AGENDA API TASK GROUP ON API 945 Amine SCC Monday April 23, 2012 11:00 am to Noon Dallas, TX Nasser Sheikhi, BP, covering for Dave Moore, Interim Chairman I. INTRODUCTIONS & APPROVAL OF AGENDA Meeting objectives: 1. Initiate a review and revision or reaffirmation of API 945 2. Establish a Task Group and Chairman as needed. II. GROUP DISCUSSION A. API 945 was last reaffirmed in 2008 and is due for action by end of 2013 B. Are there enough changes needed to justify a revision? i) Suggest consideration to update 5.2.3.1 to reflect WRC Bulletin 452 Recommended Practice to Local Heating of Welds in Pressure Vessels and ANSI/AWS D10.10-90 Recommended Practices for Local Heating of Welds in Piping and Tubing ii) API 582 gives a more restrictive PWHT temperature (1150 to 1200°F) than API 945 (1100 to 1200°F). Changes justified? iii) Any other needs changes? C. Discuss revision versus reaffirmation III. VOLUNTEERS FOR TASK GROUP AND CHAIRMAN? IV. ANY OTHER DISCUSSION? IV. ACTION ITEMS V. ADJOURN

Tg API 945 Amine Scc

  • Upload
    ahmed

  • View
    78

  • Download
    2

Embed Size (px)

DESCRIPTION

SSC in Amine Corrosion

Citation preview

Page 1: Tg API 945 Amine Scc

AGENDA

API TASK GROUP ON API 945 Amine SCC

Monday April 23, 201211:00 am to Noon Dallas, TX

Nasser Sheikhi, BP, covering for Dave Moore, Interim Chairman

I. INTRODUCTIONS & APPROVAL OF AGENDAMeeting objectives:

1. Initiate a review and revision or reaffirmation of API 9452. Establish a Task Group and Chairman as needed.

II. GROUP DISCUSSIONA. API 945 was last reaffirmed in 2008 and is due for action by end of 2013B. Are there enough changes needed to justify a revision?i) Suggest consideration to update 5.2.3.1 to reflect WRC Bulletin 452 Recommended Practice

to Local Heating of Welds in Pressure Vessels and ANSI/AWS D10.10-90 Recommended Practices for Local Heating of Welds in Piping and Tubing

ii) API 582 gives a more restrictive PWHT temperature (1150 to 1200°F) than API 945 (1100 to 1200°F). Changes justified?

iii) Any other needs changes?C. Discuss revision versus reaffirmation

III. VOLUNTEERS FOR TASK GROUP AND CHAIRMAN?

IV. ANY OTHER DISCUSSION?

IV. ACTION ITEMS

V. ADJOURN

Page 2: Tg API 945 Amine Scc

Attachment 1Budget Summary - Corrosion & Materials Research - Spring 2011

DP# Item Prior Years 2008 2009 2010 2011045 Sulfidation Guidelines $48.8 K038 Ethanol SCC Research $110 K038 Ethanol Handling Guidelines $30 K

038Ethanol SCC- Research on fuel grade EtOH- E85 Survey and Research

$234 K $100 K $100 K$40K(1)

$70K(2)

$30K

054RP 530 New Materials (Phase 1)- Scoping and Gap Analysis

$31 K

055CrMoV Fabrication Guidelines(934B) companion to 934A

$25 K

053Companion Document to RP 934C on Fabrication of 1-1/4 & 2-1/4 Cr (934D)

$30 K

053934 Series Master Editor to update 934-A and B documents from industry JIP research work

$30K(6)

053Materials, Fabrication & Repair Considerations for H2 Reformer Outlet Pigtails & Subheaders

$45K

053Materials, Fabrication & Repair Considerations for 1050 – 1400 F

$30 K

053571 Master Editor - (P. Risse)

Phase I SCCM updatePhase 2 SCCM + SCI update

$10 K (3) $20 K (3)

054 MPC Data Recovery (Buchheim / D. Cooke)

$45 K (4)$50K (8)$166K

934F Reactor MPT - consultant $30K (5)

$30K $30K

Niyama index with MTI $60K (7)

$60K

Master Editor to Support 934G $20KTotal $155 K $306 K $190 K $80 K

Notes:

1. Original approved funding was $100K. $50K has been earmarked for MPC database pilot study. $10K was applied to 934F consulting work. $40K remains for ethanol SCC work contracted in 2009.

2. $35K for tank monitoring and $35K for SCC testing.

3. Equity Engineering $10K in 2008 and $20K in 2009.

4. Contracted with Equity Engineering to develop MPC database business model proposal.

5. Funding requested in late 2008 for 934F Master Editor Work. Original request was for $30K. $10K already committed, see note 1.

6. Funding requested for Master Editor/ Consultant work to take learnings from new industry 2.25Cr-1Mo-V JIP’s and keep 934A and B updated. Expect future funding to be on the order of $50K for 2 to 3 years - Not funded, no short term need.

7. Proposed in late 2008 to co-fund with MTI casting quality research. Approved for 2010. Contract in preparation.