Upload
hada
View
57
Download
0
Embed Size (px)
DESCRIPTION
Texas NAHRO 31 st Annual Conference and Tradeshow (REAC: UPCS Inspection Protocol) April 24 - 25, 2007. Training Agenda. TUESDAY, APRIL 24 TH :. 8:30 am – Welcome / Go over this thing. 8:45 am – Protocol. 10:00 am – BREAK (30 Minutes). 10:30 am – Protocol (Oh no, not more of it!). - PowerPoint PPT Presentation
Citation preview
1
Texas NAHRO31st Annual Conference
and Tradeshow(REAC: UPCS Inspection Protocol)
April 24 - 25, 2007
2
Training Agenda
TUESDAY, APRIL 24TH:
8:30 am – Welcome / Go over this thing
8:45 am – Protocol
10:00 am – BREAK (30 Minutes)
10:30 am – Protocol (Oh no, not more of it!)
12:00 pm – LUNCH
1:30 pm – “Inspection Day” Video
2:00 pm – Deficiencies, Definitions and the Software, oh my!
3
Training Agenda (Continued)
TUESDAY, APRIL 24TH:
3:00 pm – BREAK (30 Minutes)
3:30 pm – Deficiencies, Definitions …
5:00 pm – End for the Day
4
WEDNESDAY, APRIL 25TH:
8:30 am – Deficiencies, Definitions …
9:30 am – HQS vs. UPCS, Scoring, Appeals, etc.
10:00 am – BREAK (30 Minutes)
10:30 am – HQS vs. UPCS, Scoring, Appeals, etc. (Continued)
12:00 pm – End of Session
Training Agenda (Continued)
5
Ground Rules
RULE NUMBER 1:
“Don’t shoot the messenger!” (Me.)
RULE NUMBER 2:
Ask questions! Remember, there are no dumb questions, just dumb answers. (Which I’ll try my best not to give.)
When in doubt, refer to RULE NUMBER 1 above.
RULE NUMBER 3:
6
Reminder!
=
7
- How do I properly prepare for a REAC inspection?
Questions to be Answered
- Where should I focus my resources?
- What is my role during the inspection?
8
Questions to be Answered (Continued)
- How will certain things, like smoke detectors, be checked? (Will the inspector use canned smoke or just push the button?)
- What kind of questions should I ask the inspector before he leaves my site so that I can better understand what went wrong?
9
Questions to be Answered (Continued)
- How do I educate my residents during their annual inspections in order to prevent findings during the REAC inspection?
- Is there a checklist of standards I can use before the inspection to help me make sure everything is up to par?
- How do I appeal a finding, and what kinds of documentation do I need to back up my appeal?
10
PROTOCOL
11
The Real Estate Assessment Center's (REAC) mission is to …
… provide and promote the effective use of accurate, timely and reliable information assessing the condition of HUD's portfolio;
… to provide information to help ensure that HUD subsidized housing remains decent, safe and sanitary;
… and to restore the public trust by identifying fraud, abuse and the wasting of HUD resources.
Our Mission
PIH/REAC’s Mission
12
The Uniform Physical Condition Standards (UPCS) are the foundation of HUD/PIH-REAC’s Physical Inspection Program.
– Creates the structure of the physical inspection.
• (Identifies five inspectable areas and health and safety hazards.)
– Establishes standardized definitions for inspectable items, the basis for electronic inspections via UPCS software.
• (Inspection data is validated, producing a score which indicates the physical condition of a property.)
– Provides a uniform, objective protocol for training
inspectors performing inspections of all property types.
UPCS
13
PROPERTYPROPERTYPROPERTYPROPERTY
SiteSite
Inspectable Areas
Inspectable Area
PHYSICAL INSPECTION STRUCTURE
BuildingBuildingExteriorExterior
BuildingBuildingSystemsSystems UnitsUnitsCommonCommon
AreasAreas
BuildingBuilding
14
SITEFencing and GatesGroundsMailboxes/Project SignsMarket AppealParking Lots/ Driveways/RoadsEtc.
SITEFencing and GatesGroundsMailboxes/Project SignsMarket AppealParking Lots/ Driveways/RoadsEtc.
BUILDINGEXTERIORDoorsFire EscapesFoundationsLightingRoofsWallsEtc.
BUILDINGEXTERIORDoorsFire EscapesFoundationsLightingRoofsWallsEtc.
BUILDINGSYSTEMSDomestic WaterElectrical SystemElevatorsEmergency PowerFire ProtectionHVACEtc.
BUILDINGSYSTEMSDomestic WaterElectrical SystemElevatorsEmergency PowerFire ProtectionHVACEtc.
COMMON AREASBasement/ Garage/CarportCommunity RoomDay CareHalls/Corridors/ StairsEtc.
COMMON AREASBasement/ Garage/CarportCommunity RoomDay CareHalls/Corridors/ StairsEtc.
UNITBathroomCall-for-AidCeilingDoorsElectrical SystemFloorsHot Water HeaterKitchenEtc.
UNITBathroomCall-for-AidCeilingDoorsElectrical SystemFloorsHot Water HeaterKitchenEtc.
INSPECTABLE ITEMS
HEALTH & SAFETYHEALTH & SAFETY
Air QualityAir Quality ElevatorElevator Emergency/Fire Exits Emergency/Fire Exits Flammable MaterialsFlammable Materials Electrical HazardsElectrical Hazards Etc Etc.
HEALTH & SAFETYHEALTH & SAFETY
Air QualityAir Quality ElevatorElevator Emergency/Fire Exits Emergency/Fire Exits Flammable MaterialsFlammable Materials Electrical HazardsElectrical Hazards Etc Etc.
PHYSICAL INSPECTION STRUCTURE
15
InspectableItem
Inspectable Area
ObservedDeficiency (OD)
No Observed Deficiency (NOD)
Not Applicable(NA)
Level 1
Level 2
Level 3
- or -
- or -
Deficiency DefinitionsDeficiency Definitions
UPCS SOFTWARE CONFIGURATION
16
PASSPhysical Assessment Subsystem
- Scoring- Checklist- Inspection Review- Time Stamp Analysis- Reporting
TheThe
INTERNETINTERNET
DataCollectionDevice
Inspector gathers data using UPCS
Software on a DCD
PASS SUBSYSTEM COMPONENTS
17
Physical Physical AssessmentAssessment
ScoreScore
Physical Physical AssessmentAssessment
ScoreScore
Predetermined Predetermined weightsweights
and factorsand factors
Building ProfileBuilding ProfileInformationInformation
ObservedObserved DeficienciesDeficiencies
SCORING
18
– Standard set of rules and procedures followed on all inspections as established in the UPCS.
– Includes three phases:• Pre-Inspection• Inspection• Post Inspection
– Each phase is completed in the above order
PHYSICAL INSPECTION PROTOCOL
19
– Perform objective, factual physical assessments.
– Conduct inspections according to the HUD/PIH-REAC Physical Inspection Protocol.
– Ensure success by complying with the UPCS.
INSPECTOR’S ROLE
20
– Maintain professional conduct and demeanor at all times during the inspection and interaction with the inspection participants.
– Display the HUD-issued photo id during the inspection.
– Dress appropriately.– Be courteous and professional.– Be aware of cultural differences.– Defer resident questions concerning
maintenance to the property representative.– Do not make promises about inspection results.
CODE OF CONDUCT
21
– Conflicts of interest – be aware!– Do not offer an opinion as to the quality of the site,
building or unit.– Do not bring a firearm or other weapons onto a property.– Do not invade a resident’s privacy by attempting to open
a closed door within a unit (bedroom, bathroom, etc.)
without the permission of the resident or the property representative.
CODE OF CONDUCT (Continued)
22
– Do not disclose any information to a third party about the inspection results. Defer to the property owner/representative.
– Do not utilize local HUD offices, MF or PHA offices to conduct personal business (phone calls, inspection uploads, etc.)
CODE OF CONDUCT (Continued)
23
HUD Physical Inspections are:– Objective– Consistent– Comprehensive– Evaluations of HUD-supported properties– A step to help HUD prioritize and direct its
resources– A method to ensure that we all work
together to provide housing that is decent, safe, sanitary and in good repair
SUMMARY
24
Inspection Day
Inspection Day
Receive inspection assignment
Receive inspection assignment
1Download propertyprofile
Download propertyprofile
2Confirm
inspection Confirm
inspection
3Update
inspection schedule
Update inspection schedule
4Travel topropertyTravel toproperty
5
Meet with property representative
Meet with property representative
6 7Verify/update property profile info.
a. property, b. participant, c. certificate, d. area measures
7Verify/update property profile info.
a. property, b. participant, c. certificate, d. area measures
8Visually verify/update
buildinginformation
8Visually verify/update
buildinginformation
Generate sample
Generate sample
9
a. Identify sample buildings b. Enter generated
sample units
a. Identify sample buildings b. Enter generated
sample units
10Inspect a. site,
b.-d. building(s), and e. units
Inspect a. site,
b.-d. building(s), and e. units
11Confirm/verify
inspection data
Confirm/verifyinspection
data
12Complete
Notification of Exigent and Fire
Safety HazardsObserved form
(if needed)and
provide a copyto property
representative
CompleteNotification
of Exigent and FireSafety HazardsObserved form
(if needed)and
provide a copyto property
representative
13
Uploadcompletedinspection
Uploadcompletedinspection
14
PHYSICAL INSPECTION PROTOCOL
25
PRE-INSPECTION
Receive inspection assignment
Receive inspection assignment
1Download propertyprofile
Download propertyprofile
2Confirm
inspection Confirm
inspection
3Update
inspection schedule
Update inspection schedule
4
PHYSICAL INSPECTION PROTOCOL
26
– HUD awards RAP inspections to winning bidder.
– Contractor/servicing mortgagee assigns inspection and notifies an inspector.
– Property profile information is available for downloading from the REAC Web site.
STEP 1: Receive Inspection AssignmentP
RE
-IN
SP
EC
TIO
N P
HA
SE
PR
E-I
NS
PE
CT
ION
PH
AS
E
27
PR
E-I
NS
PE
CT
ION
PH
AS
EP
RE
-IN
SP
EC
TIO
N P
HA
SE
– Inspector downloads Property Profile from the REAC Web site directly to the UPCS software on their DCD.
– Downloaded information automatically populates appropriate fields in the UPCS software.
– Property Profile contains the following information, and MUST BE VERIFIED while on site!
• Inspection number.• Property information: name, street address (no P.O. Box), and
telephone number of the property, and number of buildings and units.
• Participant information: participant’s name, role, and organization name, address, telephone number.
• Building information: building name,
street address (no P.O. Box), type,
construction year, number of units.
STEP 2: Download Property Profile
28
– Inspector contacts the authorized property representative (owner, management company or PHA) to:• Explain the purpose of the inspection
– To objectively assess the physical condition of the property, not to create a laundry list of maintenance items
• Negotiate mutually agreeable time for physical assessment
– Inspector should notify the TAC if the property owner refuses to permit an inspection.
– All inspections must occur in presence of the property representative.
PR
E-I
NS
PE
CT
ION
PH
AS
EP
RE
-IN
SP
EC
TIO
N P
HA
SE
STEP 3: Confirm Inspection [Arrange Date and Time]
29
Inspector sends an Inspection Notification Letter
– Informs property representative to:
• Notify all residents of upcoming inspection• Have available for the inspector on day of inspection ...
– Copy of document notifying residents– Total number of buildings and units– Address or unique building identifier for each building– Applicable certificates (e.g., elevators, boilers, etc.)– Occupancy rate
– Rent roll– Site map or plot of property (if available)– Area measures for parking lots/driveways/roads and
walkways/steps
PR
E-I
NS
PE
CT
ION
PH
AS
EP
RE
-IN
SP
EC
TIO
N P
HA
SE
STEP 3: Confirm Inspection [Arrange Date and Time] (Continued)
30
– Inspections are to be performed during normal business hours, which vary from agency to agency.
– The inspector is responsible for updating the REAC Inspection Schedule for any and all changes and also for notifying any affected parties.
– PIH-REAC Quality Assurance (QA) inspections are based on the REAC Inspection Schedule
• Servicing mortgagee provides REAC with individual inspector schedules• PIH-REAC must be aware of all schedule changes
PR
E-I
NS
PE
CT
ION
PH
AS
EP
RE
-IN
SP
EC
TIO
N P
HA
SE
STEP 4: Update Inspection Schedule
31
INSPECTION
Verify/update property profile info. a. property, b. participant,
c. certificate, d. area measures
Verify/update property profile info. a. property, b. participant,
c. certificate, d. area measures
7
Travel topropertyTravel toproperty
5
Meet with property representative
Meet with property representative
6
Visually verify/updatebuilding
information
Visually verify/updatebuilding
information
8
Generate sample
Generate sample
9a. Identify sample buildings
b. Enter generated sample units
a. Identify sample buildingsb. Enter generated
sample units
10
Inspect a. site,b.-d. building(s),
and e. units
Inspect a. site,b.-d. building(s),
and e. units
11
Confirm/verifyinspection
data
Confirm/verifyinspection
data
12Complete Notification of Exigent and Fire
Safety Hazards Observed form (if needed)and provide a copy to property representative
Complete Notification of Exigent and FireSafety Hazards Observed form (if needed)
and provide a copy to property representative
13
PHYSICAL INSPECTION PROTOCOL
32
Inspector must follow REAC rules for travel:– Inspector must be physically present and on time to
conduct the inspection.– If the inspection cannot be performed or completed on
the scheduled day, the inspector must call the TAC immediately.
– If the weather prevents the inspector from
arriving at the property, they must request
approval from the TAC to declare the
inspection “unsuccessful”.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 5: Travel to Property
33
– Property representative may postpone an inspection due to inclement weather.
• Inspector must report immediately to REAC’s Physical Inspections Technical Assistance Center (TAC).
• Inspector receives log number from the TAC to upload with the inspection confirming cancellation.
– Inspectors should not inspect a property if a “Severe Weather Advisory” in in effect.
• Includes, but is not limited to, hurricanes, tornadoes, thunderstorms, hail or any other adverse weather condition that would likely endanger the safety of the participants (includes any snowstorm for which such an advisory has been issued).
INCLEMENT WEATHER POLICY
34
– In the absence of a severe weather advisory, inspectors should attempt to inspect all properties regardless of snow.
• Any inspectable item not visible due to snow is recorded as NOD (No Observed Deficiency).
• Provide comment indicating items were hidden by snow.
SNOW POLICY
35
– Inspector identifies himself as an inspector of
HUD properties, not an employee of HUD.– Inspector verifies that residents were given
written notification of inspection.• Inspector must notify the TAC, if residents were NOT notified
and TAC will advise if inspector is to continue.
– Inspector discusses inspection purpose with
property representative.• To objectively record the physical condition of the
property, NOT to instruct property representative
on maintenance and repair.
– Inspector explains sampling process• Generates random sample of units to inspect.• Reduces length of inspection.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 6: Meet with Property Representative
36
– Inspector explains how Life-Threatening Health and Safety Hazards will be handled.
– Inspector ...• Displays the HUD-issued photo id at all times.• Verifies rent roll (or other all-inclusive documents) to confirm
proper building/unit count.• Verifies, if applicable, list of units relative to 504/FHA/ADA.• Verifies occupancy rate and records as percentage in DCD (for
MF properties only).• Obtains area measures.
– Inspector is always accompanied by the property representative while on the property.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 6: Meet with Property Representative (Continued)
37
• The Property Profile …– Includes information on the property, participant,
certificates and area measures.– Must be updated before the inspection begins.– Is used to generate statistically accurate building and
unit inspection samples.• Incorrect sampling will invalidate the inspection which may
require a re-inspection (at no additional cost to the Government)
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 7: Verify/Update Property Profile Information
38
– Inspector verifies/updates property information prior to conducting the inspection, including:
• Property name, address and telephone number.• Scattered site information.• Total number of buildings and units.
– A building is defined as any structure that has a contiguous roofline, a permanent foundation, is enclosed on all sides, and at least one utility servicing it, such as electric, gas, water or sewer.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 7a: Verify/Update Property Information
39
– Inspector verifies/updates participant information.• Participant name.• Participant role (e.g., site manager, owner, etc.)• Participant organization name.• Participant address and telephone number.• Participant e-mail address.
– Participants may be individuals or organizations.• There should be at least 3 participants listed.• For PHA: must include Executive Director.• For MF: must include Owner and the Management Agent.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 7b: Verify/Update Participant Information
40
– Inspectors should verify the existence of applicable certificates.
• Check expiration date to ensure it is current.• Record results in UPCS software.
– Inspectors should verify the existence of a Lead-Based Paint Disclosure Form and a Lead-Based Paint Inspection Report for buildings constructed built prior to 1978.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 7c: Verify Certificates
41
– Inspectors should try to obtain Area Measures.• Refers to proportionality.
– Proportionality is used to determine the percentage (square footage) of the defective area.
– Proportionality only applies to:» Parking lots, driveways and roads.» Walkways and steps.
– The rating level of the defect is based on the percentage of the defect.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 7d: Obtain Area Measures
42
– Inspectors must validate building information• Building name and address• Building type• Building construction year (original year built – not
rehabilitation date)• Total number of units
– Failure to validate building information may result in an inaccurate count of buildings and units
• Building and unit counts are used to generate the inspection sample
– Inspectors must also determine if a building is uninspectable
• Important to record uninspectable buildings before generating the sample
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 8: Visually Verify/Update Building Information
43
– Common Building – A detached non-residential structure.
– Duplex – A detached residential structure consisting of two units.
– Low-Rise/Garden Apartments – A multi-unit residential structure consisting of two and one-half or less floors with a common hall entrance.
– Mid/High-Rise Apartments – A multi-unit residential structure consisting of three or more floors with or without elevators.
– Row/Town House – A single unit residential structure that is connected to a similar structure by a common sidewall with individual exterior unit entrance.
– Single Family House – A detached residential structure consisting of one unit.
BUILDING TYPE DEFINITIONS
44
– For nursing homes, group homes, and assisted living facilities, any room with a bed, or beds, is considered a “client room”.
• Client rooms are to be inspected and listed as dwelling units.
– Inspectors should change the number of units in the DCD to reflect client rooms.
• All other areas of the facilities, including kitchens, dining areas, community areas, etc., are to be inspected as common areas.
CLIENT ROOM POLICY
45
– Inspector generates sample using the sampling function of UPCS software
• Mathematical and statistical equations• Statistically valid random sample• Displayed as sequence of unit numbers
– Designed to produce a sample that accurately reflects what would have been recorded if all buildings/units were inspected
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 9: Generate Sample
46
– Variations to protocol produce inaccurate samples and may invalidate inspections
– Inspector must follow protocol steps
• Verify/update all property information before generating sample
• Generate only one sample for each inspection in UPCS softwareIN
SP
EC
TIO
N P
HA
SE
INS
PE
CT
ION
PH
AS
ESTEP 9: Generate Sample (Continued)
47
Verify all property and building information prior to generating the sample.
Use the all-inclusive list of units to determine sample units.
Select units in the order they are displayed.
Select alternate units in the order they are displayed.
Do
Don’t
SAMPLING “DO’s” AND “DON’Ts”
Allow property owners to alter sample units.
Provide property owners with a list of samples prior to inspection.
Deviate from inspection protocol.
48
– UPCS software displays “Yes” in the “In Sample” field for each building included in the sample.
– UPCS software displays sequence of unit numbers in the “Sample Units” text field.
• Each number represents a unit in the selected building.• The order of the numbers represents the relative position of
each unit on a complete list of units.– For example: The number 4 represents the fourth unit on
the list.
– Inspector adds sample units by using an ALL-INCLUSIVE list of units.
• The list may be the rent roll if it includes vacant as well as occupied units.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 10a-b: Identify Sample Buildings and Enter Generated Sample Units
49
– Direct specific resident complaints to the property representative.
– Remind residents of the purpose of the inspection.
• To record the physical condition of the unit, not evaluate
housekeeping
– Observe and inspect all five inspectable areas:• Site
• Building Exterior
• Building Systems
• Common Areas
• Units
INSPECTION GUIDELINES
50
– Call out all observed deficiencies and the severity level to the property representative as you perform the inspection.
– Be alert to any Health & Safety hazards that may exist in an inspectable item.
– Record items inside the development/property.• Any physical structures under the control of the housing
provider (e.g., city streets and sidewalks) must be inspected.
INSPECTION GUIDELINES (Continued)
51
– Inspectors must rate and record observed Health and Safety deficiencies
– Health and Safety items include:• Air Quality• Electrical Hazards• Elevator• Emergency/Fire Exits
– Certain Level 3 deficiencies automatically generate Health and Safety hazards
• Flammable Materials• Garbage and Debris• Hazards• Infestation
HEALTH AND SAFETY HAZARDS
52
– Be observant of the life-threatening health and safety hazards listed on the Notification of Exigent and Fire Safety Hazards Observed form:
A. Propane, natural, or methane gas
B. Exposed wires or open electrical panels
C. Water leaks on or near electrical equipment
D. Blocked or unusable emergency or fire exits
E. Blocked fire escapes or ladders
F. Missing or misaligned chimney for gas-fired water heater/HVAC
G. Window security bars preventing exit
H. Expired fire extinguishers
I. Inoperative/missing smoke detectors
LIFE-THREATENING HEALTHAND SAFETY HAZARDS
53
– All observed life-threatening health and safety hazards ...
• MUST be recorded in the DCD.• MUST be recorded on the Notification of
Exigent and Fire Safety Hazards Observed form.• Include hazards found in buildings not in the sample.
– Inspector notifies property representative of all hazards immediately.
LIFE-THREATENING HEALTHAND SAFETY HAZARDS (Continued)
54
– Site is defined as the area surrounding the building(s) of a property
• Example: Fencing and Gates, Grounds, Mailboxes/Project Signs.
– Only one site per property.
– Site may be inspected at any time during the inspection.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 11a: Inspect Site
55
– It is encouraged to complete all inspectable areas of a building, before inspecting another building.
– The inspector must record the physical condition of three areas for each sample building:
• Building Exteriors - outside building surfaces (e.g., fire escapes, lighting)
• Building Systems - civil systems that support the building (e.g., domestic water, HVAC)• Common Areas - areas within each building that are usable by more than one resident or by the property administration.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 11b-d: Inspect Building: Exterior, Systems and Common Areas
56
– Inspector physically verifies that all buildings declared uninspectable meet REAC standards for that classification.
– If a sample building is discovered to be uninspectable during the inspection:
• Inspector indicates uninspectable reason in the UPCS software.• Inspector selects the next available alternate building.
– Alternate building may be inspected at any time during the inspection.
– Alternate buildings must be selected in the order they are displayed in the UPCS software.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 11b-d: Inspect Building: Exterior, Systems and Common Areas (Continued)
57
– Per Code of Conduct, with respect to resident privacy, an inspector should not open closed doors within a unit. After property personnel provides access, inspector may open/close to test functionality of the door(s).
– If a sample unit is declared uninspectable during the inspection:
• Inspector indicates uninspectable reason using the UPCS software.
• Inspector selects the next available alternate unit– Alternate units must be selected in the order they are
displayed in the UPCS software.
– Alternate unit may be inspected at any time during the inspection.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 11e: Inspect Units
58
– Alternate units are inspected when a sample unit is considered uninspectable.
– UPCS software automatically generates alternate units.
– Selection Guidelines for Alternate Units: • Alternate units must be selected in the order they are
displayed.– Example: If the alternates for a sample are 5 and 3,
5 must be used as an alternate before 3.• If no alternate units exist in the sample building then
select an alternate unit of the same building type.• If no alternate units exist for same building type then
select an alternate unit in the next building type group.• If no other alternate units remain then call TAC for
assistance.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 11e: Inspect Units (Continued)
59
– Multifamily housing properties:
• Vacant units are included in the random sample.
• Only inspect vacant units at properties with 15% or more total vacant units (85% or less occupancy rate).
• At properties with less than a 15% vacancy rate, inspectors should not inspect vacant units, but replace them with alternates from the sample.
VACANT UNITS POLICY
– Public housing properties:
• Vacant units are included in the random sample.
• Vacant units should not be inspected.
60
– Client rooms in nursing homes, group homes and assisted living facilities are inspected as dwelling units but do not always have assigned numbers.
• To inspect these rooms, start room count at the lowest level, move to the right, and then up through the building to select rooms as they are listed in the sample.
– Mixed-use facilities contain both client rooms and residential (apartment-style) dwelling units - the total number of units used to generate the sample will include both.
INSPECTING CLIENT ROOMS
61
– Inspector uses “Check/Prepare/Import” function of UPCS software to automatically review inspection completion.
• UPCS software verifies thoroughness and identifies any missing items.
• Use function before leaving site.
– Only completed inspections are accepted by the DCD for uploading to REAC.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 12: Confirm/Verify Inspection Data
62
– Life-threatening hazards are documented on the Notification of Exigent and Fire Safety Hazards Observed form.
– Property representative signs the form.• If representative refuses to sign, note the refusal on the form.
– A copy of the form, signed by the inspector, must be left with property representative.
INS
PE
CT
ION
PH
AS
EIN
SP
EC
TIO
N P
HA
SE
STEP 13: Complete Notification of Exigent and Fire Safety Hazards Observed Form
63
– For Public Housing properties, life-threatening deficiencies must be corrected and/or abated within 24 hours and reported to the HUD field office within 3 business days.
CORRECTING LIFE-THREATENINGDEFICIENCIES
– For Multifamily Housing properties, life-threatening deficiencies must be mitigated immediately and reported to the HUD field office within 3 business days.
64
UploadCompletedInspection
Data
UploadCompletedInspection
Data
14
PHYSICAL INSPECTION PROTOCOL
POST INSPECTION
65
– Receipt # received by inspector when upload is complete.
– Completed inspections must be uploaded to the REAC Web site within 24 hours.
– Technical problems with uploading should be referred to the TAC immediately.
– Inspections should be deleted from the DCD only after the inspections are accepted by REAC.
PO
ST
INS
PE
CT
ION
PH
AS
EP
OS
T IN
SP
EC
TIO
N P
HA
SE
STEP 14: Upload Completed Inspection Data
66
– Occur when inspectors do not follow the standard inspection procedures as defined by the Physical Inspection Protocol.
– Negatively affect the accuracy and validity of physical assessments.
– Types of variances: Subjectivity
Negligence
Gaming
VARIANCES
67
– SUBJECTIVITY• When inspectors make personal judgments about
the condition of a property or allow their personal biases to affect how they inspect
– NEGLIGENCE• When inspectors purposely try to avoid following the
Physical Inspection Protocol in order to reduce the time or effort required to inspect a property
– GAMING• When inspectors perform illicit activities in an
attempt to cheat the system
TYPES OF VARIANCES
68
– Inspection protocol is designed to:• Standardize the inspection process• Provide HUD with consistent, objective and factual inspection data
– Inspection protocol is divided into three main phases:
• Pre-Inspection• Inspection• Post Inspection
– Adherence to the protocol is critical for:• Accurate physical assessments• Maintenance of decent, safe, and sanitary
housing in good repair
SUMMARY
69
DEFICIENCIES, DEFINITIONS ANDTHE SOFTWARE, OH MY!
70
DCD 2.3 INSPECTABLE DEFECTS
* Time to check out some pictures! *
71
HQS VS. UPCS, SCORING,APPEALS, ETC.
72
The Process
OLD: (HQS)
Regulatory requirement that housing providers mustinspect their units/properties to a HUD defined standard.
HUDHeadquarters
PIH-REACQuality Assurance
Field OfficeQuality Assurance
Housing Agency Inspectsto Standard
Housing Agency Inspectsto Standard
Field Office
NEW: (UPCS)
- Paper based- Pass/Fail- Subjective- Inconsistent
- Electronic- Point Deductions- Objective- More Consistent
73
“Decent, safe, sanitary and in good repair.”
MEASUREMENT
1978 - 1998Housing Quality Standards (HQS)
1998 - FutureUniform Physical Condition Standards (UPCS)
Elements
Elements
The Standard
74
Bathroom - Tub / Shower Hot Water System, Boiler RoomBenches, Play Area & Equipment InsulationCabinets, Doors, Closets, Hardware Interior Air QualityCaulking and Weather-stripping Laundry RoomsCompactors and Incinerators Lawns and PlantingsCurtains and Shades Lead based Paint ObservedDoors, Carpets, Tiles PaintingDoors, Windows, Screens Plumbing Fixtures and SystemsDrives, Parking Lots, Paving & Curbs Porches, Balconies, Fire EscapesElectrical Fixtures and Systems Project Signs and OfficeElevators Refrigerators and RangesEnergy Efficiency Items Inspected: Roofs, Flashing, VentsExterior Lighting Smoke DetectorsExterior Painting Sprinkler and Drainage SystemExterminating Stairs, Walkways, Community SpacesFences, Walls, Guardrails Storage, Utility BuildingsFire Extinguishers Storm Doors and WindowsGarage and Carports Swimming PoolsGarbage Disposal and Exhaust Fans Underground Gas, Water, SewageGutters, Downspouts, Splash Blocks Walks, Steps, GuardrailsHealth Hazards I Code Violations Walls & FoundationsHeating and Air Conditioning Water Saver Devices
Insulation
Curtains and Shades
Water Saver Devices
HQS vs. UPCS
75
Dwelling Units
Holes/Missing Tiles/Panels
LEVEL 3 Building
DwellingUnits
Living Room
Ceiling
76
77
79
HQS:
- Uses “subjective” measurements such as “serious”, “large”, “significant” and “severe” without specifying a quantifiable amount. (Makes consistent ratings more difficult to obtain amongst different inspectors.)
- If just one item is marked “Fail”, then the entire unit fails the inspection.
UPCS:
- Uses “objective” measurements such as “larger than 8-1/2 x 11” or “more than 3 tiles”. (Makes consistent ratings more obtainable amongst different inspectors.)
-If an item receives a “Level 3” rating, then the score for that unit will be reduced from its potential maximum points.
Item: Ceiling Condition
Ceiling Condition Pass Fail Level 1 Level 2 Level 3Bulging/Buckling X X XHoles/Missing Tiles/Panels X X X X XPeeling/Needs Paint X X XWater Stains/Water Damage/Mold/Mildew X X X X
HQS UPCS
80
Item: Ceiling Condition
HQS Guidance (paper) UPCS Guidance (electronic)
*Covered under either:“Bulging/Buckling”, “Peeling/Needs Paint” or “Water Stains/Water Damage/Mold/Mildew”.
81
Building Systems
LEVEL 3 Building
BuildingSystems
DomesticWater
Misaligned Chimney/Ventilation System
82
HQS:
- If just one item is marked “Fail”, then the entire unit fails the inspection.
UPCS:
- If an item receives a “Level 3” rating, then the score for that building will be reduced from its potential maximum points.
Item: Hot Water Heater
Hot Water Heater Pass Fail Level 1 Level 2 Level 3Misaligned Chimney/Ventilation System X XMissing Pressure Relief Valve X XRust/Corrosion on Heater Chimney X X
HQS UPCS
83
Item: Hot Water Heater
HQS Guidance (paper) UPCS Guidance (electronic)
*Covered under:“Missing Pressure Relief Valve”.
84
Dwelling Units
LEVEL 3 Building
DwellingUnits
SmokeDetector
Missing/Inoperable
85
HQS:
- If this item is marked “Fail”, then the entire unit fails the inspection.
UPCS:
- If this item receives a “Level 3” rating, an “Exigent Health & Safety” notation is made but no points are deducted from the overall score.
Item: Smoke Detectors
Smoke Detectors Pass Fail Level 1 Level 2 Level 3Missing/Inoperable X X
HQS UPCS
86
Item: Smoke Detectors
HQS Guidance (paper) UPCS Guidance (electronic)
87
Top 20 Deficiencies
1. HVAC – the water heater Pressure Relief Valve discharge tube extends to within 18 inches of the floor;
2. Misaligned Chimney – the vent stack on gas operated water heaters or furnaces are properly aligned;
3. Missing HVAC Covers – there are covers on all baseboard heaters;
4. Access to the Electrical Panel – access to electrical panels is not blocked by furniture or other items;
5. Missing Covers – electrical panels have interior covers (aside from the panel lid box itself) to prevent exposure from the wire connections;
6. Open Breaker Ports – Open breaker ports are covered;
7. Doors Damaged Seals – the factory-installed seals on Exterior Doors, such as building or unit doors, are in place and undamaged;
8. Doors Damaged Hardware – Exterior door hardware locks or latches properly and Fire Doors function as designed;
9. Security Doors – security doors do not have dual-side key locks;
10. Kitchen – Damaged Stoves/Ovens – stove burners are working;
88
Top 20 Deficiencies (Continued)
11. Plumbing – pipes and faucets are not leaking, and areas around any leaks are cleaned up and repaired;
12. Damaged Sinks/Showers – any hardware problems are repaired, diverters are working, drains have stoppers, Hot or Cold water handles are in place and working;
13. Clothes Dryers - are properly vented to the outside from units or laundry rooms;
14. Storm Water Sewers - are not clogged with trash or leaves;
15. Sanitary Sewer Damaged Covers –caps located in the grass on the exterior of the building that have been damaged by a lawn mower are cleaned out. Replace and mark the areas to prevent further damage;
16. Trash Chutes – hardware is in place and the chute door closes properly;
17. Trash Receptacles - are not overflowing and are adequate in size for the property;
18. Auxiliary Lighting – the back up lighting works even when the test light does not work;
19. Leaking Domestic Water – there are no leaks in the domestic water supply, including the hose bibs located on the exterior of the building;
20. Switchplate Covers – are not cracked or broken.
89
- How do I properly prepare for a REAC inspection?
Questions to be Answered
- Where should I focus my resources?
- What is my role during the inspection?
A: Pray.
A: You have resources?!?
A: Refer to the first question above.
90
The Goal
Assign a score to the overall property
condition based on the data collected by the
inspector
–Measure physical condition
–Objective & consistent
–Accommodates all property types &
configurations
91
The inspector records the existence and the severity
of deficiencies according to preset criteria
Scoring is Based on Objective Data
92
• Relative importance (“weights”) were assignedto each physical area, item, and deficiency in the inspection protocol
• HUD applies the weightsto the inspection data to compute the score
• The score is based on a 100 point scale
The Scoring Approach
93
The weights were assigned as part of aconsensus process:
- Industry stakeholder input• Public Housing Authorities• Multifamily Housing (Owners / Agents)• Trade groups• PHA industry groups
- HUD information
- Trade professionals’ experience
Scoring Protocol
Site Building Exterior
Common Areas
DwellingUnits
Fencing and Retaining WallsGroundsLightingMailboxes/Project SignsMarket AppealParking Lots/Driveways/RoadsPlay Areas and EquipmentRefuse DisposalStorm DrainageWalkways/Steps
DoorsFire EscapesFoundationsLightingRoofsWallsWindows
Domestic WaterElectrical SystemElevatorsEmergency PowerExhaust SystemFire ProtectionHVACSanitary System
Basement/Garage/CarportOfficeCloset/Utility/MechanicalOther Community SpacesCommunity RoomPatio/Porch/BalconyDay CarePools and Related StructuresHalls/Corridors/StairsRestrooms/Pool StructuresKitchenStorageLaundry RoomTrash Collection AreasLobby
BathroomCall-for-AidCeilingDoorsElectrical SystemFloorsHot Water HeaterHVAC SystemKitchenLightingOutlets/SwitchesPatio/Porch/BalconySmoke DetectorStairsWallsWindows
Building Systems
Areas&
Items
15% 15%20%
35%15%
95
Wgt 15% 15% 20% 35% 15% 100%
Property Physical
Condition
Inspection Areas
Site Health & Safety
Deductions
Whole Point Deductions
From FinalScore
Building Exterior
Building Systems
DwellingUnits
Common Areas
Building
Scoring Dynamics
96
Wgt 15% 15% 20% 35% 15% 100%
Property Physical
Condition
Inspection Areas
Site Health & Safety
Deductions
Whole Point Deductions
From FinalScore
Building Exterior
Building Systems
DwellingUnits
Common Areas
Building
Wgt 15% 15% 20% 35% 15% 100%
Wgt 18% 18% 23% 41% 0% 100%
(For example, if there are no Common Areas on a property, the other inspection areas become more important)
No Two PropertiesAre Alike
97
Scores calculated based on:
Area Points x Item Weight x Criticality x SeverityRanges are:Area Points
Site = 15 Bldg Systems = 20 Dwelling Units = 35Bldg Ext = 15 Common Areas = 15
Item Weight (Examples)
Smoke Detector = 0 Missing Toilet = 10Damaged Ceiling = 4.5 Misalinged Chimney = 15.5
Criticality(5) Critical = 5.0 (2) Contributes = 1.25(4) Very Important = 3.0 (1) Slight Contribution = 0.5(3) Important = 2.25
Severity(3) Most Severe = 1.0
(2) Severe = 0.50
(1) Least Severe = 0.25
Scoring Methodology
98
Scoring Methodology (Continued)
99
Scoring Methodology (Continued)
100
Dwelling Unit: Living Room,Ceiling - Holes/Missing . . . - Level 3
Scoring
(Area Points x Item Weight x Criticality x Severity / # Units)
35 x 0.045 x 3.0 x 1.0 = 4.725 / 24 = 0.20 PointDeduction
(Item Weight x Criticality x Severity)
4.5 x 3.0 x 1.0 = 13.5%
*Assuming 250 Units (24 Sample Units)
101
Building Systems: Domestic Water,Misaligned Ventilation System - Level 3
Scoring
*Assuming 5 Buildings
* EH&S TICKET IT
EM! *
(Area Points Item Weight x Criticality x Severity / # Buildings)
20 x 0.155 x 5.0 x 1.0 = 15.5 / 5 = 3.10 PointDeduction
(Item Weight x Criticality x Severity)
15.5 x 5.0 x 1.0 = 77.5%
102
Dwelling Units: Smoke Detector,Missing/Inoperable - Level 3
Scoring
(Item Weight x Criticality x Severity)
0 x 5.0 x 1.0 = 0 no point deduction
(Area Points x Item Weight x Criticality x Severity / # Units)
35 x 0 x 5.0 x 1.0 = 0 / 10 = no point deduction
*Assuming 15 Units (10 Sample Units)
* EH&S TICKET IT
EM! *
103
Questions to be Answered
A: Push the button. (No cigarettes please.)
A: Don’t let them leave! (Lock them up.)
- How will certain things, like smoke detectors, be checked? (Will the inspector use canned smoke or just push the button?)
- What kind of questions should I ask the inspector before he leaves my site so that I can better understand what went wrong?
104
Technical Reviews
What qualifies for a Technical Review?
- Building Data Errors
- Unit Count Errors
- Non-Existent Deficiency Errors
You can appeal a physical score if you believe the inspection was not conducted in accordance with the Public and Indian Housing Real Estate Assessment Center (PIH-REAC) Uniform Physical Condition Standards (UPCS) inspection protocol or feel that certain inspection data may have been recorded in error that, if corrected, will result in an improvement in the property's overall score
What does NOT qualify for a Technical Review?
- Disagreements over the severity of a defect
- Deficiencies that were repaired or corrected
105
Technical Reviews (Continued)
Timeline for submittal:
- Public Housing = 15 days
- Multifamily Housing = 30 days
What to include:
- All property identification information
- All deficiency location information
How to document:
- Written Material
- Photographs
- Video
* OBJECTIVELY
VERIFIABLE
! *
106
Technical Reviews (Continued)
Where to send your request:
Attn: PASS Technical ReviewsHUD/PIH/REAC550 12th Street SW, Suite 100Washington, DC 20410
What can happen:
- Request Denied
- New Inspection Scheduled
- Correct the Inspection Report (Adjust score)
107
What qualifies for a Database Adjustment?
- Local conditions and exceptions
- Ownership issues
- Adverse conditions beyond the owner’s control
- Modernization work in progress
You can appeal a physical score if you believe the inspection was not conducted in accordance with … blah … blah … blah … (Same as the previous one.)
What does NOT qualify for a Database Adjustment?
- Deficiencies that were repaired or corrected
- Deficiencies caused by residents
- Items covered by the Technical Review process
Database Adjustments
108
Timeline for submittal:
- Public Housing = 15 days
- Multifamily Housing = 45 days
What to include:
- All property identification information
- All deficiency location information
How to document:
- Written Material
- Photographs
- Video
* OBJECTIVELY
VERIFIABLE
! *
Database Adjustments (Continued)
109
Where to send your request:
Attn: PASS Database AdjustmentsHUD/PIH/REAC550 12th Street SW, Suite 100Washington, DC 20410
What can happen:
- Request Denied
- New Inspection Scheduled
- Correct the Inspection Report (Adjust score)
Database Adjustments (Continued)
110
“In The Works”
- RAPID 1.0 (a.k.a. DCD 3.0)
111
Download Inspection
Prototype Look and Feel
112
Inspection Profile
Prototype Look and Feel
113
Property Profile
Prototype Look and Feel
114
Inspection Sample
Prototype Look and Feel
115
Archive / Restore Inspections
Prototype Look and Feel
116
Inspect Common Areas
Prototype Look and Feel
..... ...
117
Inspect Units
Prototype Look and Feel
..
..
.
..
.
.
.
.
118
Questions to be Answered (Continued)
- How do I educate my residents during their annual inspections in order to prevent findings during the REAC inspection?
- Is there a checklist of standards I can use before the inspection to help me make sure everything is up to par?
- How do I appeal a finding, and what kinds of documentation do I need to back up my appeal?A: Ha, ha ha. That’s a good one! (Ever hear of “War and Peace”?)
A: It’s easier to just have them move out.
A: The “Top 20” list is a good place to start.
119
http://www.hud.gov/offices/reac/products/pass/pass_trng.cfm