BEI/EIB Project: TRANSIT ROADS IV - Bulgaria
Territorial Analysis:
Potential Spatial Development Impacts and Network Effects
BEI/EIB Project: TRANSIT ROADS IV - Bulgaria
BEI/EIB Project: TRANSIT ROADS IV - Bulgaria
Accessibility to motorways in operation
Surface at less than 30 minutes: 5.300 Km2
BEI/EIB Project: TRANSIT ROADS IV - Bulgaria
Accessibility to motorways in operation and planned
Surface at less than 30 minutes: 10.027 Km2 Increase of 4.727 km2
BEI/EIB Project: TRANSIT ROADS IV - Bulgaria
70%
26%
1%0% 3%
Before planned motorways
6%
1% 3%
35%55%
0'-10'
10'-20'
20'-30'
30'-60'
>60'
After planned motorways
0'-10' 10'-20' 20'-30' 30'-60' >60'before 353,301 1606,821 3340,64 28784,553 76826,685after 717,359 3095,004 6214,99 38541,467 62343,18
Accessible surface to motorways:
BEI/EIB Project: TRANSIT ROADS IV - Bulgaria
Area of direct influence of the projectsThe surface at less than 30’ from project motorways entrances
Area: 9.090 km2
BEI/EIB Project: TRANSIT ROADS IV - Bulgaria
Methodology:
- Actualisation of Bulgary Road Network
- Classification of each road depending on the class and the financing source.
- Calculation of accessibility to motorways in operation and planned(ICON) within the actual bulgarian road network. Speeds considered are:
Motorways in operation: 110 km/h
Express ways and main roads first class: 85 km/h
Main roads: 70 km/h
Regional roads: 50 km/h
- Calculation of accessibility to motorways in operation and planned (ICON) within the actual bulgarian road network. Speeds considered are:
Motorways in operation and planned: 110 km/h
Express ways and main roads first class: 85 km/h
Main roads: 70 km/h
Regional roads: 50 km/h