reve

rsib

le H

ydra

ulic

plo

ugh

(xxi

) Fu

rrow

ope

ner

(xxi

i) Bu

nd fo

rmer

(xxi

ii) Cr

ust b

reak

er(x

xiv)

Roto

culti

vato

r(x

xv) P

ower

Har

row

(xvi

i) Ch

isel

Plo

ugh

Rs. 0

.10

lakh

50

%

Rs. 0

.08

lakh

40

%

Op

era

tio

nal G

uid

elin

es

of

SM

AM

31

Op

era

tio

nal G

uid

elin

es

of

SM

AM

30

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve20

- 35 B

HP

)

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

dri

ven

eq

uip

men

ts.

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

B. S

ow

ing

, P

lan

tin

g ,R

eap

ing

an

d

Dig

gin

g E

qu

ipm

en

ts:

(i)

Post

Hol

e di

gger

Rs

. 0.1

9 la

kh

50%

Rs

. 0.1

5 la

kh

40%

(ii)

Pota

to P

lant

er(ii

i) Po

tato

Dig

ger

(iv)

Grou

nd n

ut d

igge

r(v

) St

rip ti

ll dril

l(v

i) tr

acto

r dra

wn

reap

er(v

ii)

onio

n ha

rves

ter

(viii

) Ri

ce st

raw

Cho

pper

,(ix

) Ze

ro ti

ll see

d cu

m fe

rtili

zer d

rill

(x)

Rais

ed B

ed P

lant

er(x

i) Su

gar c

ane

cutt

er/S

trip

per

(xii)

M

ulti

crop

pla

nter

,(x

iii)

seed

dril

l(x

iv)

mul

ti cr

op p

lant

er(x

v)

zero

–til

l mul

ti cr

op p

lant

er(x

vi)

Ridg

e fu

rrow

pla

nter

(xvi

i) Se

ed tr

eatin

g dr

um(x

viii)

Seed

cum

fert

ilize

r dril

l(x

ix)

Turb

o Se

eder

Rs

.0.4

4 la

kh

50%

Rs

. 0.3

5 la

kh

40%

(xx)

Pn

eum

atic

Pla

nter

(xxi

) Pn

eum

atic

veg

etab

le tr

ansp

lant

er(x

xii)

Pneu

mat

ic v

eget

able

seed

er(x

xiii)

Hap

py se

eder

(xxi

v) Pl

astic

Mul

ch La

ying

Mac

hine

(xxv

) Aqu

a fe

rti s

eed

drill

(x

xvi) R

aise

d Be

d Pl

ante

r with

incl

ined

pla

te

pl

ante

r and

shap

er a

ttac

hmen

t.(x

xvii)

Mul

cher

Page 21: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve20

- 35 B

HP

) dri

ven

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

eq

uip

men

ts

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

A. L

an

d D

evelo

pm

en

t ,t

illa

ge a

nd

seed

bed

pre

para

tio

n e

qu

ipm

en

ts:

(i)

MB

Plow

Rs

. 0.

19 la

kh

50%

Rs

. 0.1

5 la

kh

40%

(ii)

Dis

c Plo

w(ii

i) Cu

ltiva

tor

(iv)

Har

row

(v)

leve

ler B

lade

(vi)

cage

whe

el(v

ii)

Furr

ow o

pene

r(v

iii)

Ridg

er(ix

) W

eed

slas

her

(x)

Lase

r Lan

d Le

velle

r(x

i) Re

vers

ible

Mec

hani

cal p

loug

h(x

ii)

Rota

vato

r Rs

.0.4

4 la

kh

50%

Rs

. 0.3

5 la

kh

40%

(xiii

) Ro

topu

ddle

r(x

vi)

Reve

rsib

le H

ydra

ulic

plo

ugh

(xxi

) Fu

rrow

ope

ner

(xxi

i) Bu

nd fo

rmer

(xxi

ii) Cr

ust b

reak

er(x

xiv)

Roto

culti

vato

r(x

xv) P

ower

Har

row

(xvi

i) Ch

isel

Plo

ugh

Rs. 0

.10

lakh

50

%

Rs. 0

.08

lakh

40

%

Op

era

tio

nal G

uid

elin

es

of

SM

AM

31

Op

era

tio

nal G

uid

elin

es

of

SM

AM

30

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve20

- 35 B

HP

)

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

dri

ven

eq

uip

men

ts.

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

B. S

ow

ing

, P

lan

tin

g ,R

eap

ing

an

d

Dig

gin

g E

qu

ipm

en

ts:

(i)

Post

Hol

e di

gger

Rs

. 0.1

9 la

kh

50%

Rs

. 0.1

5 la

kh

40%

(ii)

Pota

to P

lant

er(ii

i) Po

tato

Dig

ger

(iv)

Grou

nd n

ut d

igge

r(v

) St

rip ti

ll dril

l(v

i) tr

acto

r dra

wn

reap

er(v

ii)

onio

n ha

rves

ter

(viii

) Ri

ce st

raw

Cho

pper

,(ix

) Ze

ro ti

ll see

d cu

m fe

rtili

zer d

rill

(x)

Rais

ed B

ed P

lant

er(x

i) Su

gar c

ane

cutt

er/S

trip

per

(xii)

M

ulti

crop

pla

nter

,(x

iii)

seed

dril

l(x

iv)

mul

ti cr

op p

lant

er(x

v)

zero

–til

l mul

ti cr

op p

lant

er(x

vi)

Ridg

e fu

rrow

pla

nter

(xvi

i) Se

ed tr

eatin

g dr

um(x

viii)

Seed

cum

fert

ilize

r dril

l(x

ix)

Turb

o Se

eder

Rs

.0.4

4 la

kh

50%

Rs

. 0.3

5 la

kh

40%

(xx)

Pn

eum

atic

Pla

nter

(xxi

) Pn

eum

atic

veg

etab

le tr

ansp

lant

er(x

xii)

Pneu

mat

ic v

eget

able

seed

er(x

xiii)

Hap

py se

eder

(xxi

v) Pl

astic

Mul

ch La

ying

Mac

hine

(xxv

) Aqu

a fe

rti s

eed

drill

(x

xvi) R

aise

d Be

d Pl

ante

r with

incl

ined

pla

te

pl

ante

r and

shap

er a

ttac

hmen

t.(x

xvii)

Mul

cher

Page 22: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve20

- 35 B

HP

)

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

dri

ven

eq

uip

men

ts.

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

C.In

ter C

ult

ivati

on

Eq

uip

men

ts:

(i)

Gras

s Wee

d Sl

ashe

r Rs

. 0.1

9 la

kh

50%

Rs

. 0.1

5 la

kh

40%

(ii)

Rice

stra

w C

hopp

er(ii

i) Po

wer

Wee

der (

engi

ne o

pera

ted

abov

e

2 bh

p)D

. Eq

uip

men

ts fo

r R

esi

du

e m

an

ag

em

en

t/H

ay

an

d F

ora

ge E

qu

ipm

en

ts:

(i)

Suga

rcan

e th

rash

Cut

ter

Rs. 0

.19

lakh

50

%

Rs. 0

.15

lakh

40

%(ii

) Co

conu

t Fro

nd C

hopp

er,

(iii)

Rake

(iv)

Bale

rs(v

) St

raw

reap

er(v

i) Fe

ed b

lock

mac

hine

(vii)

St

ubbl

e sh

aver

E. H

arv

est

ing

& T

hre

shin

g E

qu

ipm

en

ts

(Op

era

ted

by

en

gin

e/e

lect

ric

mo

tor b

elo

w

5 b

hp

an

d b

y p

ow

er ti

ller , a

nd

tra

cto

r o

f b

elo

w 3

5 B

HP

tra

cto

r ):

(i)

Grou

nd N

ut P

od S

trip

per

Rs. 0

.25

lakh

50

%

Rs. 0

.2 la

kh

40%

(ii)

Thre

sher

(iii)

Mul

ti cr

op T

hres

hers

(iv)

Padd

y Th

resh

er(v

) Br

ush

Cutt

er(v

i) M

aize

shel

ler

(vii)

Sp

iral g

rade

r(x

iv)

Reap

er(x

v)

Mow

er(x

vi)

Flai

l Har

vest

er(x

vii)

Infie

lder

(xvi

ii) M

ower

Shr

edde

r (AL

L PU

RPO

SE/A

ll cro

ps)

F. C

haff

Cu

tter (O

pera

ted

by

en

gin

e/e

lect

ric

Rs

. 0.2

5 la

kh

50%

Rs

. 0.2

lakh

40

% m

oto

r ab

ove 3

- 5 h

p a

nd

by

po

wer ti

ller

a

nd

tra

cto

r o

f b

elo

w 3

5 B

HP

tra

cto

r)

Op

era

tio

nal G

uid

elin

es

of

SM

AM

33

Op

era

tio

nal G

uid

elin

es

of

SM

AM

32

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve 3

5 B

HP

) dri

ven

eq

uip

men

ts.

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

A. L

an

d D

evelo

pm

en

t ,t

illa

ge a

nd

seed

bed

pre

para

tio

n e

qu

ipm

en

ts:

(xxv

i) M

B Pl

ow

Rs. 0

.44

lakh

50

%

Rs. 0

.35

lakh

40

%(x

xvii)

D

isc P

low

(xxv

iii)

Culti

vato

r(x

xix)

H

arro

w(x

xx)

Leve

ler B

lade

(xxx

i) Ca

ge w

heel

(xxx

ii)

Furr

ow o

pene

r(x

xxiii

) Ri

dger

(xxx

iv)

Reve

rsib

le M

echa

nica

l plo

ugh

(xxx

v)

Wee

d sl

ashe

r Rs

. 0.6

3 la

kh

50%

Rs

. 0.5

0 la

kh

40%

(xxx

vi)

Lase

r Lan

d Le

velle

r(x

xxvi

i) Ro

tava

tor

(xxx

viii)

Rot

o-pu

ddle

r(x

xxix

) Re

vers

ible

Hyd

raul

ic p

loug

h(x

l) Su

b –

soile

r(x

li)

Tren

ch m

aker

s (PT

O o

pera

ted)

(xlii

) Bu

nd fo

rmer

(PTO

ope

rate

d)(x

liii)

Pow

er H

arro

w (P

TO o

pera

ted)

(xliv

) Ba

ckho

e Lo

ader

Doz

er (T

ract

or

op

erat

ed)

(xlv

) Fu

rrow

ope

ner

(xlv

i) Bu

nd fo

rmer

(xlv

ii)

Crus

t bre

aker

(xlv

iii)

Roto

culti

vato

r(x

lix)

Pow

er H

arro

w

Page 23: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve20

- 35 B

HP

)

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

dri

ven

eq

uip

men

ts.

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

C.In

ter C

ult

ivati

on

Eq

uip

men

ts:

(i)

Gras

s Wee

d Sl

ashe

r Rs

. 0.1

9 la

kh

50%

Rs

. 0.1

5 la

kh

40%

(ii)

Rice

stra

w C

hopp

er(ii

i) Po

wer

Wee

der (

engi

ne o

pera

ted

abov

e

2 bh

p)D

. Eq

uip

men

ts fo

r R

esi

du

e m

an

ag

em

en

t/H

ay

an

d F

ora

ge E

qu

ipm

en

ts:

(i)

Suga

rcan

e th

rash

Cut

ter

Rs. 0

.19

lakh

50

%

Rs. 0

.15

lakh

40

%(ii

) Co

conu

t Fro

nd C

hopp

er,

(iii)

Rake

(iv)

Bale

rs(v

) St

raw

reap

er(v

i) Fe

ed b

lock

mac

hine

(vii)

St

ubbl

e sh

aver

E. H

arv

est

ing

& T

hre

shin

g E

qu

ipm

en

ts

(Op

era

ted

by

en

gin

e/e

lect

ric

mo

tor b

elo

w

5 b

hp

an

d b

y p

ow

er ti

ller , a

nd

tra

cto

r o

f b

elo

w 3

5 B

HP

tra

cto

r ):

(i)

Grou

nd N

ut P

od S

trip

per

Rs. 0

.25

lakh

50

%

Rs. 0

.2 la

kh

40%

(ii)

Thre

sher

(iii)

Mul

ti cr

op T

hres

hers

(iv)

Padd

y Th

resh

er(v

) Br

ush

Cutt

er(v

i) M

aize

shel

ler

(vii)

Sp

iral g

rade

r(x

iv)

Reap

er(x

v)

Mow

er(x

vi)

Flai

l Har

vest

er(x

vii)

Infie

lder

(xvi

ii) M

ower

Shr

edde

r (AL

L PU

RPO

SE/A

ll cro

ps)

F. C

haff

Cu

tter (O

pera

ted

by

en

gin

e/e

lect

ric

Rs

. 0.2

5 la

kh

50%

Rs

. 0.2

lakh

40

% m

oto

r ab

ove 3

- 5 h

p a

nd

by

po

wer ti

ller

a

nd

tra

cto

r o

f b

elo

w 3

5 B

HP

tra

cto

r)

Op

era

tio

nal G

uid

elin

es

of

SM

AM

33

Op

era

tio

nal G

uid

elin

es

of

SM

AM

32

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve 3

5 B

HP

) dri

ven

eq

uip

men

ts.

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

A. L

an

d D

evelo

pm

en

t ,t

illa

ge a

nd

seed

bed

pre

para

tio

n e

qu

ipm

en

ts:

(xxv

i) M

B Pl

ow

Rs. 0

.44

lakh

50

%

Rs. 0

.35

lakh

40

%(x

xvii)

D

isc P

low

(xxv

iii)

Culti

vato

r(x

xix)

H

arro

w(x

xx)

Leve

ler B

lade

(xxx

i) Ca

ge w

heel

(xxx

ii)

Furr

ow o

pene

r(x

xxiii

) Ri

dger

(xxx

iv)

Reve

rsib

le M

echa

nica

l plo

ugh

(xxx

v)

Wee

d sl

ashe

r Rs

. 0.6

3 la

kh

50%

Rs

. 0.5

0 la

kh

40%

(xxx

vi)

Lase

r Lan

d Le

velle

r(x

xxvi

i) Ro

tava

tor

(xxx

viii)

Rot

o-pu

ddle

r(x

xxix

) Re

vers

ible

Hyd

raul

ic p

loug

h(x

l) Su

b –

soile

r(x

li)

Tren

ch m

aker

s (PT

O o

pera

ted)

(xlii

) Bu

nd fo

rmer

(PTO

ope

rate

d)(x

liii)

Pow

er H

arro

w (P

TO o

pera

ted)

(xliv

) Ba

ckho

e Lo

ader

Doz

er (T

ract

or

op

erat

ed)

(xlv

) Fu

rrow

ope

ner

(xlv

i) Bu

nd fo

rmer

(xlv

ii)

Crus

t bre

aker

(xlv

iii)

Roto

culti

vato

r(x

lix)

Pow

er H

arro

w

Page 24: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve 3

5 B

HP

) Dri

ven

e q

uip

men

ts.

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

B. S

ow

ing

, P

lan

tin

g ,

Reap

ing

an

d

Dig

gin

g E

qu

ipm

en

ts:

(i)

Zero

till s

eed

cum

fert

ilize

r dril

l Rs

. 0.4

4 la

kh

50%

Rs

. 0.3

5 la

kh

40%

(ii)

Rais

ed B

ed P

lant

er(ii

i) se

ed d

rill

(iv)

Pota

to D

igge

r(v

) tr

acto

r dra

wn

reap

er(v

i) on

ion

harv

este

r(v

ii)

Seed

cum

fert

ilize

r dril

l(v

iii)

Seed

trea

ting

drum

(i)

Post

Hol

e di

gger

Rs

. 0.6

3 la

kh

50%

Rs

. 0.5

0 la

kh

40%

(ii)

Pota

to P

lant

er(ii

i) Gr

ound

nut

dig

ger

(iv)

Strip

till d

rill

(v)

Rice

stra

w C

hopp

er,

(vi)

Suga

r can

e cu

tter

/Str

ippe

r/pl

ante

r,(v

ii)

mul

ti cr

op p

lant

er(v

iii)

zero

–til

l mul

ti cr

op p

lant

er(ix

) Ri

dge

furr

ow p

lant

er(x

) Tu

rbo

Seed

er(x

i) Pn

eum

atic

Pla

nter

(xii)

Pn

eum

atic

veg

etab

le tr

ansp

lant

er,

(xiii

) Pn

eum

atic

veg

etab

le se

eder

(xiv

) H

appy

seed

er(x

v)

Cass

ava

Plan

ter

(xvi

) M

anur

e sp

read

er(x

vii)

Fert

ilize

r Spr

eade

r – P

TO o

pera

ted

(xvi

ii) Pl

astic

Mul

ch La

ying

Mac

hine

(xix

) Au

tom

atic

rice

nur

sery

sow

ing

mac

hine

ry(x

x)

Aqua

fert

i see

d dr

ill

(xxi

) Ra

ised

Bed

Pla

nter

with

incl

ined

pla

te

pl

ante

r and

shap

er a

ttac

hmen

t.(x

xii)

Mul

cher

Op

era

tio

nal G

uid

elin

es

of

SM

AM

35

Op

era

tio

nal G

uid

elin

es

of

SM

AM

34

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve 3

5 B

HP

) dri

ven

eq

uip

men

ts.

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

C.In

ter C

ult

ivati

on

Eq

uip

men

ts:

(i)

Gras

s/ W

eed

Slas

her,

Rs.0

.63

Lakh

50

%

Rs. 0

.50

lakh

40

%(ii

) Ri

ce st

raw

Cho

pper

,(ii

i) W

eede

r (PT

O o

pera

ted)

D. H

arv

est

ing

& T

hre

shin

g E

qu

ipm

en

ts

(Op

era

ted

by

en

gin

e/e

lect

ric

mo

tor ab

ove

5 h

p a

nd

tra

cto

r o

f ab

ove 3

5 B

HP

tra

cto

r )

(xix

) Gr

ound

Nut

Pod

Str

ippe

r Rs

.0.6

3 La

kh

50%

Rs

. 0.5

0 la

kh

40%

(xx)

Th

resh

er/M

ulti

crop

Thr

eshe

rs(x

xi)

Padd

y Th

resh

er(x

xii)

Chaf

f Cut

ter

(xxi

ii)

Fora

ge H

arve

ster

(xxi

v)

Bird

s Sca

rer /

(x

xv)

Mai

ze sh

elle

r (x

xvi)

Spira

l gra

der

(xxv

ii) R

eape

r(x

xviii

) Mow

er(x

xix)

Fl

ail H

arve

ster

(xxx

) In

field

er(x

xxi)

Mow

er Sh

redd

er (A

LL P

URPO

SE/A

ll cro

ps)

E. E

qu

ipm

en

ts fo

r R

esi

du

e m

an

ag

em

en

t/H

ay

an

d F

ora

ge E

qu

ipm

en

ts:

(i)

Suga

rcan

e th

rash

Cut

ter,

Rs.0

.63

Lakh

50

%

Rs. 0

.50

lakh

40

%(ii

) Co

conu

t Fro

nd C

hopp

er,

(iii)

Hay

Rak

e(iv

) Ba

lers

(Rou

nd)

(v)

Bale

r (Re

ctan

gula

r)(v

i) W

ood

chip

pers

(v

ii)

Suga

rcan

e ra

toon

man

ager

(viii

) co

tton

stal

k upr

oote

r(ix

) St

raw

reap

er(x

) Fe

ed b

lock

mac

hine

(xi)

Stub

ble

shav

er

Page 25: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve 3

5 B

HP

) Dri

ven

e q

uip

men

ts.

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

B. S

ow

ing

, P

lan

tin

g ,

Reap

ing

an

d

Dig

gin

g E

qu

ipm

en

ts:

(i)

Zero

till s

eed

cum

fert

ilize

r dril

l Rs

. 0.4

4 la

kh

50%

Rs

. 0.3

5 la

kh

40%

(ii)

Rais

ed B

ed P

lant

er(ii

i) se

ed d

rill

(iv)

Pota

to D

igge

r(v

) tr

acto

r dra

wn

reap

er(v

i) on

ion

harv

este

r(v

ii)

Seed

cum

fert

ilize

r dril

l(v

iii)

Seed

trea

ting

drum

(i)

Post

Hol

e di

gger

Rs

. 0.6

3 la

kh

50%

Rs

. 0.5

0 la

kh

40%

(ii)

Pota

to P

lant

er(ii

i) Gr

ound

nut

dig

ger

(iv)

Strip

till d

rill

(v)

Rice

stra

w C

hopp

er,

(vi)

Suga

r can

e cu

tter

/Str

ippe

r/pl

ante

r,(v

ii)

mul

ti cr

op p

lant

er(v

iii)

zero

–til

l mul

ti cr

op p

lant

er(ix

) Ri

dge

furr

ow p

lant

er(x

) Tu

rbo

Seed

er(x

i) Pn

eum

atic

Pla

nter

(xii)

Pn

eum

atic

veg

etab

le tr

ansp

lant

er,

(xiii

) Pn

eum

atic

veg

etab

le se

eder

(xiv

) H

appy

seed

er(x

v)

Cass

ava

Plan

ter

(xvi

) M

anur

e sp

read

er(x

vii)

Fert

ilize

r Spr

eade

r – P

TO o

pera

ted

(xvi

ii) Pl

astic

Mul

ch La

ying

Mac

hine

(xix

) Au

tom

atic

rice

nur

sery

sow

ing

mac

hine

ry(x

x)

Aqua

fert

i see

d dr

ill

(xxi

) Ra

ised

Bed

Pla

nter

with

incl

ined

pla

te

pl

ante

r and

shap

er a

ttac

hmen

t.(x

xii)

Mul

cher

Op

era

tio

nal G

uid

elin

es

of

SM

AM

35

Op

era

tio

nal G

uid

elin

es

of

SM

AM

34

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Tra

cto

r (a

bo

ve 3

5 B

HP

) dri

ven

eq

uip

men

ts.

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

C.In

ter C

ult

ivati

on

Eq

uip

men

ts:

(i)

Gras

s/ W

eed

Slas

her,

Rs.0

.63

Lakh

50

%

Rs. 0

.50

lakh

40

%(ii

) Ri

ce st

raw

Cho

pper

,(ii

i) W

eede

r (PT

O o

pera

ted)

D. H

arv

est

ing

& T

hre

shin

g E

qu

ipm

en

ts

(Op

era

ted

by

en

gin

e/e

lect

ric

mo

tor ab

ove

5 h

p a

nd

tra

cto

r o

f ab

ove 3

5 B

HP

tra

cto

r )

(xix

) Gr

ound

Nut

Pod

Str

ippe

r Rs

.0.6

3 La

kh

50%

Rs

. 0.5

0 la

kh

40%

(xx)

Th

resh

er/M

ulti

crop

Thr

eshe

rs(x

xi)

Padd

y Th

resh

er(x

xii)

Chaf

f Cut

ter

(xxi

ii)

Fora

ge H

arve

ster

(xxi

v)

Bird

s Sca

rer /

(x

xv)

Mai

ze sh

elle

r (x

xvi)

Spira

l gra

der

(xxv

ii) R

eape

r(x

xviii

) Mow

er(x

xix)

Fl

ail H

arve

ster

(xxx

) In

field

er(x

xxi)

Mow

er Sh

redd

er (A

LL P

URPO

SE/A

ll cro

ps)

E. E

qu

ipm

en

ts fo

r R

esi

du

e m

an

ag

em

en

t/H

ay

an

d F

ora

ge E

qu

ipm

en

ts:

(i)

Suga

rcan

e th

rash

Cut

ter,

Rs.0

.63

Lakh

50

%

Rs. 0

.50

lakh

40

%(ii

) Co

conu

t Fro

nd C

hopp

er,

(iii)

Hay

Rak

e(iv

) Ba

lers

(Rou

nd)

(v)

Bale

r (Re

ctan

gula

r)(v

i) W

ood

chip

pers

(v

ii)

Suga

rcan

e ra

toon

man

ager

(viii

) co

tton

stal

k upr

oote

r(ix

) St

raw

reap

er(x

) Fe

ed b

lock

mac

hine

(xi)

Stub

ble

shav

er

Page 26: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , $

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Ho

rtic

ult

ura

l/P

ost

Harv

est

Tech

no

log

y

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

Eq

uip

men

ts

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

Self

Pro

pelled

/Oth

er P

ow

er D

riven

Ho

rtic

ult

ura

l Mach

inery

i. Ch

ain

Saw

/Whe

el B

arro

w /M

ango

Gra

der/

Pl

ante

r and

oth

er su

itabl

e se

lf pr

opel

led

Rs

.0.6

3lak

h 50

%

Rs.0

.50l

akh

40%

m

achi

nerie

s and

equ

ipm

ents

for

ho

rtic

ultu

re cr

ops.

Man

ual H

ort

icu

ltu

ral e

qu

ipm

en

ts

i.

Alum

iniu

m La

dder

/Lad

der

Rs.0

.10l

akh

50%

Rs

.0.0

8lak

h 40

%ii.

Al

umin

ium

Pol

e

iii.

Pluc

ker

P

ost

Harv

est

Eq

uip

men

ts fo

r fo

od

gra

ins

,oil S

eed

san

d H

ort

icu

ltu

ral E

qu

ipm

en

ts

Esta

blish

men

t of P

HT u

nits

for t

rans

fer o

f prim

ary

Rs

.1.6

0lak

h 60

%

Rs.1

.50l

akh

50%

proc

essi

ng te

chno

logy

, val

ue a

dditi

on, l

ow c

ost

scie

ntifi

c st

orag

e, p

acka

ging

uni

ts a

nd te

chno

logi

es

for b

y-pr

oduc

t man

agem

ent i

n th

e pr

oduc

tion

catc

hmen

ts.

i. M

ini R

ice

Mill

Rs

.1.5

0lak

h 60

%

Rs.1

.25l

akh

50%

i. M

ini D

al M

ill

ii.

M

illet

Mill

iii.

Oil M

ill w

ith fi

lter p

ress

(for a

ll typ

es o

f

Hor

ticul

ture

/Foo

d gr

ain/

oils

eed

crop

)

iv.

Extr

acto

r (fo

r all t

ypes

of H

ortic

ultu

re/F

ood

gr

ain/

oils

eed

crop

)

v.

Pom

egra

nate

Aril

Ext

ract

or

vi

. Cu

star

d A

pple

Pul

per (

for a

ll typ

es o

f

Hor

ticul

ture

/Foo

d gr

ain/

oils

eed

crop

)vi

i. D

ehyd

ratio

n un

it/Pr

icki

ng M

achi

ne/

H

umid

ifier

(for

all t

ypes

of H

ortic

ultu

re/

Fo

od g

rain

/oils

eed

crop

)vi

ii. P

acki

ng M

achi

nes(

for a

ll typ

es o

f

Hor

ticul

ture

/Foo

d gr

ain/

oils

eed

crop

xi.

All t

ypes

of P

ower

driv

en D

ehus

kar /

shel

ler/

Rs

.0.6

3lak

h 50

%

Rs.0

.50l

akh

40%

Th

resh

ers /

Har

vest

ers /

De-

spik

ing/

Dec

onin

g

Mac

hine

/Pee

ler/

Split

er/S

trip

per(f

or a

ll typ

e

of H

ortic

ultu

re /

food

gra

in/o

il see

ds C

rops

)x.

Al

l typ

es o

f Boi

ler/

Stea

mer

/Dry

er so

lar (

for a

ll Rs

.0.6

3lak

h 50

%

Rs.0

.50l

akh

40%

ty

pes o

f Hor

ticul

ture

/Foo

d gr

ain/

oilse

ed cr

op)

xi.

All t

ypes

of W

ashi

ng M

achi

nes(

for a

ll typ

es

Rs.0

.44l

akh

50%

Rs

.0.3

5lak

h 40

%

of H

ortic

ultu

re/F

ood

grai

n/oi

lsee

d cr

op)

xii.

All t

ypes

of G

rinde

r/Pu

lver

iser

/Pol

ishe

r (fo

r all

ty

pes o

f Hor

ticul

ture

/Foo

d gr

ain/

oils

eed

crop

)xi

ii. A

ll typ

es o

f Cle

aner

cum

Gra

der/

Gra

dien

t

sepa

rato

r /sp

ecifi

c gra

vity

sepa

rato

r (fo

r all

ty

pes o

f hor

ticul

ture

/Foo

d gr

ain/

oilse

ed cr

op)

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

All m

an

ual /

an

imal d

raw

n e

qu

ipm

en

t/

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

imp

lem

en

ts/T

oo

ls

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

A. L

an

d D

evelo

pm

en

t , t

illa

ge a

nd

seed

bed

p

rep

ara

tio

n e

qu

ipm

en

ts:

(i)

MB

Plow

Rs

. 0.1

0 la

kh

50%

Rs

. 0.0

8 la

kh

40%

(ii)

Dis

c Plo

w(ii

i) Cu

ltiva

tor

(iv)

Har

row

(v)

leve

ler B

lade

(vi)

Furr

ow o

pene

r(v

ii)

Ridg

er(v

iii)

Pudd

ler

B. S

ow

ing

an

d P

lan

tin

g E

qu

ipm

en

ts:

(i)

Padd

y pl

ante

r, Rs

. 0.1

0 la

kh

50%

Rs

. 0.0

8 la

kh

40%

(ii)

seed

cum

fert

ilize

r dril

l,(ii

i) Ra

ised

Bed

Pla

nter

,(iv

) pl

ante

r,(v

) D

ibbl

er(v

i) Eq

uipm

ents

for r

aisi

ng p

addy

nur

sery

(vii)

M

arke

r for

SRI

(viii

) Se

ed tr

eatin

g dr

um(ix

) D

rum

See

der (

Belo

w 4

Row

) Rs

. 0.0

15 la

kh

50%

Rs

. 0.0

12 la

kh.

40%

(x)

Dru

m S

eede

r (Ab

ove

4 Ro

w)

Rs.0

.019

lakh

50

%

Rs. 0

.015

lakh

40

%C

. Harv

est

ing

& T

hre

shin

g E

qu

ipm

en

ts:

(i)

Grou

nd N

ut P

od S

trip

per

Rs.0

.10

lakh

50

%

Rs. 0

.08

lakh

40

%(ii

) Th

resh

er(ii

i) W

inno

win

g fa

n(iv

) Tr

ee cl

imbe

r(v

) H

ortic

ultu

re H

and

tool

s(v

i) M

aize

shel

ler

(vii)

Fe

ed b

lock

mac

hine

(viii

) Sp

iral g

rade

r(v

i) Ch

aff C

utte

r (u

pto

3’)

Rs. 0

.05l

akh

50%

Rs

. 0.0

4 la

kh

40%

(vii)

Cha

ff Cu

tter

(ab

ove

3’)

Rs.0

.063

lakh

50

%

Rs. 0

.05

lakh

40

%D

. In

ter C

ult

ivati

on

Eq

uip

men

ts:

(i)

Gras

s Wee

d Sl

ashe

r, Rs

. 0.0

06 la

kh

50%

Rs

. 0.0

05 l

akh

40%

(ii)

Wee

der,

(iii)

Cono

wee

der

(iv)

Gard

en H

and

Tool

s

Op

era

tio

nal G

uid

elin

es

of

SM

AM

37

Op

era

tio

nal G

uid

elin

es

of

SM

AM

36

Page 27: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , $

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

Ho

rtic

ult

ura

l/P

ost

Harv

est

Tech

no

log

y

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

Eq

uip

men

ts

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

Self

Pro

pelled

/Oth

er P

ow

er D

riven

Ho

rtic

ult

ura

l Mach

inery

i. Ch

ain

Saw

/Whe

el B

arro

w /M

ango

Gra

der/

Pl

ante

r and

oth

er su

itabl

e se

lf pr

opel

led

Rs

.0.6

3lak

h 50

%

Rs.0

.50l

akh

40%

m

achi

nerie

s and

equ

ipm

ents

for

ho

rtic

ultu

re cr

ops.

Man

ual H

ort

icu

ltu

ral e

qu

ipm

en

ts

i.

Alum

iniu

m La

dder

/Lad

der

Rs.0

.10l

akh

50%

Rs

.0.0

8lak

h 40

%ii.

Al

umin

ium

Pol

e

iii.

Pluc

ker

P

ost

Harv

est

Eq

uip

men

ts fo

r fo

od

gra

ins

,oil S

eed

san

d H

ort

icu

ltu

ral E

qu

ipm

en

ts

Esta

blish

men

t of P

HT u

nits

for t

rans

fer o

f prim

ary

Rs

.1.6

0lak

h 60

%

Rs.1

.50l

akh

50%

proc

essi

ng te

chno

logy

, val

ue a

dditi

on, l

ow c

ost

scie

ntifi

c st

orag

e, p

acka

ging

uni

ts a

nd te

chno

logi

es

for b

y-pr

oduc

t man

agem

ent i

n th

e pr

oduc

tion

catc

hmen

ts.

i. M

ini R

ice

Mill

Rs

.1.5

0lak

h 60

%

Rs.1

.25l

akh

50%

i. M

ini D

al M

ill

ii.

M

illet

Mill

iii.

Oil M

ill w

ith fi

lter p

ress

(for a

ll typ

es o

f

Hor

ticul

ture

/Foo

d gr

ain/

oils

eed

crop

)

iv.

Extr

acto

r (fo

r all t

ypes

of H

ortic

ultu

re/F

ood

gr

ain/

oils

eed

crop

)

v.

Pom

egra

nate

Aril

Ext

ract

or

vi

. Cu

star

d A

pple

Pul

per (

for a

ll typ

es o

f

Hor

ticul

ture

/Foo

d gr

ain/

oils

eed

crop

)vi

i. D

ehyd

ratio

n un

it/Pr

icki

ng M

achi

ne/

H

umid

ifier

(for

all t

ypes

of H

ortic

ultu

re/

Fo

od g

rain

/oils

eed

crop

)vi

ii. P

acki

ng M

achi

nes(

for a

ll typ

es o

f

Hor

ticul

ture

/Foo

d gr

ain/

oils

eed

crop

xi.

All t

ypes

of P

ower

driv

en D

ehus

kar /

shel

ler/

Rs

.0.6

3lak

h 50

%

Rs.0

.50l

akh

40%

Th

resh

ers /

Har

vest

ers /

De-

spik

ing/

Dec

onin

g

Mac

hine

/Pee

ler/

Split

er/S

trip

per(f

or a

ll typ

e

of H

ortic

ultu

re /

food

gra

in/o

il see

ds C

rops

)x.

Al

l typ

es o

f Boi

ler/

Stea

mer

/Dry

er so

lar (

for a

ll Rs

.0.6

3lak

h 50

%

Rs.0

.50l

akh

40%

ty

pes o

f Hor

ticul

ture

/Foo

d gr

ain/

oilse

ed cr

op)

xi.

All t

ypes

of W

ashi

ng M

achi

nes(

for a

ll typ

es

Rs.0

.44l

akh

50%

Rs

.0.3

5lak

h 40

%

of H

ortic

ultu

re/F

ood

grai

n/oi

lsee

d cr

op)

xii.

All t

ypes

of G

rinde

r/Pu

lver

iser

/Pol

ishe

r (fo

r all

ty

pes o

f Hor

ticul

ture

/Foo

d gr

ain/

oils

eed

crop

)xi

ii. A

ll typ

es o

f Cle

aner

cum

Gra

der/

Gra

dien

t

sepa

rato

r /sp

ecifi

c gra

vity

sepa

rato

r (fo

r all

ty

pes o

f hor

ticul

ture

/Foo

d gr

ain/

oilse

ed cr

op)

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.

An

nexu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o.3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , #

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

All m

an

ual /

an

imal d

raw

n e

qu

ipm

en

t/

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

imp

lem

en

ts/T

oo

ls

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

A. L

an

d D

evelo

pm

en

t , t

illa

ge a

nd

seed

bed

p

rep

ara

tio

n e

qu

ipm

en

ts:

(i)

MB

Plow

Rs

. 0.1

0 la

kh

50%

Rs

. 0.0

8 la

kh

40%

(ii)

Dis

c Plo

w(ii

i) Cu

ltiva

tor

(iv)

Har

row

(v)

leve

ler B

lade

(vi)

Furr

ow o

pene

r(v

ii)

Ridg

er(v

iii)

Pudd

ler

B. S

ow

ing

an

d P

lan

tin

g E

qu

ipm

en

ts:

(i)

Padd

y pl

ante

r, Rs

. 0.1

0 la

kh

50%

Rs

. 0.0

8 la

kh

40%

(ii)

seed

cum

fert

ilize

r dril

l,(ii

i) Ra

ised

Bed

Pla

nter

,(iv

) pl

ante

r,(v

) D

ibbl

er(v

i) Eq

uipm

ents

for r

aisi

ng p

addy

nur

sery

(vii)

M

arke

r for

SRI

(viii

) Se

ed tr

eatin

g dr

um(ix

) D

rum

See

der (

Belo

w 4

Row

) Rs

. 0.0

15 la

kh

50%

Rs

. 0.0

12 la

kh.

40%

(x)

Dru

m S

eede

r (Ab

ove

4 Ro

w)

Rs.0

.019

lakh

50

%

Rs. 0

.015

lakh

40

%C

. Harv

est

ing

& T

hre

shin

g E

qu

ipm

en

ts:

(i)

Grou

nd N

ut P

od S

trip

per

Rs.0

.10

lakh

50

%

Rs. 0

.08

lakh

40

%(ii

) Th

resh

er(ii

i) W

inno

win

g fa

n(iv

) Tr

ee cl

imbe

r(v

) H

ortic

ultu

re H

and

tool

s(v

i) M

aize

shel

ler

(vii)

Fe

ed b

lock

mac

hine

(viii

) Sp

iral g

rade

r(v

i) Ch

aff C

utte

r (u

pto

3’)

Rs. 0

.05l

akh

50%

Rs

. 0.0

4 la

kh

40%

(vii)

Cha

ff Cu

tter

(ab

ove

3’)

Rs.0

.063

lakh

50

%

Rs. 0

.05

lakh

40

%D

. In

ter C

ult

ivati

on

Eq

uip

men

ts:

(i)

Gras

s Wee

d Sl

ashe

r, Rs

. 0.0

06 la

kh

50%

Rs

. 0.0

05 l

akh

40%

(ii)

Wee

der,

(iii)

Cono

wee

der

(iv)

Gard

en H

and

Tool

s

Op

era

tio

nal G

uid

elin

es

of

SM

AM

37

Op

era

tio

nal G

uid

elin

es

of

SM

AM

36

Page 28: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

An

nexu

re-I

I (

C)

con

td…

Ad

den

da

Co

mp

on

en

t 3: F

inan

cial A

ssis

tan

ce fo

r p

rocu

rem

en

t o

f A

gri

l. M

ach

inery

& E

qu

ipm

en

ts

Ty

pe o

f A

gri

cult

ure

Eq

uip

men

t Fo

r SC

,ST,S

mall &

marg

inal F

arm

ers

, Fo

r o

ther B

en

efi

ciari

es

w

om

en

an

d N

E s

tate

s b

en

efi

ciari

es

So

lar p

ho

tovo

ltaic

(SP

V) W

ate

r p

um

pin

g s

yst

em

s @

M

axim

um p

erm

issi

ble

subs

idy*

M

axim

um p

erm

issi

ble

subs

idy*

Dee

p w

ell (

Su

bm

ers

ible

) Sol

ar p

hoto

volta

ic (S

PV) W

ater

pum

ping

sy

stem

s with

A.C

Indu

ctio

n M

otor

pum

p S

et a

nd a

suita

ble

inve

rter

Mo

del I

1.

PV

Arr

ay 12

00 W

p

2.

Dyn

amic

Hea

d 45

met

er

AC

Pu

mp

s

AC

Pu

mp

s

3.

W

ater

out

put 3

8000

l/ da

y U

p to

2 h

p : R

s 55,

440

per h

p U

p to

2 h

p : R

s 50,

400p

er h

p

4.

MS

hot d

ippe

d ga

lvan

ized

, thr

ee ti

mes

man

ual t

rack

ing

faci

litie

s >2

to 5

hp:

Rs 4

7,52

0 pe

r hp

>2 to

5 h

p: R

s 432

00 p

er h

p

5.

Mot

or 1.

3 hp

( a

ppro

x)M

od

el II

1.

PV

Arr

ay 18

00 W

p

2.

Dyn

amic

Hea

d 45

met

er

3.

Wat

er o

utpu

t 570

00l/

day

4.

M

S ho

t dip

ped

glva

nise

d, th

ree

times

man

ual t

rack

ing

faci

litie

s

5.

Mot

or 2

hp

Mo

del II

I

1.

PV

Arr

ay 3

000

Wp

2.

D

ynam

ic H

ead

70 m

eter

3.

W

ater

out

put 5

7000

l/ da

y

4.

MS

hot d

ippe

d ga

lvan

ized

, thr

ee ti

mes

man

ual t

rack

ing

faci

litie

s

5.

Mot

or 3

.3 h

pM

od

el IV

1.

PV

Arr

ay 4

800

Wp

2.

D

ynam

ic H

ead

70 m

eter

3.

W

ater

out

put 9

1000

l/ da

y

4.

MS

hot d

ippe

d gl

vani

sed,

thre

e tim

es m

anua

l tra

ckin

g fa

cilit

ies

5.

M

otor

5 h

p

Op

era

tio

nal G

uid

elin

es

of

SM

AM

39

Op

era

tio

nal G

uid

elin

es

of

SM

AM

38

Shal

low

wel

l Sol

ar p

hoto

volta

ic (S

PV) W

ater

pum

ping

syst

ems w

ith

A.C

Indu

ctio

n M

otor

pum

p Se

t and

a su

itabl

e in

vert

erM

od

el I

1.

PV

Arr

ay 9

00 W

p

2.

Dyn

amic

Hea

d 12

met

er

3.

Wat

er o

utpu

t 810

00l/

day

AC

Pu

mp

s A

C P

um

ps

4.

M

otor

capa

city

1 hp

U

p to

2 h

p : R

s 55,

440

per h

p U

p to

2 h

p : R

s 50,

400p

er h

pM

od

el II

>2

to 5

hp:

Rs 4

7,52

0 pe

r hp

>2 to

5 h

p: R

s 43,

200

per h

p

1.

PV A

rray

1800

Wp

2.

D

ynam

ic H

ead

15 m

eter

3.

W

ater

outp

ut 1,

6200

0l/d

ay

4.

Mot

or ca

paci

ty 2

hp

Mo

del II

I

1.

PV

Arr

ay 2

700

Wp

2.

D

ynam

ic H

ead

25 m

eter

3.

W

ater

outp

ut 1,

3500

0l/d

ay

4.

Mot

or ca

paci

ty 3

hp

D

eep

wel

l (Su

bmer

sibl

e) S

olar

ph

otov

olta

ic (S

PV) W

ater

pum

ping

syst

ems w

ith D

.C M

otor

pum

p Se

t w

ith B

rush

es o

r Bru

sh le

ss D

C M

od

el I

1. P

V Ar

ray

1200

Wp

2. D

ynam

ic H

ead

45 m

eter

D

C P

um

p

DC

Pu

mp

3. W

ater

out

put 4

2000

l/ da

y U

p to

2 h

p : R

s 63,

360

per h

p U

p to

2 h

p : R

s 57,

600

per h

p4.

MS

hot d

ippe

d ga

lvan

ized

, thr

ee ti

mes

man

ual t

rack

ing

faci

litie

s >2

hpto

5 h

p: R

s59,

400p

er h

p >2

hpto

5 h

p: R

s 54,

000

per h

p5.

Mot

or ca

paci

ty 1.

3 h

pM

od

el II

1. P

V Ar

ray

1800

Wp

2. D

ynam

ic H

ead

45 m

eter

3. W

ater

out

put 6

3000

l/ da

y4.

MS

hot d

ippe

d gl

vani

sed,

thre

e tim

es m

anua

l tra

ckin

g fa

cilit

ies

5. M

otor

capa

city

2 h

pM

od

el II

I

1. P

V Ar

ray

3000

Wp

2. D

ynam

ic H

ead

70 m

eter

3. W

ater

out

put 6

3000

l/ da

y4.

MS

hot d

ippe

d ga

lvan

ized

, thr

ee ti

mes

man

ual t

rack

ing

faci

litie

s5.

Mot

or ca

paci

ty 3

hp

Page 29: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

An

nexu

re-I

I (

C)

con

td…

Ad

den

da

Co

mp

on

en

t 3: F

inan

cial A

ssis

tan

ce fo

r p

rocu

rem

en

t o

f A

gri

l. M

ach

inery

& E

qu

ipm

en

ts

Ty

pe o

f A

gri

cult

ure

Eq

uip

men

t Fo

r SC

,ST,S

mall &

marg

inal F

arm

ers

, Fo

r o

ther B

en

efi

ciari

es

w

om

en

an

d N

E s

tate

s b

en

efi

ciari

es

So

lar p

ho

tovo

ltaic

(SP

V) W

ate

r p

um

pin

g s

yst

em

s @

M

axim

um p

erm

issi

ble

subs

idy*

M

axim

um p

erm

issi

ble

subs

idy*

Dee

p w

ell (

Su

bm

ers

ible

) Sol

ar p

hoto

volta

ic (S

PV) W

ater

pum

ping

sy

stem

s with

A.C

Indu

ctio

n M

otor

pum

p S

et a

nd a

suita

ble

inve

rter

Mo

del I

1.

PV

Arr

ay 12

00 W

p

2.

Dyn

amic

Hea

d 45

met

er

AC

Pu

mp

s

AC

Pu

mp

s

3.

W

ater

out

put 3

8000

l/ da

y U

p to

2 h

p : R

s 55,

440

per h

p U

p to

2 h

p : R

s 50,

400p

er h

p

4.

MS

hot d

ippe

d ga

lvan

ized

, thr

ee ti

mes

man

ual t

rack

ing

faci

litie

s >2

to 5

hp:

Rs 4

7,52

0 pe

r hp

>2 to

5 h

p: R

s 432

00 p

er h

p

5.

Mot

or 1.

3 hp

( a

ppro

x)M

od

el II

1.

PV

Arr

ay 18

00 W

p

2.

Dyn

amic

Hea

d 45

met

er

3.

Wat

er o

utpu

t 570

00l/

day

4.

M

S ho

t dip

ped

glva

nise

d, th

ree

times

man

ual t

rack

ing

faci

litie

s

5.

Mot

or 2

hp

Mo

del II

I

1.

PV

Arr

ay 3

000

Wp

2.

D

ynam

ic H

ead

70 m

eter

3.

W

ater

out

put 5

7000

l/ da

y

4.

MS

hot d

ippe

d ga

lvan

ized

, thr

ee ti

mes

man

ual t

rack

ing

faci

litie

s

5.

Mot

or 3

.3 h

pM

od

el IV

1.

PV

Arr

ay 4

800

Wp

2.

D

ynam

ic H

ead

70 m

eter

3.

W

ater

out

put 9

1000

l/ da

y

4.

MS

hot d

ippe

d gl

vani

sed,

thre

e tim

es m

anua

l tra

ckin

g fa

cilit

ies

5.

M

otor

5 h

p

Op

era

tio

nal G

uid

elin

es

of

SM

AM

39

Op

era

tio

nal G

uid

elin

es

of

SM

AM

38

Shal

low

wel

l Sol

ar p

hoto

volta

ic (S

PV) W

ater

pum

ping

syst

ems w

ith

A.C

Indu

ctio

n M

otor

pum

p Se

t and

a su

itabl

e in

vert

erM

od

el I

1.

PV

Arr

ay 9

00 W

p

2.

Dyn

amic

Hea

d 12

met

er

3.

Wat

er o

utpu

t 810

00l/

day

AC

Pu

mp

s A

C P

um

ps

4.

M

otor

capa

city

1 hp

U

p to

2 h

p : R

s 55,

440

per h

p U

p to

2 h

p : R

s 50,

400p

er h

pM

od

el II

>2

to 5

hp:

Rs 4

7,52

0 pe

r hp

>2 to

5 h

p: R

s 43,

200

per h

p

1.

PV A

rray

1800

Wp

2.

D

ynam

ic H

ead

15 m

eter

3.

W

ater

outp

ut 1,

6200

0l/d

ay

4.

Mot

or ca

paci

ty 2

hp

Mo

del II

I

1.

PV

Arr

ay 2

700

Wp

2.

D

ynam

ic H

ead

25 m

eter

3.

W

ater

outp

ut 1,

3500

0l/d

ay

4.

Mot

or ca

paci

ty 3

hp

D

eep

wel

l (Su

bmer

sibl

e) S

olar

ph

otov

olta

ic (S

PV) W

ater

pum

ping

syst

ems w

ith D

.C M

otor

pum

p Se

t w

ith B

rush

es o

r Bru

sh le

ss D

C M

od

el I

1. P

V Ar

ray

1200

Wp

2. D

ynam

ic H

ead

45 m

eter

D

C P

um

p

DC

Pu

mp

3. W

ater

out

put 4

2000

l/ da

y U

p to

2 h

p : R

s 63,

360

per h

p U

p to

2 h

p : R

s 57,

600

per h

p4.

MS

hot d

ippe

d ga

lvan

ized

, thr

ee ti

mes

man

ual t

rack

ing

faci

litie

s >2

hpto

5 h

p: R

s59,

400p

er h

p >2

hpto

5 h

p: R

s 54,

000

per h

p5.

Mot

or ca

paci

ty 1.

3 h

pM

od

el II

1. P

V Ar

ray

1800

Wp

2. D

ynam

ic H

ead

45 m

eter

3. W

ater

out

put 6

3000

l/ da

y4.

MS

hot d

ippe

d gl

vani

sed,

thre

e tim

es m

anua

l tra

ckin

g fa

cilit

ies

5. M

otor

capa

city

2 h

pM

od

el II

I

1. P

V Ar

ray

3000

Wp

2. D

ynam

ic H

ead

70 m

eter

3. W

ater

out

put 6

3000

l/ da

y4.

MS

hot d

ippe

d ga

lvan

ized

, thr

ee ti

mes

man

ual t

rack

ing

faci

litie

s5.

Mot

or ca

paci

ty 3

hp

Page 30: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Mo

del IV

1. P

V Ar

ray

4800

Wp

2. D

ynam

ic H

ead

70 m

eter

3. W

ater

out

put 1

0000

0l/ d

ay4.

MS

hot d

ippe

d ga

lvan

ized

, thr

ee ti

mes

man

ual t

rack

ing

faci

litie

s5.

Mot

or ca

paci

ty 5

hp

Shal

low

wel

l Sol

ar p

hoto

volta

ic (S

PV) W

ater

pum

ping

syst

ems w

ith D

.C M

otor

pu

mp

Set w

ith B

rush

es o

r Bru

sh le

ss D

C M

od

el I

1.

PV

Arr

ay 9

00 W

p

2.

Dyn

amic

Hea

d 12

met

er

DC

Pu

mp

D

C P

um

p

3.

W

ater

out

put 9

0000

l/ da

y U

p to

2 h

p : R

s 63,

360

per h

p U

p to

2 h

p : R

s 57,

600

per h

p

4.

Mot

or 1

hp

>2hp

to 5

hp:

Rs5

9,40

0per

hp

>2hp

to 5

hp:

Rs 5

4,00

0 pe

r hp

Mo

del II

1.

PV

Arr

ay 18

00 W

p

2.

Dyn

amic

Hea

d 15

met

er

3.

Wat

er o

utpu

t 1,8

0,00

0l/ d

ay

4.

Mot

or C

apac

ity 2

hp

Mo

del II

I

1.

PV

Arr

ay 2

700

Wp

2.

D

ynam

ic H

ead

25 m

eter

3.

W

ater

out

put 1

,480

00l/d

ay

4.

Mot

or C

apac

ity 3

hp

*Cap

ital s

ubsi

dy is

app

licab

le o

n th

e sy

stem

cos

t inc

lusi

ve o

f ins

talla

tion,

com

mis

sion

ing,

tran

spor

tatio

n, in

sura

nce

5 ye

ars

mai

nten

ance

and

taxe

s w

here

ver

appl

icab

le.

Ben

efi

ciari

es:

Indi

vidu

al fa

rmer

, SH

G/U

C of

farm

ers/

co-o

pera

tive

soci

etie

s of f

arm

ers/

FPO

’s/e

ntre

pren

eurs

@Th

e pu

mps

whi

ch w

ill b

e su

pplie

d un

der

Subs

idy

prog

ram

mes

mus

t qu

alify

as

per

IEC

stan

dard

and

per

form

ance

as

per

the

cond

ition

s la

id d

own

in t

he

encl

osed

Ann

exur

e-X

and

test

ed a

nd a

ppro

ved

by o

ne o

f IEC

/NAB

L/M

NRE

acc

redi

ted

test

labs

(i)

Nati

on

al I

nst

itu

te o

f So

lar En

erg

y, G

urg

ao

n.

(ii)

Ele

ctro

nic

Qu

ality

an

d D

evelo

pm

en

t C

en

ter,

Ah

med

ab

ad

The

sim

ilar P

rogr

amm

e of

Min

istr

y of

New

and

Ren

ewab

le E

nerg

y, G

over

nmen

t of I

ndia

, is a

lso

impl

emen

ted

by th

e St

ate

Rene

wab

le A

genc

y of

resp

ectiv

e St

ates

. To

avo

id th

e du

plic

ity A

gric

ultu

ral D

epar

tmen

t of S

tate

Gov

ernm

ent m

ay a

lso

cons

ult t

o th

e St

ate

Rene

wab

le A

genc

ies w

hile

sele

ctin

g th

e be

nefic

iary

. Th

e lis

t of

the

bene

ficia

ry m

ay b

e ex

chan

ged

time

to ti

me

with

in b

oth

the

depa

rtm

ents

.

Op

era

tio

nal G

uid

elin

es

of

SM

AM

41

Op

era

tio

nal G

uid

elin

es

of

SM

AM

40

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.A

nn

exu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , $

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

All m

an

ual /

an

imal d

raw

n e

qu

ipm

en

t/

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

imp

lem

en

ts/T

oo

ls

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

Pla

nt p

rote

ctio

n e

qu

ipm

en

ts

(a) M

anua

l spr

ayer

:

(i) K

naps

ack/

foot

ope

rate

d sp

raye

r. Rs

.0.0

06 la

kh

50%

Rs

. 0.0

05 la

kh.

40%

(b) P

ower

ed K

naps

ack s

pray

er/P

ower

Ope

rate

d

Rs. 0

.031

lakh

50

%

Rs. 0

.025

lakh

40

%

Taiw

an sp

raye

r (ca

paci

ty 8

- 12

lts)

:(b

) Pow

ered

Kna

psac

k spr

ayer

/Pow

er O

pera

ted

Rs

.0.0

38 la

kh

50%

Rs

. 0.0

3 la

kh

40%

Ta

iwan

spra

yer (

capa

city

abo

ve 12

- 16

lts):

(c) P

ower

ed K

naps

ack s

pray

er/P

ower

Ope

rate

d

Rs.0

.10

lakh

50

%

Rs. 0

.08

lakh

40

%

Taiw

an sp

raye

r (ca

paci

ty a

bove

16lts

(d) T

ract

or m

ount

ed /O

pera

ted

Spra

yer

Rs.0

.10

lakh

50

%

Rs. 0

.08

lakh

40

%

(bel

ow 2

0 BH

P ):

(e) T

ract

or m

ount

ed /O

pera

ted

Spra

yer

Rs.0

.13

lakh

50

%

Rs. 0

.10

lakh

40

%

(bel

ow 3

5 BH

P ):

(f) E

co F

riend

ly Li

ght T

rap

Rs.0

.014

lakh

50

%

Rs. 0

.012

lakh

40

%(g

) Tra

ctor

mou

nted

/ O

pera

ted

Spra

yer

Rs.0

.63

lakh

50

%

Rs. 0

.50

lakh

40

%

(abo

ve 3

5 BH

P ):

(h) E

lect

rost

atic

Spr

ayer

Rs

.0.6

3 la

kh

50%

Rs

. 0.5

0 la

kh

40%

Po

st H

arv

est

Tech

no

log

y

Es

tabl

ishm

ent o

f PH

T un

its fo

r tra

nsfe

r of

Rs. 1

.50

lakh

/uni

t 60

%

Rs.1

.25

lakh

/uni

t 50

%pr

imar

y pr

oces

sing

tech

nolo

gy, v

alue

add

ition

, lo

w co

st sc

ient

ific s

tora

ge, p

acka

ging

uni

ts a

nd

tech

nolo

gies

for b

y-pr

oduc

t man

agem

ent i

n th

e pr

oduc

tion

catc

hmen

ts.

PTO

– P

ow

er Take O

ff*I

llust

rativ

e lis

t of t

he e

quip

men

ts te

sted

from

FM

TTIs

& o

ther

des

igna

ted

Inst

itute

s may

be

refe

rred

at w

ww

.farm

ech.

gov.

in**

All t

este

d eq

uipm

ents

from

eith

er F

MTT

Is o

r des

igna

ted

Inst

itute

from

DAC

are

onl

y el

igib

le fo

r sub

sidy

in a

ll sta

tes u

nder

Gov

ernm

ent a

ssis

ted

prog

ram

me

# T

hese

Agr

icul

tura

l Impl

emen

ts a

utho

rized

to te

st a

t des

igna

ted

Inst

itute

from

DAC

&FW

.$

Thes

e Ag

ricul

tura

l mac

hine

ry a

utho

rized

to te

st a

t FM

TTIs

and

sele

cted

des

igna

ted

test

ing

inst

itute

s of D

AC&F

W.

Ple

ase

als

o refe

r p

ara

11.

1.3 fo

r d

eta

ils

on

gu

idelin

es

of te

stin

g.

• An

y ex

tra

equi

pmen

t pro

pose

d by

Sta

tes w

ould

be

cons

ider

ed b

y D

AC u

nder

the

appr

opria

te ca

tego

ry o

f ass

ista

nce

Page 31: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Mo

del IV

1. P

V Ar

ray

4800

Wp

2. D

ynam

ic H

ead

70 m

eter

3. W

ater

out

put 1

0000

0l/ d

ay4.

MS

hot d

ippe

d ga

lvan

ized

, thr

ee ti

mes

man

ual t

rack

ing

faci

litie

s5.

Mot

or ca

paci

ty 5

hp

Shal

low

wel

l Sol

ar p

hoto

volta

ic (S

PV) W

ater

pum

ping

syst

ems w

ith D

.C M

otor

pu

mp

Set w

ith B

rush

es o

r Bru

sh le

ss D

C M

od

el I

1.

PV

Arr

ay 9

00 W

p

2.

Dyn

amic

Hea

d 12

met

er

DC

Pu

mp

D

C P

um

p

3.

W

ater

out

put 9

0000

l/ da

y U

p to

2 h

p : R

s 63,

360

per h

p U

p to

2 h

p : R

s 57,

600

per h

p

4.

Mot

or 1

hp

>2hp

to 5

hp:

Rs5

9,40

0per

hp

>2hp

to 5

hp:

Rs 5

4,00

0 pe

r hp

Mo

del II

1.

PV

Arr

ay 18

00 W

p

2.

Dyn

amic

Hea

d 15

met

er

3.

Wat

er o

utpu

t 1,8

0,00

0l/ d

ay

4.

Mot

or C

apac

ity 2

hp

Mo

del II

I

1.

PV

Arr

ay 2

700

Wp

2.

D

ynam

ic H

ead

25 m

eter

3.

W

ater

out

put 1

,480

00l/d

ay

4.

Mot

or C

apac

ity 3

hp

*Cap

ital s

ubsi

dy is

app

licab

le o

n th

e sy

stem

cos

t inc

lusi

ve o

f ins

talla

tion,

com

mis

sion

ing,

tran

spor

tatio

n, in

sura

nce

5 ye

ars

mai

nten

ance

and

taxe

s w

here

ver

appl

icab

le.

Ben

efi

ciari

es:

Indi

vidu

al fa

rmer

, SH

G/U

C of

farm

ers/

co-o

pera

tive

soci

etie

s of f

arm

ers/

FPO

’s/e

ntre

pren

eurs

@Th

e pu

mps

whi

ch w

ill b

e su

pplie

d un

der

Subs

idy

prog

ram

mes

mus

t qu

alify

as

per

IEC

stan

dard

and

per

form

ance

as

per

the

cond

ition

s la

id d

own

in t

he

encl

osed

Ann

exur

e-X

and

test

ed a

nd a

ppro

ved

by o

ne o

f IEC

/NAB

L/M

NRE

acc

redi

ted

test

labs

(i)

Nati

on

al I

nst

itu

te o

f So

lar En

erg

y, G

urg

ao

n.

(ii)

Ele

ctro

nic

Qu

ality

an

d D

evelo

pm

en

t C

en

ter,

Ah

med

ab

ad

The

sim

ilar P

rogr

amm

e of

Min

istr

y of

New

and

Ren

ewab

le E

nerg

y, G

over

nmen

t of I

ndia

, is a

lso

impl

emen

ted

by th

e St

ate

Rene

wab

le A

genc

y of

resp

ectiv

e St

ates

. To

avo

id th

e du

plic

ity A

gric

ultu

ral D

epar

tmen

t of S

tate

Gov

ernm

ent m

ay a

lso

cons

ult t

o th

e St

ate

Rene

wab

le A

genc

ies w

hile

sele

ctin

g th

e be

nefic

iary

. Th

e lis

t of

the

bene

ficia

ry m

ay b

e ex

chan

ged

time

to ti

me

with

in b

oth

the

depa

rtm

ents

.

Op

era

tio

nal G

uid

elin

es

of

SM

AM

41

Op

era

tio

nal G

uid

elin

es

of

SM

AM

40

CO

ST N

OR

MS A

ND

PA

TTER

N O

F A

SSIS

TA

NC

E U

ND

ER

SU

B M

ISSIO

N O

N A

GR

ICU

LTU

RA

L M

EC

HA

NIZ

ATIO

N (

SM

AM

) D

UR

ING

12TH

PLA

N P

ER

IOD

.A

nn

exu

re-I

I (c

) C

on

td.

Co

mp

on

en

t N

o. 3

: Fin

an

cial A

ssis

tan

ce fo

r P

rocu

rem

en

t o

f A

gri

cult

ure

Mach

inery

an

d E

qu

ipm

en

tTy

pe o

f A

gri

cult

ura

l Eq

uip

men

ts *

* , $

Fo

r SC

, ST, S

mall &

Marg

inal f

arm

ers

, Wo

men

Fo

r o

ther b

en

efi

ciary

an

d N

E S

tate

s b

en

efi

ciary

All m

an

ual /

an

imal d

raw

n e

qu

ipm

en

t/

Maxim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

M

axim

um

Perm

issi

ble

su

bsi

dy

P

att

ern

of

imp

lem

en

ts/T

oo

ls

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

per M

ach

ine/ Eq

uip

men

t p

er

A

ssis

tan

ce

ben

efi

ciary

ben

efi

ciary

Pla

nt p

rote

ctio

n e

qu

ipm

en

ts

(a) M

anua

l spr

ayer

:

(i) K

naps

ack/

foot

ope

rate

d sp

raye

r. Rs

.0.0

06 la

kh

50%

Rs

. 0.0

05 la

kh.

40%

(b) P

ower

ed K

naps

ack s

pray

er/P

ower

Ope

rate

d

Rs. 0

.031

lakh

50

%

Rs. 0

.025

lakh

40

%

Taiw

an sp

raye

r (ca

paci

ty 8

- 12

lts)

:(b

) Pow

ered

Kna

psac

k spr

ayer

/Pow

er O

pera

ted

Rs

.0.0

38 la

kh

50%

Rs

. 0.0

3 la

kh

40%

Ta

iwan

spra

yer (

capa

city

abo

ve 12

- 16

lts):

(c) P

ower

ed K

naps

ack s

pray

er/P

ower

Ope

rate

d

Rs.0

.10

lakh

50

%

Rs. 0

.08

lakh

40

%

Taiw

an sp

raye

r (ca

paci

ty a

bove

16lts

(d) T

ract

or m

ount

ed /O

pera

ted

Spra

yer

Rs.0

.10

lakh

50

%

Rs. 0

.08

lakh

40

%

(bel

ow 2

0 BH

P ):

(e) T

ract

or m

ount

ed /O

pera

ted

Spra

yer

Rs.0

.13

lakh

50

%

Rs. 0

.10

lakh

40

%

(bel

ow 3

5 BH

P ):

(f) E

co F

riend

ly Li

ght T

rap

Rs.0

.014

lakh

50

%

Rs. 0

.012

lakh

40

%(g

) Tra

ctor

mou

nted

/ O

pera

ted

Spra

yer

Rs.0

.63

lakh

50

%

Rs. 0

.50

lakh

40

%

(abo

ve 3

5 BH

P ):

(h) E

lect

rost

atic

Spr

ayer

Rs

.0.6

3 la

kh

50%

Rs

. 0.5

0 la

kh

40%

Po

st H

arv

est

Tech

no

log

y

Es

tabl

ishm

ent o

f PH

T un

its fo

r tra

nsfe

r of

Rs. 1

.50

lakh

/uni

t 60

%

Rs.1

.25

lakh

/uni

t 50

%pr

imar

y pr

oces

sing

tech

nolo

gy, v

alue

add

ition

, lo

w co

st sc

ient

ific s

tora

ge, p

acka

ging

uni

ts a

nd

tech

nolo

gies

for b

y-pr

oduc

t man

agem

ent i

n th

e pr

oduc

tion

catc

hmen

ts.

PTO

– P

ow

er Take O

ff*I

llust

rativ

e lis

t of t

he e

quip

men

ts te

sted

from

FM

TTIs

& o

ther

des

igna

ted

Inst

itute

s may

be

refe

rred

at w

ww

.farm

ech.

gov.

in**

All t

este

d eq

uipm

ents

from

eith

er F

MTT

Is o

r des

igna

ted

Inst

itute

from

DAC

are

onl

y el

igib

le fo

r sub

sidy

in a

ll sta

tes u

nder

Gov

ernm

ent a

ssis

ted

prog

ram

me

# T

hese

Agr

icul

tura

l Impl

emen

ts a

utho

rized

to te

st a

t des

igna

ted

Inst

itute

from

DAC

&FW

.$

Thes

e Ag

ricul

tura

l mac

hine

ry a

utho

rized

to te

st a

t FM

TTIs

and

sele

cted

des

igna

ted

test

ing

inst

itute

s of D

AC&F

W.

Ple

ase

als

o refe

r p

ara

11.

1.3 fo

r d

eta

ils

on

gu

idelin

es

of te

stin

g.

• An

y ex

tra

equi

pmen

t pro

pose

d by

Sta

tes w

ould

be

cons

ider

ed b

y D

AC u

nder

the

appr

opria

te ca

tego

ry o

f ass

ista

nce

Page 32: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Annexure-V

List of institutions approved by the Department of Agriculture & Cooperation & Farmers

Welfare Ministry of Agriculture & Farmers Welfare Government of India for Testing and

Certifying Agricultural Machineries and Equipments

S. No. Name of the State Name of the Institute

1 ANDHRA PRADESH Acharya N.G. Ranga Agriculture University (ANGRAU), Rajendra Nagar, HYDERABAD (ANDHRA PRADESH)

2 BIHAR Faculty of Agricultural Engineering, Rajendra Agriculture University, PUSA (BIHAR)

3 CHHATTISGARH State level Agriculture Implement Testing Centre, Directorate (Agricultural Engineering), Agriculture Department, Govt. of Chhattisgarh, TeliBandha, Gorav Path, RAIPUR (CHHATTISGARH)

4 DELHI Division of Agricultural Engineering, Indian Agricultural Research Institute, NEW DELHI-12.

5 GUJARAT College of Agricultural Engineering & Technology, Junagarh Agricultural University, JUNAGARH (GUJARAT)

6 HARYANA College of Agricultural Engineering & Technology, ChoudharyCharan Singh Agriculture University, HISSAR

7 JAMMU & KASHMIR Sher-e-Kashmir University of Agri. Science & Technology, SRINAGAR

REGION (J. & K.) and JAMMU REGION (J. & K.)

8 JHARKHAND Birsa Agriculture University, Kanke, RANCHI (JHARKHAND)

9 Jharkhand Agriculture Machinery Testing and Training Centre (JAM-TTC), Department of Agriculture and Cane Development (Directorate of Soil Conservation), Jharkhand, Agricultural Engineering Section at Extension Training Campus, Govt. of Jharkand, RANCHI (JHARKHAND)

10 KARNATAKA University of Agricultural Sciences, Gandhi KrishiVignyan Kendra, BANGALORE (KARNATAKA.)

11 College of Agricultural Engineering, UAS, RAICHUR, KARNATAKA.

12 KERALA Farm Machinery Testing Centre, Kerala Agricultural University Kelappaji College of Agricultural Engineering & Technology Tavanur, Malappuram (Dist), Kerala- 679573

13 MADHYA PRADESH Central Institute of Agricultural Engineering, Berasia Road, BHOPAL

14 MAHARSHTRA Dr. A.S. College of Agricultural Engineering Mahatma Phule Krishi Vidyapeeth, Rahuri, Distt. Ahmednagar, Maharashtra (MPKV)

15 Farm Machinery Testing, Training and Production Centre, Department of Farm Power and Machinery, Dr. PDKV, Akola,

Op

era

tio

nal G

uid

elin

es

of

SM

AM

49

Op

era

tio

nal G

uid

elin

es

of

SM

AM

48

16 College of Agricultural Engineering and Technology, Dr. Balasaheb Sawant Konkan Krishi Vidyapeeth, DAPOLI (MAHARSHTRA)

17 ORISSA College of Agricultural Engineering and Technology, Orissa University of Agriculture and Technology, BHUBANESWAR

18 State Level Farm Machinery Training & Testing Centre, Agriculture Department, Government of Odisha, Bhubaneswar, Odisha.

19 PUNJAB College of Agricultural Engineering and Technology, Punjab Agriculture University, LUDHIANA (PUNJAB)

20 Central Institute of Post Harvest Engineering and Technology (CIPHET) ,

Ludhiyana , 141004

21 RAJASTHAN Farm Implements and Machinery Testing & Training Centre, Central Workshop, Swami Keshwanand Rajasthan Agricultural University, Bikaner (Rajasthan).

22 College of Technology and Agricultural Engineering, Maharana Pratap, University of Agriculture and Technology, UDAIPUR (RAJASTHAN)

23 SIKKIM College of Agricultural Engineering and Post Harvest Technology, RANIPOOL, GANGTOK (SIKKIM)

24 TAMIL NADU Tamil Nadu Agricultural University, COIMBATORE (TAMIL NADU)

25 UTTAR PRADESH State Level Farm Machinery Training and Testing Institute, Govt. of U.P., Rehmankhera, LUCKNOW (U.P.)

26 Sam Higginbottom Institute of Agriculture, Technology & Science (AAI), Deemed University, ALLAHABAD (U.P.)

27 UTTARANCHAL College of Technology, Gobind Ballabh Pant University of Agriculture and Technology, PANTNAGAR (UTTARANCHAL)

28 WEST BENGAL Department of Agriculture & Food Engineering, Indian Institute of Technology, KHARAGPUR (WEST BENGAL.)

29 State Farm Machinery Training-cum-Testing Institute, Faculty of Agricultural Engineering, Bidhan Chandra KrishiViswavidyalaya (BCKVV), Mohanpur, DISTT. NADIA (WEST BENGAL)

Annexure - V (Contd.)

Page 33: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Annexure-V

List of institutions approved by the Department of Agriculture & Cooperation & Farmers

Welfare Ministry of Agriculture & Farmers Welfare Government of India for Testing and

Certifying Agricultural Machineries and Equipments

S. No. Name of the State Name of the Institute

1 ANDHRA PRADESH Acharya N.G. Ranga Agriculture University (ANGRAU), Rajendra Nagar, HYDERABAD (ANDHRA PRADESH)

2 BIHAR Faculty of Agricultural Engineering, Rajendra Agriculture University, PUSA (BIHAR)

3 CHHATTISGARH State level Agriculture Implement Testing Centre, Directorate (Agricultural Engineering), Agriculture Department, Govt. of Chhattisgarh, TeliBandha, Gorav Path, RAIPUR (CHHATTISGARH)

4 DELHI Division of Agricultural Engineering, Indian Agricultural Research Institute, NEW DELHI-12.

5 GUJARAT College of Agricultural Engineering & Technology, Junagarh Agricultural University, JUNAGARH (GUJARAT)

6 HARYANA College of Agricultural Engineering & Technology, ChoudharyCharan Singh Agriculture University, HISSAR

7 JAMMU & KASHMIR Sher-e-Kashmir University of Agri. Science & Technology, SRINAGAR

REGION (J. & K.) and JAMMU REGION (J. & K.)

8 JHARKHAND Birsa Agriculture University, Kanke, RANCHI (JHARKHAND)

9 Jharkhand Agriculture Machinery Testing and Training Centre (JAM-TTC), Department of Agriculture and Cane Development (Directorate of Soil Conservation), Jharkhand, Agricultural Engineering Section at Extension Training Campus, Govt. of Jharkand, RANCHI (JHARKHAND)

10 KARNATAKA University of Agricultural Sciences, Gandhi KrishiVignyan Kendra, BANGALORE (KARNATAKA.)

11 College of Agricultural Engineering, UAS, RAICHUR, KARNATAKA.

12 KERALA Farm Machinery Testing Centre, Kerala Agricultural University Kelappaji College of Agricultural Engineering & Technology Tavanur, Malappuram (Dist), Kerala- 679573

13 MADHYA PRADESH Central Institute of Agricultural Engineering, Berasia Road, BHOPAL

14 MAHARSHTRA Dr. A.S. College of Agricultural Engineering Mahatma Phule Krishi Vidyapeeth, Rahuri, Distt. Ahmednagar, Maharashtra (MPKV)

15 Farm Machinery Testing, Training and Production Centre, Department of Farm Power and Machinery, Dr. PDKV, Akola,

Op

era

tio

nal G

uid

elin

es

of

SM

AM

49

Op

era

tio

nal G

uid

elin

es

of

SM

AM

48

16 College of Agricultural Engineering and Technology, Dr. Balasaheb Sawant Konkan Krishi Vidyapeeth, DAPOLI (MAHARSHTRA)

17 ORISSA College of Agricultural Engineering and Technology, Orissa University of Agriculture and Technology, BHUBANESWAR

18 State Level Farm Machinery Training & Testing Centre, Agriculture Department, Government of Odisha, Bhubaneswar, Odisha.

19 PUNJAB College of Agricultural Engineering and Technology, Punjab Agriculture University, LUDHIANA (PUNJAB)

20 Central Institute of Post Harvest Engineering and Technology (CIPHET) ,

Ludhiyana , 141004

21 RAJASTHAN Farm Implements and Machinery Testing & Training Centre, Central Workshop, Swami Keshwanand Rajasthan Agricultural University, Bikaner (Rajasthan).

22 College of Technology and Agricultural Engineering, Maharana Pratap, University of Agriculture and Technology, UDAIPUR (RAJASTHAN)

23 SIKKIM College of Agricultural Engineering and Post Harvest Technology, RANIPOOL, GANGTOK (SIKKIM)

24 TAMIL NADU Tamil Nadu Agricultural University, COIMBATORE (TAMIL NADU)

25 UTTAR PRADESH State Level Farm Machinery Training and Testing Institute, Govt. of U.P., Rehmankhera, LUCKNOW (U.P.)

26 Sam Higginbottom Institute of Agriculture, Technology & Science (AAI), Deemed University, ALLAHABAD (U.P.)

27 UTTARANCHAL College of Technology, Gobind Ballabh Pant University of Agriculture and Technology, PANTNAGAR (UTTARANCHAL)

28 WEST BENGAL Department of Agriculture & Food Engineering, Indian Institute of Technology, KHARAGPUR (WEST BENGAL.)

29 State Farm Machinery Training-cum-Testing Institute, Faculty of Agricultural Engineering, Bidhan Chandra KrishiViswavidyalaya (BCKVV), Mohanpur, DISTT. NADIA (WEST BENGAL)

Annexure - V (Contd.)

Page 34: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Op

era

tio

nal G

uid

elin

es

of

SM

AM

53

Op

era

tio

nal G

uid

elin

es

of

SM

AM

52

Note

1. To test the machine on Additional Crops, extra @40% test fee over and above the original test fee shall be charged.

2. The Raw material required for test shall be arranged by the applicant at his own cost as per the requirement of the parameters.

3. The above testing charges shall be applicable w.e.f. date of issue of order. 4. The testing charges shall be revised annually. The testing charges shall be enhanced by 10% over

the test fee prevailing in the previous year. The enhanced test fee shall be applicable w.e.f 1st day of the fiscal year. The enhanced test fee shall not be made applicable on those machines which have been admitted for test before the 1st day of the fiscal year.

5. The Service Tax and Cess as per the prevailing rates would be extra over and above the above testing fee.

6. Once the machine is submitted for test with all necessary test fees and subsequently if the manufacturer/applicant withdraws the machine from test , there shall be no refund of the test fee deposited.

Annexure-VII

Sub Mission on Agricultural Mechanization (SMAM)

Format for Annual Action Plan

Name of State:

Financial Year:

Nodal Department:

Background Information:

FARM POWER AVAILIBITY (kW/ha):Main Crops:Type of Soil:

Component No.1: Promotion and Strengthening of Agricultural Mechanisation through Training,

Testing and Demonstration

S.N Component Approved pattern Estimated Central Share

of assistance Cost

i. Demonstrations

1 Total no. of Demonstrations Rs. 4000 per Hectare(i) Cropping pattern based deoms= per operation upto (ii) New technology machines/equipments 100 ha per season demos= ii. Training

1 Total no. of courses to be conducted and Rs. 4000 per trainee No. of trainees to be trained under each course per week(i) U1-U13=(ii) T1-T9= iii. Augmenting the facilities and infrastructure for testing Centres

1 Total No. of Centres to be strengthened Rs. 150 lakhs max. per institutionTotal Cost (A): i+ii+iii =

Component No.2: Demonstration, Training and Distribution of Post Harvest Technology and Management (PHTM)

i. Demonstrations

1 Total Area to be covered under demonstrations Rs. 4000 per techno-(i) Cropping pattern based demos = logy upto 100 demo(ii) New technology machines/ equipments per season demos =ii. Training

1 Total no. of courses to be conducted Rs. 4000 per trainee and No. of trainees to be trained under per week each course iii. Establishment of PHT Technology

Total number of PHT Technologies to 50% of the cost limited be established to Rs. 1.25 lakhs (Additional 10% to SC/ST/Small and Marginal/Women and North Eastern States)Total Cost (B): i+ii+iii =

Page 35: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Op

era

tio

nal G

uid

elin

es

of

SM

AM

55

Op

era

tio

nal G

uid

elin

es

of

SM

AM

54

(c) Component No.3: Financial Assistance for Procurement of Agriculture Machinery and Equipment

S.N Component Pattern of Estimated Central State

Assistance Cost Share Share

1 Name of machines No. of machines As per to be procured to be procured Annexure-II (c) Tractor Power tiller self propelled machines Tractor driven implements animal/manual drawn machines PP Manual PP Power Total Cost (C ):

(D) Component No.4 : Farm Machinery Banks for Custom Hiring

1 Total no. of farm machinery Banks Pattern of Estimated Central State

Assistance Cost Share Share

a) Upto 10 lakh = 40% limited to Rs. 4 lakh b) Upto 25 lakh = 40% limited to Rs. 10 lakh c) Upto 40 lakh = 40% limited to Rs. 16 lakh d) Upto 60 lakh = 40% limited to Rs. 24 lakh Total Cost (D):

(E) Component No. 5 : Hi-Tech, High Productive Equipment Hub for Custom Hiring

1 Total no. of Hubs Pattern of Estimated Central State

Assistance Cost Share Share

a) Upto 100 lakh = 40% limited to Rs. 40 lakh b) Upto 150 lakh = 40% limited to Rs. 60 lakh c) Upto 200 lakh = 40% limited to Rs. 80 lakh d) Upto 250 lakh = 40% limited to Rs. 100 lakh Total Cost (E ):

(F) Component No. 6 : Promotion of Farm Mechanisation in Selected Villages

1 No. of Farm Machinery Banks Pattern of Estimated Central State

Assistance Cost Share Share

80% of the project cost limited to Rs. 10 lakhs per village Total Cost ( F):

(G) Component No. 7 : Financial Assistance for Promotion of Mechanized Operations/hectare Carried out Through

Custom Hiring Centres

S.N Intervention Pattern of Estimated Central State

Assistance Cost Share Share

a) Operational Charges to farmer members 50% of the cost of of Farm Machinery Banks set up under operation/ha limited to component (6) – Type of Operation & Area (i) Rs. 2000/ha per farmer to be covered under each operation per year for tractor/power operated operations(ii) Rs. 1000/ha per farmer per year for animal drawn mechanized operations and (iii) Rs. 750/ha per farmer per year for manual operations

b) No. of Field Demo by CHCs Rs. 4000/ha with a minimum of 120 ha/ season per CHC Total Cost ( G):

(H) Component No. 8 : Promotion of Farm Machinery and Equipment in North-Eastern States

S.N Intervention Pattern of Estimated Central State

Assistance Cost Share Share

a) Financial assistance for procurement of 100% of cost of machinery/ machinery/ implements implement/ equipment Name of machines No. of machines upto Rs.1.25 lakhs per to be procured to be procured beneficiary Tractor Power tiller self propelled machines Tractor driven implements animal/manual drawn machines PP Manual PP Power b) Financial assistance for Farm Machinery 95% of cost of Farm Banks for group of farmers Machinery Banks & upto Rs.10 lakhs per Farm Machinery BankTotal Cost (H):

(I) Flexi Funds:

1 Local Initiatives (10% of the approved outlay)

Total Cost (I)

J. Management/Administrative Cost (<5%):

Total Cost (A+B+C+D+E+F+G+H+I+J)=

Total Central Share=

Total State Share=

Page 36: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Op

era

tio

nal G

uid

elin

es

of

SM

AM

55

Op

era

tio

nal G

uid

elin

es

of

SM

AM

54

(c) Component No.3: Financial Assistance for Procurement of Agriculture Machinery and Equipment

S.N Component Pattern of Estimated Central State

Assistance Cost Share Share

1 Name of machines No. of machines As per to be procured to be procured Annexure-II (c) Tractor Power tiller self propelled machines Tractor driven implements animal/manual drawn machines PP Manual PP Power Total Cost (C ):

(D) Component No.4 : Farm Machinery Banks for Custom Hiring

1 Total no. of farm machinery Banks Pattern of Estimated Central State

Assistance Cost Share Share

a) Upto 10 lakh = 40% limited to Rs. 4 lakh b) Upto 25 lakh = 40% limited to Rs. 10 lakh c) Upto 40 lakh = 40% limited to Rs. 16 lakh d) Upto 60 lakh = 40% limited to Rs. 24 lakh Total Cost (D):

(E) Component No. 5 : Hi-Tech, High Productive Equipment Hub for Custom Hiring

1 Total no. of Hubs Pattern of Estimated Central State

Assistance Cost Share Share

a) Upto 100 lakh = 40% limited to Rs. 40 lakh b) Upto 150 lakh = 40% limited to Rs. 60 lakh c) Upto 200 lakh = 40% limited to Rs. 80 lakh d) Upto 250 lakh = 40% limited to Rs. 100 lakh Total Cost (E ):

(F) Component No. 6 : Promotion of Farm Mechanisation in Selected Villages

1 No. of Farm Machinery Banks Pattern of Estimated Central State

Assistance Cost Share Share

80% of the project cost limited to Rs. 10 lakhs per village Total Cost ( F):

(G) Component No. 7 : Financial Assistance for Promotion of Mechanized Operations/hectare Carried out Through

Custom Hiring Centres

S.N Intervention Pattern of Estimated Central State

Assistance Cost Share Share

a) Operational Charges to farmer members 50% of the cost of of Farm Machinery Banks set up under operation/ha limited to component (6) – Type of Operation & Area (i) Rs. 2000/ha per farmer to be covered under each operation per year for tractor/power operated operations(ii) Rs. 1000/ha per farmer per year for animal drawn mechanized operations and (iii) Rs. 750/ha per farmer per year for manual operations

b) No. of Field Demo by CHCs Rs. 4000/ha with a minimum of 120 ha/ season per CHC Total Cost ( G):

(H) Component No. 8 : Promotion of Farm Machinery and Equipment in North-Eastern States

S.N Intervention Pattern of Estimated Central State

Assistance Cost Share Share

a) Financial assistance for procurement of 100% of cost of machinery/ machinery/ implements implement/ equipment Name of machines No. of machines upto Rs.1.25 lakhs per to be procured to be procured beneficiary Tractor Power tiller self propelled machines Tractor driven implements animal/manual drawn machines PP Manual PP Power b) Financial assistance for Farm Machinery 95% of cost of Farm Banks for group of farmers Machinery Banks & upto Rs.10 lakhs per Farm Machinery BankTotal Cost (H):

(I) Flexi Funds:

1 Local Initiatives (10% of the approved outlay)

Total Cost (I)

J. Management/Administrative Cost (<5%):

Total Cost (A+B+C+D+E+F+G+H+I+J)=

Total Central Share=

Total State Share=

Page 37: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Op

era

tio

nal G

uid

elin

es

of

SM

AM

57

Op

era

tio

nal G

uid

elin

es

of

SM

AM

56

Annexure-VIII

FORM GFR 19-A

(See Government of India’s Decision (i) below rule 150)

Form of Utilization Certificate

SI. Letter No. AmountNo & Date

Certified that out of Rs. --------of grants-in –aid sanctioned during the year ----- in

favour of ------------- under this Ministry/ Department letter No. given in the margin

and Rs. -------------on account of unspent balance of the previous year, a sum of Rs.-

------------ has been utilized for the purpose of ---------For which it was sanctioned

and that the balance of Rs.----------- remaining unutilized at the end of the year has

been surrendered to Government (Vide No.---------dated-----------) will be adjusted

towards the grant –in-aid payable during the next year-------------

2. Certified that I have certified myself that the conditions on which the grant-in-aid was sanctioned have been duly

fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilized

for the purpose for which it was sanctioned.

Kind of checks exercised.

1)

2)

3)

4)

5)

Signature: -------------------------

Name: ------------------------------

Designation: ----------------------A

nn

exu

re-I

X

Su

b M

issi

on

on

Ag

ricu

ltu

ral M

ech

an

izati

on

(SM

AM

)

Fo

rmat

for

Qu

art

erl

y /

An

nu

al P

rog

ress

Rep

ort

Nam

e o

f Sta

te:

Fin

an

cial Y

ear:

No

dal D

ep

art

men

t:

S.N

C

om

po

nen

ts

Act

ivit

ies

Targ

et A

pp

roved

by

DA

C

Qu

art

erl

y /A

nn

ual P

rog

ress

Rep

ort

A

chie

vem

en

ts fo

r

Ach

ievem

en

ts till

q

uart

er I/

II/I

II

31s

t M

arc

h

P

hy

sica

l

Fin

an

cial

Ph

ysi

cal

Fin

an

cial

Ph

ysi

cal

Fin

an

cial

1 Pr

omot

ion

and

a)

Tra

inee

s tra

ined

in

No.

of T

rain

ees

St

reng

then

ing

of

U1-

U13

cour

ses

Ag

ricul

tura

l b)

Tra

inee

s tra

ined

in

No.

of t

rain

ees

M

echa

niza

tion

T1

-T9

cour

ses

th

roug

h Tr

aini

ng,

c) In

stitu

tion

stre

ngth

ened

N

ame

of th

e in

st.

Te

stin

g an

d

for t

estin

g

Dem

onst

ratio

n d)

Dem

onst

ratio

n on

crop

ping

Ar

ea co

vere

d (h

a),

syst

em b

ased

app

roac

h Ty

pe o

f equ

ipm

ents

and

Type

of c

ropp

ing

sy

stem

e)

Dem

onst

ratio

n of

new

Ty

pe o

f equ

ipm

ents

te

chno

logy

equ

ipm

ents

/

and

Area

cove

red

mac

hine

s

(ha)

2 D

emon

stra

tion,

a)

Nam

e &

No.

of c

ours

es

No. o

f Tra

inee

s tra

ined

Tr

aini

ng a

nd

b) D

emon

stra

tion

of P

HT

N

ame

of te

chno

logy

dist

ribut

ion

of P

ost-

& Ar

ea in

ha

H

arve

st T

echn

olog

y

c) E

stab

lishm

ent o

f Pos

t N

ame

and

No.

of

an

d M

anag

emen

t (PH

TM)

Har

vest

Tec

hnol

ogie

s

tech

nolo

gies

esta

blis

hed

3 Fi

nanc

ial A

ssis

tanc

e

Ty

pe o

f m

ach

ines

N

o. o

f mac

hine

s

for P

rocu

rem

ent o

f a)

Tra

ctor

pr

ocur

ed

Agric

ultu

re M

achi

nery

b)

Pow

er ti

ller

an

d Eq

uipm

ent

c)se

lf pr

opel

led

mac

hine

s

d)

Tra

ctor

driv

en im

plem

ents

e) A

nim

al/m

anua

l dra

wn

mac

hine

s

f)

PP M

anua

l

g)

PP

Pow

er

Page 38: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

Op

era

tio

nal G

uid

elin

es

of

SM

AM

57

Op

era

tio

nal G

uid

elin

es

of

SM

AM

56

Annexure-VIII

FORM GFR 19-A

(See Government of India’s Decision (i) below rule 150)

Form of Utilization Certificate

SI. Letter No. AmountNo & Date

Certified that out of Rs. --------of grants-in –aid sanctioned during the year ----- in

favour of ------------- under this Ministry/ Department letter No. given in the margin

and Rs. -------------on account of unspent balance of the previous year, a sum of Rs.-

------------ has been utilized for the purpose of ---------For which it was sanctioned

and that the balance of Rs.----------- remaining unutilized at the end of the year has

been surrendered to Government (Vide No.---------dated-----------) will be adjusted

towards the grant –in-aid payable during the next year-------------

2. Certified that I have certified myself that the conditions on which the grant-in-aid was sanctioned have been duly

fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilized

for the purpose for which it was sanctioned.

Kind of checks exercised.

1)

2)

3)

4)

5)

Signature: -------------------------

Name: ------------------------------

Designation: ----------------------

An

nexu

re-I

X

Su

b M

issi

on

on

Ag

ricu

ltu

ral M

ech

an

izati

on

(SM

AM

)

Fo

rmat

for

Qu

art

erl

y /

An

nu

al P

rog

ress

Rep

ort

Nam

e o

f Sta

te:

Fin

an

cial Y

ear:

No

dal D

ep

art

men

t:

S.N

C

om

po

nen

ts

Act

ivit

ies

Targ

et A

pp

roved

by

DA

C

Qu

art

erl

y /A

nn

ual P

rog

ress

Rep

ort

A

chie

vem

en

ts fo

r

Ach

ievem

en

ts till

q

uart

er I/

II/I

II

31s

t M

arc

h

P

hy

sica

l

Fin

an

cial

Ph

ysi

cal

Fin

an

cial

Ph

ysi

cal

Fin

an

cial

1 Pr

omot

ion

and

a)

Tra

inee

s tra

ined

in

No.

of T

rain

ees

St

reng

then

ing

of

U1-

U13

cour

ses

Ag

ricul

tura

l b)

Tra

inee

s tra

ined

in

No.

of t

rain

ees

M

echa

niza

tion

T1

-T9

cour

ses

th

roug

h Tr

aini

ng,

c) In

stitu

tion

stre

ngth

ened

N

ame

of th

e in

st.

Te

stin

g an

d

for t

estin

g

Dem

onst

ratio

n d)

Dem

onst

ratio

n on

crop

ping

Ar

ea co

vere

d (h

a),

syst

em b

ased

app

roac

h Ty

pe o

f equ

ipm

ents

and

Type

of c

ropp

ing

sy

stem

e)

Dem

onst

ratio

n of

new

Ty

pe o

f equ

ipm

ents

te

chno

logy

equ

ipm

ents

/

and

Area

cove

red

mac

hine

s

(ha)

2 D

emon

stra

tion,

a)

Nam

e &

No.

of c

ours

es

No. o

f Tra

inee

s tra

ined

Tr

aini

ng a

nd

b) D

emon

stra

tion

of P

HT

N

ame

of te

chno

logy

dist

ribut

ion

of P

ost-

& Ar

ea in

ha

H

arve

st T

echn

olog

y

c) E

stab

lishm

ent o

f Pos

t N

ame

and

No.

of

an

d M

anag

emen

t (PH

TM)

Har

vest

Tec

hnol

ogie

s

tech

nolo

gies

esta

blis

hed

3 Fi

nanc

ial A

ssis

tanc

e

Ty

pe o

f m

ach

ines

N

o. o

f mac

hine

s

for P

rocu

rem

ent o

f a)

Tra

ctor

pr

ocur

ed

Agric

ultu

re M

achi

nery

b)

Pow

er ti

ller

an

d Eq

uipm

ent

c)se

lf pr

opel

led

mac

hine

s

d)

Tra

ctor

driv

en im

plem

ents

e) A

nim

al/m

anua

l dra

wn

mac

hine

s

f)

PP M

anua

l

g)

PP

Pow

er

Page 39: TG II (1) 50307/16 Directorate of Agriculture ... Thaliparamba, ASC, Kannur District. Similarly, the funds can be utilized for the other Agro Service Centre under this component. v

4 Es

tabl

ish Fa

rm M

achi

nery

Siz

e o

f FM

Ban

k

No.

of B

anks

Bank

s for

Cus

tom

Hiri

ng

Upt

o 10

lakh

es

tabl

ishe

d

U

pto

25 la

kh

U

pto

40 la

kh

U

pto

60 la

kh5

Esta

blis

h H

i-Tec

h, H

igh

Siz

e o

f H

i-te

ch H

ub

N

o. o

f Hub

s

Prod

uctiv

e Eq

uipm

ent

Upt

o 10

0 la

kh

esta

blis

hed

H

ub fo

r Cus

tom

Hiri

ng

Upt

o 15

0 la

kh

Upt

o 20

0 la

kh

Upt

o 25

0 la

kh

6 Pr

omot

ion

of fa

rm

Farm

Mac

hine

ry B

anks

N

o. o

f Ban

ks

mec

hani

satio

n in

es

tabl

ishe

d

se

lect

ed v

illag

es

7 Fi

nanc

ial A

ssis

tanc

e fo

r a)

Ope

ratio

nal C

harg

es to

the

N

ame

of th

e

prom

otio

n of

Mec

hani

zed

far

mer

mem

bers

of F

arm

op

erat

ion

and

area

oper

atio

ns/h

ecta

re

Mac

hine

ry B

anks

set u

p un

der

cove

red

(ha)

ca

rrie

d ou

t thr

ough

co

mpo

nent

(6)

cu

stom

hiri

ng C

entr

es

b) D

emon

stra

tions

by

CHCs

N

ame

of th

e

un

der c

ompo

nent

(7)

equi

pmen

t & N

o. o

f

Fiel

d De

mo o

rgan

ized

an

d ar

ea co

vere

d8

Prom

otio

n of

farm

Ty

pe o

f m

ach

ines

N

o. o

f mac

hine

s

mac

hine

ry a

nd

a) T

ract

or

proc

ured

eq

uipm

ent i

n N

orth

- b)

Pow

er ti

ller

Ea

ster

n St

ates

c)

self

prop

elle

d m

achi

nes

d) T

ract

or d

riven

impl

emen

ts

e)

Ani

mal

/man

ual d

raw

n m

achi

nes

f) PP

Man

ual

g) P

P Po

wer

Fa

rm M

achi

nery

Ban

ks fo

r N

o. o

f Ban

ks

grou

p of

farm

ers

esta

blis

hed

9 Fl

exi F

unds

Ty

pe o

f loc

al in

itiat

ives

(L

ocal

Initi

ativ

es)

10

Man

agem

ent/

Ad

min

istra

tive C

ost (

≤1%

):

Tota

l:

Op

era

tio

nal G

uid

elin

es

of

SM

AM

58

Op

era

tio

nal G

uid

elin

es

of

SM

AM

59

Annexure-X

Minimum Technical Requirements for Design, Construction, Test Procedure and Safety for Solar

PV Modules and Performance Standards for Solar PV Pumping System up to 5 HP.

i. Test codes reference for Solar PV Modules

IEC 61215/IS14286 design qualification and type approval must confirm for crystalline Silicon Terrestrial Modules or

IES 61646/Equivalent IS under Development for thin Film Terrestrial Modules.

IEC 616730 part I &II for construction, testing procedure and safety qualification

Testing of Integrated unit of Solar Array and compatible pumping units for performance Test as given below:

II. PERFORMANCE SPECIFICATIONS AND REQUIREMENTS (DUTY CYCLE) up to 5 HP Solar PV pumping System

Solar PV Water Pumps with PV array capacity in the range of 200 Watt to 5 KWp could be installed on a suitable bore-

well, open well, Water Reservoir, Water stream, etc.

Under the “Average Daily Solar Radiation” condition of 7.15 KWh’sq.m. on the surface of PV array (i.e coplanar with

the PV Modules), the minimum water output from a Solar PV Water Pumping System at different “Total Dynamic

Heads” should be as specified below.

For D.C.Motor Pump Set with Brushes or Brush Less D.C.(B.L.D.C):

(i) 100 liters of water per watt peak of PV array, from a Total Dynamic Head of 10 metres (Suction head, if

applicable, minimum of 7 metres) and with the shut off head being at least 12 metres.

(ii) 55 liters of water per watt peak of PV array, from a Total Dynamic Head of 20 metres (Suction head, if

applicable, up to a maximum of 7 metres) and with the shut off head being at least 25 metres.

(iii) 35 liters of water per watt peak of PV array, from a Total Dynamic Head of 30 metres and the shut off head

being at least 45 metres.

(iv) 21 liters of water per watt peak of PV array, from a Total Dynamic Head of 50 metres and the shut off head

being at least 70 metres.

(v) 14 liters of water per watt peak of PV array, from a Total Dynamic Head of 70 metres and the shut off head being

at least 100 metres.

For A.C. Induction Motor Pump Set with a suitable Inverter :

(i) 90 liters of water per watt peak of PV array, from a Total Dynamic Head of 10 meters (Suction head, if

applicable, minimum of 7 metres) and with the shut off head being at least 12 metres.

(ii) 50 liters of water per watt peak of PV array, from a Total Dynamic Head of 20 metres (Suction head, if

applicable, up to a maximum of 7 metres) and with the shut off head being at least 25 metres.

(iii) 32liters of water per watt peak of PV array, from a Total Dynamic Head of 30 metres and the shut off head being

at least 45 metres.

(iv) 19 liters of water per watt peak of PV array, from a Total Dynamic. Head of 50 metres and the shut off head

being at least 70 metres.

(v) 13 liters of water per watt peak of PV array, from a Total Dynamic Head of 50 mertres and the shut off head