ATTACHMENT A ACKNOWLEDGEMENT:
I acknowledge that I have reviewed and agree to the terms and conditions set forth in(attached).
Signed: Date:
CONTRACTOR ALTERNATES:
Contractor Alternate 1:
Add/Deduct $ + bond $ = $(circle one)
Contractor Alternate 2:
Add/Deduct $ + bond $ = $(circle one)
PROPOSAL UNIT PRICES:
All unit prices shall include all items, labor, material, equipment, overhead and profit, insurance, etc., for acomplete unit price.
Unit Price A:
Unit Price B:
Additional or deleted over excavation
Additional or deleted structural fill/select fill
$ /CY
(including machine and hand backfill and compaction) $ /CY
Unit Price C: Caisson spoil removal (waste onsite) $ /CY
Caisson spoil removal (waste offsite) $ /CY
Unit Price D: Export concrete/masonry spoils (offsite) $ /LD (End Du
Unit Price E: Additional mobilizations
$ /EA
Unit Price F: Rock excavation (refer to specification for definition of rock) $ /CY
Unit Price G: Utility spoils (onsite) $ /CY
Utility spoils (offsite) $ /CY
Unit Price H: Erosion control:
Silt fence installed $ /LF
V.T.C. pads $ /EA
7/25/2019 Tender Sample
2/2
LABOR UNIT PRICES: Labor unit prices per man-hour including all overhead, profit and fringe benefits. (This will be used forevaluation of change orders and T & M work.)
Labor Description* Regular Shift Work Overtime
*i.e.: foreman, framer, carpenter, laborer, etc.
EQUIPMENT UNIT PRICES
Unit cost for operated equipment, including all costs and overhead/profit.
Equipment Description* Daily Weekly Monthly
(Attach a separate page if necessary.)
TYPE OF WORK:
SPECIFICATION SECTION NUMBERS:
Division 1, General RequirementsDivision 311000, Site ClearingDivision 312000, Earth MovingDivision 321123, Aggregate Base Courses
DRAWING NUMBERS:
SPECIFICATIONS:
Corporate Seal