Texas Nodal Program: Market Readiness Metrics Update. Mike Beck . Program Status: Readiness. There has been a mix of positive and negative changes since the last meeting:. ERCOT:red green (+) EDS3:red amber (+) MP:green red (–). ERCOT. - PowerPoint PPT Presentation
Citation preview
22 May 2008TPTF
Texas Nodal Program:Market Readiness Metrics Update
Mike Beck
2Texas Nodal Program UpdateMay 22, 2008 2
Program Status: Readiness
There has been a mix of positive and negative changes since the last meeting:
ERCOT: red green (+)EDS3: red amber (+)
MP: green red (–)
3Texas Nodal Program UpdateMay 22, 2008 3
ERCOT
• Engagement (green)• ERCOT remains fully engaged
• Training (green)• a new round of training for ERCOT
operators started this week • completion target is August 31, 2008
• Process (green)• updated weekly• completion target is August 31, 2008
• Staffing (majority green)• updated transition plans expected in early
June• this remains the only category with red
and amber • recruitment is ongoing
• Testing (green)• no recent developments
ERCOT readiness status is GREEN, but likely to go AMBER June 1st based on staffing metric
4Texas Nodal Program UpdateMay 22, 2008 4
Market Participants
• Engagement (>95% green)• will be updated June 12th when Cycle 4
Survey is scored
• Connectivity (>95% green)• no change, pending further EDS
developments (MIS Portal, TML)
• Registration and Qualification (red)• MP17 goes active June 2nd
• MP10 and MP11 (Resource Mapping and RARF Submissions) are causing overall red status
• Telemetry (green)• no change, present measurements complete
• Training (>95% green)• will be updated June 12th when Cycle 4
Survey is scored
• Trials Participation (>95% green)• no change, pending further EDS
developments
Market Participant readiness status is RED, driven by MP10 and MP11
5Texas Nodal Program UpdateMay 22, 2008 5
Market Participant Readiness
Overall registration and qualification status for Market Participants is RED• Situation
• A number of Market Participants are not in compliance with MP11 (Registration Activities)
• There are an estimated 215 RARFs representing 720 unit-specific resources, 671 of which are modeled (the remaining 49 are distributed generation resources).
• 91% (608 of 671) of Generation and Load Resource units have been submitted, representing 93% of MW capacity
• Most RARFs are expected to be returned to MPs for revision (most likely several rounds)
• Current rate of acceptance [with Tier 1 review] of submittals into RARF database is about 80% Acceptance does not indicate valid data
• QSE’s w/Resources that represent Resource Entities who are missing RARFs will be rejected from EDS trials
• June 16 closed loop LFC test (and preceding open-loop test) will not be conducted until 100% of MW capacity has been accepted by ERCOT
• Mitigation Steps• Contacted non-responding resource entities [completed]
• Developed a temporary work-around for TML submission [completed]
• Ongoing outreach to MPs to assist in addressing issues [ongoing]
• Publish “wall of shame” for non-responsive entities [ongoing]
Data as of 5.21.08
6Texas Nodal Program UpdateMay 22, 2008 6
Market Participant Readiness
Data as of 5.21.08
QSEs with Resources - RED
• American Electric Power Service Corp• Barton Chapel Wind LLC• City of Austin DBA Austin Energy• Eagle Energy Partners I LP• Formosa Utility Venture LTD
• FPL Energy Power Marketing• Lower Colorado River Authority• Luminant Generation Company LLC• NRG Texas LP• Reliant Energy Power Supply LLC
QSEs without Resources - RED
• Aquila Inc DBA Aquila Networks• Citadel Energy Products LLC• Clearview Electric Inc• Glacial Energy Inc
MPs with red status under registration and qualification
• Kansas City Power and Light Company• National Power Company Inc• Texpo Power LP• Urban Energy Source LLC
7Texas Nodal Program UpdateMay 22, 2008 7
EDS
• EDS 1 (green) no recent changes
• EDS 2 (red) remaining metrics are intertwined with the state estimator quality of data being delivered to ERCOT is not compliant with the state estimator
• EDS 3 (amber) following recent acceptance of ACE data by TAC EDS 3 went from red to amber
• EDS 4 (red) outage evaluation system is not yet completed
EDS 1, 2, and 4 status remains the same, while EDS 3 has improved to amber
8Texas Nodal Program UpdateMay 22, 2008 8
Readiness Metrics
We will begin to measure the following metrics in early June
Metric Description Start CompleteEMO8 Conduct EECP Test 6/1/2008 8/1/2008
E7 Validate EDW WEMM Access & Accuracy
6/2/2008 8/31/2008
E10 Validate EDW Commercial Systems Access &
Accuracy
6/2/2008 8/31/2008
E11 Validate EDW Compliance Data Access
6/2/2008 8/31/2008
MP17* MP Qualification Activities 6/2/2008 8/15/2008
* With the implementation of MP17, all existing MP metrics are active
9Texas Nodal Program UpdateMay 22, 2008 9
Market Participant Engagement Survey: Cycle 4
• Cycle 4 of the Market Participant Engagement Survey was released on May 15 th
• This survey focuses on staffing, processes, and technology from present through the 168-hour test
• This survey will be open for response through May 30th
• Results will be available June 12th on the scorecards
• ERCOT Account Managers will take an active role with outreach to MPs will beginning mid-survey to ensure full participation
Market Participants are currently completing Cycle 4 of the Engagement Survey
10Texas Nodal Program UpdateMay 22, 2008 10
Questions ?