14
Recommendations for new ANSI C12.1 Standards for In-service Performance Tom Lawton The Eastern Specialty Company

TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Embed Size (px)

DESCRIPTION

TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance Covering Section 5

Citation preview

Page 1: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Recommendations for new ANSI C12.1 Standards for In-service Performance

Tom Lawton

The Eastern Specialty Company

Page 2: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

•  Consider new meters

•  Consider AMI devices

•  Consider new metering device acceptance testing

•  Provide definition of Statistical Sampling plans

•  Consider performance monitoring of newly certified meters

Subcommittee 25 Objectives Update ANSI C12.1 Section 5:

Page 3: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Current ANSI C12.1 Section 5

Page 4: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Current ANSI C12.1 Section 5 Issues

•  Acceptance testing of new meters is not mentioned.

•  Statistical sampling plans are not adequately defined.

•  Post deployment or performance monitoring of newly certified meters not covered.

Page 5: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Recommended Changes AMI Devices

•  New concept of what is a meter…includes everything under the cover.

•  AMI communications modules and service disconnect switches.

•  Applies sampling and testing requirements to these devices when part of the AMI meter.

Page 6: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Recommended Changes New Meters & Metering Devices

• New meters are covered by sampling and testing requirements.

•  As-found, as-left, returned to service tests.

•  Accuracy classes in C12.20 (0.2% and 0.5%) referenced.

Page 7: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Recommended Changes Statistical Sampling Plans

•  In-service statistical sampling plans should be developed using plans such as: – ANSI/ASQ Z1.9 Sampling Procedures and Tables for

Inspection by Variables – ANSI/ASQ Z1.4 Sampling Procedures and Tables for

Inspection by Attributes

•  Provides guidance on how to handle sample failures.

Page 8: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Recommended Changes New Metering Device Acceptance Testing

•  Sampling and testing of new meter shipments

• Uses ANSI Z1.4 (attributes) or ANSI Z1.9 (Variables) for sample size and acceptance criteria.

•  Specifies an Acceptable Quality Limit (AQL) of 1% or less.

Page 9: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Recommended Changes Performance Monitoring of Newly Certified

Meters

•  Evaluate newly certified meters after installation…. Different than in-service.

• Use statistical sampling plan.

Page 10: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Recommended Changes In-Service Requirements for Other Metering

Devices

• Use of statistical sampling plans. • Old Standard included:

–  Instrument transformers, demand registers, pulse recorders, coupling-capacitor voltage transformers.

• New Standard includes: –  Instrument transformers, demand registers, pulse

recorders, coupling-capacitor voltage transformers, meter communication devices/modules, service switches, non energy measurement features of a meter.

Page 11: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Coordination of ANSI C12.1 & IEC/OIML Requirements

•  ANSI working with IEC to coordinate standards (new OIML R46). Many issues!

•  Working to tie IEC meter specifications to ANSI requirements. Meters in classes

A - 2%, B – 1%, C – 0.5%, D – 0.2%

•  IEC standard does not allow changes to meter after seal is on without testing (similar to Measurement Canada).

Firmware changes???

Page 12: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Coordination of ANSI C12.1 & IEC Requirements

•  IEC assumes testing done by government controlled organizations.

• Other differences: – More tests and are run longer – Higher RF frequency range. Accuracy tested during

RF application – Magnetic field strengths higher – Electrical discharge levels higher

Page 13: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Path Forward New Metering Device Acceptance Testing

•  Complete sub-committee work and forward proposed draft to full ANSI C12 Main committee at April 5, 2012 meeting (next full committee meeting). Hoping for comments and small revisions then approval and adoption by the October 2012 meeting (Full committee meets twice per year).

•  Begin educating EEI members and Utility Commissions that a standard suitable for in-service testing of “smart meters” now exists and can be used as a basis for post-deployment testing programs.

•  Appoint members of sub-committee 25 to committee to reconcile differences with IEC and OIML. Members of ANSI committee are already working on both the IEC and the OIML committee but none of the three has an approved new standard yet.

•  Edit and keep the new standards consistent and up to date as new equipment and new features reach the marketplace.

Page 14: TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance

Questions?

Tom Lawton [email protected] 215-688-0298 (cell)

The Eastern Specialty Company