75
Procurement Services 450 Cowie Hill Rd. PO Box 8388, RPO CSC Halifax, NS B3K 5M1 Telephone: (902) 490-4998 Tender # T26.2019 JD Kline Water Treatment Plant Roof Phase 2 Tender Issue Date Wednesday, July 3 rd , 2019 Bids submitted on the attached bid form ONLY in a vendor identified envelope: Tender# T26.2019 JD Kline Water Treatment Plant Roof Phase 2 Addressed to: Halifax Water Attn: Brent Hickman Procurement Services 450 Cowie Hill Road P.O. Box 8388 RPO CSC Halifax, NS B3K 5M1 Will be received until 2:00 p.m. Atlantic Time, Tuesday, July 30, 2019 for the above Tender as per the specifications and terms and conditions. Check for changes to this request - Before submitting your bid, visit the Provincial Government Web Portal at www.novascotia.ca/tenders or contact our office to see if any Addenda detailing changes have been issued on this tender. Changes may be posted up until the tender closing time. It is the bidders’ responsibility to acknowledge and take into account all Addenda. Bidders shall be solely responsible for the delivery of their bids in the manner and time prescribed. Bids received after the time and date specified shall be rejected. Electronic and facsimile bids are not accepted. The lowest or any submission will not necessarily be accepted.

Tender # T26.2019 JD Kline Water Treatment Plant Roof …Tender # T26.2019 JD Kline Water Treatment Plant Roof – Phase 2 Tender Issue Date – Wednesday, July 3rd, 2019 Bids submitted

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • Procurement Services 450 Cowie Hill Rd.

    PO Box 8388, RPO CSC

    Halifax, NS B3K 5M1

    Telephone: (902) 490-4998

    Tender # T26.2019

    JD Kline Water Treatment Plant Roof – Phase 2

    Tender Issue Date – Wednesday, July 3rd, 2019

    Bids submitted on the attached bid form ONLY in a vendor identified envelope:

    Tender# T26.2019 – JD Kline Water Treatment Plant Roof – Phase 2

    Addressed to:

    Halifax Water

    Attn: Brent Hickman

    Procurement Services

    450 Cowie Hill Road

    P.O. Box 8388 RPO CSC

    Halifax, NS B3K 5M1

    Will be received until 2:00 p.m. Atlantic Time, Tuesday, July 30, 2019 for the above Tender as perthe specifications and terms and conditions.

    Check for changes to this request - Before submitting your bid, visit the Provincial Government Web Portal at

    www.novascotia.ca/tenders or contact our office to see if any Addenda detailing changes have been issued on this

    tender. Changes may be posted up until the tender closing time. It is the bidders’ responsibility to acknowledge

    and take into account all Addenda.

    Bidders shall be solely responsible for the delivery of their bids in the manner and time prescribed. Bids received

    after the time and date specified shall be rejected.

    Electronic and facsimile bids are not accepted.

    The lowest or any submission will not necessarily be accepted.

    http://www.novascotia.ca/tenders

  • PROPONENT’S SUBMISSION SHEET

    The undersigned hereby acknowledges that he/she, as an officer of the stated corporation, has read and

    understands the specifications, requirements, and proposed agreement regarding the JD Kline Water

    Treatment Plant Roof – Phase 2 to Halifax Water. He/she further acknowledges that the seller’s

    proposed product, equipment, materials, and services fully meet or exceed those as specified in Halifax

    Water’s Tender. Additionally, the Proponent agrees that all its bid documents and responses to the

    aforementioned Tender will, at the option of Halifax Water, become a legally binding and essential portion

    of the final contract between the successful Proponent and Halifax Water.

    The following information must be completed to ensure tender acceptance.

    *ADDENDA No. to INCLUSIVE WERE CAREFULLY EXAMINED.

    DATED THIS DAY OF , 2019

    PROPONENT’S COMPANY NAME:

    ADDRESS:

    CITY/PROVINCE: POSTAL CODE:

    PHONE NO.: FAX NO.:

    EMAIL ADDRESS:

    WEBSITE:

    CONTACT NAME (PLEASE PRINT)

    TITLE (please print):

    AUTHORIZED SIGNATURE:

    HST REGISTRATION NO.:

    NS WCB COVERAGE: YES NO

    * The proponent shall list and initial all addenda received during the period and shall take them into consideration when

    preparing their bid submission. A signed copy of each Addendum must be included with the bid submission. Failure to

    comply may be cause for rejection of bid submission.

    HALIFAX WATER RESERVES THE RIGHT TO REJECT ANY OR ALL SUBMISSIONS. THE LOWEST OR ANY SUBMISSION

    WILL NOT NECESSARLIY BE ACCEPTED.

    This tender will adhere to Halifax Water’s Standard Terms & Conditions. They can be found on our website at

    https://halifaxwater.ca/procurement-tender-opportunities

    https://halifaxwater.ca/procurement-tender-opportunities

  • Pockwock Water Treatment Plant Roof – Phase 2

    T26.2019

    Table of Contents July 2019

    Section No. of Pages

    Proponent’s Submission Sheet

    00 20 00 Overview ............................................................................................................... 1 Page

    00 21 00 Information to Tenderers .................................................................................... 6 Pages

    00 41 43 Tender Form........................................................................................................ 6 Pages

    00 43 00 Supplementary Tender Information .................................................................... 6 Pages

    00 53 43 Form of Agreement ............................................................................................. 6 Pages

    00 74 00 Supplementary Specifications ........................................................................... 15 Pages

    07 52 16 SBS Modified Bituminous Membrane Roofing ................................................ 7 Pages

    Appendix A – Halifax Water Contractor Health and Safety Forms

    Appendix B – Police Record Check

    Appendix C – Environmental Management System ***

    Tender Drawings

    *****

  • Pockwock Water Treatment Plant Roof – Phase 2

    T26.2019

    Table of Contents July 2019

    Staff Signature Date

    Manager Water Infrastructure

    or Manager Stormwater

    Wastewater Infrastructure

    Project Engineer

    Original signed by Tom Gorman July 3, 2019

    Original signed by Johnathan MacDonald

    July 3, 2019

  • Overview

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 20 00

    T26.2019 Page 1

    Overview July 2019

    2017

    OVERVIEW

    This document is a Supplementary Specification to the Standard Specification for Municipal

    Services, developed by the Nova Scotia Roadbuilders - Consulting Engineers of Nova Scotia

    Joint Committee on Contract Documents.

    The Halifax Regional Water Commission (“Halifax Water”), in response to a need to standardize

    their specification practices, reduce review and approval time, and regulate the specifications

    produced by their consultants, have adopted the Standard Specification for Municipal Services.

    As an active member on the Joint Committee during the Standard Specification’s development,

    Halifax Water became familiar with, and contributed input to, the Standard Specification’s

    development.

    Whereas the Standard Specification is intended for both sewer and water projects throughout the

    province of Nova Scotia, Halifax Water’s concern is limited to water and wastewater systems

    within the limits of the Halifax Regional Municipality, additional specification requirements will

    be provided as supplementary specifications.

    These project documents have been prepared for use with and require being read in conjunction

    with the 2017 updated version of The Standard Specifications for Municipal Services as

    published by the Nova Scotia Roadbuilders – Consulting Engineers of Nova Scotia Joint

    Committee on Contract Documents. Copies of The Standard Specification for Municipal

    Services are available from:

    The Joint Committee on Contract Documents

    18 Laurier Street

    Dartmouth, NS, B3A 2G7

    Telephone (902) 233-9362

    OR Email: [email protected].

    *****End of Section 00 20 00*****

  • Information to Tenderers

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 21 00

    T26.2019 Page 1

    Information to Tenderers July 2019

    JD Kline Water Treatment Plant Roof – Phase 2

    T26.2019

    Owner: Halifax Regional Water Commission

    450 Cowie Hill Road

    Halifax, Nova Scotia

    1. Tender Submission .1 Submit completed Section 00 41 43 - Tender Form and

    Section 00 43 00 - Supplementary Tender Information for

    above project in sealed envelope marked as follows:

    TENDER

    JD Kline Water Treatment Plant Roof – Phase 2

    T26.2019

    Closing at 2:00 p.m., Atlantic Time, Tuesday, July 30th, 2019

    and addressed to:

    Halifax Water

    Attn: Brent Hickman

    Procurement Services

    450 Cowie Hill Road, P.O. Box 8388 RPO CSC Halifax, NS B3K 5M1

    2. Tender Opening .1 Tenders will be opened immediately after closing, at the

    offices of the Halifax Regional Water Commission 450

    Cowie Hill Road, Halifax, NS. Opening will be public.

    3. Document Deposit .1 Deposit for Project Documents is non-refundable.

    4. Accuracy of

    Referencing .1 Indexing and cross-referencing are for convenience only.

    5. Conditions of

    Tendering .1 Take full cognizance of content of all Contract Documents in

    preparation of Tender. Refer to Section 00 41 43 – Tender

    Form, Subsection 3.10 for a complete list of Contract

    Documents.

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 21 00

    T26.2019 Page 2

    Information to Tenderers July 2019

    6. Tenderers to

    Investigate .1 Tenderers will be deemed to have familiarized themselves

    with existing site and working conditions and all other

    conditions which may affect performance of the Contract.

    No plea of ignorance of such conditions as a result of failure

    to make all necessary examinations will be accepted as a

    basis for any claims for extra compensation or an extension

    of time.

    7. Clarification and

    Addenda .1 Notification of omissions, errors or ambiguities found in the

    Contract Documents must be sent in writing not less than two

    (2) working days before Tender Closing to:

    Brent Hickman, S.C.M.P.

    Procurement Officer

    Halifax Water

    450 Cowie Hill Road, P.O. Box 8388 RP0 CSC

    Halifax, Nova Scotia B3K 5M1

    [email protected]

    If it is deemed that correction, explanation or interpretation is

    necessary, a written addendum will be issued and distributed

    through the Provincial Procurement Web Portal

    (novascotia.ca/tenders). All addenda will form part of the

    Contract Documents.

    .2 Confirm that all addenda have been received.

    8. Preparation of Tender .1 Complete Tender Form provided with Project Documents in

    ink or by typewriter. Tender all items and fill in all blanks.

    Have corrections initialed by person signing Tender.

    9. Taxes .1 Include all taxes except Harmonized Sales Tax in tender unit

    prices.

    .2 The Contractor will indicate on each application for payment,

    as a separate amount, the appropriate Harmonized Sales Tax

    the Owner is legally obliged to pay. This amount will be

    paid to the Contractor in addition to the amount certified for

    payment under the Contract.

    10. Tender Security .1 Provide Tender Security in amount of 10% of the Estimated

    Contract Price with Tender, in the form of a Certified Cheque

    or Money Order payable to the Owner, or a Bid Bond on

    CCDC Form 220.

    mailto:[email protected]

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 21 00

    T26.2019 Page 3

    Information to Tenderers July 2019

    11. Contract Security .1 Refer to Section 00 74 00 Supplementary Specifications,

    GC11.2 – Contract Security.

    12. Insurance .1 Refer to Section 00 72 45 (General Conditions) subsection

    GC11.1 – Insurance and Section 00 73 00 (Supplementary

    General Conditions), for insurance required.

    13. Agreement .1 Agreement is attached for information purposes only.

    14. Return of

    Tender Security .1 Tender will be returned to:

    .1 all except the three lowest acceptable Tenderers within

    7 days of Tender Opening.

    .2 two remaining unsuccessful Tenderers within 7 days of

    date of the executed Agreement.

    .3 successful Tenderer following receipt by Owner of

    executed Agreement, specified Contract Security, and

    Insurance documents.

    15. Amendment or

    Withdrawal of Tender .1 Tenders may be amended or withdrawn by email to

    [email protected] or facsimile at 902-490-1583.

    .2 Amendment of individual unit prices is the only acceptable

    price amendment. Amendments shall not disclose either

    original or revised total price.

    .3 Head amendment or withdrawal as follows:

    “[Amendment]/[Withdrawal] of Tender for JD Kline Water

    Treatment Plant Roof – Phase 2 (T26.2019)” Sign and seal as

    required for Tender, and submit at address given for receipt

    of Tenders prior to time of Tender Closing.

    16. Informal or

    Unbalanced Tenders .1 Tenders which in the opinion of the Owner are considered to

    be informal or unbalanced may be rejected.

    17. Right to Accept or

    Reject any Tender .1 Owner reserves right to accept or reject any or all Tenders,

    including without limitation the lowest Tender, and to award

    the Contract to whomever OWNER in its sole and absolute

    mailto:[email protected]

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 21 00

    T26.2019 Page 4

    Information to Tenderers July 2019

    discretion deems appropriate notwithstanding any custom of

    the trade nor anything contained in the Contract Documents

    or herein. OWNER shall not, under any circumstances, be

    responsible for any costs incurred by the Tenderer in

    preparing of its Tender.

    Without limiting the generality of the foregoing, the OWNER

    reserves the right, in its sole and absolute discretion, to accept

    or reject any Tender which in the view of the OWNER is

    incomplete, obscure, or irregular, which has erasures or

    corrections in the documents, which contains exceptions and

    variations, which omits one or more prices, which contains

    prices the OWNER consider unbalanced, or which is

    accompanied by a Bid Bond or Consent or Surety issued by a

    surety not acceptable to the OWNER.

    Criteria which may be used by the OWNER in evaluating

    tenders and awarding the Contract are in the OWNER’s sole

    and absolute discretion and, without limiting the generality of

    the foregoing, may include one or more of: price, total cost

    to OWNER; the amount of Nova Scotia content; the amount

    of Canadian content; reputation; claims history of Tenderer;

    qualifications and experience of the Tenderer and its

    personnel; quality of services and personnel proposed by the

    Tenderer; ability of the Tenderer to ensure continuous

    availability of qualified and experienced personnel; the

    Construction Schedule and Plan; the proposed Labour and

    Equipment; and the proposed Supervisory Staff.

    Should the OWNER not receive any tender satisfactory to the

    OWNER in its sole and absolute discretion, the OWNER

    reserves the right to re-tender the Project, or negotiate a

    contract for the whole or any part of the Project with anyone

    or more persons whatsoever, including one or more of the

    Tenderers.

    18. Safety Certification .1 Submit with Tender, a copy of Tenderer’s current and valid

    Letter of Good Standing issued jointly by the Nova Scotia

    Construction Safety Association and the Province of Nova

    Scotia Department of Labour.

    .2 Out of province companies shall submit, with their Tender, a

    current and valid Letter of Good Standing from their province

    of origin or from a recognized Safety Association which

    utilizes an external audit element.

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 21 00

    T26.2019 Page 5

    Information to Tenderers July 2019

    .3 Out of province companies may obtain a Letter of Good

    Standing from the Nova Scotia Construction Safety

    Association upon submission of documentation verifying

    training and compliance with the NS OH&S Act and

    Regulations.

    .4 In any event, out of province Tenderers will have to satisfy

    the Nova Scotia Construction Safety Association in respect to

    their safety status prior to being awarded a contract.

    19. Security

    Clearance .1 The successful tenderer must submit proof of security

    background clearances for all staff proposing to work on the

    project.

    .2 The HRWC reserves the right not to award the contract based

    on the results of the security background clearance.

    20. Workers’

    Compensation Board .1 The Contractor shall provide to the Commission’s

    representative a clearance certificate from the Nova Scotia

    Workers’ Compensation Board at the following project

    milestones:

    .1 Prior to award of the contract.

    .2 Every month during the progress of the project.

    .3 Prior to release of Holdback.

    21. Site Meeting .1 A non-mandatory site meeting will be held on Monday, July

    15, 2019 from 10am-11am to provide an opportunity for

    tenderers to gain access to the facility. PPE (CSA footwear,

    hardhat and vest) will be required. The plant is located at

    1749 Pockwock Road in Hammonds Plains, NS. Interested

    bidders are asked to confirm their attendance with the project

    engineer via email: [email protected]

    ******End of Section 00 21 00*****

    mailto:[email protected]

  • Tender Form

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 41 43

    T26.2019 Page 1

    Tender Form July 2019

    1. SALUTATION:

    .1 To: Halifax Regional Water Commission

    450 Cowie Hill Road, P.O. Box 8388 RP0 CSC,

    Halifax, NS B3K 5M1

    .2 For: JD Kline Water Treatment Plant Roof – Phase 2

    Contract No. T26.2019

    .3 From:

    2. TENDERER DECLARES:

    .1 That this tender was made without collusion or fraud.

    .2 That the proposed work was carefully examined.

    .3 That the Tenderer was familiar with local conditions.

    .4 That Contract Documents and Addenda No. to inclusive were carefully

    examined.

    .5 That all the above were taken into consideration in preparation of this Tender.

    3. TENDERER AGREES:

    .1 To enter into a contract to supply all labour, materials and equipment and to do all

    work necessary to construct the Work as described and specified herein for the unit

    prices stated in Subsection 4 hereunder, Schedule of Quantities and Unit Prices.

    .2 That the total tendered price shall be the sum of the products of the tendered unit

    prices times the estimated quantities in Subsection 4 hereunder.

    .3 That this Tender is valid for acceptance for 90 days from the time of Tender Closing.

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 41 43

    T26.2019 Page 2

    Tender Form July 2019

    .4 That measurement and payment for items listed in Subsection 4 hereunder shall be in

    accordance with corresponding items in Section 01 22 00 Measurement and Payment.

    .5 The value of the liquidated damages payable to the Owner for the duration of the

    Period of Delay is $1,000.00 per day as detailed in Section 00 73 00 Supplementary

    Specifications, GC6.5.

    .6 In addition to the information required to be submitted by Section 00 43 00, Halifax

    Water may require further information to be provided within 7 days of request, which

    information may include: experience in similar work, work currently under contract,

    senior supervisory staff available for the project, equipment available for use on

    project, and financial resources.

    .7 To execute in triplicate the Agreement and forward same together with the specified

    contract security and insurance documents to the Owner within 14 days of written

    notice of award.

    .8 That failure to enter into a formal contract and give specified insurance documents

    and contract security within time required will constitute grounds for forfeiture of

    certified cheque or enforcement of bid bond.

    .9 That if certified cheque is forfeited, Owner will retain difference in money between

    amount of Tender and amount for which Owner legally contracts with another party

    to perform the Work and will refund balance, if any, to Tenderer.

    .10 That the Contract Documents include:

    .1 The 2018 updated version of the Standard Specifications for Municipal

    Services.

    .2 Project Documents:

    .1 00 20 00 Overview

    .2 00 41 43 Tender Form

    .3 00 43 00 Supplementary Tender Information

    .4 00 53 43 Form of Agreement

    .5 00 74 00 Supplementary Specifications

    .6 07 52 16 SBS Modified Bituminous Membrane Roofing

    .7 Appendix A –Halifax Water Contractor Health and Safety Policy Forms

    .8 Appendix B – Police Record Check

    .9 Appendix C – Environmental Management System

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 41 43

    T26.2019 Page 3

    Tender Form July 2019

    .10 Drawings

    Drawing A-1 - Roof E and F Plan Phase 2

    Drawing A-2 - Roof E and F Plan Phase 2

    Drawing A-3 - Section Details Phase 2

    Drawing A-4 – Section Details Phase 2

    .11 Addenda as issued and as confirmed in subsection 2.4 of this section.

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 41 43

    T26.2019 Page 4

    Tender Form July 2019

    4. SCHEDULE OF QUANTITIES AND UNIT PRICES

    Item

    No. Description

    Unit of

    Measurement

    Estimated

    Quantity

    Unit

    Price

    $

    Amount

    1

    Blister repair as indicated on

    drawings and specifications Lump Sum 1

    2

    Wet insulation removal and

    reinstatement as indicated on

    drawings and specifications Lump Sum 1

    3

    Install new cap sheet on roof

    sections C, D, E & F and

    reinstatement as indicated on

    drawings and specifications

    Lump Sum 1

    4

    Roof replacement for section G

    as indicated on drawings and

    specificaitons

    Lump Sum 1

    5 Blister repair - additional areas

    (Provisional) Square foot 200

    6

    Wet insulation removal –

    additional areas (Provisional) Square foot 200

    SCHEDULE OF QUANTITIES AND UNIT PRICES

    SUMMARY

    Total Tendered Price (Excluding HST) $

    Add HST (15% of Total Tendered Price) $

    Estimated Contract Price $

    Tenderer’s HST Registration No.

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 41 43

    T26.2019 Page 5

    Tender Form July 2019

    5. COMPLETION TIME

    .1 Tenderer agrees to have the work substantially complete on or before December

    15th, 2019.

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 41 43

    T26.2019 Page 6

    Tender Form July 2019

    6. SIGNATURE*

    DATED THIS DAY OF , 2019.

    [Seal]

    Name of Firm Tendering

    Witness Signature of Signing Officer

    Name and Title (printed)

    Witness Signature of Signing Officer

    Name and Title (printed)

    Company Address

    Telephone No.

    Fax No.

    *NOTE: Tenders submitted by or on behalf of any Corporation must be signed and sealed in the

    name of such Corporation by a duly authorized officer or agent.

    *****End of Section 00 41 43*****

  • Supplementary Tender Information

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 43 00

    T26.2019 Page 1

    Supplementary Tender Information July 2019

    1. This Section is required to be completed and submitted at the time of tendering with all

    information requested completed in full. Failure to submit the information requested in this

    Section will be cause for Halifax Water to treat your Tender as non-compliant.

    2. Submit with Tender the following:

    .1 Name and address of the chartered Canadian bank or reputable financial institutions

    to vouch for firm’s financial status.

    .2 Name and address of the company who has agreed to underwrite the bonds for

    Performance and for Labour and Material Payment.

    .3 Name and address of the company who will underwrite the contract insurance

    required.

    .4 Particulars of recent contracts successfully completed or progressing towards

    completion.

    .5 A list of equipment to be used.

    .6 A list of project personnel.

    .7 A list of subcontractors.

    .8 A program of the work.

    3. Submittals

    .1 Confirmation of Tenderer’s financial status.

    Name

    Address

    Contact Person Telephone

    .2 Name and address of company who has agreed to underwrite the bonds for

    Performance and for Labour and Material Payment. These bonds shall be issued by

    a duly licensed surety company authorized to transact the business of suretyship in

    the Province of Nova Scotia.

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 43 00

    T26.2019 Page 2

    Supplementary Tender Information July 2019

    Name

    Address

    Contact Person Telephone

    .3 Name and address of company who has agreed to underwrite insurance, the type and

    amount. This insurance shall be issued by a company having insurance adjusting

    representation in the Halifax metropolitan area.

    Name

    Address

    Contact Person Telephone

    Type of Insurance Amount

    .4 Particulars of recent contracts. Furnish particulars of a minimum of three contracts

    successfully carried out or in the process of being constructed. Projects listed shall

    be approximate in nature to the work being tendered for and be comparable or

    greater in size.

    Authority Description Date Contract Value

    from

    to

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 43 00

    T26.2019 Page 3

    Supplementary Tender Information July 2019

    from

    to

    from

    to

    from

    to

    from

    to

    from

    to

    .5 List of equipment to be used on this project.

    .6 List of project personnel.

    Include below the names, qualifications and previous experience of those employees

    who will be directly involved with the project. Include project engineer or manager,

    superintendent, foreman, and other senior staff.

    Name Position Related Experience

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 43 00

    T26.2019 Page 4

    Supplementary Tender Information July 2019

    .7 List of Subcontractors

    Enter the name and address of each Subcontractor used in making up this Tender.

    Only name one Subcontractor for each part of the Work to be sublet.

    Upon acceptance of a Tender by the Commission, the Contractor shall not substitute

    another Subcontractor in place of the one named without the written approval from

    the Commission’s Representative.

    Refer to Standard Specification Section 00 72 45 – General Conditions of the Civil

    Work Contract, Subsection GC 3.8 – SUBCONTRACTORS AND SUPPLIERS.

    Subtrade Subcontractor Extent of Work Value of Work

    Name and Address

  • JD Kline Water Treatment Plant Roof – Phase 2 Section: 00 43 00

    T26.2019 Page 5

    Supplementary Tender Information July 2019

    .8 Program of the Works

    Insert a brief description of the proposed method of operation and phasing to ensure

    completion in the period set forth in Section – 00 41 43 – Tender Form, Subsection 5

    – COMPLETION TIME.

    *****End of Section 00 43 00*****

  • Form of Agreement

  • JD Kline Treatment Plant Roof – Phase 2 Section: 00 53 43

    T26.2019 Page 1

    Form of Agreement July 2019

    This Agreement made on the day of in the year 2019.

    BY AND BETWEEN

    Halifax Regional Water Commission, 450 Cowie Hill Road, P.O. Box 8388 RP0 CSC

    Halifax, Nova Scotia B3K 5M1

    hereinafter called the “Owner”

    and

    hereinafter called the “Contractor”.

    The Owner and the Contractor agree as follows:

    ARTICLE A1 – THE WORK

    The Contractor shall:

    .1 Perform the Work required by the Contract Documents for

    JD Kline Water Treatment Plant Roof – Phase 2___________________________

    located within the Halifax Regional Municipality

    for which the Agreement has been signed by the parties, and for which

    Jonathan MacDonald, P.Eng (Insert above the name of the Engineer)

    is acting as and is hereinafter called the “Engineer”

    and

    .2 do and fulfill everything indicated by this Agreement, and

    .3 Tenderer agrees to complete the Work on or before December 15th, 2019

  • JD Kline Treatment Plant Roof – Phase 2 Section: 00 53 43

    T26.2019 Page 2

    Form of Agreement July 2019

    ARTICLE A2 – AGREEMENTS AND AMENDMENTS

    The Contract supersedes all prior negotiations, representations or agreements, either

    written or oral, relating in any manner to the work, including the bidding documents that

    are not expressly listed in Article 3 of the Agreement.

    ARTICLE A3 – CONTRACT DOCUMENTS

    The following is an exact list of the Contract Documents referred to in subsection 1.1 of

    this Agreement and as defined in subsection 2 of Section 00 71 00 DEFINITIONS. This

    list is subject to subsequent amendments in accordance with the provisions of the

    Contract Documents.

    .1 Most recent updated version of the Standard Specifications for Municipal Services.

    .2 Project Documents

    .1 00 20 00 Overview

    .2 00 41 43 Tender Form

    .3 00 43 00 Supplementary Tender Information

    .4 00 53 43 Form of Agreement

    .5 00 74 00 Supplementary Specifications

    .6 07 52 16 SBS Modified Bituminous Membrane Roofing

    .7 Appendix A –Halifax Water Contractor Health and Safety Policy Forms

    .8 Appendix B – Police Record Check

    .9 Appendix C – Environmental Management System

    .10 Drawings

    Drawing A-1 - Roof E and F Plan Phase 2

    Drawing A-2 - Roof E and F Plan Phase 2

    Drawing A-3 - Section Details Phase 2

    Drawing A-4 – Section Details Phase 2

    .11 Addenda as issued and as confirmed in subsection 2.4 of this section.

    ARTICLE A4 – CONTRACT PRICE

    .1 The Estimated Contract Price is the sum of the products of the estimated quantities

    multiplied by the appropriate Unit Prices in the Tender Form plus the amount of

    Harmonized Sales Tax.

    .2 The Estimated Contract Price is $

    .3 The amount shall be subject to adjustment as provided in the Contract Documents.

  • JD Kline Treatment Plant Roof – Phase 2 Section: 00 53 43

    T26.2019 Page 3

    Form of Agreement July 2019

    .4 The Contract Price shall be the sum of the products of the actual final quantities that

    are incorporated in, or made necessary by the Work, as confirmed by count and

    measurement, multiplied by the appropriate Unit Prices from the Tender Form

    together with any adjustments that are made in accordance with the provisions of the

    Contract Documents plus the amount of Harmonized Sales Tax.

    ARTICLE A5 – PAYMENT

    .1 The Owner shall pay the Contractor in Canadian funds for the performance of the

    Contract.

    .2 The Owner shall make monthly payments on account to the Contractor for the Work

    performed, as certified by the Engineer, subject to a 10% holdback.

    .3 The amount of the monthly payments shall be calculated as follows:

    .1 The quantity for each pay item on which actual work has been performed shall

    be measured.

    .2 For each Unit Price item this quantity shall be multiplied by the applicable

    Unit Price as provided in the Tender Form.

    .3 For each lump sum item, multiply the percent complete by the value of the

    lump sum item.

    .4 The total value of work completed for the payment period shall be calculated

    by adding the total of the products for all pay items from subsection 3.2 and

    3.3 of this section.

    .5 The amount of the monthly payment shall be determined by deducting the

    10% holdback and the total of all previous payments from the total value of

    such completed work as determined under subsection 3.4 of this section.

    .6 To the amount calculated above, the Harmonized Tax will be added.

    .4 The last day of the payment period shall be the last Friday of the month.

    .5 Upon Substantial Performance of the Work as certified by the Engineer the Owner

    shall pay to the Contractor the holdback monies then due in accordance with the

    provisions of Section 00 72 45 – General Conditions, subsection GC5.8 – PAYMENT

    OF HOLDBACK UPON SUBSTANTIAL PERFORMANCE OF THE WORK.

    .6 Upon the issuance of the final certificate for payment, the Owner shall pay to the

    Contractor the balance of monies then due in accordance with the provision of

    Section 00 72 45 – General Conditions, subsection GC5.10 – FINAL PAYMENT,

  • JD Kline Treatment Plant Roof – Phase 2 Section: 00 53 43

    T26.2019 Page 4

    Form of Agreement July 2019

    subject to the provisions of GC5.8 – PAYMENT OF HOLDBACK UPON

    SUBSTANTIAL PERFORMANCE OF THE WORK.

    .7 In the event of loss or damage occurring where payment becomes due under the

    property and boiler insurance policies, payment shall be made to the Contractor in

    accordance with the provisions of Section 00 72 45 – General Conditions, subsection

    GC11.1 INSURANCE.

    .8 If the Owner fails to make payments to the Contractor as they become due under the

    terms of the Contract, interest shall be payable as follows:

    .1 The annual interest rate applicable to the contract is [7] % compounded semi-

    annually.

    .2 Interest shall be calculated on the overdue balance from the due date.

    .9 The Streets & Services Permit Fee listed in the Section 00 41 43 – Form of Tender,

    Section 4 is an estimate. Payment of this amount will be based on the actual fee (as

    determined by HRM) which may be higher or lower than the estimate. Contractors are

    to submit a separate invoice for the actual fee. The invoice is to state that the fee is tax

    exempt and shall be accompanied by the payment receipt.

    ARTICLE A6 – RECEIPT OF AND ADDRESSES FOR NOTICES

    .1 Communications in writing between the parties or between them and the Engineer

    shall be considered to have been received by the addressee on the date of delivery if

    delivered by hand to the individual, or to a member of the firm, or to an officer of the

    corporation for whom they are intended, or if sent by post or by facsimile, to have

    been delivered within five (5) working days of the date of the mailing, dispatch or of

    delivery to the company when addressed as follows:

    .1 The Owner at 450 Cowie Hill Road, P.O. Box 8388 RP0 CSC, Halifax, Nova

    Scotia, B3K 5M1

    .2 The Contractor at

    .3 The Engineer at

  • JD Kline Treatment Plant Roof – Phase 2 Section: 00 53 43

    T26.2019 Page 5

    Form of Agreement July 2019

    ARTICLE A7 – QUANTITIES AND MEASUREMENT

    .1 The quantities shown in Section 00 41 43 Tender Form – Schedule of Quantities and

    Unit Prices are estimated.

    .2 Measurement for the actual quantities used to determine payments and Contract Price

    shall be in accordance with Section 01 22 00 – Measurement and Payment.

    ARTICLE A8 – SUCCESSION

    The aforesaid Contract Documents are to be read into and form part of the Agreement and

    the whole shall constitute the Contract between the parties and subject to law and the

    provisions of the Contract Documents shall ensure to the benefit of and be binding upon

    the parties hereto, their respective heirs, legal representatives, successors and assigns.

    ARTICLE A9 – RIGHTS AND REMEDIES

    .1 No action or failure to act by the Owner, Engineer, or Contractor shall constitute a

    waiver of any right or duty afforded any of them under the Contract, nor shall any

    such action or failure to act constitute an approval of or acquiescence in any breach

    thereunder, except as may be specifically agreed in writing.

    ARTICLE A10 – TIME

    Time shall be construed as being of the essence of the Contract.

  • JD Kline Treatment Plant Roof – Phase 2 Section: 00 53 43

    T26.2019 Page 6

    Form of Agreement July 2019

    In witness whereof the parties hereto have executed this Agreement and by the hands of

    their duly authorized representatives.

    SIGNED, SEALED AND DELIVERED CONTRACTOR [Seal]

    in the presence of:

    company name

    witness signature of signing officer

    name and title (printed)

    witness signature of signing officer

    name and title (printed)

    HRWC [Seal]

    Halifax Regional Water Commission

    company name

    witness signature of signing officer

    name and title (printed)

    witness signature of signing officer

    name and title (printed)

    (Where either the Halifax Regional Water Commission or Contractor calls for proof of

    authority to execute this document, proof of such authority in the form of a certified copy

    of a resolution naming the person or persons in question as authorized to sign the

    Agreement for and on behalf of the corporation or partnership, parties to this Agreement,

    should be attached.)

    *****End of Section 00 53 43*****

  • Supplementary Specifications

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 1

    Supplementary Specifications June 2019

    INTENT

    .1 The Work of this Contract is to be constructed in accordance with the 2018 updated version

    of the Standard Specifications for Municipal Services, as developed and published by the

    Nova Scotia Road Builders Association and Nova Scotia Consulting Engineers Association

    Joint Committee on Contract Documents, except as modified herein.

    .2 These Supplementary Specifications modify the specification sections to which they refer.

    .3 The Supplementary Specifications take precedence over the specification to which they

    refer.

    SECTION 00 21 00 – INFORMATION TO TENDERERS

    Delete in its entirety and replace with new section included in this document.

    SECTION 00 41 43 – TENDER FORM

    Delete in its entirety and replace with new section included in this document.

    SECTION 00 53 43 – FORM OF AGREEMENT

    Delete in its entirety and replace with new section included in this document.

    SECTION 00 71 00 - DEFINITIONS

    Add new definitions as follows:

    28. SPECIALIST

    CONTRACTOR .1 Specialist Contractor means a firm or person with

    whom the Owner has or will enter into a Contract or

    has placed or will place a purchase order for items or

    plant and equipment for incorporation in the Work.

    SECTION 00 72 45 – GENERAL CONDITIONS

    GC 3.5 – CONSTRUCTION SCHEDULE

    Delete Subsections GC 3.5.1.1 and replace with the following:

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 2

    Supplementary Specifications June 2019

    3.5.1.1 The Contractor shall prepare and submit to the Owner and the Consultant not later

    than seven (7) days after receipt of the letter of authorization to proceed with the

    Work, a construction schedule that indicates the timing of the major activities of the

    Work and provides sufficient detail of the critical events and inter-relationship to

    demonstrate the Work will be performed in conformity with the Contract Time;

    GC 5.4 – BASIS OF PAYMENT FOR COST PLUS WORK

    Add the following Subsections to GC 5.4:

    5.4.1.1 The fee for Contractor’s overhead and profit shall be 10% of the cost of the work.

    5.4.1.2 The cost for Contractor’s equipment shall be the current published Nova Scotia Road

    Builders Association Suggested Rental Rates for Construction Equipment. These

    rates are assumed to include overhead and profit and thus the percentage amount

    indicated in 5.4.1.1 shall not apply

    GC 5.7 – SUBSTANTIAL PERFORMANCE OF THE WORK

    Add the following Subsection to GC 5.7:

    5.7.5 In addition to the requirements for Substantial Completion of the Work (see

    definition 20) the successful completion of all testing and CCTV inspection relating

    to water, sanitary sewer, and storm sewer infrastructure must also be achieved in

    order for substantial completion of the work to be deemed achieved.

    GC 5.8 – PAYMENT OF HOLDBACK UPON SUBSTANTIAL PERFORMANCE OF THE

    WORK

    Delete Subsection GC 5.8.4 and replace with the following:

    5.8.4.1 Sixty (60) days after the issue by the Engineer of the Certificate of Substantial

    Performance of the Works, provided that the Contractor has by then signed the Final

    Measure, and has provided the Engineer with the following documents:

    .1 A statutory declaration to the effect that all expenses incurred by him in

    carrying out the Contract have been paid and releasing the Owner from any

    and all further claims relating to the Contract.

    .2 A certificate from a barrister stating that there are no Builders’ Liens filed

    relating to the Contract Works.

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 3

    Supplementary Specifications June 2019

    .3 A clearance certificate from the Nova Scotia Worker’s Compensation Board.

    Then the Owner shall release to the Contractor seventy-five percent (75%) of the

    Holdback. If, however, the Final Measure is not signed within the sixty (60) days

    following the issue of the Certificate of Substantial Performance or if the Contractor

    has failed to provide the required documents as listed above, then the Owner shall

    release seventy-five percent (75%) of the Holdback within two (2) weeks following

    the date on which the Contractor meets these requirements.

    5.8.4.2 The Owner will retain an amount equal to 25% of the Holdback as security and not

    as holdback. The Owner will utilize this security towards rectification of deficiency

    or warranty items that have not been addressed prior to the end of the warranty period.

    The use of these security funds does not relieve the Contractor from any obligations

    or requirements identified in GC12 Warranty. Within 21 days of the one year

    anniversary date of Substantial Performance, the Owner will release to the Contractor

    all monies and surety still retained, less the amount of any funds utilized by the Owner

    to rectify deficiencies as noted above.

    5.8.4.3 The Owner may retain out of the holdback amount, any sums required by law to

    satisfy any liens against the Work or, if permitted by the lien legislation applicable to

    the Place of Work, other third party monetary claims against the Contractor which

    are enforceable against the Owner.

    GC 6.5 – DELAYS

    Add the following Subsection to GC 6.5:

    6.5.6 Notwithstanding the above subsections, time shall be construed as being of the

    essence of the Contract. The date of expiring of the time allowed in accordance with

    the Contract for substantial performance of the Work shall be termed the Date for

    Completion. Should the Contractor fail to substantially perform the Work by the Date

    of Completion, the period of time from the Date for Completion to the date of

    Substantial Performance of the Work as determined by the Engineer, shall be termed

    the Period of Delay.

    6.5.7 In the event of there being a Period of Delay, the Contractor shall be liable for and

    shall pay to the Owner the cost of continuance of supervision during the Period of

    Delay, and all additional fees, disbursements and costs incurred by the Owner by

    reason of there being such period of delay. The said sum or sums in view of the

    difficulty of ascertaining the losses which the Owner may suffer by reason of delay

    in the performance of the said Works, is hereby agreed upon, fixed and determined

    by the parties hereto as liquidated damages that the Owner will suffer by reason of

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 4

    Supplementary Specifications June 2019

    said delay and default and not as a penalty. The value of the liquidated damages shall

    be $1000.00 per day for the duration of the Period of Delay. The Owner may deduct

    the amount of such liquidated damaged from any monies payable to the Contractor

    under the Contract.

    GC 9.1 – PROTECTION OF WORK AND PROPERTY

    Add the following Subsection to GC 9.1:

    9.1.5 Replace any survey markers, monuments, and survey pins disturbed during

    construction activities under the direction of a qualified provincial land surveyor.

    Include costs for these services in the Contract Price.

    GC 10.2 – LAWS, NOTICES, PERMITS AND FEES

    Add the following Subsections to GC 10.2:

    10.2.8 In addition to the permits required under GC 10.2.3, the Contractor shall obtain and

    pay for permits related to sedimentation and erosion control approvals and temporary

    watercourse control and diversion approvals, as required to complete the work, from

    Nova Scotia Environment.

    10.2.9 The Contractor shall obtain and pay for Watercourse Alteration permits, as required

    to complete the work, from Nova Scotia Environment. Include the costs for these

    permits in the Contract Price.

    10.2.10 The Contractor shall be responsible for providing any refundable deposits associated

    with obtaining HRM Streets and Services Permits.

    GC 11.2 – CONTRACT SECURITY

    Delete Subsection GC 11.2 and replace with the following:

    11.2.1 The Contractor shall provide to the Owner within fourteen (14) days of acceptance

    of his Tender a Performance Bond and a Labour and Material Payment Bond each in

    the amount of 50% of the Estimated Contract Price, or alternatively, provide an

    unconditional irrevocable letter of credit for 100% of the Estimated Contract Price.

    11.2.2 The bonds shall be issued by a duly licensed surety company authorized to transact a

    business of suretyship in the Province of Nova Scotia and shall be maintained in good

    standing until the fulfillment of the Contract. The form of the bonds shall be in

    accordance with the latest edition of the CCDC approved bond forms.

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 5

    Supplementary Specifications June 2019

    11.2.3 The letter of credit shall be issued by a chartered Canadian Bank and shall be valid

    until the conditions of GC 5.8.4.1 are fulfilled.

    GC 12.3 – WARRANTY

    Delete Subsection GC 12.3.1 and replace with the following:

    12.3.1 Except for extended warranties as described in paragraph 12.3.6, the warranty period

    under the Contract is two (2) years from the date of Substantial Performance of the

    Work.

    Add the following to Subsection GC 12.3:

    12.3.7 The Contract requires an operational combination of several components comprising

    the Work which are customarily guaranteed by their suppliers. Under the terms of

    this Contract, the Contractor shall provide a guarantee for the Works for a period of

    two (2) years following the date of continuous operation. The terms of the guarantee

    shall be as follows:

    .1 Where failure or incipient failure of the material is apparent, the Contractor

    shall actively commence repair or other remedy not more than twenty-four

    (24) hours after receiving due notice of trouble.

    .2 If the Contractor on being notified does not for any reason commence repairs

    within twenty-four (24) hours, the Owner shall have the right to have repairs

    made by others as necessary to restore or continue service. The cost of such

    repairs by others is to be borne by the Contractor. The Owner shall at all times

    inform or attempt to inform the Contractor before hiring others to effect any

    repairs and it shall be at all times the Contractor’s right to be informed as soon

    as possible of difficulties and proposed remedial action by others and to make

    or where practical to complete such repairs at any other time of the guarantee

    period in preference to others.

    .3 The employment of some other person or persons for reasons set out shall in

    no wise affect the Contractor’s obligations or liability hereunder or relieve

    him of the performance and fulfillment of any or all of his covenants,

    undertakings, obligations, or duties under the Contract.

    .4 After the acceptance by the Engineer and during the guarantee period, the

    burden of maintenance shall fall upon the Halifax Water as Owner. In the

    event of damage, failure or incipient failure of any part or parts directly

    attributable to inadequate or improper maintenance, the Contractor shall be

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 6

    Supplementary Specifications June 2019

    responsible for remedial action but the cost of all such repairs will be

    reimbursed by the Owner.

    .5 If the Contractor arranges that the manufacturer of some component or some

    other party approved by the Engineer provide the guarantee on a sub-contract

    basis, he may designate the direct implementer of the guarantee as his agent

    under the Contract in which case due notice to the agent will be taken as due

    notice to the Contractor. This will be a matter for Contractor’s convenience

    only, and shall in no way affect the Contractor’s obligations and liabilities

    hereunder or relieve him from the performance and fulfillment of any or all

    of his covenants, undertakings, or duties under this Contract.

    .6 In emergency situations the Owner reserves the right to make appropriate

    repairs at the Contractor’s expense.

    .7 All work of repair or replacement carried out during the Warranty period shall

    be maintained for a period of two (2) years from the date of the Owner’s

    acceptance of the work of repair or replacement notwithstanding that the

    Warranty period expires before the expiration of the said year. This

    requirement does not apply to normal operational maintenance, which will be

    carried out by the Owner.

    After Section 12, add the following new Section:

    GC 13 – RIGHT-OF-WAYS AND EASEMENTS

    13.1.1 The acquisition or obtaining of easements in respect of the lands comprising the Site

    will be effected by the Owner. If the Contractor deems it advisable to acquire the

    right or rights to use, enjoy or occupy any additional or adjacent land or lands in order

    to facilitate the execution of the Work, he shall obtain such right or rights at his own

    expense and shall, at all times, indemnify and save harmless the Owner from any and

    all claims arising from the acquisition of such right or rights or the use, enjoyment or

    occupancy of such lands or land.

    13.1.2 No building shall be constructed nor will any change in final grade be permitted on

    Halifax Regional Water Commission easements.

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 7

    Supplementary Specifications June 2019

    SECTION 01 10 00 – GENERAL REQUIREMENTS

    Delete Subsection 2 – SUMMARY OF WORK and replace with the following:

    2. SUMMARY OF WORK

    .1 The JD Kline Treatment Plan Roof project is

    located in the community of Hammonds Plains,

    Halifax. This project includes the replacement of

    wet areas, blister repairs and cap sheet on sections

    C, D, E, F & G as detailed on the drawings and

    specifications.

    .2 The supply and installation of all materials,

    services and labour required to complete the

    reinstatement of all disturbed areas as indicated on

    the drawings and specifications to existing or

    better condition.

    .3 Provision of environmental protection, where

    required.

    .4

    .5

    .6

    The work includes obtaining approval and

    necessary permits from the appropriate authorities

    of the Halifax Regional Municipality and their

    associated costs.

    The tender award is contingent on the approval

    from the Halifax Water Board and Nova Scotia

    Utility and Review Board.

    Award of the tender is contingent on obtaining

    criminal record check clearance on all employees

    required to complete the work. Contract will not be

    awarded until tenderer provides proof of criminal

    record check clearance to Halifax Water as per

    procedure outlined in Appendix B – Police Record

    Check.

    Add the following Subsection 7.1 – SHOP DRAWINGS:

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 8

    Supplementary Specifications June 2019

    7.1 SHOP DRAWINGS .8 This review will not mean that the Engineer approves

    the detailed design inherent in the shop drawings,

    responsibility remains with the Contractor, and such

    review does not relieve the Contractor from his

    responsibility for meeting all requirements of the

    Contract Documents.

    .9 If pre-ordered materials and equipment form part of

    the Work, make own arrangements with suppliers for

    the provision of shop drawings and be responsible for

    obtaining further information required to facilitate and

    ensure correct installation of materials and equipment.

    Add the following Subsection 7.5.3 – OPERATING AND MAINTENANCE DATA:

    7.5.3 OPERATING

    AND

    MAINTENANCE

    DATA

    .3 .3 Provide the Engineer with O&M manual information which

    shall include equipment, shop drawings, and information on

    valves and piping as well as an Equipment; Manufacturer; and

    Supplier’s List providing contact information in an Excel

    Spreadsheet format. The O&M manual information must also

    conform to Halifax Water Specifications.

    Add the following Subsections 8.3, 8.4 and 8.5 – RECORD DRAWINGS:

    8 RECORD DRAWINGS .3 Supply survey coordinates and elevations

    representative of all manholes, catch basins, valves,

    structures, pipework, and buried portions of the Work

    to the Engineer one (1) month after Substantial

    Performance of the Work.

    .4 Maintain a red line markup of changes to the drawing

    information provided in the contract drawings. At the

    end of the project a red line markup of changes made

    during the project in addition to an AutoCAD file with

    those changes shall be provided to the Engineer.

    .5 All materials provided to be complete and professional

    in appearance.

    Add the following to Subsection 9 - QUALITY CONTROL:

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 9

    Supplementary Specifications June 2019

    9. QUALITY CONTROL .8 Provide assistance, labour, and materials, as are

    normally required for examining, testing, and

    measuring the quality, weight, or quantity of any

    material used and supply samples of material

    requested before incorporation into the Work.

    .9 Include costs for providing assistance and samples for

    testing and of arranging tests in Contract Price.

    .10 Provide the Engineer with assistance for tests and

    inspections.

    Delete Subsection 12 – TRAFFIC CONTROL and replace with the following:

    12. TRAFFIC CONTROL .1 Provide traffic control in accordance with Temporary Workplace Traffic Control Manual, latest edition, as

    issued by the Nova Scotia Department of

    Transportation and Infrastructure Renewal. A traffic

    control plan is required for all Work performed within

    HRM and NSTIR rights-of-way. Contact HRM Traffic

    and Right of Way Services for traffic control

    requirements.

    .2 Traffic control and pedestrian management plans shall

    be submitted to HRM for approval prior to

    commencement of the work. A traffic control plan and

    pedestrian management plan that does not include all

    of the required elements listed below will be found

    incomplete, and returned for revision and re-submittal.

    Proposed street closures will require approval from

    HRM and the Engineer.

    .1 Traffic control plan shall indicate

    construction methods allowing work within

    rights-of-way to be completed efficiently and

    effectively, while maintaining a safe and

    organized movement of vehicles and

    pedestrians around and through temporary

    workplaces and, as well, to protect workers

    from errant vehicles. Traffic control plans to

    include details for controlling traffic at any

    signalized intersections and proposed lengths

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 10

    Supplementary Specifications June 2019

    and estimated duration of each diversion.

    Traffic control plans to also indicate how

    vehicular access will be maintained for

    residents of the affected streets during

    construction.

    .2 Pedestrian management plan shall

    indicate construction methods allowing work

    within rights-of-way to be completed

    efficiently and effectively, while maintaining a

    safe and organized movement of pedestrians

    around and through temporary workplaces and,

    as well, to protect and pedestrians from errant

    vehicles.

    .3 Prior to construction, the contractor shall survey all

    pavement markings within the project limits and

    submit a survey plan of existing markings to HRM for

    review. All affected pavement markings are to be

    reinstated as per the submitted plan or as per any

    modifications to the plan required by HRM Traffic

    Services.

    .4 Refer to the latest edition of HRM’s Traffic Control

    Manual Supplement for additional traffic control

    requirements when working in the Halifax Regional

    Municipality. This document can be found at

    https://www.halifax.ca/sites/default/files/documents/

    business/doing-business-

    halifax/Traffic_Control_Manual_Supplement-

    2018.pdf.

    Should the Contractor wish to use more restrictive

    traffic control measures, the Contractor shall submit a

    request for approval to HRM a minimum of two (2)

    weeks in advance of the proposed work.

    .5 A full closure of streets will not be permitted unless

    approved in advance by HRM.

    .6 All existing sidewalks must remain opened during

    construction. If a sidewalk must be closed, the

    Contractor shall submit a temporary sidewalk closure

    plan to HRM for approval.

    https://www.halifax.ca/sites/default/files/documents/business/doing-business-halifax/Traffic_Control_Manual_Supplement-2018.pdfhttps://www.halifax.ca/sites/default/files/documents/business/doing-business-halifax/Traffic_Control_Manual_Supplement-2018.pdfhttps://www.halifax.ca/sites/default/files/documents/business/doing-business-halifax/Traffic_Control_Manual_Supplement-2018.pdfhttps://www.halifax.ca/sites/default/files/documents/business/doing-business-halifax/Traffic_Control_Manual_Supplement-2018.pdf

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 11

    Supplementary Specifications June 2019

    .7 Maintain access to all adjacent properties.

    .8 All costs associated with traffic and pedestrian

    management, permitting and advertising will be borne

    by the Contractor.

    .9 HRM retains the right to deny requests made by the

    Contractor if such requests are not considered

    appropriate by HRM.

    Add the following Subsections:

    17. PHOTOGRAPHS .1 Prior to commencement of the Works, the Engineer

    may arrange for photographs to be taken of the site and

    those properties adjacent to the site.

    .2 Accompany Engineer during the taking of

    photographs to make any comments on the conditions

    of the site or adjacent properties.

    .3 Engineer will retain photographs, together with a

    written report, on the condition of existing roads,

    sidewalks, trees, lawns, and adjacent properties as

    determined by mutual agreement as a record of

    existing conditions prior to the start of Work.

    18. NOISE .1 Operate construction equipment such that there is a

    minimum amount of noise and vibration.

    .2 At the discretion of the Engineer, Contractors working

    for Halifax Water may be permitted night and

    weekend work if provisions are followed in

    accordance with HRM By-Law (N-200).

    19. FLOATATION AND

    FLOODING .1 Prevent floatation and flooding during construction of

    the Work. Make good any damage to pipes or

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 12

    Supplementary Specifications June 2019

    structures caused by floatation and flooding at no extra

    cost to the Contract.

    .2 De-water all excavations and remove accumulations

    of water prior to backfilling.

    .3 Dispose of water drained or pumped such that the

    Work and adjacent properties are not damaged.

    20. UTILITIES .1 Do not operate valves, electrical and telephone

    controls on existing utility systems.

    .2 Apply to the utility having jurisdiction for permission

    to operate such systems if it becomes necessary, and

    only operate such system in accordance with, and in

    the presence of a representative of the utility company

    affected.

    .3 Include an amount in the contract price to cover the

    cost of having a utility company representative present

    when the Work passes under or in close proximity to

    underground cables, structures or utility poles.

    .4 Provide a letter from the utility affected stating that

    any services damaged during construction have been

    repaired to the utility company’s approval.

    21. DAMAGE AND INJURY .1 Protect the Work and adjacent property from damage

    and injury in accordance with Section 00 72 45,

    General Conditions, Part 9 – GC 9.1 PROTECTION

    OF WORK AND PROPERTY.

    .2 Immediately inform Engineer of any damage or injury

    to any persons, property, services or materials.

    .3 Relocate survey markers, monuments, and survey pins

    disturbed during construction under the direction of a

    qualified provincial land surveyor. Include costs in

    Contract Price.

    22. HEALTH AND SAFETY .1 The Contractor and subcontractors, as applicable, shall

    at all times, have in effect a Letter of Good Standing

    of the Certificate of Recognition Program from the

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 13

    Supplementary Specifications June 2019

    Nova Scotia Construction Safety Association. The

    Letter of Good Standing shall indicate the Contractor’s

    or the Sub-Contractor’s current standing falls into one

    of the following categories:

    Certificate of Recognition

    Audit Pending

    In the Process

    .2 Compliance with Section 5 (Contractor Health and

    Safety Policy) of Halifax Water’s Occupational

    Health & Safety Manual is a project requirement.

    This document and related forms are included in

    Appendix A.

    .3 Seven (7) days prior to the start of construction, the

    Contractor shall submit a Site Specific Hazard

    Assessment, and copies of his Safe Work Practices,

    Utility Locates and Corporate Safety Policy to

    Halifax Water.

    23. POLICE RECORD CHECKS .1 All Contractor personnel who will be working for

    Halifax Water must obtain a “Police Record

    Check” (PRC). Refer to Appendix B. PRC shall

    be in place prior to an individual working on the

    project.

    SECTION 01 22 00 – MEASUREMENT AND PAYMENT

    General

    Delete Subsection 1. and replace with the following:

    1. The unit and lump sum prices for all items in the Form of Tender “Schedule of Quantities

    and Unit Prices” shall be full compensation for the work of the Item and shall include the

    cost of furnishing all materials, labour, tools, and equipment necessary to complete the

    work in accordance with the Contract, the Drawings and Specification, and shall cover all

    costs of surety, mobilization, assistance to the Engineer and site offices. Each item shall

    include for all necessary supervision, labour, tools and equipment, materials, plant and

    services, Quality Assurance and all operations and allowances customary and necessary to

    complete each item and the Contract as a whole notwithstanding the fact that not every

    such necessary operation is mentioned or included specifically for measurement.

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 14

    Supplementary Specifications June 2019

    Delete Subsection 2. and replace with the following:

    2. For each item include all of the following as required where individual quantities are not

    provided in the Tender Form: approvals, permitting and/or permissions in accordance with

    requirements of Authorities having jurisdiction, mobilization, police record checks, site

    offices, all plan submissions, assistance to the Engineer, traffic control, coordination of work

    by external utilities (NSPI, Aliant, Halifax Water, HRM, Heritage Gas, and any others),

    environmental protection, clearing, grubbing, site grading, common excavation, shoring,

    sheeting, cofferdams, dewatering, temporary works, temporary watercourse control and

    diversion, protection and supporting of existing services, control of water and runoff, tree

    protection, removal and disposal of existing infrastructure at approved disposal facility,

    backfilling, bedding, compaction, polyethylene encasement, anodes, protective coating, joint

    restraints and thrust blocks, disposal of surplus materials, pipeline insulation, marker tape,

    trace wire and test stations, frames and covers, reinstatement of all disturbed surfaces

    (including curbs, gutters and sidewalks) with specified materials and thicknesses,

    reinstatement of site amenities (including guardrails and signs), repair of all existing water

    and sewer service laterals that are damaged during construction, testing, pipe cleaning,

    flushing, disinfection, dechlorination, marker stakes, field records and survey, supply of

    record and O&M information, commissioning and operator training and all incidentals.

    Add Subsections 5. and 6. as follows:

    6. Halifax Water will retain a materials testing engineer for quality assurance of materials

    placed on site. Halifax Water will pay for this service with the exception of re-testing due to

    failed materials test results. Any additional costs incurred by Halifax Water due to failed

    materials test results will be back charged to the contractor.

    7. Provisional items shall mean that the unit price as tendered shall be included in the

    estimated Contract Price and that the Owner reserves the right to delete all or portions of

    this item from the estimated Contract Price.

    Delete item 5 as and replace with the following:

    5. Blister Repair – Additional Areas (Provisional)

    Unit of Measurement: square foot (ft2)

    Method of Measurement: Surface area of blister repair area

  • JD Kline Treatment Plant Roof – Phase 2

    T26.2019

    Section: 00 74 00

    Page 15

    Supplementary Specifications June 2019

    This item includes: All labour and materials to complete the work where the area of existing

    blistered cap sheet is found to be larger than indicated on the plan. This pay item shall be the unit

    price for removal and replacement of cap sheet ready to receive the new recover cap sheet as

    detailed on the drawing and specifications.

    Delete item 6 and replace with the following:

    6. Wet insulation removal – additional areas (Provisional)

    Unit of Measurement: square foot (ft2)

    Method of Measurement: Surface area of wet roof insulation area

    This item includes: All labour and materials to complete the work where the area of wet insulation

    is found to be larger than indicated on the plan. This pay item shall be the unit price per sq. ft. for

    removal of the roof system with wet insulation, preparation of the vapour barrier surface and

    replacement of the total roofing system ready to receive the new recover cap sheet.

    NEW SECTIONS TO BE INCLUDED

    SECTION 00 43 00 – SUPPLEMENTARY TENDER INFORMATION

    SECTION 07 52 16 – SBS MODIFIED BITUMINOUS MEMBRANE ROOFING

    *****End of Section 00 74 00*****

  • SBS Modified Bituminous Membrane Roofing

  • Pockwock Water Treatment Plant Roof – Phase 2 Section: 07 52 16 T26.2019 Page 1

    SBS Modified Bituminous Membrane Roofing June 2019

    PART 1 - GENERAL

    1.1 SCOPE OF THE WORK .1 The project was divided into two phases:

    .1 PHASING .1 PHASE 1 - Roof Block A and B where re-roofed in

    2017. .2 PHASE 2 is to be done in the summer of 2019.

    .2 PHASE 2: Roof Block C, D, E, F and G are to have a cap sheet recover installed after replacing identified wet insulation and patching of blisters where the insulation is not wet.

    1.2 RELATED WORK PERFORMED BY OTHERS .1 Nil.

    1.3 RELATED WORK PERFORMED BY OWNER .1 Nil.

    1.4 REFERENCES .1 CSA B35.3-1962 Tapping and Drive Screws (Slotted and Recessed Head, Thread).

    .2 CGSB 37-GP-56M-80 Membrane, Modified, Bituminous, Prefabricated, and Reinforced for Roofing.

    .3 Canadian Roofing Contractors Association - CRCA Roofing Specifications Manual - latest edition.

    .4 CAN/ULC-S704 Thermal Insulation, Polyisocyanurate Boards and Pipe Covering.

    . 1.5 SHOP DRAWINGS .1 Provide product data for each component / material to be provided.

    1.6 STORAGE AND HANDLING .1 Provide and maintain dry, off-ground weatherproof storage.

    .2 Store rolls of membrane in upright position.

    .3 Remove only in quantities required for same day use.

    .4 Place plywood runways over work to enable movement of material and other traffic.

    .5 Store caulking at +5C minimum.

    .6 Store insulation protected from weather and deleterious materials.

    1.7 PROTECTION .1 Fire Extinguishers: maintain one stored pressure rechargeable type with hose and shut off nozzle, ULC labeled for A, B, and C class

  • Pockwock Water Treatment Plant Roof – Phase 2 Section: 07 52 16 T26.2019 Page 2

    SBS Modified Bituminous Membrane Roofing June 2019

    protection. One size 9 kg unit on the roof per torch applicator, within 6 m of the applicator.

    .2 Maintain fire watch for 1 hour after each day=s roofing operations cease.

    1.8 ENVIRONMENTAL REQUIREMENTS .1 Do not install roofing when wind chill temperature remains below -18

    degrees C for torch application.

    .2 Install roofing on dry deck, free of snow and ice, use only dry materials and apply only during weather that will not introduce moisture into roofing system.

    1.9 WARRANTY .1 Contractor hereby warrants that modified bituminous roofing and membrane flashings as follows: .1 2 year CRCA materials and workmanship against leaks and

    blow off. .2 10 year material warranty that the membrane will perform as a

    roofing material.

    .2 1 year CRCA warranty against defects of materials and workmanship for the sheet metal work.

    1.10 COMPATIBILITY .1 Compatibility between components of roofing system is essential. Provide written declaration to Architect stating that materials and components, as assembled in system, meet this requirement.

    PART 2 - PRODUCTS

    2.1 VAPOUR BARRIER .1 Vapour Barrier : existing two ply felt and asphalt vapour barrier to

    remain.

    2.2 POLYISOCYANURATE INSULATION .1 Polyisocyanurate insulation: to ULC-CAN-S701

    .2 Type 2, Class 3.

    .3 Size 4' x 4' square edge.

    .4 Insulation thickness plus recovery board with factory applied base sheet is to match existing roofing total thickness and provide a level surface for the new torched cap sheet. Insulation is uniform thickness.

    Thickness probes have been done on all four roof sections and that information is noted in the legend as 3” overall thickness.

    .5 Thickness of replacement insulation plus recovery board at drains is to match the existing drain flange level so new cap sheet can easily be installed to the drain flange.

  • Pockwock Water Treatment Plant Roof – Phase 2 Section: 07 52 16 T26.2019 Page 3

    SBS Modified Bituminous Membrane Roofing June 2019

    .6 Acceptable material; .1 Sopra-ISO by Soprema .2 IKO Therm

    2.3 TWO PART LOW RISE FOAM ADHESIVE .1 Two part low rise polyurethane adhesive for roofing insulation and

    overlay boards. .1 Acceptable material:

    .1 IKO Millennium

    .2 Soprema Duotack

    2.4 FASTENERS .1 ¼” x 1 ½” Zamac pin bolts for termination bars to concrete.

    .2 Color Mate screws where exposed on metal flashing.

    2.5 INSULATION COVER BOARD WITH FACTORY APPLIED BASE SHEET .1 Support panel composed of 180 gram base sheet with thermofusible

    surface laminated to 3/16” asphalt recovery board. Sanded bottom surface. Total thickness approximately 1/4".

    .2 Acceptable material: .1 Smart Board - by Soprema .2 Protectobase Welded Board - by IKO

    2.6 CAP SHEET MEMBRANE .1 Cap sheet: to CGSB 37-GP-56M, Styrene-Butadiene-Styrene (SBS)

    elastomeric polymer prefabricated sheet, polyester reinforcement, weighing 250 g/m2. .1 Type 1 fully adhered. .2 Class A-granule surfaced. .3 Grade 2 heavy duty service. .4 Bottom surface polyethylene .5 Acceptable material:

    .1 PrevENT TP 250 Cap by IKO

    .2 Sopralene Flam 250 FR GR by Soprema

    2.7 SEALERS AND PRIMER .1 Modified plastic cement: asphalt, to CAN/CGSB-37.5.

    .2 Sealing compound: to CAN/CGSB037.29, rubber asphalt type.

    .3 Primer for modified roof membrane as recommended by the membrane manufacturer.

    2.8 METAL FLASHING .1 22 gauge pre-painted steel - Colorite HMP finish.

    .2 Color - to match existing.

    2.9 ROOF DRAINS .1 Reuse existing.

  • Pockwock Water Treatment Plant Roof – Phase 2 Section: 07 52 16 T26.2019 Page 4

    SBS Modified Bituminous Membrane Roofing June 2019

    .2 Drill out any broken studs and re-tap.

    .3 Install new metal domes on all drains.

    2.10 PLYWOOD AND WOOD .1 Wood for blocking to be No. 1 or better S-P-F NOT PRESSURE

    TREATED.

    .2 Plywood to be softwood plywood - select.

    2.11 PLUMBING VENT FLASHING .1 Thaler Stackjack Flashing SJ-37 - 7" high, insulated.

    2.12 EXPANSION JOINT .1 Situra FlamLINE 40

    2.13 SEAL AT DUCT SUPPORTS

    .1 Sealing system for duct supports. .1 Precast form components – height 2” .2 Structural sealant .3 Pourable sealant Approved products -

    .1 Sopramastic Blocks, Sopremastic SP-2 and Sopramastic PF pocket fill

    .2 ChemCurb Blocks, M-1 structural sealant, 1 Part Pourable Sealant

    PART 3 - EXECUTION

    3.1 WORKMANSHIP .1 Do roofing work in accordance with applicable, standard in Canadian Roofing Contractors Association (CRCA) Roofing Specifications Manual, latest edition, and the printed instructions from the membrane manufacturer.

    3.2 PROTECTION .1 Cover walls and adjacent work where materials are hoisted or used.

    .2 Use warning signs and barriers. Maintain in good order until completion of work.

    .3 Clean off drips and smears of bituminous material immediately.

    .4 Ensure that all roof drains remain in operation from the start of the project until completion. Clamping rings are to be re-installed at the end of every day.

    .5 Protect roof from traffic and damage. Comply with precautions deemed necessary by Architect.

    .6 At end of each day's work or when stoppage occurs due to inclement weather, provide protection for completed work and materials out of storage.

  • Pockwock Water Treatment Plant Roof – Phase 2 Section: 07 52 16 T26.2019 Page 5

    SBS Modified Bituminous Membrane Roofing June 2019

    3.3 INSULATION THICKNESS

    .1 The overall thickness of the existing layer of insulation, cover board and roof membrane has been probed in each of the four roof areas and that information is noted in the legend as 3”.

    3.4 REMOVALS .1 Remove expansion joint flashing and dispose of legally off site.

    .2 Where insulation has been identified as wet, as noted on the Roof Plan, remove the existing roof system, including wet insulation to the level of the existing two ply felt and asphalt vapour barrier.

    .3 Do not damage the existing two ply felt and asphalt vapour barrier.

    .4 Use a manually powered stiff wire brush to remove any insulation and insulation facer still adhered to the vapour barrier.

    .5 At identified blisters cut back cap sheet to well adhered membrane.

    .6 Vacuum up all dust and debris.

    3.5 INSTALLATION OF INSULATION ON ORIGINAL VAPOUR BARRIER .1 Install insulation over existing vapour barrier using two part low rise

    foam in beads spaced at 6” c/c over the entire area of cleaned off vapour barrier. Bead to be minimum of 1/2” diameter when it exits the nozzle.

    .2 Cut end pieces to fit tightly.

    .3 Ballast down each 4’ x 4’ piece of insulation with four rolls of membrane standing on end until adhesive has achieved lock up.

    3.6 INSTALLATION OF INSULATION COVER BOARD

    .1 Install an 8” width of base sheet around the perimeter of the new insulation area as per the detail to provided a barrier to flame getting to the edges of the existing roof which has a double ½” fiberboard insulation cover board.

    .2 Install insulation cover board with joints staggered from those in the insulation layer and all edges tightly butted using the same adhesive bead size and pattern as for insulation

    .2 Ballast down each board with sufficient rolls of membrane, standing on end, to ensure good contact until adhesive sets up.

    .3 Heat weld all end and side laps.

  • Pockwock Water Treatment Plant Roof – Phase 2 Section: 07 52 16 T26.2019 Page 6

    SBS Modified Bituminous Membrane Roofing June 2019

    3.7 PREPARATION OF EXISTING CAP SHEET TO RECEIVE NEW CAP SHEET .1 Cut out all blisters in existing cap sheet and apply torched cap sheet

    patches set flush to edges of existing membrane.

    .2 Use a powered wire brush to remove all loose granules and lichen from the existing cap sheet but do not destroy the surface of the cap sheet.

    .3 Heavily prime the prepared surface of the existing cap sheet and let it dry completely.

    3.8 EXPOSED MEMBRANE APPLICATION

    .1 Cap sheet application: .1 Starting at low point on roof, perpendicular to slope, unroll cap

    sheet, align and re-roll from both ends. .2 Unroll and torch cap sheet onto base sheet taking care not to

    burn membrane or its reinforcement. .3 Lap sheets 75 mm minimum for side laps and 150 mm

    minimum for end laps. Offset joints in cap sheet 300 mm minimum from those in base sheet.

    .4 Application to be free of blisters, fishmouths and wrinkles.

    .5 Do membrane application in accordance with manufacturer's recommendations.

    .2 Self-adhesive membrane flashing application: .1 Prime the exterior wood surface of the roof edge blocking and

    install self-adhesive membrane over the full surface. Lap modified bituminous flashing membrane down over the self-adhesive membrane without torching and nail with roofing nails at 6" c/c along the edge of the membrane.

    3.9 SEAL AT DUCT SUPPORT POSTS INSTALLATION .1 Install the ChemCurb / Soprema System as per the printed instructions

    of the manufacturer.

    .2 Remove all previous caulk, mastic cement, asphalt and other contaminants from the surface of the posts with a wire brush to ensure proper bonding.

    .3 Ensure that there is a minimum of 1" spacing between the post and the edge of the shell.

    3.10 METAL FLASHING .1 Generally existing to remain.

  • Pockwock Water Treatment Plant Roof – Phase 2 Section: 07 52 16 T26.2019 Page 7

    SBS Modified Bituminous Membrane Roofing June 2019

    3.11 CLEANING .1 Remove bituminous markings from finished surfaces.

    .2 In areas where finished surfaces are soiled by work of this section. Consult manufacturer of surfaces for cleaning advice and comply with their documented instructions.

    .3 Repair or replace defaced or disfigured finishes caused by work of this section.

    3.12 FIELD QUALITY CONTROL .1 Periodic site review of roofing application will be carried out by the

    Architect.

    END OF SECTION

  • Appendix A – Contractor Health and Safety Policy and Forms

  • OCCUPATIONAL HEALTH & SAFETY PROGRAM MANUAL

    Section 5

    Contractor Health & Safety Policy Rev: March 2016 Page 5.1

    5.01 Purpose To promote the health and safety of both Halifax Regional Water Commission (Halifax Water) employees and contracted personnel at all times when conducting work on behalf of Halifax Water. This policy does not relieve employees or contracted personnel from adhering to the Occupational Health and Safety Act (OHSA). 5.02 Scope This procedure applies to all Halifax Water administered Work where the Contractor controls the Place of Work within the street right of way, public easement or Halifax Water property. 5.03 Definitions Corrective Action Plan (CAP) A specific plan developed to address a safety deficiency or

    required improvement to a safe work practice. The plan should contain tasks or changes required to mitigate future risks, provide a timeline for implementation of the tasks and identify the responsible person.

    Place of Work Specific Safety Plan Is a tool to identify all tasks that the Contractor will be

    performing throughout the duration of the Work and shall include a hazard analysis for each task identifying the controls the Contractor will be putting in place to address the hazard. The Contractor Place of Work specific safety plan shall be kept up-to-date throughout the duration of the Work.

    Near Miss Is an unplanned event that did not result in injury, illness,

    or damage but had the potential to do so. Note in the context of the OHSA the Contractor is the “Constructor” 5.04 References Occupational Health & Safety Act of Nova Scotia (“OHSA”) Occupational Safety General Regulations

  • OCCUPATIONAL HEALTH & SAFETY PROGRAM MANUAL

    Section 5

    Contractor Health & Safety Policy Rev: March 2016 Page 5.2

    5.05 Roles and Responsibilities

    Owner The Owner is responsible to ensure the implementation of and adherence to this policy at all times, which includes monitoring the Work. Contractor Contractors must comply with this policy at all times and are responsible to ensure their employees, sub-contractors, suppliers and agencies comply with this policy at all times. Contractors must communicate all safety concerns and deficiencies to the Owner. A Corrective Action Plan (CAP) shall accompany the notification. 5.06 Implementation The Contractor must adhere to the following after securing the Contract with Halifax Water: Ongoing Compliance Throughout the duration of the Contract, the Contractor must immediately provide the Owner with copies of any regulatory inspections, such as:

    • compliance orders; • notices of compliance; • directives; and/or • fines administered by any regulatory authority in connection with the Work

    Place of Work-Specific Safety Plan Review A Contractor Place of Work Specific Safety Plan (see attached) shall be submitted to the Owner, prior to commencement of Work. The Contractor Place of Work Specific Safety Plan shall be reviewed with the Contractor at the Place of Work, before the Work commences. Accident/Near Miss Reporting and Safety Deficiencies Contractors must follow their own work safe procedures for incident/Near Miss reporting and inspections processes. Contractors must immediately report all incidents and Near Misses to the Owner. If a Contractor does not have a Near Miss program, the Owner’s Near Miss form may be used (see attached). If a Contractor is given notice of a safety deficiency, the Contractor must comply with the Safety Deficiency Notice for Contractors (see attached) and correct deficiencies as immediately.

  • OCCUPATIONAL HEALTH & SAFETY PROGRAM MANUAL

    Section 5

    Contractor Health & Safety Policy Rev: March 2016 Page 5.3

    Work within Halifax Water Facilities When Work is to occur within facilities operated by Halifax Water, the following forms are to be completed by the owner and Contractor:

    • Halifax Water Safe Work Permit • Contractor Orientation Sign-Off

    5.07 Forms Place of Work-Specific Safety Plan Near Miss Reporting Form Safety Deficiency Notice for Contractors Halifax Water Safe Work Permit Contractor Orientation Sign-Off

  • PLACE OF WORK SPECIFIC SAFETY PLAN SECTION 1- GENERAL INFORMATION: Date: ________________________________________________ Work: ________________________________________________ Scope: ________________________________________________ Owner: ________________________________________________ Signature Contractor: ________________________________________________ Contractor Representative: _____________________________________________ Signature

    SECTION 2 – SITE HAZARD EVALUATION Excavations, Power Lines and Traffic Control *Note: All excavations must comply at all times with Part 14 of the Occupational Safety General Regulations

    Check if

    Complete

    Excavations Method of Protection: Sloping Trench Sheild Approved Shoring Manufactured System Geotech Engineer’s Certificate

    Have all buried utilities been located? Yes No Have all locate certificates been obtained? Yes No Is blasting required? Yes No