16
TETRA Release 2 - Overview Ranko Pinter Simoco Digital Systems

TETRA Release 2 - Overview Ranko Pinter Simoco Digital Systems

Embed Size (px)

Citation preview

TETRA Release 2 - Overview

Ranko PinterSimoco Digital Systems

Agenda

•ETSI Project TETRA

•Market Overview

•TETRA 2 Enhancements

•TETRA 2 Users and Applications

•Current Status of the TETRA R2.

ETSI Project TETRA (EPT)

EPTM an ag em en t C om m ittee

(R e lease 2 S tra teg y)

W G 2R ad io A sp ec ts

A ir In te rfa ceE n h a n ce m e n ts

W G 3N etw ork A sp ec ts

In te rw o rk in g& R o a m in g

W G 4H ig h S p eed D a ta

W G 5C od ec

W G 6S ecu rity

W G 7S IM

W G 1S ervices & F ac ilit ies

A p p lica tion s

C om m unica tion Indus tryM obile C om m s M arke t

T E T RA M arke ts & S ec tors

ETSI Specs

vv

v v v v v

v

v

Market Overview

•Release 1 TETRA is almost complete

•Growth of Wireless communication

•Impact of Internet & 2.5/ 3G on TETRA

market

•Need for TETRA enhancements is driven

by new applications, e.g requiring higher

data speeds.

TETRA Release 2 Services & Facilities

Not a new Standard but enhancement of

the various aspects of TETRA Release 1,

viz.

•Air Interface

•Speech Coding

•SIM Evolution

•Roaming & Interworking with Cellular

•High Speed Data

Air Interface Enhancements

•Extending RF Range

•Reducing Call set- up Time and End-

to-end Delay

•Increasing in Subscriber Capacity

•Extending Battery Life

•Reducing Terminals Size & Weight.

Roaming & Interworking Codec and SIM

•Roaming to GSM/ GPRS Systems

•Retrieval of WAP Applications

•Retrieval of SMS Messages

•Use of UMTS/ 3G SIM Technology for

Improved Interworking

•Use of UMTS/ 3G Codecs to Avoid Double

Voice Coding.

TETRA R2 - High Speed Data

•IP driven requirement for higher-speed

packet data

•Two-track approach adopted - TAPS and

TEDS, in order to meet conflicting market

needs:

- of PAMR Operators for Rapid market

deployment (overlay TAPS)

- for backward compatibility (integrated

TEDS)

TETRA Advanced Packet Service - TAPS

•An Overlay System

•Needs New Infrastructure & Terminals

•Data rates up to 384 kbps

•200 kHz Channel Raster

•Based on Adaptation of GPRS and Classic

EDGE Technologies

•Standard Publication expected in early

2002.

TETRA Enhanced Data Service - TEDS

•An Integrated System

•Technology selection based on User

Requirement Specification from EPT

Working Group 1

•Four candidate technology currently

under consideration in EPT Working Group

4

•Technology selection expected during Q1

2002

Findings from Questionnaire - HSD TEDS•Mandatory requirements

•Backward compatibility

•Service flexibility

•Security compatibility

•As marketable as Release 1

•Other important

requirements•Ease of Infrastructure upgrade

•Minimal need for extra B/Ss

•Flexible upgrade to 400kbps

•Efficient use of spectrum

•Ease of MS upgrade

TETRA HSD Road MapTETRA HSD Road Map

OK

C

69

F BABC

R1/ TEDSBase Station

INTEGRATED TAPS?

Base Station

x

OK

C

69

F BABC TAPSterminal

TETRA R1terminal

OK

C

69

F BABC

R1+TAPSterminal??

TETRA R1Base Station

TETRA TAPSBase Station``

xx

TETRA R1Base Station

TETRA R1terminal

OK

C

69

F BABC

TETRA R1terminal

x x

TETRA R1max. 28.8kbps

TETRA R2 Phase 1TAPS max. 384 kbps

TETRA R2 Phase 2 ??28.8kbps<TEDS<384 kbps

TETRA R1Network

TETRA R1Network

TAPSNetwork

R1/ TEDSNetwork

Integrated TEDS/ TAPS?

Network

INFRASTRUCTURE

TERMINALS

Appendix EPT WG1 (01)037

R1+TEDS

OK

C

69

F BABC

OK

C

69

F BABC

INTEGRATEDTEDS & TAPS?

TAPSterminal

TETRA Release 2 Applications - Technocop

video camera attached to video camera attached to the personal weaponthe personal weapon

CIS using new antenna technology CIS using new antenna technology including an in-built GPS including an in-built GPS

batteries and the batteries and the support systemsupport system

personal comm.. personal comm.. & info. pack& info. pack visor with head-up displayvisor with head-up display

protective clothing, with protective clothing, with built-in telepresence built-in telepresence system, i.e.. sensors system, i.e.. sensors monitoring chemical, monitoring chemical, RF or radiation attackRF or radiation attack

Present Situation

•Set of TETRA Release 2 User Requirement Specifications (URS) has been approved and issued as Technical Report TR 102 021to all the EPT Working Groups

•User Workshop has been organised in order to resolve conflicting requirements for HSD

•Continued liaison between WG1 and other Working Groups is essential to achieve the right balance and the successful outcome

Thank you.

For more information visit:www.tetramou.com

www.etsi.org