81
http://www.gratisexam.com/ Testkings.C4040-251.184.Questions with Answers Number : C4040-251 Passing Score : 800 Time Limit : 120 min File Version : 27.3 http://www.gratisexam.com/ C4040-251 Power Systems with POWER8 Scale-out Technical Sales Skills V1 Full marks for this real exam vce. I got through with flying colors. Corrected few mistakes I found. Valid in north America and surroundings countries.

Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Testkings.C4040-251.184.Questions with Answers

Number: C4040-251Passing Score: 800Time Limit: 120 minFile Version: 27.3

http://www.gratisexam.com/

C4040-251

Power Systems with POWER8 Scale-out Technical Sales Skills V1

Full marks for this real exam vce. I got through with flying colors. Corrected few mistakes I found. Valid in north America and surroundings countries.

Page 2: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Exam A

QUESTION 1Which of the following describes benefits that Power Systems servers might offer to a customer administering a growing number of Intel-based Linux servers?

A. Consolidating on PowerLinux servers would run multiple Linux applications on fewer systems.B. PowerLinux servers manage both POWER-based and Intel-based Linux servers from a single console.C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core.D. PowerLinux servers with SMT4 can execute up to 5 instructions per cycle, reducing the number of servers needed.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 2An existing Power Systems client has implemented an SAP application with the financial, database and web serving applications on separate POWER5+ servers. APower 760 proposal to consolidate all three POWER5+ systems using LPARs has been presented.The CIO has stated that only the unpredictable performance of the web server justifies replacement. What should the response be?

A. The Power 760 offers Linux web serving for higher performanceB. Split the web server into multiple LPARs for better performance on the new Power 760C. Consolidation onto one Power 760 using dedicated LPARs to support the three environmentsD. Consolidation onto one Power 760 offers the ability to dynamically move virtual system resources to the web server when required.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 3A customer has a Power 720 with an expansion unit. The disk slots in the CEC and the expansion drawer are full. The customer wants to add SSD capacity. Whichof the following is the most economical option for the customer?

A. Install an SSD disk riser in the Power 720 CEC

Page 3: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

B. Install PCIe SSD SAS adapter to support SSDs without using disk slotsC. Install a SAS RAID adapter and an optional disk riser in the CEC to support SSDs.D. Install an SSD enablement feature and a second expansion unit on the Power 720 to house the SSDs

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 4Which of the following statements is true regarding IBM PowerLinux servers?

A. PCIe adapter cards can be hot-pluggable in the system unit (CEC).B. PowerVM is included at no charge in the initial order of PowerLinux servers.C. Initial cost of acquisition is lower for those customers who will only run Linux.D. Red Hat and/or SuSe distributions are included at no charge in the initial order

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 5Which of the following measures, monitors, and manages electrical and thermal components of IBM servers, storage and networking equipment?

http://www.gratisexam.com/

A. Active Energy ManagerB. Tivoli Monitoring Director

Page 4: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

C. Intelligent AC power distribution unitsD. Power Environment Measuring Probe

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 6A CIO has asked for a comparison of the performance between Power Systems servers running AIX and HP-UNIX servers. Which benchmark should bediscussed?

A. rPerfB. TPCC. MIPSD. CPW

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 7What is a function found in PowerVM that has no equivalent function in VMware?

A. Remote RestartB. Partition MobilityC. Memory SharingD. Processor virtualization

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

Page 5: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 8An existing Power Systems customer wants to run Java programs, and they know that Java is now owned by Oracle. The customer has asked how they can runJava programs on a Power Systems server. What is the appropriate response?

A. Java programs need to be compiled to run natively in AIX.B. Java programs run natively in AIX, IBM i and Linux partitions.C. Java runtime licenses can be downloaded from the open source community.D. Workload management subsystems in IBM i run Java programs without the requirement of a separate LPAR.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 9When moving an HP-UX based application workload from an HP Superdome onto a Power Systems server, which operating system will provide the easiesttransition'?

A. AIXB. IBM iC. Red Hat Enterprise LinuxD. SuSe Linux Enterprise Server

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 10The VP of marketing for a clothing distributor explained that the IT department is looking at Hadoop-based technologies to help the company better understandcustomer buying trends and behavior. What IBM solution specifically applies to this type of environment?

A. pureScale

Page 6: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

B. BiglnsightsC. SmartCloudD. PureSystems

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 11What is a unique RAS characteristic of Power Systems Enterprise servers compared to Power Systems Express servers?

A. Dynamic Processor SparingB. Dynamic Processor DeallocationC. Dynamic Processor Error RecoveryD. Dynamic Service Processor Failover

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 12A customer would like a Scale-out server solution with eight cores. They require three partitions.Each partition needs redundant LAN and SAN adapters.

Which solution supports the minimum requirement?

A. (2) 146GB disk drives(2) 4-port LAN(2) 4-port SAN adapters

B. (6) 146GB disk drives(6) 4-port LAN(6) 4-port SAN adapters

C. 14) 146GB disk drives

Page 7: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

(4) 4-port LAN(4) 4-port SAN adapters(2) VIO Servers

D. (2) 146GB disk drives(2) 4-port LAN(2) 4-port SAN adapters(1) VIO Server

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 13A customer has a 4-node cluster serving a few different applications. The storage requirements are not clearly defined and would be very unpredictable.

How would shared storage pools benefit this customer?

A. They reduce the total required storage by half.B. They eliminate the need for multiple repository disks.C. They reduce I/O bandwidth by sharing the LUNs.D. They reduce the time and effort needed to allocate storage.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 14A customer is considering a fully-virtualized infrastructure to be built on Power Systems.

Which capability would allow storage virtualization, and reduce the effort of adding storage to client partitions for the Power system administrator?

A. vSCSIB. NPIV

Page 8: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

C. SSPD. SR-IOV

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 15A customer needs a new server for their database currently running on a 16-core POWER7 4.1 GHz based server. Oracle has informed the customer that theirSPARC T5 based servers are best suited for running databases, because the SPARC T5 has eight threads per core, while the current servers only allow for up tofour threads per core.

Which of the following statements could be correctly used to repudiate the Oracle claim?

A. Databases are mostly single-threaded workloads. Scale-out POWERS servers have higher clock speeds and can scale to more cores than SPARC T5 servers.B. Oracle T5 Servers are engineered to run Oracle workloads faster. Non-Oracle workloads will run slower on their hardware due to the amount of threads.C. More threads will implicate more licensing for the database software. Less threaded processors provide a better TCO by reducing the licensing.D. The number of threads cannot guarantee better performance. Servers based on POWERS have better per core performance in benchmarks when compared to

SPARC T5 based servers.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 16The Payment Card Industry Data Security Standard (PCI DSS) has the following requirements to meet compliance:"Secure audit trails so they cannot be altered.""Verify that current audit trail files are protected from unauthorized modifications via access control mechanisms, physical segregation, and network segregation."

Which PowerSC offering will support these requirements?

A. Trusted Network ConnectB. Trusted Logging

Page 9: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

C. Trusted AuditD. Trusted Surveyor

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 17What supports the Easy Tier function for an S822?

A. (8) drives with a split backplaneB. (12) drives with a split backplaneC. (8) drives with a second SAS controllerD. (12) drives without split backplane

Correct Answer: CSection: (none)Explanation

Explanation/Reference:Reference:http://www-01.ibm.com/common/ssi/cgi-bin/ssialias?infotype=an&subtype=ca&appname=gpateam&supplier=897&letternum=ENUS114

QUESTION 18A client needs to analyze data in motion in order to be able to respond to millions of events as they happen per second.

Which offering will satisfy their requirement?

A. IBM Infosphere Master Data ManagementB. IBM Infosphere Big InsightsC. IBM Infosphere Clinical AnalyticsD. IBM Infosphere Streams

Correct Answer: DSection: (none)

Page 10: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Explanation

Explanation/Reference:

QUESTION 19What provides a comparison of Power Systems to competitors for applications?

A. SPECintB. RPE2C. SPECfpD. TPM

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 20A customer is setting up two new partitions where IBM i is hosting the storage. The customer's high priority is to complete the backups to physical tape as fast aspossible, while automating the movement of the single tape library between the partitions Tape library functions are needed for the backup.

Which combination of storage virtualization will achieve the customer's backup priority''

A. One very large virtual disk unit sized to fit the partition with a virtual iSCSI interface to the tape library.B. Virtual disk units sized to provide 10 disk units, with the tape and DVD virtualized by IBM i.C. Larger virtual disk units and a SAS adapter on each partition, with dual SAS adapter on the tapelibrary.D. At least six virtual disk units with the tape drive virtualized with VIO Server and NPIV

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 21A customer with IBM i and AIX platforms wants to take advantage of a recently acquired XIV Storage System, TS3500 and POWERS system. They are planning to

Page 11: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

implement 10 LPARs and need to have access to the tape library for SAN backups. The customer also wants to minimize the downtime by VIO Servermaintenance.

Which option will satisfy their requirements?

A. (1)VI0 Server, LPARs using SSP for disks, and NPIV for tape libraryB. (2) VIO Servers, All LPARs using NPIV virtualizationC. (2) VIO Servers, LPARs using vSCSI for disks, and NPIV for tape libraryD. (1) VIO Server, LPARs using vSCSI for disks, and NPIV for tape library Manage the VIO Server updates with alternate disk update method

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 22An AIX customer wants to be sure they can update their SAN multipath drivers with a minimal amount of risk, while still being able to perform Live Partition Mobilityoperations.

Which disk connectivity technology supports these requirements?

A. NPIVB. iSCSIC. SASD. vSCSI

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 23A customer running AIX wants to run DB2 on a new S824 server with uncapped partitions. The customer has licensed DB2 for 15 of the 24 active cores and will useit in multiple partitions.

How can the customer ensure that DB2 does not exceed the number of licenses purchased?

Page 12: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. Create 15 shared processor pools for the DB2 partitions.B. Limitthe number of virtual processors on each DB2 partition to 15.C. Use partitions that cannot use more processor capacity than its assigned processing capacity forthe DB2 partitions.D. Use a 15-core shared processor pool for the DB2 partitions.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 24A customer wants to consolidate AIX, Linux and IBM i workloads. They are also thinking about Analytic applications and a small-to-mid-size database.Which of the following servers satisfies the customer's requirements?

A. S822LB. S822C. S812D. S824

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 25What is a characteristic of virtualizing workloads?

A. Processors are virtualized per core.B. Greater virtualization reduces the cost of workloads.C. Resources must be shared or dedicated.D. Greater virtualization increases the cost of computing

Correct Answer: B

Page 13: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Section: (none)Explanation

Explanation/Reference:

QUESTION 26A customer wants to save on IBM i licensing costs:

They have three configurable processors and one IBM i license.LPAR1 is running IBM i with .5 CPULPAR2 is running IBM i with .5 CPULPAR3 is running AIX with 1 CPUAll of the LPARs are uncapped.They want to limit the IBM i LPARs to using one core.

How can the customer enforce the limit and save on their IBM i licensing costs?

A. Put the IBM i LPARs in a shared processor pool with one core.B. Put the AIX LPAR in a shared processor pool with one core.C. Set the entitlement of each IBM i LPAR to "one"D. Change the AIX partition to have .5 CPU entitlement.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 27Which of the following Linux distributions supports Little Endian (LE) on POWERS processor- based?

A. RHEL5B. SLES 11C. RHEL6D. Ubuntu 14

Correct Answer: DSection: (none)

Page 14: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Explanation

Explanation/Reference:Reference:http://www-01.ibm.com/support/knowledgecenter/linuxonibm/liaam/liaamdistros.htm

QUESTION 28What benefit does the CAP I feature of POWER8 provide?

A. The ability to attach accelerators that have shared memory access that is coherent with the system's processors.B. An implementation of AME on a hardware accelerator.C. The ability to dispatch multiple virtual machines on a single core at the same time.D. An alternative to memory lock base synchronization.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 29A customer wants to run seven AIX 7.1 partitions in a virtualized environment. The server is a 20-core S822, with 128GB of memory.

Which of the following I/O adapter combinations satisfies the requirement?

A. (4)PCIe4-port 1GbE(4) PCIg-4x 2-port 8Gb Fibre Channel

B. (4) PCIe4-port 1GbE(4) PCIe LP 8Gb 2-port Fibre Channel

C. (4) PCIe-2 LP 4-port 1 GbE(4) PCIe-2 LP 8Gb 2-port Fibre Channel

D. (4) PCIe LP 4-port 1 GbE(4) PCIe-4x 2-port 8Gb Fibre Channel

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

Page 15: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 30Which of the following is open source software that hosts the virtual machines on a KVM hypervisor?

A. QEMUB. OPALC. PHYPD. CAPI

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 31A customer wants to show workloads in real time, highlighting possible problems or bottlenecks.

What will satisfy the requirement?

A. System DirectorB. PowerVCC. PowerVPD. PowerSC

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 32A customer is ordering a 4-core S814 with the following partitions:

An IBM i partition capped at 1.0 processorsA second IBM i partition capped at 0.5 processors, running a Web Sphere application.An AIX partition capped at 0.5 processors.

Page 16: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A Linux partition capped at 0.5 processors.

How many WebSphere licenses are required to support this configuration?

A. 4.0B. 1.0C. 30D. 2.0

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 33A customer wants to have an AIX PowerHA cluster span two sites separated by 100 kilometers.

Which option will span the two sites?

A. PowerHA SystemMirror Standard EditionB. PowerHA SystemMirror Enterprise EditionC. PowerHA Smart AssistsD. Power HA Cluster Aware AIX

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 34A customer wants to move from an IBM Power 740 to an IBM Power S824.The 740 contains:

(4) disks in the CEC(10) disks in a FC #5802 (I/O drawer with disks)(12)disks in a EXP12S

Page 17: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

(24) disks in a EXP24S How many disks can be reused with the S824'?

How many disks can be reused with the S824?

A. 14B. 38C. 28D. 24

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 35A customer wants to install a POWER8 tower system at a remote site. The system will run Red Hat Linux.

Which system is the best option for the requirement?

A. S812LB. S822LC. S824D. S814

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 36A customer would like to consolidate their five AIX servers to one S822 server, in a virtual environment with two VIO Servers for boot drives.

What is the minimum requirement?

A. IVM

Page 18: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

B. ASMIC. PuTTYD. HMC

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 37What is the main function of the P0WER8 CAPI feature?

A. It improves memory bandwidth.B. It improves cache coherency.C. It increases the clock frequency speed.D. It connects auxiliary processors such as GPUs.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 38What does the numeral "4" represent in a model S824?

A. The number of power suppliesB. The number of installed coresC. The number of PCIe slotsD. The number of rack EIA units.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

Page 19: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 39A customer wants to use SAN FlashCopy with Geographic Mirroring to synchronize an IBM i application between two sites. It is required that the application can behalted and moved to the remote system without disrupting other applications.

Which of the following describes a required application characteristic to support these requirements?

A. The application code and data must reside in an IBM i user Auxiliary Storage Pool (ASP).B. All the application data objects must be defined to remote journaling.C. The application code and data must reside in the IBM i system Auxiliary Storage Pool (ASP).D. The application code and data must reside in an IBM i Independent Auxiliary Storage Pool (ASP).

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 40Which of the following RAS features, previously available only on POWER 7+ midrange and enterprise systems is now available on POWER8 scale-out servers?

A. Active Memory Mirroring, which maintains two identical copies of the Power Hypervisor in memory at all times.B. A redundant Service Processor with the ability to dynamically fail over from the primary service processor to a secondary for solid service processor fault.C. An on-chip controller on the processor module, which handles Power Management and Thermal Monitoring without a need for a separate controller.D. Active Memory Sharing, which can be exploited to increase memory utilization on the system by decreasing the system memory requirement.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 41Which tape backup option is supported for migration from a POWER6 520 with a SCSI attached external LTO-3 tape drive to a POWER8 S814, and is readcompatible with LTO-3?

Page 20: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. Migrate the SCSI adapter to the S814 and attach it to an existing LTO-3 tape drive.B. Add an SAS adapter and external LTO-5 tape drive.C. Add an internal LTO-4 tape drive in the CEC.D. Add an SAS adapter and external LTO-6 tape drive.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 42Which feature is recommended to move memory resources from one LPAR to another?

A. Dynamic LPAR operationB. Active Memory SharingC. Active Memory ExpansionD. Live Partition Mobility

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 43Which of the following statements is true regarding CAPI?

http://www.gratisexam.com/

A. CAP1 allows for adapters like FPGAs and GPUs to bypass the CPU and access the memory directly, allowing for faster data access and reduced CPU

Page 21: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

utilizationB. CAPI enabled servers use general purpose accelerators that increase the processor clock without compromising stability and RAS.C. CAPI allows supported third party CPUs (Oracle, Intel, AMD, etc.) to be installed to speed up processing of specific workloads such as big data, compression or

Java.D. CAPI is designed for High-Performance Computing only. Commercial workloads cannot benefit from CAPI acceleration

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 44A customer has a partitioned system running IBM i and Domino. The customer is considering a new system to replace the existing system and wants to add aWebSphere application and an AIX application.

Which of the following will assist in sizing the new system?

A. Performance Management (PM) for Power SystemsB. Workload Estimator (WLE)C. SnapShotD. System Planning Tool (SPT)

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 45How does Instruction Retry help a customer achieve maximum reliability?

A. Continually retries a failing instruction until it works properly to preclude an application failureB. Isolates failing instructions and provides an interface for the administrator to enter an alternative instruction and retry itC. Prevents an application failure by moving the failing application instruction to an alternative server and re-executing the instruction thereD. Enables an instruction to re-execute if there is an error, to preclude intermittent core errors from causing an immediate application failure

Page 22: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 46Which tool will help create a strong ROI case for a server consolidation opportunity?

A. The AlineanToolB. Economic Replacement ToolC. Consolidation Discovery and Analysis ToolD. SmartCloud Enterprise Monthly Cost Estimator

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 47A customer needs to run a single Linux application at the lowest cost. The application requires 8 cores and 320GB memory Which Power Server should berecommended?

A. POWER7+710B. POWER7+730C. PowerLinux Systems 7R1D. PowerLinux Systems 7R2

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 48

Page 23: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A customer needs 2 Power Systems servers, each with at least 12 cores. Which of the following servers supports this requirement while using the least amount ofrack space?

A. Power 710 ExpressB. Power 720 ExpressC. Power 730 ExpressD. Power 740 Express

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 49An IT manager plans to purchase a new Power 770 System with multiple LPARs. This company previously had a bad experience with a non-IBM solution that wasmissing several necessary hardware components when first acquired. Which resource below emulates an LPAR configuration and validates that the plannedpartitions are valid?

A. TechDocsB. InfoCenterC. Workload EstimatorD. Systems Planning Tool

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 50What is a reason that POWER7 technology can provide higher throughput than Xeon x86 technology?

A. POWER7 supports more DIMM slots than x86.B. POWER7 has higher redundancy of registers than x86.C. POWER7 supports more virealization technologies than x86.D. POWER7 supports 4 threads per core, while Xeon supports only 2.

Page 24: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 51What is the benefit of using the Active Memory Expansion feature in Power Systems servers?

A. Memory capacity will virtually be doubled.B. Memory will be disk-cached to improve performance.C. Memory will be allocated to an LPAR to improve performance.D. Memory contents are compressed to allow for greater utilization.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 52A system needs 3TB of disk storage, based on plans for expansion The storage manager of the IT department would like to use thin provisioning to make best useof storage space What disk technology would provide this type of capability?

A. Storwize V7000 with RAID-5B. Dual VIO Server with storage poolingC. EXP30 with SAS drives using EasyTierD. Logical Volume Mirroring with RAID-1 on internal SSD

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

Page 25: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 53An HMC is required under which circumstances?

A. If partition mobility is requiredB. If dual VIO Servers are requiredC. If PureFlex chassis are being managedD. If System Director is managing virtual resources

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 54A prospective customer is about to decide on a strategic server platform and wants to understand the value proposition of Power Systems as compared to x86based systems. Which statement is an appropriate response?

A. Lowest cost of implementation with non-stop computing capabilitiesB. Systems with the ability to support Unix, Linux and Windows environmentsC. Highest performing servers with the ability to use industry standard parts for lowest cost build to order configurationD. Full range of servers, operating systems, support, vertical scalability, and virealization technologies from a single vendor

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 55Which Power Systems tool uses published benchmark data to create a simple cost comparison between Scale-out and x86 servers?

A. Quick Reference ToolB. Workload Estimator ToolC. TCA-TCO Seller ToolD. Server Consolidation Tool

Page 26: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 56Which power option is provided with the S822?

A. (1)1400 Watt 200-240 VoltB. (2) 1400 Watt 200-240 VoltC. (2)1400 Watt 125-240 VoltD. (1)1400 Watt 125-240 Volt

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 57A customer will be consolidating a number of IBM i and AIX partitions from several older servers onto an existing S824 These partitions are parts of variousoperating groups within the customer and require connectivity to various private networks and network redundancy. The server utilizes SAN Storage and dualVIOServer partitions.

Which solution satisfies the customer's requirements?

A. Add two additional VIO Server partitions each with a quad port Ethernet card. Create an SEA in VIO Server to each port of the Ethernet card.Configure virtual Ethernet connections to the VIO Server partitions for each SEA with one flagged priority

B. Utilize two of the IBM i Partitions to bridge to the outside Attach a quad port Ethernet IOA to each partition and bridge the ports lo internal VLANs needed by theguest partitions.

C. Add two SR-IOV capable Ethernet adapters.Allocate each of them to the partitions and create the connections to the correct VLANs as needed.

D. In the existing VIO Server partitions, add a quad port Ethernet card. Create an SEA in VIOS to each port of the Ethernet card. Configure virtual Ethernetconnections to the VIO Server partitions for each SEA with one flaggedpriority.

Correct Answer: ASection: (none)

Page 27: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Explanation

Explanation/Reference:

QUESTION 58A client is considering hardware platforms for their Hadoop implementation.

Which of the following is an advantage of a Power Systems solution over an x86 solution for then implementation?

A. Support for two copies of dataB. Support for the Hadoop File Placement OptimizerC. Support for IBM Elastic StorageD. Built-in High Speed Cluster Interconnect

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 59As compared to POWER7/7+, what feature of POWER8 processor technology enables more efficient processor utilization in support of highly threadedapplications?

A. Decimal floating point executionB. Simultaneous Multi-ThreadingC. Out of order executionD. Single precision floating point

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 60A customer currently is running a POWER7 6-core 720 with 3 IBM i cores for production, and utilizing PowerHA to a POWER6 2-core server as their backup

Page 28: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

machine.

The production machine also has unlimited users, IBM i Access users, SOL, and ILE Compilers. They are only using the backup machine to do backups, but it isnot a CBU; it has only one IBM i and one licensed PowerHA core.The customer wants the backup server to have the same capacity as the production server so it can be a true high availability server.

Which of the following is the correct course of action at the least cost?

A. Upgrade the POWER6 to a POWER7.Add two additional IBM i and PowerHA Licenses, IBM i and IBM i Access users SQL and ILE Compilers

B. Upgrade both servers to P0WER8 and transfer all the software to the new POWERS servers.C. Purchase a new POWER8 to replace the POWER6 server and transfer the software from the POWER6 Designate the POWER8 as a CBU to the POWER7.D. Purchase two new POWER8 servers designating one of them as a CBU.

Transfer all the software from the POWER7 to one of the POWER8 servers and all the IBM i and PowerHA software from the POWER6 to the other POWER8server.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 61What is the number of threads that can be processed for maximum throughput on a POWER8 core?

A. 12B. 4

http://www.gratisexam.com/

C. 8D. 2

Page 29: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 62Which of the following statements correctly describes a difference between the S814 and S824?

A. The S814 is a tower server and the S824 can be either a tower or rackmounted serverB. The S814 has one socket and the S824 has up to two socketsC. The S814 can have one or two sockets and the S824 has four sockets.D. The S814 uses 1U of rack space andthe S824 uses 2U of rack space.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 63What virtualization management solution will allow a customer to implement Ubuntu, Red Hat and SUSE distributions on POWERS scale-out servers?

A. PowerKVMB. PowerVCC. PowerVMD. Linux on Power (LoP)

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 64Which technology provides simple virtualization for Ethernet, with quality of service controls that specify minimum bandwidth per partition?

Page 30: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. SR-IOV (Single Root I/O Virtualization)B. SEA (Shared Ethernet Adapter)C. HEA (Host Ethernet Adapter)D. CNA (Converged Network Adapter)

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 65A customer is willing to consolidate several servers running Oracle and DB2 databases from several departments on a single server, while keeping themadministratively separate.

They are concerned about licensing after consolidation, because they are not willing to pay for Oracle licenses for the cores running DB2 and pay for DB2 licenseson cores running Oracle. What would be the best method to handle this situation, to make the environment compliant and achieve the customer demands?

A. Create two capped LPARs, one for Oracle databases and other for DB2 databases, and make sure the LPARs have the right amount of cores assigned to themaccording to customer existing licenses

B. Create one capped LPAR per consolidated server, on each LPAR profile page on the HMC select the corresponding database type, and make sure DB Isolationoption is checked

C. Create one uncapped LPAR per consolidated server, monitor CPU usage and keep a spreadsheet up-to-date to account for the databases licenses used forcompliance audits.

D. Create two Shared Processor Pools, one for Oracle and another for DB2, and consolidate the servers on distinct LPARs on the corresponding pool

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 66A customer has two Power 570 servers that need to be replaced to accommodate company growth.

·The first server runs a transactional workload with high server usage during the day (8am-8pm)

Page 31: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

·The second server runs analytic queries based on the transactional data during the night (10pm-6am).·A technical sizing analysis determined that each server would require (18) POWERS 3.52GHz cores and 160GB RAM, considering the needed growth.

What would be the most cost-efficient way to satisfy the customer needs?

A. (1) new Power S824 with 24 cores and 384GB and DLPAR CPU resources among LPARsB. (1)new Power 770 with 36 active cores and 384GB active, virtualized with capped LPARsC. (1) new Power S824 with 36 cores and 384GB, virtualized with capped LPARs.D. (2) new Power S824 with 20 cores and 192GB RAM each.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 67What feature of IBM i prevents editing object code?

A. Single level storageB. Integrated antivirusC. Authorization listsD. Object-Oriented Architecture

Correct Answer: DSection: (none)Explanation

Explanation/Reference:Reference:http://www.ibm.com/developerworks/library/os-php-7oohabits/

QUESTION 68A customer requires each AIX or IBM i LPAR to have access to two different VLANs but without VLAN tagging. They plan to have dual VIO Servers on the samePOWER8 system, using EtherChannel and SEA for each VLAN.

What is the minimum requirement to support the configuration?

Page 32: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. (2) quad port Ethernet adaptersB. (4) quad port Ethernet adaptersC. (2) dual port Ethernet adaptersD. (4) dual port Ethernet adapters

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 69A customer has a requirement for four partitions, each with 1TB of Storage They want to put a new S814 machine in. but only have 4U available in the rack.

Which POWER8 option accomplishes this?

A. Order a 6-core machine with the Expanded Function backplane with (18) SFF SAS 283GB drives, all the drives owned by VlO Server and then allocated to eachpartition.

B. Order a 6-core machine with the Split backplane, with each side having (4) 283GB drives for two partitions and two sets of EJ03 Disk Controllers eachconnected to a 5887 with (4) 283GB disks each for the other two partitions.

C. Order a4-core machine with the Expanded Function backplane with (10) SFF SAS 571GB drives, all the drives owned by VlO Server and then allocated to eachpartition.

D. Order a 4-core machine with the Split backplane with (18) SFF SAS 283GB drives, all the drives owned by VlO Server and then allocated to each partition.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 70A customer consolidated several environments running IBM i, Linux and AIX into an S824. Now the system's installed memory is insufficient. The customer believesthat the Active Memory Expansion feature may resolve the memory issue.

Which of the following operating systems is capable of using the compression and decompression technology to resolve the issue?

Page 33: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. AIXB. IBMiC. Red HatD. SUSE

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 71A customer is ordering a 4-core S814 with the following partitions. The default processor pool will be used.·An IBM i partition capped at 1.0 processors.·A second IBM i partition capped at 0.5 processors.·An AIX partition capped at 0.5 processors.·A Linux partition capped at 0 5 processors.

How many IBM i processor licenses are required to support this configuration?

A. 3.0B. 2.0C. 1.0D. 4.0

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 72A customer needs faster response time from their database server and is considering purchasing POWERS. They are familiar with Easy Tier, and have heard thatthey can use it locally on some servers.

Page 34: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Which feature(s) would enable this function?

A. Enhanced backplane (EJOP)B. Standard backplane (EJON)C. Enhanced backplane (EJOP) with the Split backplane feature (EJOS)D. Standard backplane (EJON) with optional SSD cage (EJTM)

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 73How can system software charges be reduced when migrating from POWER6 to a POWER8 Scale-out server?

A. Only activate the necessary cores.B. Select the per-socket licensing model.C. Configure the system with POWER8 Dual-Core Modules (DCM)D. Disable all un-needed cores with Processor Deconfiguration.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 74A large manufacturer wants to consolidate their existing AIX and Linux environments to POWER8. The customer has four AIX servers and twelve Ubuntu servers.

Which solution will satisfy the requirements?

A. (1) S822L with PowerKVMB. (1)S822 with PowerVM and (1)S822L with PowerKVMC. (1) S822L with PowerVMD. (1) S822 with PowerVM and PowerKVM

Page 35: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 75A customer is interested in migrating Little Endian (LE) Linux workloads to POWERS servers running PowerKVM.

Which Linux distribution will satisfy the requirement?

A. UbuntuB. RedHatC. CentOSD. SUSE

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 76A customer with POWER8 processor-based systems needs an application server that supports environments from single server and medium-sized configurations,to large deployments requiring tier clustering over multiple application server instances. Which IBM product family will satisfy the customer's requirements?

A. RationalB. WebSphereC. Information ManagementD. Cognos

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

Page 36: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 77A customer will be using an S822L and PowerKVM. They want to know how they will attach a console to their machine over the network during installation.

Which console solution should they use?

A. VirshB. HMCC. IVMD. SOL

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 78An AIX customer is running AIX 5.3 on a POWER7 machine and wants to run this workload on a POWER8 server without upgrading their operating system.

What is their best option to migrate their workload?

A. PowerHA failoverB. Live Partition MobilityC. PowerVCD. Versioned WPAR

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 79Which of the following is a stand-alone offering in the PowerSC family, that provides a consolidated view of the virtual data center VM network isolation landscape?

Page 37: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. Real-time Compliance ManagementB. Trusted SurveyorC. Trusted FirewallD. Trusted Network Connect

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 80A customer wants to be able to automatically failover their Power System nodes that are running AIX in the event of a disaster. The customer will place the serversin No data centers that are in different geographies

Which IBM product will satisfy the customer's requirement?

A. IBM Metro MirrorB. PowerHA SystemMirror for AIX Enterprise EditionC. Geographic Logical Volume ManagerD. General Parallel File System (GPFS)

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 81An AIX customer plans to boot their LPARs from the SAN and wants the ability to easily update multipathing software in their VIO Server clients.

Which disk option should be used for their rootvg?

A. NPIVB. vSCSIC. NFSD. iSCSI

Page 38: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 82Which Power Systems feature or capability is a significant contributor in TCO analysis?

A. Capacity on Demand capabilityB. Upgrade processes between modelsC. Ability to run multiple operating systemsD. More efficient rack space requirements

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 83A prospective customer has a large quantity of x86 servers. What value is gained by consolidating onto Power Systems servers?

A. Improved VMware reliability and availabilityB. Higher system utilization and lower energy costsC. Improved performance by running Windows in WPARsD. Savings on software since PowerVM is included in the price of Express servers

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 84

Page 39: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

What is required to implement Live Partition Mobility (LPM)?

A. The source and destination servers should access the same fabrics.B. The source and destination servers should be managed by the same HMC.C. The source and destination servers must have the same quantity of Virtual I/O Servers.D. All LPARs should have the same vendor Storage Subsystem

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 85What is used to provide basic deployment and management firmware updates, host monitoring and Virtual Machine templates of PowerKVM hosts from a GUI?

A. virshB. PowerVCC. KimchiD. HMC

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 86A customer has a Power System S824 server with the following components:·(1) 8-core 4.15 GHz POWER8 processor·(1)8 Gigabit PCI Express Dual Port Fibre Channel adapter ·(1) PCIe2 Quad Port 1GbE adapter·PowerVM Standard Edition·(1) VIO Server using one core, and (7) guest LPARs each using one core

Page 40: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

The customer needs to add a redundant VIO Server and implement another three LPARs, each with one core.

In addition to one 8 Gigabit PCI Express Dual Port Fibre Channel adapter, which of the followingcomponents must be ordered to satisfy the minimum requirement?

A. (1)4-core POWER8 processor(1) PCIe2 Quad Port 1GbE adapter(4) licenses of PowerVM Express Edition

B. (1)4-core POWERS processor(1) PCIe2 Quad Port 1GbE adapter(4) licenses of PowerVM Standard Edition

C. (1) 8-core POWER8 processor(1) PCIe2 Quad Port 1GbE adapter(16) licenses of PowerVM Enterprise Edition

D. (1) 8-core POWER8 processor(1) PCIe2 Quad Port 1GbE adapter(8) licenses of PowerVM Standard EdiHon

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 87Customer recently installed a new six- core S824, with ( 18 ) SFF-3 bay storage HDD disk backplane completely filled . They want to include ( 4 ) SSD solid statedrive, the data in order to improve the thermal performance. Customers want to avoid adding a EXP24S I / O drawer to place the SSD costs .

Which of the following to meet customer requirements in order to improve the performance of hot data ?

A. plus an eight-slot 1.8-inch solid state drive cage backplaneB. plus an SSD SAS bay PCIe RiserC. plus a PCIe RAID and SSD SAS adapterD. plus a USB SSD cage connection

Correct Answer: ASection: (none)Explanation

Page 41: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Explanation/Reference:

QUESTION 88In what case , all I / O must be virtualized ?

A. When an AIX 7 WPAR belong to a global environment .B. When an IBM i partition belong to dry another IBM i partition.C. When a logical partition when using a shared storage pool (SSP).D. When using PowerVM Enterprise Edition and Enterprise Edition with PowerHA .

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 89A company wants to integrate six existing AIX workloads onto a single logical partition six Power8 single server .

Which server options to meet the requirements?

A. S822 is equipped with an HMCB. S822L with PowerVMC. S824 with PowerKVMD. S822 is equipped with PowerVM Express Edition

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 90Which components of PowerKVM provide I / O virtualization ?

A. IPMI

Page 42: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

B. virshC .QEMU

C. Kimchi

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 91The shared storage pool (SSP) was established in Cluster Aware AIX (CAA) Which of the following can provide the kind of high-value features ?

A. client logical partition memory thin provisioning (Thin provisioning).B. Zero configuration operations to implement NPIV storage.C. throughout the cluster VIO server synchronization hard name.D. Logical partitions automatic failover between Power Systems servers.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 92Customers are migrating from the Power7 to Power8 systems. In the new VIO server environment, they want to use storage multipathing client logical partition.

Customers should use something to meet their requirements ?

A. NFSB. NPIVC. iSCSID. vSCSI

Correct Answer: BSection: (none)Explanation

Page 43: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Explanation/Reference:

QUESTION 93There are 20 partitions on the customer's Power8 system , want to allocate additional storage from non- IBM SAN to each partition. License fees for all partitionsdrivers and multi-path software beyond the current budget.

Which one of the following technologies will meet their demands in the budget ?

A. NPIVB. SASC. SSDD. vSCSI

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 94Customers want to have a mix of the S824 SSD and HDD, using the extended functions ( 18 disks ) backplane (EJOP), and do not want to use the Easy Tierfeature.How to achieve ?

A. Use RAID 5T2 configure all drives.B. on SSD and HDD ARRAY different configurations.C. The SSD installed in EJTM 8-Bay 1.8 SSD cage.D. Use backplane isolation, and put on the back side of the SSD , HDD on the other side .

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 95

Page 44: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A customer interest in the PostgreSQL server workloads to Power8 , but more concerned about the cost .

Compared with x86 servers , which system of pricing the most competitive ?

A. S822B. S814C. S824LD. S812L

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 96Customer has multiple partitions running applications. Due to the user's different regions, each district will have a lot of memory requirements in the different timesof day .

Which memory technology can be used to best achieve dynamic shared memory between logical partitions ?

A. Virtual Memory PoolB. Virtual Memory BoostC. Active Memory SharingD. Active Memory Expansion

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 97Customers to migrate to the 6-core Power6 520 S814, Which backplane RAID 5 provides the best performance ?

A. detachable back with 6 + 6 SFF-3 bracket and the second SAS controllerB. with ( 12 ) SFF-3 bracket and integrated SAS storage controller backplane

Page 45: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

C. with ( 18 ) SFF-3 bracket and dual SAS controllers and write cache storage backplaneD. detachable back with PCIe3 12GB Cache RAID SAS adapter and EXP24S of

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 98Which technology provides virtual machine dedicated virtual resources, improve QoS, remove the I / O virtualization load ?

A. PowerVMB. CNA ( converged network adapters )C. FCoE( Fiber Ethernet protocol run )D. SR-IOV ( single point of management I / O virtualization )

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 99Compared with 720 quad-core , four -core S814 What added to the standard features to improve RAS capabilities ?

A. RAID 0B. Chipkill MemoryC. Support PCIe HotD. alternate processor recovery (Alternate Processor Recovery}

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

Page 46: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 100In addition to the media slot , S824 GEC also integrates Which of the following ?

A. (6) USB portB. (10) Gb HMC portC. an RDX moduleD. a half-height LTO drive slot

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 101SAN team hopes customers will easily be able to map each LUN to a specific WWPN for each client logical partition on the Power8 server.

Which technology should be implemented to meet the requirements?

A. SASB. NPIVC. iSCSID. vSCSI

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 102Dynamic partition migration , the following is required ?

A. PowerVM Enterprise EditionSAN disk systemVirtual Ethernet

Page 47: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

B. dedicated processorPowerVM Enterprise EditionVirtual Ethernet

C. dual VIO serverPowerVM Enterprise EditionSAN attached diskTwo virtual processors

D. dedicated processorDual VIO serverSAN disk systemVirtual Ethernet

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 103A customer has an 18-core POWER7 750 with 512GB of memory. The customer anticipates 100% growth in the next year and needs to add capacity. Thecustomer has requested a proposal by the end of the week.

What is the next step in determining how much capacity needs to be added?

A. Conduct a study to determine how much processor, memory and disk storage is currently utilized.B. Use the AME tool to determine if additional cores and memory can be added to the existing system.C. Activate Trial Capacity on Demand processors to determine how much processing capacity will be needed.D. Engage the Benchmark Center to simulate the anticipated growth so the correct upgrade can be determined.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 104A customer needs to add 768GB of memory and 18 cores to their PureElex environment in a single node. Which model supports these requirements?

Page 48: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. p260B. p360C. p460D. p560

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 105Which of the following demonstrates the versatility of Power Systems Express servers?

A. Capacity on Demand processors can be configured for workload growth.B. Commercial and compute-intensive workloads can run on the same server hardware.C. Each server can be configured as a rack mount, deskside or PureFlex node and supports AIX, Linux and IBM i.D. Offered as commercial servers and technical workstations that are specifically designed to provide maximum performance.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 106What is the function of the Flexible Service Processor (FSP)?

A. Enables the virtualization layer fault toleranceB. Enables system analysis in case of an application failureC. Automates the implementation of Operating System updatesD. Logs the status of Power Systems components for reporting back to IBM in the event of a failure

Correct Answer: DSection: (none)Explanation

Page 49: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Explanation/Reference:

QUESTION 107Other than Linux as the only supported operating system, which of the following is a true statement about the PowerLinux 7R2 servers?

A. HMC is requiredB. No Solid State Drive supportC. Expansion drawers supported on one modelD. Only PowerVM Standard Edition is supported

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 108What is an advantage of PowerVM compared to VMware VSphere?

A. PowerVM can support as many as 20 LPAR5 per core while VMware can support only 10 virtual machines per core.B. PowerVM can virtualize processor, storage and networking resources while VMware virtualizes only processor and storage.C. PowerVM offers 2-way Live Partition Mobility for both Red Hat and SuSe while VMware can only provide 1-way mobility with vMotion.D. PowerVM can dynamically reallocate processor, memory storage and I/O while VMware is limited onlyto "hot-add" of processor and memory.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 109When upgrading a POWER6 570 to a POWER7+ 780. Which of the following can be re- utilized?

A. Memory and DisksB. PCIe Gen2 adapters and disks

Page 50: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

C. Disks and PCIe Gen 1 adaptersD. Memory and PCIe Gen 2 adapters

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 110Where can customers find details of IBM plans and commitments for future investment, support and development for Power Systems?

A. Roadmaps and Executive Briefing CenterB. Power Systems Redbooks and White PapersC. Published investment levels in Power Systems, AIX and IBM iD. Presentation on Power Systems growing share of the UNIX market

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 111What is a benefit of purchasing a new Power Systems Express Server IBM Edition packages, compared to custom configured systems?

A. Half of the initial memory is priced at no additional charge.B. It is a fixed, pre-configured IBM hardware and software offering.C. A qualified ISV software solution is being sold as part of the solution.

C D. Half of the initial processor core activations are priced at no additional charge.

Correct Answer: Section: (none)Explanation

Explanation/Reference:

Page 51: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 112An AIX customer who has a POWER6 570 with PowerVM Enterprise Edition plans to upgrade to a POWER7+ 770.Applications moving from the POWER6 570 to the POWER7+ 770 must remain available. Which option will support minimal outage to the application environment?

A. Install Smart Cloud Entry on the POWER7+ 770 and use the integrated migration tool to move the application into the cloud.B. Install the POWER7+ 770 and use Live Partition Mobility to move the applications from the POWER6 570.C. Install PowerHA System Mirror on both the POWER6 570 and the POWER7+ 770 and do a failover.D. Perform a disk copy on the POWER6 570 and restore the image on the POWER7+ 770.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 113A prospective customer who is considering Power Systems has a very small staff and wants to run a CRM application. What operating system should be proposed?

A. AIX because of its operational flexibilityB. IBM i because of its operational characteristicsC. Linux because it uses open source managementD. Portable Application Solutions Environment because it supports multiple environments

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 114What is a key benefit of SmartCloud offerings?

A. Lowers customer administrative costsB. Reduces the need for data deduplicationC. Provides higher levels of provisioning securityD. Enables multiple companies to share end-user application licenses

Page 52: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 115What functional characteristic is common between the PureFlex p260 compute node and the Power 720 server?

A. Two processor socketsB. Industry standard PCIe slotsC. Accommodates internal disk drivesD. Includes PowerVM Standard Edition

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 116Which of the following is a unique competitive strength that the POWER Hypervisor has when compared to x86 server hypervisors such as vSphere, Xen, KVM andHyper-V?

A. POWER Hypervisor is fault-tolerant.B. POWER Hypervisor supports multi-threading.C. POWER Hypervisor requires less total disk space.D. POWER Hypervisor has never had a reported security breach

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

Page 53: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 117Systems Director simplifies IT systems administration by reducing which of the following?

A. The frequency of system updatesB. The time to diagnose critical problemsC. The amount of required virtual resourcesD. The number of management tools and interfaces

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 118A pre-sales Technical Delivery Assessment is required for which of the following systems?

A. Power 770, 780, and 795B. Power 760, 770, 780, and 795C. Power 750, 760, 770, 780, and 795D. Power 720, 740, 750, 760, 770, 780, and 795

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 119Which of the following Power Systems design functions allows the system to identify situations which can result in a system outage?

A. Light Path DiagnosticsB. Electronic Service AgentC. First Failure Data CaptureD. Alternate Processor Recovery

Page 54: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 120Which of the following models is offered in either a tower or rack-mounted configuration?

A. 710B. 7R2C. 720D. 740

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 121Why would a customer choose a Power Systems Express Server over a non-Express server?

A. Express Servers are delivered faster.B. Express Servers offer Express service and support at no charge.C. Express Servers have fixed configurations and are easier to order.D. Express Servers have a lower list price than equivalently configured build to order systems.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 122Customers expect their virtual environment network and storage I / O traffic will be very large . They are interested in the I / O load separation. They also hope to be

Page 55: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

in the case of the VIO server without downtime for maintenance.

Which option to meet the requirements ?

A. (2) VIO servers , each handling a part of the flowB. (4) VIO servers , each handling a part of the flowC. (4) VIO server , wherein two processing network , handling two storageD. (2) VIO server , wherein a processing network , a processing memory

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 123Easy Tier feature on what support S822?

A. (8) drives and a split backplaneB. (12) drives and a split backplaneC. (12) drive , do not split backplaneD. (8) SAS drives and an auxiliary controller

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 124Customers have a server using IVM as a logical partition management . They want to implement PowerVC.Which PowerVC versions to meet the requirements?

A. PowerVC EntryB. PowerVC ExpressC. PowerVC StandardD. PowerUC Enterprise

Page 56: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 125A Power 740 customer with 4 cores licensed to AIX is planning to add 4 additional cores and a partition for IBM i. They have sized the new IBM i workload at 1.7cores and AIX will use the other 6.3 cores. What software will be necessary to enable this solution'?

A. PowerVM Standard Edition licensed for 8 coresAIX Standard Edition licensed for 7 coresIBM i licensed for 2 cores

B. AIX Enterprise Edition licensed for 6 coresIBM i licensed for 2 cores

C. PowerVM Express Edition licensed for 8 coresAIX Express Edition licensed for 7 coresIBM i licensed for 2 cores

D. PowerVM Standard Edition licensed for 8 coresAIX Standard licensed for 6.3 coresIBM i licensed for 1.7 cores

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 126A customer has let their Software Maintenance (SWMA) expire and needs to activate additional processors on their Power 770. What does the customer need topurchase?

A. Additional licenses for the new processors.B. New licenses for the both the existing and new processors.C. After License Fee for both the new and the old processors.D. Additional licenses for the new processors and After License Fee for the existing processors.

Page 57: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 127A sales professional is engaged in a competitive sales situation against a non-IBM solution that is unfamiliar to them. Which resource should be engaged first?

A. CompeteLineB. Migration FactoryC. TCO analysis toolsD. Pre Sales Advisor tool

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 128A customer has several dedicated LPARs. The key application in one LPAR temporarily needs more processing power. How can performance be improved?

A. Mirror the LPAR to a second systemB. Add a second LPAR to the applicationC. Change dedicated LPARs to shared LPARsD. Reduce the number of LPARs on the system

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 129Which of the following can be used to provide a basis for proving that Power Systems have a lower cost of ownership than x86 systems?

Page 58: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. rPerf and CPW measurementsB. Analysis report from the Alinean ToolC. ISV recommendations and lower IBM financing costsD. White papers that illustrate IBM's leadership technology

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 130Which of the following features are unique to PowerKVM ?

A. vTPMB. SR-IOVC. Support UbuntuD. Factory Integration Linux

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 131An existing IBM customer needs to acquire a new Power Systems server with the following characteristics:

Must support 12 processor coresMust accommodate the largest number of adapters in the system unit Must fit within 4U of existing rack space

Which of the following should be proposed'?

A. Power 720B. Power 730C. Power 740

Page 59: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

D. Power 750

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 132What energy capability of Power Systems can be used in data centers to restrict server energy consumption, especially in cases where the data center might benearing the limit of the energy it can provide?

A. Power CappingB. EnergyScale for I/OC. Processor Core NapD. Dynamic Power Saver

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 133What is the minimum HMC model required to manage POWER7 or POWER7+ servers?

A. 7310-CR2B. 7310-CR3C. 7310-CR4D. 7042-CR5

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

Page 60: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 134A Chief Financial Officer (CFO) has requested a brief review of an IBM Power proposal before providing final approval. Which of the following are key topics thatshould be included in the executive summary?

A. How Power Systems supports customer objectives Acquisition cost Total Cost of Ownership

http://www.gratisexam.com/

B. Acquisition cost Listing of software products How Power Systems supports customer objectivesC. Power Systems overview Proposed financing Total Cost of OwnershipD. Power value proposition Acquisition cost Hardware features

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 135Which of the following features demonstrate the versatility of Power Systems?

A. Support for RAID-1 thru 5PCIe Gen 2 expansion drawers

B. Choice of AIX, IBM i and LinuxAbility to run Windows in a WPAR

C. Highly efficient partition virtualizationVirtualized I/O with redundancy

D. Support for LDAPSupport for Oracle applications on PowerLinux

Correct Answer: CSection: (none)

Page 61: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Explanation

Explanation/Reference:

QUESTION 136Which of the following Power Systems servers offer Capacity on Demand (CoD)?

A. Power 71Y, 7R2B. Power 770, 780, 795C. Power 720, 740, 750D. Power 750, 755, 770

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 137A prospective customer is running a database application that cannot be upgraded. They plan to replace it with a DB2-based server environment that can scale inthe future. The prospect has asked why anyone would choose Power Systems servers when Intel-based servers cost less. Which of the following is an effectiveresponse?

A. DB2 on Power Systems delivers more than ten times the throughput per core than on Intel due to exploitation of SMT.B. Core for core, Intel-based servers have more expensive DB2 software licensing costs when compared to Power Systems.C. Power Systems servers offer a lower TCO due to greater processor power, virealization technologies and both horizontal and vertical growth.D. Power Systems servers offer superiority in energy-management technologies and use dramatically less energy while generating much less heat.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 138A customer with a 15TB data base needs very fast data access to approximately 15% of that data. Which storage solution below supports the customerrequirements?

Page 62: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. Solid State Drives in the internal disk baysB. Solid State Drives and SAS disk drives, in an external SAN utilizing Easy-tierC. 900GB SAS disk drives implemented in an external I/O drawer to 2 GX++ bussesD. Solid State Drives and SAS drives mixed internally with virtualized access using VIO Server

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 139What solution can be deployed to enable maintenance on a server while ensuring that a mission critical LPAR remains operational?

A. Use PowerSC to insure continuous uptime on another server.B. Use PowerVM Enterprise Edition to move the partition to another server.C. Use Active Memory Sharing to enable the LPAR to continue running on the current serverD. Use VMControl Enterprise Edition to suspend and resume the application on the current server.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 140A customer has two production IBM POWER7+ 750s in the same data center. The customer has an application in an LPAR that needs to run 24x7. What isrequired to allow the planned migration of that LPAR to the second system?

A. A shared Hardware Management ConsoleOne dedicated core on each Power 750

B. PowerVM Enterprise Edition on both systemsSAN storage accessible to the VIO Servers on each Power 750

C. Systems Director Enterprise EditionA common shared processor pool on each Power 750

D. PowerVM Standard Edition

Page 63: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Dual system accessibility to virtual SCSI or virtual Fibre Channel

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 141A prospective customer using Itanium-based servers is concerned about the future of Itanium when considering investing in additional capacity. What should benoted when considering investing in Power Systems?

A. IBM uses Power Systems internally and will continue to invest in Power to support the growth of IBM.B. Major storage vendors are integrating with POWER architecture, providing incentive for IBM to continue investing in POWER.C. The Itanium roadmap shows convergence with Power Systems in the next 3 years.D. Power Systems have met their technology commitments for 20 years, and now have POWER8 and POWER9 on the development roadmap.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 142An environment for a popular ISV application used on Power Systems must be sized. Which IBM tool or resource should be used?

A. TechlineB. eConfiguratorC. Facts and FeaturesD. System Planning Tool

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

Page 64: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 143A customer is moving a small application from an existing POWER7 server to a new system in a new location. They will be moving an existing 12X I/O drawer tothe new server Which of the following configuration will support a 12X PCI-X expansion drawer?

A. A4-corePower 710B. A 4-core Power 720C. A 6-core Power 730D. A 6-core Power 720

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 144A customer that needs high performance in their servers raises an objection, saying Power System servers have slower memory than x86 servers, and thereforehave slower performance. Which of the following is an appropriate response?

A. Memory is buffered in Power Systems, so the memory speed is irrelevantB. The slower memory speed in Power Systems is offset by faster memory bussesC. Power Systems have a large cache system which reduces the need for fast, expensive memoryD. Power Systems consistently have higher benchmark results than x86 due to a balanced approach to performance

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 145A customer has very unpredictable short workload increases. Which automated capability of Power 770, 780 and 795 servers would satisfy this need?

A. Trial Capacity on DemandB. Utility Capacity on DemandC. Elastic Capacity on Demand

Page 65: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

D. Capacity Upgrade on Demand

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 146A company has HP and Dell servers installed. The company wants to consolidate all the existing ERP solutions to SAP or to Oracle ERP Suite on a single sewer.An RFP has been issued and must be answered.

What key strategy should be considered when answering the REP?

A. Present AME as a significant performance advantage.B. Consider a three tier approach with Web, application and database on different sewers.C. Focus on reliability, availability, scalability and I/O bandwidth of Power Systems sewers.D. Suggest IBM Systems Director VMControl for consolidated management of different applications on Power systems.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 147A customer needs to attach an expansion drawer to the POWER7+ 760. What is required to do this?

A. A GX++ bus adapterB. A PCIe Gen 2 adapterC. A VIO Server adapterD. A Converged Network Adapter (CNA) multifunction card

Correct Answer: ASection: (none)Explanation

Page 66: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Explanation/Reference:

QUESTION 148A customer is interested in a Cloud solution. Since this is a new project they are looking for technical services to help insure a successful implementation. WhichIBM organization should be engaged to provide the service?

A. TechlineB. Lab ServicesC. The TigerTeamD. Infrastructure Services Group

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 149A customer is concerned that the Power 720 cannot be used in distributed retail locations due to physical space constraints.

Which of the following is an appropriate response?

A. IBM offers a slim-line 22U rack to minimize the space occupied by the Power 720.B. The Power 720 comes in a tower model with minimal space requirements.C. The Power 720 is available in special 15 inch desktop model with an included monitor.D. The Power 720 has a special retail environment with reduced space due to the elimination of the second Power Supply.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 150A customer with a single Power Systems Express server want to use virtualization technology including Live Partition Mobility.

What is the minimum required to achieve this goal?

Page 67: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. An additional Power Systems sewer and PowerVM Enterprise Edition on both systemsB. An additional Power Systems Enterprise server and any PowerVM Edition on both systemsC. An additional Power Systems Express sewer and PowerVM Express Edition on source and target systemsD. PowerVM Enterprise Edition with Live Partition Mobility on source and target partitions of the single Power Systems sewer

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 151A financial corporation is running their core Windows applications on several x86 servers. Due to headlines regarding attacks on banks they are consideringmigrating onto a more secure platform.

Why should this corporation consider moving onto Power Systems servers?

A. Running windows applications on Power Systems decreases external threats.B. PowerSC software will improve security on the Power Systems platform.C. Power Systems servers offer security packages optimized for the financial industry.D. Automatic intrusion detection and prevention are embedded in the POWER Hypervisor.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 152A customer calls and states that they have a 20-year old midrange IBM system running only home-grown RPG II applications. They plan to migrate theirapplications to a new Power Systems server, but find the operating system choices confusing.

Which operating system below is the most likely choice to lead the opportunity?

A. AIXB. IBM i

Page 68: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

C. Red Hat Enterprise LinuxD. SuSe Linux Enterprise Server

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 153A customer needs to decrease energy costs in their data centers. How can Power Systems servers support this requirement?

A. Power Systems servers can be mounted in energy efficient 42U racks.B. Power Systems enable the use of turbo mode to control thermal trends.C. Power Systems use the advanced functions of the HMC to cap energy usage.D. Power Systems can use System Director plug-ins to limit energy consumption.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 154A customer needs a Power Systems server to be initially configured with 8 active cores and 256GB of memory, and upgrade at a later date to 16 cores and 512GBof memory. Which model supports these requirements at the lowest cost?

A. Power 710B. Power 720C. Power 730D. Power 740

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

Page 69: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 155Why should customers keep the Software Maintenance Agreement for IBM software up-to-date?

A. It cannot be re-instituted if it expires.B. It provides automated fix updates via CHARM.C. It provides software support and upgrade protection.D. It provides standard 7x24 defect and non-defect support.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 156What is an appropriate response to a customer who has a switched SAN environment, is adding a new application, and wants to match connection bandwidth todisk I/O requirements?

A. There are 4Gb, 8Gb, and 16Gb HBAs available to match the performance requirementsB. The 16Gb converged network adapter connects to all switched networks and devices and auto senses for optimal speed.C. The 32Gb Pole Gen2 adapter auto senses the switch speed and provides the best performanceD. The integrated Multifunction adapter auto senses and matches the transmission speed of the SAN up to 16Gb.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 157An ISV intends to offer their ERP as a cloud service to their clients. The requirements for the environment are:Provides the largest possible number of partitions in no more than 8U of physical rack space.Includes software to assist with automatic provisioning of new environments.

In addition to offering all supported operating systems, which of the following designs supports the ISV requirements?

Page 70: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. One 48-core POWER7+ 760 sewerSmartCloud Entry Edition

B. Two 32-core POWER7+ 750 serversSmartCloud Enterprise Edition

C. Two 36-core POWER7+ 760 serversSmartCloud Entry Edition

D. Four 32-core POWER7 + p460 PureElex compute nodesSmartCloud Enterprise Edition

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 158A prospective customer has been told that their order volumes will fit on either a 16-core Power 750 or a 16-core Power.

740. The customer must minimize their 3-year expenditures while their business is expected to double during that time.

What key difference between the two models should be part of their decision?

A. The Power 750 can be upgraded to 32-cores.B. The Power 740 has a 3-year hardware warranty.C. The Power 740 can be upgraded to a Power 750.D. The Power 750 has superior processor virtualization capabilities.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 159Which scenario can be improved by the addition of Solid State Drives (SSDs)?

A. Disk capacity 80% full1 low I/O utilization, high processor utilization

Page 71: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

B. Large number of low capacity disks, low I/O and processor utilization, 10% hot dataC. Small number of large capacity disks, low memory utilization, high processor utilizationD. Small number of large capacity disks, low memory and processor utilization, 10% hot data

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 160A company is running older-technology servers with increasing maintenance costs. The IT manager wants a technology refresh but cannot secure any additionalbudget. Which approach can overcome this objection?

A. A TOO comparison of installed servers and new serversB. A large discount on a mixture of new and used technologyC. Deferred payment plans with an IBM Global Finance leaseD. Used equipment from IBM with a lease from IBM Global Finance

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 161Rack mounted Power Systems Express Servers are offered in which of the following models?

A. Power 710 and 7200 onlyB. Power 710, 720, 730, 740 onlyC. Power 710 720, 730, 740,750 onlyD. Power 710, 720. 730, 740, 750, 755, 770 only

Correct Answer: CSection: (none)Explanation

Page 72: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Explanation/Reference:

QUESTION 162What are key elements of a TOO analysis in support of a proposed POWER7+ server consolidation project of older POWER6 servers?

A. Security and business continuity costsB. Existing server hardware and administrative costsC. Hardware maintenance and software licensing costsD. Software upgrades and virtualization education costs

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 163What is the function of Live Partition Mobility?

A. The ability to provide reliable failure detection and automated recovery of partitionsB. The ability to relocate an application from one partition to another without restartingC. The ability to dynamically reconfigure a logical partition, without the need to shut downD. The ability to move active logical partitions from one system to another without downtime

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 164The customer wants to place a mission critical Linux application on an x86 server. Which statement should be used to encourage the customer to place theapplication on their existing Power 770 server?

A. Light path diagnostics will ensure availability of the Power System server.B. VMware on the Power System server will ensure a high degree of utilization.

Page 73: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

C. IBM System Director can control resources to allow for longer periods between maintenance.C D. Capacity on Demand on the Power System server allows for growth without interrupting normal operations.

Correct Answer: Section: (none)Explanation

Explanation/Reference:

QUESTION 165An IT manager is concerned that all components required for a working system are included in the price quotation. Which resource insures that all the featuresrequired for a working system are priced?

A. eConfiguratorB. Workload EstimatorC. Systems Planning ToolD. Technical Delivery Assessment

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 166Which energy management capabilities of Power Systems will help a government customer that needs to reduce energy usage by 10%?

A. POWEP7 servers are Energy Star certified, and consume at least 10% less energy than POWEP6 servers.B. Optional features monitor the system, dynamically deactivate what is not required, and report on energy consumed.C. The HMC monitors system features, enabling the customer to deactivate components based on energy usage reporting.

C D. Intelligent Power Distribution Units can be ordered to support different energy consumption requirements set by the customer.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

Page 74: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 167A customer has purchased a remote site to become the fail over location for disaster recovery. The customer currently uses SAN Volume Controller (SVC)technology in their data center and will use PowerHA Enterprise Edition to provide for fail over.

In addition to a Power Systems server, what storage will be most easily integrated into the environment?

A. StorwizeV7000B. System Storage DCS3700C. Exp30 Ultra SSD I/O DrawerD. System Storage DS3500 Express

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 168Which of the following statements about Elastic (On/Off) Capacity on Demand (COD) is true?

A. It can only be used for non-production workloads.B. It provides reserved processor pools for inactive cores.C. It provides on/off memory days for every processor ordered.D. It is included without charge on Power 770, 780, or 795 orders.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 169Which of the following key element should be included in an executive summary?

A. A mini-business case

Page 75: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

B. Three years TOO and key milestonesC. How the proposal addresses stated business requirementsD. Acquisition cost, the installation time-line, and services provided

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 170Which of the following describes a key business benefit that Systems Director VMControl can provide to a customer with multiple Power Systems servers?

A. Offers an easy-to-use web-based interlace with a point and click tool to manage LPARs from a single screen.B. Provides an industry-standard tool with the flexibility to address multiple systems in a network as though they were a single machine.C. Reduces the total cost of ownership in a virtual environment by decreasing management costs and improving utilization across the network.

C D. Provides a simple interlace where business goals and policies can be used to determine infrastructure virtualization and performance metrics.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 171An insurance company has been losing money due to payments made on fraudulent claims. What product will help identify fraudulent claims?

A. CognosB. PowerSCC. Hadoop databaseD. SmartCloud Orchestrator

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

Page 76: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

QUESTION 172A customer has limited rack space but needs a PCI-X card to be included in the base configuration. Which system would satisfy this request?

A. POWFR7 720B. POWER7 730C. POWER7 740D. POWER7 750

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 173Due to changes in management structure, a Power customer is questioning the cost effectiveness of Power Systems servers as compared to HP ProLiant servers.

Which response addresses the issue?

A. Power Systems servers typically have a lower software cost.B. Power Systems servers typically have a lower environmental cost.C. Power Systems servers typically have a lower total cost of ownership.D. Power Systems servers typically have a lower total cost of acquisition.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 174Which product will enable higher quality services and improved security capabilities for a customer with an AIX environment?

A. PowerSCB. AIX Security Advisor

Page 77: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

C. PowerVM EncryptionD. Cryptographic Coprocessors

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 175A customer has a Power 570 server with a 3582 Tape Library and LTQ-4 drives. The customer is buying a Power 740 server and wants the highest performancetape drive which will enable him to write tapes that can be read on the Power 570.

Which of the following will perform that task?

A. 3573 with LTO-4B. 3573 with LTO-5C. 3573 with LTO-6D. 3582 with LTO-6

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 176Which statement describes how Active Memory Mirroring contributes to RAS?

A. Corrects multiple single-bit errors to keep memory from failingB. Disables failed memory from the system configuration at startupC. Protects the hypervisor code and its components from a memory failureD. Detects and reports memory errors that might be developing before they cause a outage

Correct Answer: CSection: (none)Explanation

Page 78: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Explanation/Reference:

QUESTION 177A prospective customer is considering a Dell x86 server running Windows, VMware, and WebSphere versus a Power System running IBM i, AIX, PowerVM andWebSphere.

Which value proposition favors IBM in this situation?

A. Running an all IBM solution guarantees the highest performance.B. When ordering all the components from IBM, a significant package discount is applied.C. IBM can provide the entire hardware and software stack and is a single source for support if needed.D. All the components are provided by IBM and are available in a single, integrated, pre- installed package.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 178Why is a Power System 760 an excellent platform for server consolidation?

http://www.gratisexam.com/

A. Reduces costs since the Power 760 includes PowerCare vouchers.B. Supports more virtual machines per unit of rack space than other servers.C. Growth can be obtained using the processor and memory CUoD features.D. Improves efficiency by combining workloads onto a server capable of scaling to 64 cores

Correct Answer: B

Page 79: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Section: (none)Explanation

Explanation/Reference:

QUESTION 179In which situation would PowerHA Enterprise Edition be a fit for a customer environment?

A. To integrate with Tivoli Site ManagerB. To provide for local application failoverC. To assist with intra-site disk duplicationD. To reduce recovery time to a disaster recovery site

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

QUESTION 180What is the value of a pre-implementation Technical Delivery Assessment for a customer?

A. The assessment is performed by IBM Lab Services to ensure solution design quality.B. The assessment ensures that system administration requirements are consistent with customer expectations.C. The assessment maximizes customer satisfaction by creating a checklist of actions designed to reduce risk.D. The assessment creates a report detailing the education and services needed to ensure maximum system performance.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 181Which software product ships with the Business Intelligence Solution Edition pre-installed and tested on Power 710 through Power 740 servers?

Page 80: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

A. SPSSB. CognosC. InfoSphereD. Business Objects

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 182A prospect has 10 Dell servers with Microsoft Windows and SQL Server installed. They plan to move to Power Systems with DB2 and have asked for guidance onhow their applications might be ported.

How can the IBM Migration Factory provide support?

A. Provide a benchmark system to stress, tune and test the application to be movedB. Provide head-to-head sizing comparison data and detailed analyses of competitive weaknessesC. Deliver a preliminary analysis, a detailed assessment, a plan with estimated costs, and deployment and testingD. Provide on-site training and skill transfer to enable the customer to convert their applications to Power Systems.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 183A customer wants a Power Systems server because of the I/O performance and reliability needed to support an Oracle database. Which operating system shouldbe recommended?

A. AIXB. IBM iC. Oracle LinuxD. Red HatLinux

Page 81: Testkings.C4040-251.184.Questions with Answers · C. PowerVM on PowerLinux servers enables a consolidation of up to 10 Intel virtual machines per POWER core. ... An AIX customer wants

http://www.gratisexam.com/

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 184When comparing PowerVM to VMware, what differentiating statement can be made?

A. PowerVM supports direct attached storage where VMware cannot.B. PowerVM can share processor resources between partitions where VMware cannot.C. PowerVM has Live Partition Mobility where VMware can only move stopped partitions.D. PowerVM has dual VIO Servers where VMware has only a single I/O virtualization module.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

http://www.gratisexam.com/