32
TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP38_actual WorldSkills International Secretariat Keizersgracht 62-64, 1015 CS Amsterdam, The Netherlands www.worldskills.org, Tel: +31 23 5311071, Fax: +31 23 5310816 WSC2015

TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

  • Upload
    hadan

  • View
    213

  • Download
    1

Embed Size (px)

Citation preview

Page 1: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP38_actual

WorldSkills International Secretariat Keizersgracht 62-64, 1015 CS Amsterdam, The Netherlands www.worldskills.org, Tel: +31 23 5311071, Fax: +31 23 5310816 WSC2015

Page 2: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

TEST PROJECT MODULES There are Three (3) Modules to complete in the 20 hour competition.

A) Component Fabrication 13.5 Marks Time Allowed 3.0 Hrs B) Refrigeration System Installation and Commissioning 49 Marks Time Allowed 13.0 Hrs C) Air Conditioning System Fault Find, Repair and Commissioning 37.5 Marks Time Allowed 4.0 Hrs

TEST PROJECT DOCUMENTATION Section 1: Competitor Instructions – Competition Details

This contains all of the competition details, except for the specific information on the refrigeration and air conditioning systems to be used in the competition. This will be provided to all participating countries approximately six (6) months prior to the competition to enable it to be translated into the Competitor’s language and passed onto the Competitor. This document will be superseded by Section 4 prior to the competition.

Section 2: Competitor Instructions – Manufacturers, Equipment and Materials Manuals

This contains the full operating manuals, wiring diagrams and specifications of the major equipment to be used in the competition. This will be provided to all participating countries approximately three (3) months prior to the prior to the competition to enable it to be translated into the Competitor’s language and passed onto Competitors, all information will be available online via the WorldSkills Infrastructure List for competition

Section 3: Test Project Drawings

The drawings will be distributed with Section 1. The drawings may be altered as part of the 30% change to the project which will take place at the competition. The drawings are issued as a guide only and are finalized at the competition.

Section 4: Competition Instructions

This document supersedes Section 1 and will be provided to all Competitors at the Information Session prior to start of the competition and will include a 30% change to the test project described in Section 1, it will include or provide reference to:

• The Competitor’s competition timetable • Health, safety and environment requirements • Category competition rules and procedures • Refrigeration Competition Standards • Additional information

Section 5: Marking Scale

The marking summary will be distributed with Section 2 approximately three months prior to the competition. The marking scale detail will be finalized by the Experts prior to the competition dependent on the availability of materials and equipment supplied by the host nation and the 30% change to the Test Project.

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 2 of 19

Page 3: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

TIME ALLOWED FOR EACH MODULE To enable all Competitors complete the Modules they will carry out the work at the same time. The

Competition Time Table in the Competitors Instructions Section 4 must be followed. Where system pipe work is installed, the Competitor is free to work autonomously in a safe manner with all relevant assessment being completed outside of competition time, pressure transducers may be used to ensure minimum pressure test and evacuation requirements are met by the Competitors. Competitors MUST perform all electrical testing in the presence of an Expert prior to energizing the installation.

CHECK POINTS An important part of this competition are the procedures used to carry out various tasks. Therefore, at various points in this competition you must ask an Expert to observe and check your work. Once checked the Expert must place their initial in a progress box as per the example below.

Electrical Installation Testing Expert 1 Initials and Country CM AUS

Expert 2 Initials and Country MF UK

Expert 3 Initials and Country DO IE

INFORMATION CONCERNING SAFETY REQUIREMENTS During the competition, all Competitors MUST follow the safety rules listed below along with the local Health, Safety and Environment requirements of the host country.

SHOES • Fully enclosed work shoes or boots must be worn at all times.

CLOTHING • Legs must be covered at all times, by either long work trousers or overalls. • Upper body must be covered at all times. • Arms must be covered with long sleeves, when brazing and using refrigerant.

CLEAR SAFETY GLASSES • Must be worn when necessary to protect your eyes. • Must be worn when brazing, soldering, filing, reaming, hack-sawing, drilling, grinding and using refrigerant,

dry nitrogen and compressed air.

GLOVES

• Must be worn when brazing and using refrigerants

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 3 of 19

Page 4: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

ELECTRICAL • Competitors must NOT switch on (apply power) to any electrical equipment until they receive permission

from an Expert, except for hand power tools.

Any Competitor that is identified as not wearing the correct safety attire or is engaging in any unsafe practice will be stopped and advised on the correct safety practice by an Expert. If the unsafe working practice is repeated the Expert may STOP the Competitor and report the issue to the chief or Deputy Chief Expert. The Competitor may not be allowed to continue until the safety issue is resolved. The Competitor will lose associated safety marks.

If the Competitor continues to ignore the safe working practice they may be removed from the competition area for a safety briefing for ten minute by the host country health, safety and environment representative, the time taken to complete the safety briefing will be considered to be a part of the Competitor’s competition time.

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 4 of 19

Page 5: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

COMPETITION DETAILS - MODULE A

COMPONENT FABRICATION

MAXIMUM TIME ALLOWED - 3 HOURS 13.5 MARKS

SCOPE The Competitors are required to fabricate a copper tubing circuit for the secondary refrigerant circuit that will form the ice rink surface, this coil will be incorporated into the design of the system at a later stage. The coil is constructed using 13 lengths of 1/2” copper tubing, fed by a 7/8” copper header as per supplied drawing. This entire unit will sit in the bottom of a tank and form the secondary refrigerant coil for the ice rink being installed in Module B.

TIMING Competitors are to all complete the ice rink piping at the same time in the morning of C1, this will allow for marking to take place in the afternoon, any Competitors that do not finish Module A in the allocated time will be required to submit the unfinished project for assessment. Competitors will receive additional points for completing this module in less than the allocated time (as defined in the marking summary) providing that the fabricated component does not leak when pressure tested.

ASSESSMENT Competitors will be assessed as per technical description, the marking scale will reflect dimensions and tolerances for assessment in addition to the quality of brazed joints. Fabricated component will be tested for leaks by pressure testing with dry nitrogen to ensure no leaks are present. Any Competitor who does not complete Module A in the required time (3 hours) will be allowed to complete it after it is assessed and handed back to them during Module B – no additional time will be allowed for either Module A or Module B for those who do not complete the fabrication in the allotted time.

DRAWINGS R.001 Coil of Ice Rink

COMPONENTS Components to be installed will include the following;

• Pre manufactured 7/8” header copper pipework

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 5 of 19

Page 6: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

COMPETITION DETAILS - MODULE B

REFRIGERATION SYSTEM INSTALLATION AND COMMISSIONING

MAXIMUM TIME ALLOWED - 13 HOURS 49.0 MARKS

SCOPE Competitors are to install a refrigeration system to refrigerate a small scale ice rink, the system uses a secondary refrigerant to remove heat from the ice rink and mimics a small industrial plant commonly used to carry out a much larger duty.

The Competitors are required to use the supplied components along with the coil fabricated in Module A to form a low pressure flooded system that utilizes a brazed plate heat exchanger to refrigerate propylene glycol to remove heat from water to form the ice rink. A small condensing unit is used to draw vapour off the top of the vessel and compress and condense the refrigerant, an electric expansion valve is used to meter the refrigerant into the vessel. Two level switches are used to control the liquid level inside the vessel, a capacity control valve is used to ensure suction pressure does not drop below design. Refrigerant is R134a.

Secondary refrigerant circuit for ice rink is to be constructed using copper pipe, copper pipe will be used to form the secondary refrigerant pipe circuit joining heat exchanger, ice rink coil and glycol tank with a flexible hose connection used to connect the copper pipe to the circulating pump.

Competitors are required to connect all components to a prewired electrical panel

TIMING Competitors are to all complete the installation over C1, C2 and C3. The secondary refrigerant circuit (glycol) pipework must be completed by the end of C2 for assessment overnight, the entire installation will be completed by the end of C3 for assessment. The completed project with ice rink frozen may be left running and displayed on C4.

ASSESSMENT Competitors will be assessed as per technical description with particular weighting on the commissioning and operation of the project.

DRAWINGS R.002 Primary refrigerant flow circuit

R.003 Secondary refrigerant flow circuit

R.004 General Installation View

R.005 Glycol Tank and Ice Rink

R.006 Low Pressure Vessel

R.007 Electrical Control Panel

R.008 Electrical Control Diagram

R.009 Electrical Power Diagram

R.010 Electrical Terminal Connections

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 6 of 19

Page 7: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

COMPONENTS Components to be installed will include the following;

• Basic air cooled condensing unit with liquid receiver ad oil separator • Low pressure vessel • Capacity control valve (Danfoss KVC) • Electric expansion valve (Danfoss AKV) • 2 x liquid level switches (Reed Switch) • Brazed plate heat exchanger (Danfoss) • Circulating pump (submersible type) • Electrical switchboard • Temperature controller (Danfoss) • Data logging pressure transducer (Siemens)

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 7 of 19

Page 8: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

SYSTEM DESIGN SPECIFICATIONS The following system design specifications for the installation should be used for commissioning and control setting and are as follows:

SYSTEM SPECIFICATIONS • Primary refrigerant = R134a • Secondary refrigerant = Propylene Glycol (40% by volume) • Maximum ambient temperature = 35°C Db, 28°C Wb • Design saturated suction temperature = -15 °C • Suction line pressure drop = 1 K • Design Glycol temperature = -10°C supply to ice rink

CONTROL AND SAFETY SETTING

• Low Pressure Controller cut off 5K lower than design saturated suction temperature (SST). • Low Pressure Controller cut in at -10 °C saturated suction temperature • Capacity control valve to maintain -15 °C saturated suction temperature • High Pressure cut out the system when the Condensing temperature reaches 55 °C • Temperature controller cut out at -15 °C • Temperature controller cut in at -10 °C • Temperature sensor to be submerged in glycol tank

SYSTEM OPERATION

• Low level liquid level sensor to cycle on electric expansion valve • High level liquid level sensor to cycle off electric expansion valve • Temperature controller to cycle off expansion valve if glycol tank temperature falls below -15 °C • Temperature controller to cycle on expansion valve if glycol tank temperature rises above -10 °C • Capacity control valve set to maintain -15 °C saturated suction temperature and limit temperature cycling to

safety only (unit should run continually and not cycle on and off)

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 8 of 19

Page 9: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

INSTALL AND COMMISSION REFRIGERATION SYSTEM All Competitors will be required to perform the following tasks to complete this module, task 6 has an Expert sign off sheet which needs to be filled in and signed prior to moving ahead on this task

1. INSTALL REFRIGERATION SYSTEM All Competitors will supplied with all necessary equipment and materials to complete the installation of the refrigeration system in accordance with test project drawings and WorldSkills International Standard for Refrigeration and Air Conditioning.

Refer to the following project drawings to assist to complete this task

R.002 Primary refrigerant flow circuit

R.003 Secondary refrigerant flow circuit

R.004 General Installation View

R.005 Glycol Tank and Ice Rink

R.006 Low Pressure Vessel

2. INSTALL ELECTRICAL SYSTEM All Competitors will supplied with all necessary equipment and materials to complete the installation of the refrigeration system in accordance with test project drawings and WorldSkills International Standard for Refrigeration and Air Conditioning.

All cabling to be installed in double insulated, flexible cable or single insulated cable protected by conduit, no single insulated cable is to be left without additional protection. All temperature probe cables to be protected by conduit.

Refer to the following project drawings to assist to complete this task

R.007 Electrical Control Panel

R.008 Electrical Control Diagram

R.009 Electrical Power Diagram

R.010 Electrical Terminal Connections

3. PRESSURE TEST SYSTEM Carry out a staged pressure test of the primary refrigeration system (R134a) to a value of 9.5 bar gauge (950kpa). The pressure test point should not drop from the starting point in the fifteen (15) minutes after the pressure test is isolated from the Nitrogen cylinder. If the pressure test has not been achieved, the Competitor can continue to fix the leak and achieve the pressure test, however the full mark for Pressure Test will be lost. The pressure test will be monitored remotely via a data logging process to ensure all Competitors achieve the required pressure and standing time.

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 9 of 19

Page 10: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

To be filled in by COMPETITORS

PRESSURE TEST ATTEMPT #1

Starting test pressure: __________________________□ kPa □ psi

Starting Time: __________________________ Test pressure after standing time: __________________________□ kPa □ psi

Finishing Time: __________________________

PRESSURE TEST ATTEMPT #2

Starting test pressure: __________________________□ kPa □ psi Starting Time: __________________________

Test pressure after standing time: __________________________□ kPa □ psi

Finishing Time: __________________________

4. EVACUATION Evacuate the primary refrigeration system (R134a) in accordance with manufacturer’s instructions and WorldSkills standards using the Deep Vacuum Method to hold a vacuum of at least 1000 microns (130Pa absolute) of mercury. The evacuation point should not rise to a value greater than 1000 microns in the Ten (10) minutes after the vacuum pump is isolated from the system under test.

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 10 of 19

Page 11: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

To be filled in by EXPERTS ONLY

EVACUATION TEST ATTEMPT #1

Starting evacuation level: __________________________□ microns

Starting Time: __________________________ Evacuation level after standing time: __________________________□ microns

Finishing Time: __________________________

EVACUATION TEST ATTEMPT #2

Starting evacuation level: __________________________□ microns Starting Time: __________________________

Evacuation level after standing time: __________________________□ microns

Finishing Time: __________________________

Comments:

Refrigeration Evacuation Test Expert 1 Initials & Country:

Expert 2 Initials & Country:

Expert 3 Initials & Country:

5. CHARGING WITH REFRIGERANT – PRIMARY CIRCUIT Charge the primary refrigeration system (R134a) with the required weight of refrigerant to ensure operation according to specification above, and in accordance with acceptable trade and environmental practices.

To be filled in by EXPERTS ONLY

Bottle weight prior to charging: __________________________□ kg □ lb Bottle weight at completion of charging: __________________________□ kg □ lb

Comments:

6. CHARGING WITH REFRIGERANT – SECONDARY CIRCUIT Charge the secondary refrigeration system (propylene glycol) with the required quantity of glycol and water to ensure operation according to specification above, and in accordance with acceptable trade and environmental practices.

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 11 of 19

Page 12: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

To be filled in by EXPERTS ONLY

Bottle volume prior to charging: __________________________□ L □ fl oz Bottle volume at completion of charging: __________________________□ L □ fl oz

Comments:

7. ELECTRICAL TESTING Under the supervision of an Expert, perform all necessary safety checks to ensure the Test Project is safe to energize.

PLEASE FILL IN THE EXPERT CHECK POINT SHEET BELOW BEFORE PROCEEDING ANY FURTHER

To be filled in by EXPERTS ONLY

Competitor Name:

Competitor Country:

All wiring inspected by Expert prior to energizing: □ Yes

Electrical safety checks performed prior to energizing: □ Yes

Comments:

Refrigeration System Electrical Test

Expert 1 Initials & Country:

Expert 2 Initials & Country:

Expert 3 Initials & Country:

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 12 of 19

Page 13: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

8. COMMISSION THE SYSTEM Competitors are to commission the system for operation in accordance with the design specifications supplied. Please fill out the following commissioning document with the system fully operational and as close to operating temperatures as possible. Please indicate units by checking appropriate boxes.

Ambient Temperature: _____________ □ Celsius □ Fahrenheit

Refrigerant Type: _____________ □

Mass of Refrigerant Charge: _____________ □ grams □ pounds

Suction Pressure: _____________ □ kPa □ psi

Discharge Pressure: _____________ □ kPa □ psi

Condenser Subcooling: _____________ □ Kelvin □ Fahrenheit Degrees

Total System Superheat: _____________ □ Kelvin □ Fahrenheit Degrees

LP Control Cut In: _____________ □ kPa □ psi

LP Control Cut Out: _____________ □ kPa □ psi

HP Control Cut Out: _____________ □ kPa □ psi

HP Control Cut In: _____________ □ kPa □ psi

Capacity regulator setting: _____________ □ Celsius □ Fahrenheit

Glycol supply to ice rink temp: _____________ □ Celcius □ Fahrenheit

Glycol return from ice rink temp: _____________ □ Celsius □ Fahrenheit

Condensing Unit Operating Current: _____________ □ Amps

Glycol Pump Operating Current: _____________ □ Amps

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 13 of 19

Page 14: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

COMPETITION DETAILS - MODULE C

AIR CONDITIONING SYSTEM FAULT FIND, REPAIR & COMMISSIONING

MAXIMUM TIME ALLOWED - 4 HOURS 37.5 MARKS

SCOPE Competitors will be provided with an air conditioning system that has been leak tested and verified to have no leaks, pressure testing of the system is not required at any point in time. Competitors will be required to identify 1x electrical fault and 1x refrigeration system fault on the supplied air conditioning systems, once faults have been identified the Competitors will be required to repair the faults including full refrigerant recovery and recharging of refrigerant charge to manufacturer’s specifications. Competitors will then be required to commission the system and plot operating conditions on a psychometric chart.

TIMING Competitors are all to complete this module on C4 at the same time

ASSESSMENT Competitors will be assessed as per technical description with particular weighting on the fault finding and commissioning of the project.

DRAWINGS R.011 Cradle for AC Unit

R.012 Psychrometric chart (SI units)

R.013 Psychrometric chart (IP units)

1. FAULT FINDING All Competitors are required to identify 1 x electrical fault and 1 x refrigeration system fault with the operation of the unit, the root cause must be found and repaired. Once the fault is identified Competitors are to fill in this sheet of paper identifying what they believe to be the fault with the equipment. An Expert then needs to sign this sheet of paper.

All fault finding MUST be done with all relevant safety rules adhered to.

Once faults are found and recorded the Competitor is free to continue by running the unit and progressing to the next stage of the Module.

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 14 of 19

Page 15: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

ELECTRICAL SYSTEM FAULT Please write down what the fault with the equipment is and any supporting information that indicates what the fault was.

________________________________________________________________________________________________________________________

________________________________________________________________________________________________

____________________________________________________________________________________________________________

Please indicate what repairs need to be done to the system to return it to normal operation

________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________

____________________________________________________________________________________

REFRIGERATION SYSTEM FAULT Please write down what the fault with the equipment is and any supporting information that indicates what the fault was.

________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________

____________________________________________________________________________________

Please indicate what repairs need to be done to the system to return it to normal operation

________________________________________________________________________________________________________________________

________________________________________________________________________________________________________________________

____________________________________________________________________________________

2. REPAIR SYSTEM All Competitors are required to repair the faults they have identified on the unit, refrigerant must be removed from the system to repair the refrigeration fault. All necessary materials will be provided to repair the equipment and return it to an operating state

All repairs MUST be done with all relevant safety rules adhered to.

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 15 of 19

Page 16: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

3. RECLAIM SYSTEM All Competitors are required to repair the fault they have identified on the unit, the refrigerant will need to be removed from the system to complete the repair then the system pressure tested, evacuated and recharged with refrigerant. All necessary materials will be provided to repair the equipment and return it to an operating state.

All repairs MUST be done with all relevant safety rules adhered to.

To be filled in by EXPERTS ONLY

Reclaim System

Reclaim bottle weight prior to reclaim: _____________________□ kg □ lb Reclaim bottle weight at completion of reclaim:_____________________□ kg □ lb

Comments:

4. EVACUATION Evacuate the refrigeration system in accordance with manufacturer’s instructions and WorldSkills standards using the Deep Vacuum Method to hold a vacuum of at least 1000 microns (130Pa absolute) of mercury. The evacuation point should not rise to a value greater than 1000 microns in the Ten (10) minutes after the vacuum pump is isolated from the system under test.

To be filled in by EXPERTS ONLY

Evacuation Test

Starting evacuation level: __________________________□ microns

Starting Time: __________________________ Evacuation level after standing time: __________________________□ microns

Finishing Time: __________________________

Comments:

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 16 of 19

Page 17: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

Air Conditioning System Evacuation

Expert 1 Initials & Country:

Expert 2 Initials & Country:

Expert 3 Initials & Country:

5. CHARGING WITH REFRIGERANT Charge the refrigeration system with the required weight of refrigerant to ensure operation according to specification above, and in accordance with acceptable trade and environmental practices.

To be filled in by EXPERTS ONLY

Refrigerant Charging

Bottle weight prior to charging: _____________________□ kg □ lb Bottle weight at completion of charging: _____________________□ kg □ lb

Comments:

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 17 of 19

Page 18: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

6. COMMISSION THE SYSTEM Competitors are to commission the system for operation in accordance with the manufacturers specifications supplied. Please fill out the following commissioning document with the system fully operational, on “Cooling” mode, indoor fan on highest speed and as close to operating temperatures as possible. Please indicate units by checking appropriate boxes.

Ambient Temperature: _____________ □ Celsius □ Fahrenheit

Return Air Dry Bulb Temperature: _____________ □ Celsius □ Fahrenheit

Return Air Wet Bulb Temperature: _____________ □ Celsius □ Fahrenheit

Supply Air Dry Bulb Temperature: _____________ □ Celsius □ Fahrenheit

Supply Air Wet Bulb Temperature: _____________ □ Celsius □ Fahrenheit

Air Velocity of indoor unit: _____________ □ m/sec □ ft/sec

Air Volume of indoor unit: _____________ □ m3/sec □ cfm

Indoor Fan Speed: □ High □ Medium □ Low

Mode of Operation: □ Cooling □ Heating

Refrigerant Type: _____________ □

Mass of Refrigerant Charge: _____________ □ grams □ pounds

Suction Pressure: _____________ □ kPa □ psi

Total System Superheat: _____________ □ Kelvin □ Fahrenheit Degrees

Compressor Operating Current: _____________ □ Amps

Indoor Fan Operating Current: _____________ □ Amps

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 18 of 19

Page 19: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

7. COOLING PROCESS Plot the supply and return air conditions as specified in your commissioning report on the psychrometric chart supplied. Join the supply and return conditions with a line as per below example.

WSC2015_TP38_actual Version: 3.0

Date: 9.08.15 19 of 19

Page 20: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

Ø1/2"

Ø 1/2"

Ø 1/2"

Ø 7/8"

Ø 1/2"

30

0

50

50

533

Ø 7/8"

30

R001 - Coil of the Ice

Rink.dwg

COIL OF THE ICE RINK

42

0

Detail 1

Page 21: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

R002 - Primary Refrigerant

Flow Circuit.dwg

Hermetic

Compressor

Oil Separator

TEE

3/8"x3/8"x3/8"

Condenser

Liquid Tank

Sight glass

Filter Dryer

Ball Valve

Electric

Expansion

Valve

Suction

Accumulator

Service

Valve

Dual Pressure

Switch

Low

Pressure

Vessel

Plate Heat

Exchanger

TEE

1/2"x1/2x1/4"

TEE

1/2"x1/2x1/2"

TEE 3/8"x3/8"x1/4"

Q1Q4

Q2Q3

PRIMARY REFRIGERANT FLOW CIRCUIT

Hot Gas

Bypass Regulator

Pressure

Transducer

3/8"

3/8"3/8"

3/8"

3/8"

3/8" 3/8" 3/8" 3/8" 1/2"

1/4"

1/4"

1/2"1/2" 1/2"

1/2"

1/2"1/2"

Sleeve

3/8" x 1/2"

7/8"

Sleeve

7/8"x1/2"

1/4"

TEE

1/2"x1/2x1/4"

Access

LP

HP

Page 22: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

R003 - Secondary

Refrigerant Flow Circuit.dwg

Plate Heat

Exchanger

Q1Q4

Q2Q3

SECONDARY REFRIGERANT FLOW CIRCUIT

1/2"

1/2"

1/2"

5/8"

Ice Rink Tank

Water Pump

Coil of Ice Rink

Glycol Tank

5/8"

5/8" 1/2"

5/8" 1/2"

Page 23: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

R004 - General Installation

View.dwg

CRADLE

Glycol Tank

Ice Rink Tank

Condensing Unit

1

0

0

5

0

30

3

0

Page 24: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

150

3

0

0

6

0

0

4

5

0

100

Glycol Tank

Ice Rink Tank

R005 - Glycol_Ice Rink Tank.dwg

ICE RINK AND GLYCOL TANK

1

5

Page 25: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

A ( 5 : 1 )DIN 509

B ( 5 : 1 )DIN 509

C ( 5 : 1 )DIN 509

D ( 5 : 1 )DIN 509

E ( 5 : 1 )DIN 471 F

( 5 : 1 )DIN 471

A ( 1 : 1 )

A

B C

D

EF

A

WorldSkills 2015

PROJETO:

NOME:

ESCALA:

UNIDADE:

DATA:

AUTORIZADO POR:

MATHEUS DIOMAR SOUZA LIMA

Evaporador Inundado1:2

mm

02/2015A3

PAULO VINÍCIUS

FOLHA:

1 /1

A A

B B

C C

D D

ISOMÉTRICO

NOTAS-TOLERÂNCIAS GERAIS PARA CONSTRUÇÕESSOLDADAS CONFORME DIN EN ISO 13920-B -INDICAÇÃO DE SOLDA CONFORME DIN 22553 -PROCESSO DE SOLDAGEM CONFORMEDIN EN ISO 4063

NOTAS-TOLERÂNCIAS GERAIS PARA DIMENSÕES CONFORME DIN ISO 2768-mk;-CHANFROS NÇAO ESPECIFICADOS ADOTAR -0,5x45°;-CANTOS SIMPLIFICADOS CONFORME DIN 6785 -RAIOS NÃO COTADOS ADOTAR - R2mm;-INDICAÇÃO DE ACABAMENTO SUPERFICIAL CONFORME DIN ISO 1302;-TOLERÂNCIA GEOMÉTRICA CONFORME DIN ISO 1101.

ENGRENAGEM SEM FIMMÓDULO (m):NÚMERO DE ENTRADAS (z):ÂNGULO DE PRESSÃO (a):DIÂMETRO EXTERNO (De):DIÂMETRO INTERNO (Di):DIÂMETRO PRIMITIVO (Dp):ÂNGULO DA HÉLICE (b):

ENGRENAGEMMÓDULO (m):NÚMERO DE ENTRADAS (z):ÂNGULO DE PRESSÃO (a):DIÂMETRO EXTERNO (De):DIÂMETRO INTERNO (Di):DIÂMETRO PRIMITIVO (Dp):ÂNGULO DA HÉLICE (b):

x

01

x01

= = =

x

y

z

Ra 3,2

Ra 1,6

Ra 0,8

DIN EN ISO 4063 -311DIN EN ISO 6947 - PBDIN EN ISO 12536

DIN EN ISO 4063 -111DIN EN ISO 6947 - PBDIN EN 499 - E35 2 C25

DIN EN ISO 4063 - 131DIN EN ISO 6947 - PBDIN EN 349 - l1DIN EN ISO 440 - G46 4 MG3Si1

DIN EN ISO 4063 - 135DIN EN ISO 6947 - PBDIN EN 439 - M21DIN EN 440 - G 46 4 M G3Si1DIN EN ISO 4063 - 141DIN EN ISO 6947 - PBDIN EN 439 - R1DIN EN 440 - G46 M G3Si1

DIN EN ISO 4063 - 136DIN EN ISO 6947 - PBDIN EN 439 - l1DIN EN 440 - G46 M G3Si1

FURO DE CENTROISO 6411A3,15/6,7

SAÍDA DE REBOLODIN 509 - E0,6 x 0,3

SAÍDA DE REBOLODIN 509 - F0,6 x 0,3

ANEL DE RETENÇÃODIN 472 - 20 x 1,3

ANEL DE RETENÇÃODIN 471 - 20 x 1,3

SAÍDA DE ROSCADIN 76-B - M10 x 1,5

EIXO OU CUBO RANHURADOCOM FLANGES RETOSISO 14 - LIGHT SERIES6d10 - 23f7 x 26a11

EIXO OU CUBO RANHURADOCOM FLANGES RETOSISO 14 - MEDIUM SERIES6d10 - 23f7 x 26a11

EIXO OU CUBO RANHURADOCOM FLANGES RETOSISO 14 - MEAVY SERIES6d10 - 23f7 x 26a11

EIXO DENTADO COM FLANGES ENVOLVENTES

ISO 4156 - Ø3,5x1,46z 0,5 x 30p - 7h/7H

0,3

0,02

15°

2,5 00,05+

0,6R 0,02

2,5 00,05+

0,3

00,2

+

15°1°

0,6R 0,02

2,5 00,05+

0,6R 0,02

0,3

0,02

15°

15°1°

0,3

2,5 00,05+

0,6R 0,02

2,7

1,8

2,7

1,8

y

y

y

y

y

y

y

yy

y

y

y

y

y

y

y

y

y

y

y

y

Ø0,05 A

Ø0,05 A

Ø0,05 A

Ø0,05 A

Ø0,05 A

Ø0,05 A

NOTAS-TOLERÂNCIA NÃO ESPECIFICADA CONFORME IS0 13920-A;-AJUSTE ISO CONFORME ISO 286-1;-CHANFROS NÃO ESPECIFICADOS Ch 0,5x45°;-RAIOS NÃO ESPECIFICADOS R0,5mm;-CANTOS SIMPLIFICADOS CONFORME ISO 13715 -TOLERÂNCIAS PARA SUPERFÍCIES FUNDIDAS - J14 / j14;-TOLERÂNCIAS GEOMÉTRICAS CONFORME ISO 1101;-ACABAMENTO DAS SUPERFÍCIES CONFORME ISO 1302;-SIMBOLOGIA DE SOLDAGEM CONFORME ISO 2553.

RECARTILHA PARALELA

DIN 82-RAA 1,0

RECARTILHA CRUZADA

DIN 82-RGE 1,0

73

120

53,63

12,75

91,7

SENSORES

13/16-20 UENF-

19,25

30

,75

30

,75

-TODAS AS SOLDAS DEVERÃO SER DO TIPO PRATA 45%

12,75 12,75

12,75

3/8"- 16G UNC

3/8"- 16G UNC

Page 26: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

R007 - Electrical Control Panel.dwg

ELETRONIC TEMPERATURE CONTROLLER

60

29

72

100

100

100

115 85 85

40

40

40

85

20

DRILLING FOR THE ELETRONIC

TEMPERATURE CONTROLLER

FRONT VIEW DRILLING OF THE COVER MOUNTING PLATE

FIXING RAIL

FOR THE COMPONENTS

DIN 35mm

RIVET

400

500

ELECTRICAL CONTROL PANEL

Page 27: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

R008 - Electrical Control Diagram.dwg

S2 - D

EF

RO

ST

IN

G P

RO

BE

SENSORS

S1 - T

EM

PE

RA

TU

RE

C

ON

TR

OL

L2(S)

X1

13

X1

14 15

L1(R)

SS3

13

96

A2

A1

K1

DPS

X1

11

HP

CD

A

X1

B

09

OR

95

98

X1

10

97

H5H4H2

14

13

14

LP

A2

A1

K3

HLS

22

21

K3

14

13

22

21

LLS

A2

A1

K2

X1

12

H3H1

K1SS2

13

14

SS1

X1

21

X1

20

X1

22

X1

23

RED 1mm²

PRETO 1mm²

22

21

D(S1) C(S2) B(S3) A(DI)

1 2 3 4 5

FA

N

DE

FR

OS

T

CO

MP

RE

SS

OR

TE

MP

ER

AT

UR

E

CO

NT

RO

L

DE

FR

OS

TIN

G

PR

OB

E

16

ELETRONIC REFRIGERATION CONTROLLER

DANFOSS ERC 102C

ELECTRICAL CONTROL DIAGRAM

Page 28: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

R009 - Electrical Control Power Diagram.dwg

CONDENSING UNIT

OR

2 220V 60Hz~

RED 2,5mm²

A1

A2

2 220V 60Hz

PE

L1(R)

L2(S)

~

BLACK 2,5mm²

X1

04

X1

05

1 3

2 4

5

6

X1

06

Q1

K1

X1

X1

X1

03

01

02

1 3

2 4

5

6

Q2

L2(S)

L1(R)

1

2

3

4

GREEN 2,5mm²

1

2

3

4

RED 1mm²

BLACK 1mm²

A1

A2

X1

07

X1

08

K2

1 3

2 4

5

6

A1

A2

X1

17

X1

18

X1

19

K3

1 3

2 4

5

6

M

2 ~

GLYCOL PUMP AKV

ELECTRICAL CONTROL POWER DIAGRAM

Page 29: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

R010 - Electrical Terminal Connection.dwg

L1(R) - PHASE

BLACK - BLACK FLEXIBLE CABLE

LEGEND

CONDENSING UNIT (R)

CONDENSING UNIT (S)

CONDENSING UNIT (PE)

GLYCOL PUMP (R)

GLYCOL PUMP (S)

DUAL PRESSURE SWITCH - A

DUAL PRESSURE SWITCH - B

DUAL PRESSURE SWITCH - C

DUAL PRESSURE SWITCH - D

S1 - TEMPERATURE CONTROL

S2 - DEFROSTING PROBE

AKV (R)

AKV (S)

AKV (PE)

HIGHER LIQUID LEVEL SWITCH

HIGHER LIQUID LEVEL SWITCH

LOW LIQUID LEVEL SWITCH

LOW LIQUID LEVEL SWITCH

L2(S) - PHASE

PE - EARTH

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

19

20

21

22

RED - RED FLEXIBLE CABLE

GREEN - GRREN FLEXIBLE CABLE

Q1 - BIPOLAR BREAKER FOR POWER CIRCUIT

Q2 - BIPOLAR BRAKER FOR COMMAND CIRCUIT

K1 - POWER CONTACTOR OF CONDENSING UNIT

K2 - CONTACTOR OF GLYCOL PUMP

K2 - CONTACTOR OF AKV EXPANSION VALVE

OR - OVERLOAD RELAY OF CONDENSING UNIT

AKV - COIL OF ELETRONIC EXPANSION VALVE

HLS - HIGHER LIQUID LEVEL SWITCH OF LOW PRESSURE VESSEL

LLS - LOWER LIQUID LEVEL SWITCH OF LOW PRESSURE VESSEL

SS3 - SELECTOR SWITCH OF AKV

H1 - DASH LAMP FOR "TURNED OFF CONDENSING UNIT"

H2 - DASH LAMP FOR "TURNED ON CONDENSING UNIT"

H3 - DASH LAMP FOR "HIGH PRESSURE"

H4 - DASH LAMP FOR "LOW PRESSURE"

H5 - DASH LAMP FOR "OVERLOAD CONDENSING UNIT"

DPS - DUAL PRESSURE SWITCH

SS1 - SELECTOR SWITCH OF CONDENSING UNIT

SS2 - SELECTOR SWITCH OF GLYCOL PUMP

23

S1 - TEMPERATURE CONTROL

S2 - DEFROSTING PROBE

ELECTRICAL TERMINAL CONNECTION

Page 30: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

7

0

0

1900

1

1

0

0

3

0

0

3

0

0

3

0

0

3

0

0

300

300

1

/

8

"

7

/

8

"

7

/

8

"

R011 - Cradle for AC Unit.dwg

CRADLE FOR AC UNIT

2

0

0

Page 31: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

0 5 10 15 20 25 30 35 40 45 50

DRY BULB TEMPERATURE - °C

5

10

15

20

25

30

15 20 25 30 35 40 45 50

55

60

65

70

75

80

85

90

95

100

105

110

110

115

115

120

120

125

125

130

EN

TH

ALP

Y -

KJ

PE

R K

G O

F D

RY

AIR

10

15

20

25

30

35

40 45

50

55

60

65

70

75

80

85

90

95

100

105

ENTH

ALPY

- KJ

PER K

G O

F D

RY

AIRSA

TUR

ATIO

N T

EMPE

RATU

RE

- °C

0

5

5

10

10

15

15

20

20

25

25

30 WET BULB TEMPERATURE - °C

30

10% RELATIVE HUMIDITY

20%

30%

40%

50%

60%

70%

80%

90%

.78

.80

.82

.84

.86

.88

.90 SP

EC

IFIC

VO

LUM

E m

³/kg OF

DR

Y A

IR

.92

.94

HU

MID

ITY

RA

TIO

- G

RA

MS

OF

MO

IST

UR

E P

ER

KIL

OG

RA

M O

F D

RY

AIR

PSYCHROMETRIC CHARTSea LevelBAROMETRIC PRESSURE 760 mm of Mercury

Linric Company Psychrometric Chart, www.linric.com

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

VA

PO

R P

RE

SS

UR

E -

MM

OF

ME

RC

UR

Y

-40

-20

-10

0

10

20

25

30

DE

W P

OIN

T -

°C

Page 32: TEST PROJECT – REFRIGERATION AND AIR …worldskills.no/getfile.php/Dokumenter/Kjøleteknikk...TEST PROJECT – REFRIGERATION AND AIR CONDITIONING WSC2015_TP3 8_actual WorldSkills

20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120

DRY BULB TEMPERATURE - °F

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

180

190

200

210

5 10 15 20 25 30

35

40

45

50

55

55

60

60

65

10

15

20

25

30

35

40

45

50

ENTH

ALPY

- BT

U P

ER P

OU

ND

OF

DR

Y AI

R

SATU

RAT

ION

TEM

PER

ATU

RE

- °F

20

25

2530

3035

3540

4045

45 50

50 55

55 60

6065

65

70

70

75

75

80

80

85 WET BULB TEMPERATURE - °F

85

90

10% RELATIVE HUMIDITY

20%

30%

40%

50%

60%

70%

80%

90%

12.5

13.0

13.5

14.0 SP

EC

IFIC

VO

LUM

E ft³/lb O

F D

RY

AIR

14.5

15.0

HU

MID

ITY

RA

TIO

- G

RA

INS

OF

MO

IST

UR

E P

ER

PO

UN

D O

F D

RY

AIR

PSYCHROMETRIC CHARTSea LevelBAROMETRIC PRESSURE 29.921 inches of Mercury

Linric Company Psychrometric Chart, www.linric.com

.1

.2

.3

.4

.5

.6

.7

.8

.9

1.0

1.1

1.2

1.3

VA

PO

R P

RE

SS

UR

E -

INC

HE

S O

F M

ER

CU

RY

-20 0

10

20

25

30

35

40

45

50

55

60

65

70

75

80

85

DE

W P

OIN

T -

°F