21
Texas Skyward User Group Conference Setting Up Day Rotations in Future Scheduling Barbara Belter, Fort Bend ISD 1

Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Texas Skyward User Group Conference

Setting Up Day Rotations in Future SchedulingBarbara Belter, Fort Bend ISD

1

Page 2: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Setting Up Day Rotations in Future Scheduling

Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.? This session will provide an overview of how to set up day rotations and how to record the rotations accurately in the Class Meet records in the Course Master.

• What is a Day Rotation

• Deciding on a Day Rotation

• Setting the rotation in Entity Setup

• Determining the rotation for specific courses

• Setting the rotation in the Class Meet2

Page 3: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Setting Up Day Rotations in Future Scheduling

• The Day Rotation identifies whether a class meets every day or only certain days.

• The days a campus has chosen to have their classes meet is set up through their Day Rotation.

3

Page 4: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Setting Up Day Rotations in Future Scheduling

• Skyward offers many Day Rotation configurations that allow campuses flexibility in creating their master schedules.

• For instance, a class can meet every day, every other day, every third day or a combination of days.

4

Page 5: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Setting Up Day Rotations in Future Scheduling

• FBISD uses Day Rotations in scheduling our ancillary classes for our elementary campuses.

• Prior to working in Future Scheduling, campuses are asked to evaluate their current schedule.

5

Page 6: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Setting Up Day Rotations in Future Scheduling

The initial step in creating a new Rotation schedule begins by selecting the following menu path:(PS\WS\ES\CF\EY)• Product Setup• Student Management• Entity • Configuration• Entity Year Setup

Double Click on Entity Year Set up to access the campus to update.

6

Page 7: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

• When the screen expands, select View All School Years.

• Select and expand School Year  (look for next year school year)

7

Page 8: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

• Select Edit Maximum Values.

• Select the Day Type Option you want to use, the number of Days in Rotation and the Day Label you wish to display.  (Day Label will not be available if the Day Type is Weekdays.)

8

Page 9: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

After selecting the Day Type, Days in Rotation and Day Label (if available), select Save. 

The WARNING! for all the other areas to be updated will appear.Follow the menu paths provided to update the new rotation for:• Day Patterns• Scheduling Period Times• Mass Change Course Master 

Fields Utility

9

Page 10: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Select Day Patterns ‐ DP

Select Add Enter the Day Pattern Select Save

To create new Day Patterns select menu path:PS\SM\OF\FS\BC\PS\CO\DP

10

Page 11: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Select Edit for each scheduling period.

Setting Up Day Rotations in Future Scheduling

To update Scheduling Period Time records, the menu path is:   SM\OF\FS\BC\PS\CO\SP

11

Page 12: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Select Add to create a new template.

To mass update day patterns on all existing Class‐Meet records, the Mass Change Course Master Fields utility needs to be run. The utility can be found here: SM\OF\FS\BC\PS\UT\MC.

12

Page 13: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Setting Up Day Rotations in Future Scheduling

• Setting Up Day Rotations in Future Scheduling

For Districts that have used a campus calendar without a day rotation to clone to their other campuses, the Run the Assign Calendar Day Numbers Utility will need to be run.The utility can be found:OF\AT\PS\CO\CC• Office• Attendance• Setup• Codes• Calendar Codes

13

Page 14: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Setting Up Day Rotations in Future Scheduling

• Setting Up Day Rotations in Future Scheduling Select Edit next to Funding Periods 

to verify the Funding periods are correct.

Select the Utilities option next to Calendar Days.

Select Assign Day Numbers

14

Page 15: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Setting Up Day Rotations in Future Scheduling

• Setting Up Day Rotations in Future Scheduling Verify  Calendar Year Calendar Dates Day Number Method (hint: 

should be Alternate Day Numbers for Day Rotation)

Start With Day Number (hint: should be the day number of the first day of school)

Select OK to run the utility

15

Page 16: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Once the Day Rotation has been created in the Entity Year Setup, the Master Schedule Builder can create the meets in Future Scheduling / Course Master.Prior to entering the meet details in Skyward a matrix can be created to determine which day(s) in a rotation a class will meet.This will make it easier to identify the days to be checked in the Meet Pattern fields.

Sample Rotation Schedules

4 DAY ROTATION

Class ART MUSIC PE LIBRARYSection 101 1 2 3 4

102 4 1 2 3103 3 4 1 2104 2 3 4 1

WEEK DAY ROTATION

Class ART MUSIC PE LIBRARY Science LabSection 101 M T W TH F

102 T W TH F M103 W TH F M T104 TH F M T W105 F M T W TH

16

Page 17: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

After a Section is created,  the Meet Pattern is entered in the Edit Class Meet screen.

Select Save and Add Meet. In the Meet screen check the boxes in the Meet Pattern field based on the periods and day of the rotation or the day of the week a class will meet. 

17

Page 18: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Sample 1, this Kindergarten Library class will go to Library every 4th day.Hint: In sample 1, the Day Type = Day Rotation, Days in Rotation = 4 and Day Label = Numeric.

18

Page 19: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Sample 2, this Kindergarten Art class will meet every Wednesday.Hint: In Sample 2 the Day Type = Weekdays, Days in Rotation = 0 and Day label = MTWRF

Setting Up Day Rotations in Future Scheduling

19

Page 20: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Barbara Belter

SIS Conversion Specialist

Fort Bend ISD

281-634-1482

[email protected]

Setting Up Day Rotations in Future Scheduling

20

Page 21: Texas Skyward User Group Conference Setting Up Day ... Up...Setting Up Day Rotations in Future Scheduling Do you need to set up a campus for a 2‐day, 3‐day, 6‐day rotation etc.?

Texas Skyward User Group Conference

THANK YOU FOR ATTENDING!

21