TEST SCHEDULE ON FIRE ALARM & SMOKE DETECTION
SYSTEM
Sr
.
N
o.
NAME OF TEST REFERENCE LIMIT
1. Check the provision ofequipment
As per orderingspec.
-
2. L.A.R -do- -
3. Check the electrical item: -do- -
a) DPDT switch for MAINSAC
b) Change over facilityfrom mains to S/B and viceversa
c) Battery make, voltage,
capacity Date ofcharge/discharge
4. Functional Test on :
a) Main control panel(Smoke detection system /PA system)
- Check in built charger,boost/ trickle charge.
b) Local control panel
c) Repeater control panel
d) PA system (if provided)e) Closed circuit test Operates within40 50 secs
f) Open circuit test
g) Short circuit test
- for (f) and (g) test shallbe taken in such a way tocover the circuit of all zone/LCP
5. Check the proper fuserating in the circuit
As per orderingspec.
6. Check the operation ofreset and isolating keys
-do-
7. Check the ratio ofionization and photoelectric type smokedetector above the falseceiling
1:1 for mixmonitoring
8. Check of zone, division &its coverage as perapproved layout
-do-
9. Check the provision ofdetectors
- Below the false floor
- Above the ceiling void &
8/6/2019 Test Schedule on Fire Alarm
2/3
Sr
.
N
o.
NAME OF TEST REFERENCE LIMIT
- inside the duct.
10.
Functional test onindicators & Audio visual
alarms for
EI AT-7000
a) Actuation of- Smokedetector (ionization)- Photo electricdetector- Heat detector
b)Response indicatorc) Electronic hooter oneach floord)Manual call point
e)Shut down of AHU onactuation of smokedetector
8/6/2019 Test Schedule on Fire Alarm
3/3
Sr
.
N
o.
NAME OF TEST REFERENCE LIMIT
11.
Check the sign writing on:a) All detectors for
identification of type, zoneno. Sl.No.
-do-
12.
GENERAL INSPECTION
a) Check a provision of potential free loop to SW room equipment forextending infrastructure alarm for:(i) fire detection(ii) fire system fault(iii) fire system OFF
b) Check this facility from RLUs to main exchange (if provided)c) Check the provision of fire extinguishers/ fire buckets filled with
sand.d) Marking of EXIT arrows, evacuation instructions in case of fire.e) Check the location of hooters, it shall be at a place where staff
present round the clockf) Check the manufacturer test certificate of all type of detectors.g) Check the separate mounting base for each detector for
maintenance purpose.h) Check suitable location (about 1.2m above floor level) of manual
call point painted with fire red. The glass front cover shall have awrite up of BREAK GLASS IN CASE OF FIRE
i) Check the provision of potential free loop line for the following:(i) To fire station through external public telephone line.(ii) Disconnection of air-conditioning plant(iii) Operation of remote alarm signal.
j) Check DPDT SW for mains AC supply is kept, under a cover havinglock & key arrangement.
k) Near local and main control panel, the layout for area and zones isbe displayed.
l) Check proper earthing on LCP/MCP.NOTE:
1. For all above test EI No. Protection fire AT-7000 may bereferred.
2. For testing the detectors, smoke may be created by the incensestick, 1 feet below the detectors.