BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 1 of 32 Year 2018
TENDER DOCUMENT FOR BUTT CRUSHING AT
RODDING SHOP
TENDER DOCUMENT-
BALCO/COMM/CONTRACT/BCRUSH/2018
Head Commercial
Bharat Aluminium Company Ltd.
Commercial Office
Admin Building
BALCO NAGAR
Korba – 495684
E-mail: [email protected]
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 2 of 32 Year 2018
TENDER REF. NO:- BALCO/COMM/CONTRACT/BCRUSH/2018
INDEX
1. Instruction to the Bidder
2. Offer Letter
3. Scope of work;
4. Period of Contract
5. Payment Terms
6. Contract Performance Evaluation
7. Balco's General Terms & Conditions
8. Price Format
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 3 of 32 Year 2018
1) INSTRUCTION TO THE BIDDER
Vedanta Resources plc (“Vedanta”) is a LSE listed FTSE 100 Company with a market cap including that of its listed subsidiaries of about $ 50 billion. We operate across the following core business sectors: Zinc-Lead-Silver, Copper, Aluminum, Iron Ore and Energy, with operation located in geographies spanning India, Australia, UAE, Zambia, South Africa, Namibia and Ireland. Over the past 5 years the group has displayed exemplary appetite for organic and inorganic growth-with an industry leading organic growth program of $ 20 billion nearing completion. Bharat Aluminium Company Limited (BALCO), a Member of Vedanta India is a fully integrated Aluminium producer with an installed capacity of 245 ktpa aluminium and 810 MW of power. We are currently implementing expansion projects, which includes a 650 ktpa capacity Aluminium smelter (1st phase 3.25 ktpa) and 1200 MW Power Plant. With the completion of these projects, BALCO will have a total installed metal capacity of 1 mtpa and 2010 MW of power. Our metal business currently produces 75 ktpa rolled products & 200 ktpa wire rods & with completion of 1st phase metal expansion, rolled products & wire rods capacity shall increase to 80 ktpa & 500 ktpa respectively. Our businesses also include a coal mines and operating Bauxite mines. What BALCO is looking forward with this contract:
High Level of Service quality.
100% adherence to all the deliverables.
Zero accidents environment.
100% reporting of all the near miss incidents and corrective measures for all to ensure no accident due to the unsafe conditions.
Increased availability of all the equipments and the total system to ensure better efficiency and higher levels of productivity.
Ensuring higher productivity per man hour by introducing better Operating Procedures.
Introduction of innovative ideas which can save in terms of time or money.
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 4 of 32 Year 2018
Information / Credential of Service Providers / Bidder The following information is Compulsory and should be furnished completed in all aspects
along with your offer.
I. Brief history of organization, along with organization chart, mentioning the Name,
Designation & Tel. Nos of the contact persons in your company holding all key
positions.
II. Client list, with copies Contracts of your Top 5 clients.
III. Banker’s name and your Company’s annual audited report / Balance Sheet for last 2
years.
IV. The details of Machinery and Equipment available with you which are in working
condition are to be furnished.
V. If the space provided in the registration form is not sufficient, please attach separate
VI. Sheets and give Annexure reference number on the attached sheet.
VII. Registration Details
VIII. Registration No. and date (Kindly attach a photocopy of registration certificate)
IX. Membership to any body
X. Any other Statutory Registration.
XI. Registration details with taxation authorities:
a. Permanent Income Tax A/c No.
b. Service tax Registration
XII. For any new agency participating first time in BALCO tendering, must register their
company as new service Service Provider on our SRM Portal at
www.Balcoindia.com/Service Providerzone
For Clarifications: Commercial: Mr.Mahesh Lanjhekar <[email protected]>
8827176168 Technical: Mr Harsh Mittal <[email protected]>
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 5 of 32 Year 2018
2) FORMAT FOR OFFER LETTER
To,
Head Commercial Contract Cell
Bharat Aluminium Company Ltd.
Commercial Office
Admin Building
BALCO NAGAR
Korba – 495684
Offer reference N.: /…………..dt. ……….2014
Sir,
1. We hereby undertake to perform the scope of work as defined in the condition of
Bharat Aluminium Co. Ltd., Tender Ref no: , dated . .2014 at the
prices and within the period stated in the attached schedules & in conformity with all the
conditions are included therein.
2. This offer is valid for a minimum period of 90 days.
3. We agree that any Contract placed as result of this offer will be in accordance with the
terms & conditions in the said offer. We declare that any other terms or conditions of the
contract or any general reservations which may be printed on any correspondence of
documents emanating from us in connection with tender shall not form part of any resulting
contract unless specifically agreed to by BALCO and included in this contract.
4. We also enclose herewith the following documents:
Schedule of compliance with
Acceptance of contract conditions.
Schedule of prices (Price Formats to be completed)
The offer should contain all the details like Service Tax Reg. No. etc.
Documents required by BALCO as mentioned in “Instructions to Bidders”.
M/s (Name and Address of the Company)
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 6 of 32 Year 2018
Signature of the authorized Signatories of the company.
3) SCOPE OF WORK,
Scope of work includes 1. Installation of Static crusher for material crushing
2. Breaking of anode blocks or butt into suitable sizes for feeding inside crusher
3. Crushing of input material up to 50mm size
4. Feeding or Charging of crushed material into conveying system provided by
Rodding
Installation of Static crusher for Crushing – Crusher installation including foundation
comes under contractor’s scope. Materials required for foundation including all material
required for installation of crusher comes under contractor’s scope.
Breaking of anode blocks or butt into suitable sizes for feeding inside crusher – JCB or
loader with breaker attachment is required for breaking anode blocks or high butt before
feeding into crusher. JCB required for material feeding and breaking comes under contractor
scope.
Crushing of input material up to 50mm size – Output size of material crushed from static
crusher should be up to 50 mm
Quantity to be crushed – 15000 Mt (Outside Butt, Rejected Baked anodes, Rejected Green
Anodes)
Minimum Quantity required per month – 2000 Mt Manpower Details:- In Service Provider’s scope as per their requirement however detail to be provided and permission to be taken from BALCO for obtaining gate Passes. Technical Supervisor and Safety supervisor must be there.
Vehicles/ Machinery :- In Service provider’s scope .
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 7 of 32 Year 2018
Safety penalty applicable as per rule.
Safety PPE’s as per basic safety requirement of this job (May change as per need )
Sl.No. PPEs Frequency
1 Safety Helmet 0ne time
2 Safety Shoes 0ne time
3 Hand Gloves Twice in a month
4 Safety Goggles Once in a month
5 Dust Mask Twice in a month
PME in service provider’s scope.
Maintenance /repair /replacement In Service Provider's scope
Vehicle /Machines/Crusher/Tools and tackles
In Service Provider's scope
Consumables /spares In Service Provider's scope
Diesel both rates as give with fuel & with out fule
Work time May be In 3 shifts (A,B,C) ,Over time not to be done .
WORKING DAYS 26 working days in a month
Accomodation ,travel ,lcal conveyance,transportation,mobilization etc
In Service Provider's scope
Penalty Penalty against safety violation as per BALCO’s terms.
Firm Charges No additional charge ,expense other than quoted price shall be entertained.
Safety All the safety rules,cardinal rules ,safety for Height,Vehicle,machineries and road safety to be followed strictly.
Other conditions 1. PME of manpower cost shall be Service
Provider’s scope against Form 21
2. Service Provider has to ensure all the safety
measure during job and Service Provider has to provide all the PPEs as per job requirement.
3. Special tools and tackles to execute the job
will be in the Service Providers scope
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 8 of 32 Year 2018
4. ESI, EPF of the operators to be deployed in
Service Provider scope
5. Required manpower will be in Service
Provider scope
6. Necessary Gate Pass approval shall be in
Service Providers scope and necessary support will be provided BACLO
7. There is no provision for OT.
4) PERIOD OF CONTRACT:
1. Mobilization Period: Immediate after receipt of Service Order.
2. Contract Period: as per need (to be mentioned by service provider)
5)PAYMENT-TERMS
1. Payment Terms:
Subject to any deductions / adjustments from the Contract Price as per the Contract, the
Contractor shall be entitled to receive the Contract Price, from the Owner, in the following
manner:
a) Payment shall be released within 30 days after submission of monthly bills .
b) All the bills should be duly certified by Engineer In Charge.
c) Security deposit (SD)– Performance Bank Guarantee (PBG) / Security deposit Bank
Guarantee (SDBG) of 10 % of the contract value will be submitted within 15 days of Contract
and the validity of the same will be till closure of the contract plus a claim period of 3 months.
In case the Service Provider fails to submit the PBG/SDBG before the said time line the deduction
of Security deposit (SD) and retention amount will be done as per BALCO standard terms which
are as follows :
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 9 of 32 Year 2018
Security deposit will be 5% of the contract value as under 1. This amount shall be calculated on yearly contract value and the same will be either
deducted or SDBG will be submitted.
2. From Second Year onwards Amount /PBG will increase by additional amount to
match the Revised Annual Contract Value for subsequent years of contract tenure.
3. Final amount/PBG shall be released on final settlement on certification of EIC.
d) Labour Liability :
Reimbursement against labour liabilities, 15 % deducted from monthly billing:
1 .While paying RA bills to contractor 15% of gross wages payable to labour shall be kept
under hold in account of final settlement of liabilities.
2. Amount against leave encashment shall be paid to contractors after successful completion
of one year of the contract after certification from EIC and HR department of Balco.
3. The contractor will pay to its employees bonus on the occasion of Diwali and Dussehra
every year and the same will be reimbursed to the said contractor from above amount (w.r.t
the point 1) after they pay bonus to their employees, on certification of HR .
4. Retrenchment benefit shall be given on completion of successful contract period on
certification of HR.
6) CONTRACT PERFORMANCE EVALUATION:
CONTRACT PERFORMANCE EVALUATION shall be done on the basis of work standard
.
7) GENERAL TERMS & CONDITIONS OF CONTRACT:
I. STATUTORY COMPLIANCES The Contractor shall be solely liable for Statutory Compliance in respect of all applicable
laws of land which interalia includes Central/State Labour laws and Regulations/Rules made
there under including but not limited to Compliance of provisions of Contract Labour
(Regulation and Abolition) Act, 1970, Employees State Insurance Act, 1948, Employees
Provident Funds and Miscellaneous Provisions Act, 1952, Minimum Wages Act, 1948,
Payment of Bonus Act, 1965, Payment of Gratuity Act, 1972, Payment of Wages Act, 1936,
Workmen’s Compensation Act, 1923, Interstate Migrant Workmen (regulation of
Employment and Conditions of Service) Act, 1979. The Contractor shall also be solely
responsible for maintenance of records and filing of various forms/ returns prescribed under
all applicable Central/State Labour laws and Regulations/Rules made there under in respect
of Workmen employed by it.
Other than consequent to increase in the notified statutory minimum wages, the contractor
shall communicate its intention to increase the wages/ salaries and other benefits, during the
period of the contract. The contractor irrevocably agrees that any increase in wages/ salaries
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 10 of 32 Year 2018
and other benefits to its employees shall be borne exclusively by the contractor and there
shall no enhancement of the contract value on this account.
II. WELFARE You shall pay an amount of Rs. 10/- per employee per day of attendance against canteen
allowance.
III. FORCE MAEJURE a) If any time during the continuance of this Service Order the performance in whole or in
part by either Party or any obligation under this Agreement shall be prevented or delayed by
reason of governmental decision, war, hostilities, act of the public enemy, civil commotion,
sabotage, fire, lightening, flood, explosion, epidemics, quarantine restrictions or any other
event beyond the reasonable control of the Party concerned (hereinafter referred to as “the
eventuality”), then notice of such eventuality shall be given by the affected Party to the other
within fifteen (15) days from the date of occurrence thereof.
b) If the performance in whole or part of any obligation under this Service Order is delayed
by reason of any such eventuality for a period exceeding one (1) months, the parties shall
meet and review in good faith the desirability and conditions of terminating this Service
Order.
IV. TERMINATION This Service Order shall be terminated by BALCO without any prior notice and without any
compensation under the following Circumstances:
a)Contractor has becomes insolvent; or
b) Contractor has been convicted of any crime which in BALCO’s reasonable judgment is
likely to adversely affect the goodwill of BALCO; or
c) Any failure by the Contractor to comply with any of the provisions of the Service Order; or
d) Failure of Contractor to provide services/deliverables as per agreed time schedule; or
Contractor assigns the Service Order to any third party without the consent in writing of
BALCO; or
If any of the representations of the statements etc. made by the Contractor in connection with
this Service Order are incorrect or are found to be incorrect.
B e) The termination by BALCO for reason stated above shall be without prejudice to other
remedies that are available to BALCO under this Service Order and/or Law.
V. Exit Clause: The contract can be terminated with 3 months of prior notice.
1 VI. SAFETY: The contractor shall be responsible to take all precautions to ensure safety of
the labours / workers at work. The contractor will supply his labours / workers safety
equipment as per rules. The following requirement is to be fulfilled prior to safety clearance:
a. Driving licence of the all individuals of contractors whoever are using 2/4 wheeler of
technological vehicles. Declaration certificate for individual in Balco’s format
b. The contractor shall apply for the safety clearance through Execution In charge & H.R
Deptt. of the company Detailed list of PPEs(Personal Protection Equipment’s) required for
the individual contracts inside the plant will be made available by BALCO’s SAFETY Deptt
and the same will have to be provided to all individual workmen before getting the safety
clearance .
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 11 of 32 Year 2018
c. The contractor shall provide to BALCO a duly acknowledged receipt of the employees
having been given the PPEs both mandatory and specific to the contract,, without which no
payments shall be released to the contractor.
d. Physical Fitness certificate (Certified by MBBS Doctor)and persons to be working in high
risk jobs,as to provide with necessary medical clearance certificate from MBBS doctor as per
BALCO’s format.
e. Competency certificate has to be produced by the contractor for their workmen engaged for
specialized jobs, as per BALCO’s format.
f. List of tools & tackles, machine & equipment and pressure vessels along with copies of
their Validity certificate issued by competent person as per Chattisgarh State. Factories Rules.
Name of the safety officer /supervisor /steward and contact number with E-mail I.D.
PENALTY FOR VIOLATION OF SAFETY MEASURES:
In case of any violation of safety measures and or on noncompliance of safety PPE by the
Contractor or his employee (s) Balco shall penalize the contractor as follows :
Rs 500/- First time
Rs 1000/- Second time onwards
If contractor continue for failing to provide the safety &/ or PPE Balco reserves its right to
terminate the contract.
At any point of time safety compliance will be checked by BALCO’s SAFETY department.
The contractor shall immediately upon knowing of any accident, damage or losses, in which
he is involved on the site, should inform the area-in-charge.
The contractor shall take all safety precautions and provide adequate supervision by
competent persons in order to do the job safely and without damage to plant, personnel,
equipment, and the environment.
Any accident causing fatal or non-fatal injury to the employee(s) of the contractor shall be the
exclusive responsibility of the contractor. In the event BALCO and /or its employee(s) are
prosecuted by any other authority under law for accident causing fatal or non-fatal accident,
the contractor undertakes to reimburse BALCO all fines, penalties and expenditure incurred
in connection with defending such prosecution by BALCO and towards this the contractor
irrevocably agrees to BALCO deducting such amounts from its pending bills.
VII. VEHICLE NORMS: The contractor shall comply with legal statutory requirement in
respect to Vehicle Emission norms, Permits, Driving License, Registration number,
Insurance, Working condition of Rear Lights, Brake Lights, Indictors, Reverse Horn etc., as
per Motor Vehicles Act 1988.
VIII. OCCUPATIONAL HEALTH & SAFETY (OH & S) : The contractor shall be
responsible to take all precautions to ensure safety of the labours / workers at work. The
contractor will supply his labours / workers safety equipment as per rules. If you are bringing
your own equipment to carryout of job inside the plant such equipment should be subject
hazard identifications and risk assessment prior to commencing of work.
The persons engaged by you shall be given appropriate awareness on OH&S, those personal
who will carry out jobs affecting OH&S shall be properly trained and made competent for the
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 12 of 32 Year 2018
job performed by them. During emergency situation which may be faced in the plant your
personal should move to the emergency shelters. They should not spread any rumor. (An OH
&S booklet is available in Safety Deptt and is required to be signed by the contractor
agreeing to comply with the same
ENVIORNMENT: All the scrap generated after execution of the jobs shall be disposed in
appropriated identified bins.
IX. HOUSE KEEPING: The contractor shall ensure that its employees while on BALCO premises or while carrying
out their obligations under this contract, observe the standards of cleanliness, decorum and
general discipline laid down by BALCO shall be the sole judge as to whether or not, the
contractor and or its employees have observed the same.
If any of the above conditions specifically mentioned in the main service order/contract to
bring in effectiveness, then the same shall prevail upon as contractual obligation.
XI. INSURANCE: The Service Provider shall obtain group accidental Insurance for all its employees deployed
at Company’s site.
The Service Provider shall obtain Comprehensive Insurance Cover for third party Liabilities.
The Service Provider shall obtain Insurance for all its assets/equipment brought at
Company’s site.
XII. ARBITRATION & JURISDICTION:
a) In the event of any dispute arising out of the performance or the interpretation of this
Service Order, the Parties hereby agree to make every effort to reach an amicable settlement.
b) Any dispute, controversy or claim arising out of or relating to this Service Order, or the
breach, termination or invalidity thereof shall be settled by reference of dispute to Sole
Arbitrator to be appointed by the Chief Executive Officer or the Managing Director or the
President of BALCO. The Arbitration shall be conducted in accordance with the Arbitration
and Conciliation Act, 1996. The place of arbitration shall be Korba, Chattisgarh. The
language used in arbitral proceedings shall be English.
c) This Service Order shall be construed in accordance with and governed by the laws of
India. The parties hereby expressly submit themselves to exclusive jurisdiction of the courts
in Korba, Chattisgarh, India.
8) PRICE FORMAT
With Fuel
Desc QTY UOM Unit Price (INR) Amount (INR)
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 13 of 32 Year 2018
Crushing in 0-50 MM size and feeding 15000 Ton
Without Fuel
Desc QTY UOM Unit Price (INR) Amount (INR)
Crushing in 0-50 MM size and feeding 15000 Ton
EHS-terms & condition for any contract
9. STATUTORY COMPLIANCES & CLEARANCES
9.1 The Service Provider shall be solely liable for Statutory Compliance in respect of all
applicable laws of land which inter alia include Central/State Labour laws and
Regulations/Rules made thereunder including but not limited to Compliance of
provisions of Contract Labour (Regulation and Abolition) Act, 1970, Employees
State Insurance Act, 1948, Employees Provident Funds and Miscellaneous Provisions
Act, 1952, Child Labor Act, Minimum Wages Act, 1948, Payment of Bonus Act,
1965, Payment of Gratuity Act, 1972, Payment of Wages Act, 1936, Employees
Compensation Act, 1923, Interstate Migrant Workmen (regulation of Employment
and Conditions of Service) Act, 1979 etc in respect of all employees employed by the
Service Provider, directly or indirectly or through any sub-contractor. The Service
Provider shall be solely responsible for maintenance of records and filing of various
forms/ returns prescribed under all applicable Central/State Labour laws and
Regulations/Rules made thereunder in respect of Workmen employed by it.
9.2 Company shall be entitled to deduct/adjust from amount payable to the Service
Provider, any dues, wages, compensation on accident or death, expenses incurred for
benefits, provision for amenities and amounts paid or payable by the Company in
compliance with the applicable laws, in respect of workmen/employees of the Service
Provider.
9.3 The Service Provider shall ensure compliance under the Safety Provisions of the
applicable State/ Central laws and shall ensure that its employees are trained,
competent, physically and mentally fit for the assignment and are not suffering from
any chronic or contagious disease.
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 14 of 32 Year 2018
Service Provider is responsible for the safety and security of all men and materials
employed by him. Service Provider should provide all safety equipments (such as
tools & tackles, aprons, gloves, safety shoes etc) to all Service Provider team
members. Service Provider should provide adequate coverage against any accident
met by Service Provider’s team during the period of Contract. Service Provider shall
indemnify the Company and its officers against any claim, dispute and litigations
arising in this regard. Further no separate consideration shall be payable by Company
for the same.
9.4.1 The Service Provider shall take all the required clearances under the applicable laws
which includes but is not limited to Environment Protection Act, CG Land Revenue
Code, CG Municipal Corporation Act etc.
STATUTORY COMPLIANCE:
1. Payment of minimum wages (notified by labour Department) to labours by 7th working
day of each month in the presence of HR representative & give copy of muster roll in
form xviii to HR department for certification.
2. Invariably inform HR department before making the wage payment.
3. Deduction of PF @ 12% even for one days attendance and deposit of the same adding
equal employer subscription and submit copy of challan with HR by 15th day of each
month.
4. Distribution of wage slips to the laborers at the time of disbursement of wages.
5. Distribution of employment card to the labours at the start of the contract.
6. Obtain labour license against each work order and cover all labours under ESI. Also obtain
safety clearance from safety officer of the Company. This is a pre-condition for issue of
labour permission
7. Maintain all registers in the prescribed formats as per the Contract Labour (Regulation &
Abolition) Act, 1970 and submit them quarterly to HR Department of the Company for
verification.
8. Payment of bonus @ 8.33% of the gross wage to all labours on the rolls before Deepawali
and provide a copy of proof to HR Department of the Company.
10. Retrenchment benefit: 15 days wages (last wage drawn) to labourers who have 240 days
attendance in the contract as per the provisions of the Industrial Disputes Act, 1947.
11. EL: 1 day for every 20 days attendance fraction ½ attendances to be rounded off to one
12. Grant of CL when applied by the labour - total entitlement 7 days (1 day for every 35
days) attendance.
13. Payment of Rs. 10/-per day as canteen allowance to each contract labour on actual
attendance.
14. Quality & frequency of safety appliances (PPEs) to all workers would be as per the
recommendation of the Company’s Safety Officer.
15. Compliance to Employees State Insurance Act.
16. Compliance of EDLI.
17. Supply of Soap, Gamchha, Gud & All the necessary safety Appliances including
Uniform as per existing practice.
18. Service Provider shall take third party liability insurance, personal accident insurance and
workmen) and such other insurance required as per statute.
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 15 of 32 Year 2018
19. Service Provider shall be responsible for ensuring safe and disciplined working of your
equipment / manpower and shall bear full liability in case of your failure to do so.
20. Service Provider shall be required to obtain No objection certificate from the Company’s
Industrial Relations department thereby ensuring compliance to above as well as safety
requirements.
21. If there will be abnormal increase in labour wages by government other than the regular
April and October Half Yearly escalation the same will e considered on actual attendance
basis.
LEGAL COMPLIANCE:
Service Provider shall comply with all statutory requirements, related to your equipment /
workmen deployed at site, including amongst others, the following:
(A) Payment of Wages Act
(B) Minimum Wages Act
(C) Contract Labour (Regulation and Abolition Act), 1970
(D) Employer’s Liability Act
(E) Factories Act, 1948 & MP/CG rules,1962
(F) Payment of Gratuity Act, 1972
(G) Employees’ Compensation Act, 1923
(H) Employees State Insurance Act
(I) Apprenticeship Act
(J) Employee PF Miscellaneous Provisions Act, 1952
(K) Child Labour Act
(L) Other statues applicable to the nature of work.
Other Requirements:
The following requirements are to be fulfilled prior to Safety Clearance of any new Job.
1. A copy of work order.
2. Service Provider must submit risk assessment study report of the entire job pertaining to
the work order.
3. Driving license of the all individuals of Service Provider whoever are using 2 / 4 wheeler
of all technological vehicles.
4. Declaration certificate for all individuals (format available in safety department of the
Company.)
5. A request letter (on the Service Provider’s letter head) for safety clearance routed through
execution in-charge & H.R. department.
6. List of PPEs given to workers with their signature on receipt.
The following PPEs are considered essential for any type of work inside plant. Helmet
(yellow), safety shoe [with steel toe] as per area of work / gumboot, goggles, dust mask,
gloves (type based on associated hazard), ear plugs. The following ppes to be provided
based on particular job requirements. Chemical suit, pvc gloves, full body safety harness,
ear plugs or muffs.
7. Physical fitness certificate (ESI/Certifying surgeon) and persons to be working in high-risk
jobs, as to provide with necessary medical clearance certificate from MBBS Doctor.
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 16 of 32 Year 2018
8. All workers wearing with required PPEs must be present for physical verification with a
PPE issue register.
9. All workers must undergo the safety induction training which the part of safety clearance
system is.
10. Name of the Unit Manager /supervisor / and contact number with e-mail ID.
11.All the vehicle operator must undergone the traffic/road safety training ,which is part of
safety clearance .
19. DISCIPLINE AT WORK AREA:
Service Provider has to maintain discipline at work area. He has to keep the area neat and
clean after work is over. All the spares, waste material, like oil grease etc has to be kept at
designated area and the work place to be cleaned after job is over. In case, maintenance
activities are found to be suffering due to non-performance by Service Provider’s employees
or job negligence, then suitable punitive action will be taken by Balco for the same.
20. EMERGENCY:
The Service Provider shall ensure that its workers follow the following instructions:
1. To contact fire control room on telephone No. 5333, 2666,2334, 5393, 2333, 242033
and inform name, location and brief of the emergency. If telephone is not available, break
the glass of nearest manual call point( if available)of fire alarm or use the nearby portable
fire extinguisher if you know the operation of the extinguisher.
2. Rush to the location of Emergency and assess the situation Combat the Emergency with the
help of the available people using fire hydrant and fire extinguisher.
3. Rush to nearby Assembly Point [displayed in the department] in case of an extreme
emergency.
4. As soon as any Emergency calls, the Fire control room operator will immediately ask the Turn
out no.1 available at Fire Station plant-I to rush at the emergency spot.
5. He will simultaneously inform to Main Security Gate of respective plants.
21. OCCUPATIONAL HEALTH & SAFETY (OH & S) :
The Service Provider shall be responsible to take all precautions to ensure safety of the
labours / workers at work. The Service Provider will supply his labours / workers safety
equipment as per rules. If you are bringing your own equipment to carryout of job inside
the plant such equipment should be subject to hazard identifications and risk assessment
prior to commencement of work.
The person engaged by you shall be given appropriate awareness on OH&S, those personal
who will carry out jobs affecting OH&S shall be properly trained and made competent for
the job performed by them. Pre-employment Examination certificate to be provided for
personal being engaged, Periodic Medical Examination and Special Medical Examination
to be carried out as per The Factories Act 1948 & MP/CG factory Rules 1962. The records
for all the During emergency situation which may be faced in the plant your personal
should move to nearest emergency assembly points. They should not spread any rumor.
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 17 of 32 Year 2018
(An OH&S booklet is available in Safety Depts. and is required to be signed by the
Service Provider agreeing to comply with the same
26.SAFETY:
Before Starting execution of the job Service provider must attend the kick off meeting
with safety department-
Bharat Aluminium Company Ltd.
Safety Department Kick Off Meeting Agenda for Safety Assurance from Agency
Balco: 495684 (C.G.)
Agency : Date :
Scope : Time :
S. N. Agenda Guideline Requirement
Compliance assurance
Remarks, if any
1 Site Specific Safety Plan It includes at minimum the following: Prior Start of Site Work Scope of Work, Work methodology, Generic group risk assessment, Roles & responsibilities of contractor's management & Employees, Site layout, Proposed location of electrical & other services, Identification of High risk activities, Site safety prevention / mitigation employees, Reporting system of accident / incident,
Emergency Rescue Plan
2 Site Specific Risk Assessment of
All All activity must be covered. Prior Start of Site Work
Activity
3 Mobilization of Resources For Manpower:Induction - Photo Gate Pass, Screening, For new deployment
Medical Check up, Mandatory PPEs For Machineries:Fitness & Test certificate at the time of mobilization, Pre start up inspection and identification for "Ready to Use"
4 Electrical Installation Set up Proposal to BALCO with electrical SLD including the Prior to get power supply
details of load-- Selection of cables -- route --Type of DB,
Panel -- Presence of licensed electrician, Rain protection of DB -- Use of ELCB of 30 mA sensitivity -- proper earthing including double earth for metal enclosure machines.
5 Deployment of Safety Personnel Qualified and experienced safety officer / Engg. @ 1 : As & When reqd.
250, Safety Stewart @ 1 : 40, Full coverage of work hour.
6 Certification of Lifting Appliances By Local Govt. approved third party competent Prior First Use
authority, Internal inspection and maintain of colour coding as per scheme, ID mark and SWL punching on body, Hydra with run over protection
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 18 of 32 Year 2018
7 Work Permit System Work permit must be followed with JSA/Lifting Plan Ongoing and tool box talk
8 Inspection & Checking Periodic inspection as per pre approved checklist & Ongoing record keeping
9 Response of advice /
instruction given Written compliance report As & When reqd. by inspecting agency
10 Formation of Safety
Committee Record of MOM to be maintained As & When reqd.
11 Safety Walkdown In presence of high official of contractor Weekly
12 Safety Review Meeting At BALCO office Saturday @ 16:00 Hrs.
13 Safety Clearance From BALCO During submission RA
bill
14 Safety Campaign Display sign board, poster, caution board As & When reqd.
15 Barrication All hazardous locations with suitable measures As & When reqd.
16 Tool Box Meeting & Pre Job Discussion Prior to start of job Everyday
followed by Job Safety Analysis
17 Height Work Special medical check up (As per BALCO), Scaffolding As & When reqd. & Inspection -- As per relevant codes of practices -- Use of Ladder -- Provision of usages of Fall arrest device, Full Body Safety Harness with double lanyard scaffolding hook, Safety Net, Lifeline etc.
18
Suspended Platform / Man bucket
Fabrication as per pre approved plan, Third
Party As & When reqd.
Certification, Regular inspection, Marking of ID, SWL on the body
19 Hot Work & Fire Prevention Use of Min. 2 Phase standard welding machine, Only As & When reqd.
lug / Ferrule joint, Crimping tool, Appropriate PPEs Use of Flash Back Arrestor, Cylinder trolley, Standard
regulator / gauge etc.
Spatter protection from height Deployment of Fire watcher with suitable Fire Extinguisher
20 Chemical Hg Availability of MSDS, Training, Job Specific PPEs Prior to use
21 Material Storage Segregation of material -- Cylinder storage --
Fire
During mobilization / as & when reqd.
prevention / permit of storage of flammable material, Separate storage of chemicals
22 Emergency Preparedness Well equipped FA box -- Display of emergency Nos., At beginning & SSSP
Concept of assembly point
23 Housekeeping Removal & Disposal of scrap Daily basis
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 19 of 32 Year 2018
24 Ambulance Facility As per BALCO As & When reqd.
25 Environmental Protection Dust & Noise, Oil Spillage prevention As & When reqd.
26 Award & Reprimand As per BALCO scheme As & When reqd.
27 Control of multiple activities Proper planning and co ordination As & When reqd.
28 Night Work Proper planning and task lighting As & When reqd.
29 Monthly Safety Performance Reporting As per approved scheme from BALCO Monthly
30 Documentation As per approved list from BALCO As & When reqd.
31 Safety Statistics Board Display sign board As & When reqd.
Sig. with Name of Representative from Balco
Sig. with Name of Representative from Agency
Date : Time :
Date :
Time
4 Service provider shall provide all necessary safety like Safety shoes, Goggles,
Helmets, Masks, and PVC Gloves, respirators etc. to his employees (standard of PPEs
for contract workmen should be as per BALCO safety guidelines). Neither Service
provider nor his employees will be permitted to enter factory premises without safety
PPE. The Service provider will ensure strict compliance of safety measure adopted by
the BALCO. In case of any violation of safety measures by the Service provider or his
employee will be taken seriously and in such situation. BALCO reserves its right to
cancel this contract and/or suitably penalize the Service provider.
At BALCO following standards are being used:
S.
No
Name of safety
appliance Specification
Area /
Application
1
Safety Helmet
Yellow - for
contract
Employees
Blue - for Balco
White - for Visitor
IS- 2925, Material : HDPE, Cradle : 6 point plastic
suspension, Weight : 400 gms[approx],Size : 51 cm- 62
cm , Sweat band : Brushed cloth on foam, Chin strap:
Adjustable with chin strap
For All
Application
2a
Safety
Shoes(DGMS
Approved)
IS-5852,IS -1989, Safety shoes with steel toe cap as
per IS -5852 , high ankle, Electrically insulated, with
extra protection on tongue with Velcro ISI No. 1989 ,
PU sole,S3 DIN leather upper stitched with Kevlar
thread, complete flame retardant
Mines operation
2b Safety Shoes(Non-
Magnetic)
Safety shoes with non-magnetic toe cap as per IS -
5852 , high ankle, Electrically insulated, with extra
protection on tongue with Velcro ISI No. 1989 , Nitrile
rubber sole , to withstand 500 C temperature, Barton
printed leather 1.8/ 2.o,Black,
Potroom / Cast
House
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 20 of 32 Year 2018
2c Safety
Shoes(General)
Safety shoes with steel toe cap as per IS -5852 , high
ankle, Electrically insulated, with extra protection on
tongue with Velcro ISI No. 1989 , PU sole,S3 DIN
leather upper stitched with Kevlar thread ,complete
flame retardant leather
Except Mines /
Potroom / Cast
house
3a Goggles (Plain
glass)
IS:7524, Frameless design, light, all around impact
protection, Ratchet temple and adjustable angle for a
personalized fit, polycarbonate lens, Lens thickness
2.1mm-2.46mm,9 base spherical, Scratch resistant,
Hard coating, 99.9% protection,
General Purpose
3b Goggles (UV)
BIS 5983, Ultra violet protective eye wear, provide
excellent protection with deep wrap around side
shields, Rugges, flexible, graphite polymer frame. UV
scratch/Fog/Static resistant ,light weight and lens
approved as per IS
Heat / Radiation
4 Dust Mask
(disposable)
EN-149FFPIS approved, CMRI & CLI tested, Light
weight, economial and durable with advanced electret
media maximizes user protection, with high filtering
efficiency and to provide longer period of user
comfort.
For General Use
5a Ear plugs
(washable)
IS: 6229, Foam ear plugs with a cord that drapes
around the neck, It should be washable
For All
Application
5b Ear plugs (sponge) IS: 6229, Foam ear plugs with a cord that drapes
around the neck
For All
Application
6a
Working hand
gloves with
leather palm
Cotton hand gloves with leather palm , Size - 14"
Mines/ Material
breaking
activities
6b Working hand
gloves Cotton hand gloves , Size - 14" General Purpose
7 Leather Hand
gloves
IS - 2573, Model No. F524 , Natural split welder glove
split cuff 15 cm
Welding, Gas
Cutting, Sharp
Edge Handling,
Heat Resistant,
8 Heat resistance
hand gloves
IS - 1720, Model No. H044K-Yellow dyed split
welder, natural, split cuff 15 cm with Kevlar lining and
Kevlar stitched, to with stand temperature of 250 C,
Hot Metal
Handling
9 PVC /Rubber
hand gloves ISI Marked
Caustic Soda /
Acid/Alkali/Other
Chemicals
10a Respirators (HF
Protection)
NIOSH 42 CFR 84 N95 requirements.TC-84 A-1300,
High protection, comfort provided by advanced electra
media, Special odour -removing carbon filtering
material to give protection against nuisance level acid
gases
Fumes/ HF
10b Respirators (Acid
fumes & others)
EN-149FFPIS approved,CMRI & CLI tested, Light
weight ,economical and durable with advanced electret
media maximizes user protection, with high filtering
efficiency and to provide longer period of user
comfort.
So2 / Pitch
Fumes
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 21 of 32 Year 2018
11 Leather leg guards Chrome leather, soft Hot Metal
Handling
12 Leather aprons Chrome leather, soft, Split type
Heat / Radiation/
Hot Metal
handling
13 Face shields IS - 1179, Poly carbonate FC-48 Blue Eagle ANSI 287-
1 8 x 5 1/2" to be fitted in the contour of helmet
Heat / Radiation/
Hot Metal
handling
14 Gum Boots
IS-12254, 14" Full size gum boots in yellow color with
a non-magnetic toe cap , superior virgin PVC
compounds, Single piece with dual density compounds,
sweat absorbent hosiery cloth lining, anti skid cleated
soles which are acid, alkali, oil resistant &
Acid / Alkali
15 Ear muffs ISI Marked High Noise
16 Boiler suit Cotton based cloth Heat Protection
17 PVC suit ISI Marked, suitable for Acid & Alkali, 3 Piece set
Caustic Soda /
Acid/Alkali/Other
Chemicals
18 Safety Belts
(Full Body)
IS:3521,EN 361 CE, Full body harness, Fully
adjustable shoulder , thigh straps, single connected
back D ring, 1/2" nylon rope or 16 mm polypropylene
rope 10 feet long & special electroplated screw hook.
Working at height
19
Face Hood
protection against
dust & heat
Cotton Face Hood Covering Head to Shoulder
Alumina / Bath /
Coal dust
handling
Note: It is the responsibility of service provider to provide any additional PPE as required to
perform any specific job.
In case of ambiguity our safety department guidelines on the brand &
quality of PPEs will be final.
5 The service provider should provide quantity of PPEs proportionate to the no of
manpower deployed & the Nature of the job at the site .In case of ambiguity our
Safety Department Guideline on brand and Quality of PPEs will be final.
6 At any point of operation of contract the service provider shall remain liable to report
to the safety department with respect to ensuring Safety at the site.
7 Road Safety norms: All Employees of service provider including the vehicles used by them should strictly
follow Road Safety Policy of Balco while working inside the plant premises.
8 Work Permit : Necessary work permits ( Working at Height, Hot work permit, Working in confined
Space, Excavation, Electrical work ,Working on critical equipment cranes, lifts
,Working on dangerous lines etc )should be taken from relevant authority before
starting such jobs. All safety guidelines mentioned in these work permits should be
strictly adhered to.
9 Height Works:
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 22 of 32 Year 2018
For working at height corporate has published one Guidance note(GN-21) which
needs to comply by the service provider to ensure safe execution of the job.
Supervisor must be present at site during height jobs or other risky jobs & take
Necessary work permits. Suitable scaffolding should be provided for workmen for all
works that cannot safely be done from the Ground or from solid construction except
such short period work as can be done safely from ladders. When a ladder is used an
extra person shall be engaged for holding the Ladder and if the ladder is used for
carrying material as well, suitable footholds and handholds shall be Provided on the
ladder and the ladder shall be given an inclination not steeper than 1 in 4 (1 horizontal
and 4 vertical). Safety nets conforming to IS5175 should be provided, if required..
10 Electrical Works: Strict enforcement of Lockout & Tag out system to be ensured & necessary work
permits to be taken before starting of the Job. Mandatory use of Arc protection suit for
work on electrical system of voltage 6.6KV & above to be ensured.
11 Excavation, trenching & Demolition: Necessary work permits to be taken before any Excavation & Demolition work.
All trenches 1.2 meters or more in depth shall at all times be supplied with at
least one ladder for each 50 meters length or fraction thereof. Ladder shall be
extended from bottom of the trenches to at least 1 meter above the surface of the
ground. The sides of the trenches which are 1.5M in depth shall be stepped back to
give suitable slope or securely held by timber bracing, so as to avoid the danger of
sides to collapse. The excavated materials shall not be placed within 1.5 meters of
the edge of the trench or half of the trench width whichever is more. Cutting shall be
done from top to bottom. Under no circumstances undermining or under-cutting shall
be done.Before any demolition work is commenced and also during the progress of
the demolition work -
a) All roads and open areas adjacent to the work site shall either be closed or suitably
protected
b) No electric cable or apparatus which is liable to be a source of danger shall remain
electrically charged.
c) All practical steps shall be taken to prevent danger to persons employed from risk
of fire or explosion or flooding. No floor, roof or other part of the building shall be
so overloaded with debris or materials as to render it unsafe. All necessary personal
safety equipment as considered adequate by the Engineer -In-Charge should be kept
available for the use of the persons employed on the Site and maintained in condition
suitable for immediate use, and the contractor shall take adequate steps to ensure
proper use of equipment by those concerned.
11 Pressure vessels, Lifting Tools,& Lifting machines :
All Pressure vessels, Lifting tools ,tackles, machines & mobile equipment like
cranes, hydra, forklifts, etc. should comply to Safety Standard & should have valid
test certificate as per MP CG Factory Rule 63 and maintained as per the prescribed
guidelines . A list of all such Pressure vessels, lifting machines, tools and tackles
along with copy of test certificates must be submitted to concern Safety Head before
taking into use. All Pressure vessels to have a clear marking of Safe Operating
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 23 of 32 Year 2018
Pressure & to be operated below the Safe Operating pressure at all-time complying to
the Guidelines.
Every crane driver or hoisting appliance operator shall be properly qualified and no
person under the age of 21 years should be in charge of any hoisting machine
including any scaffolding, winch or give signals to the operator.
The below mentioned things to be ensured.
Record of all lifting tools, tackles, lifting machines, hoists & lifts to be
maintained in a Register as per rule 63 MP CG factory Rule.
All Lifting gears to be marked with Identification No, SWL, Testing date, Due
Date of Testing.
Annual & half yearly inspection as applicable to be carried out for all lifting
machines, chains, ropes, & lifting tackles by competent person as per per MP
/CG factory rule factory rule 62 & Record to be maintained as per MP /CG
factory Rule 63.
Half yearly inspection to be carried out for all hoists & lifts by competent
Agency. Record of the same to be maintained as per MP CG factory rule 62.
Quarterly inspection color coding to be carried out by respective Agency
/Department. (Q1-Orange;Q2-Blue;Q3-Yellow;Q4;Green, Rejected; Red) for
the year 2014-15.
Physical verification to be done at site for all lifting tools, tackles, Slings &
ropes by respective agency as per checklist.
Periodic maintenance of All Lifting tools & tackles to be covered under
Preventive Maintenance schedule of the plant.
Forklifts /pallet trucks to be tested annually and record to be maintained.
All Lifting machines to be painted, fitted with fluorescent stickers (both front
& back) & maintained in good condition with daily checking register by the
drivers.
EOT cranes should have at least one independent escape route and shall be
provided with Warning/alarm devices while in operation.
Standard hand signals to be displayed and training to be provided to the
operators, riggers & signalers.
All hooks shall be provided with spring retainers/latch.
Hydra is strictly prohibited for shifting the materials .It can only be used for
lifting the loads. Hydra crane shall comply with run over protection as per
standard attached. Also all hydras to have clear marking of SWL in bold letter
on different height of Boom, a display of load chart, copy of test certificate &
board mentioning the details of Equipment no, SWL, Testing Date, Due Date
of testing.
All lifting tools and tackles shall comply to BIS and applicable reference
standard number to be quoted for each equipment.
Any incident of failure/breakdown to be properly investigated and recorded.
Pre-employment & periodic medical examination including Audiometry &
Color blindness test to be carried out for all EOT crane operators & drivers of
lifting machines(Hydra, Forklift, Hencon, ATV, PTM, MTV etc.). & record to
be maintained.
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 24 of 32 Year 2018
12 Competency:
All contractors engaging 100 or more workers will have to keep full time qualified &
experienced (minimum 5 years) Safety Officers with qualifications as per factory act
section 40-B & MP CG factory rule 72A-72E . Other contractors should appoint a
safety supervisor/co-coordinator for coordinating safety activities with company
safety office. Competency certificates Experience and/ or statutory qualification)
for welders, Riggers, electricians, Heavy earthmoving machine operators/drivers and
other such specialist workers, shall be submitted by each contractor to the respective
department HODs.
13 Maintenance of Safety Records & Reporting: The Service provider should
maintain applicable legal registers. Apart from the same they should maintain register
of PPEs Issue, Training of employees, Accident/Injury register, & Health checkup
details LT & Tackles record etc. Following information to be submitted at the end of
the every month (before 3rd of next month) to the respective Safety HODs directly
with copy to site in charge.
A. Total nos. of employees =
Working hrs / days =
Duration of contract (in days) =
B. Status of safety - gadgets
- Nos. of helmets = issued & stock available at store
- Nos. of safety belt = issued & stock available at store
- Nos. of goggles = issued & stock available at store
Welding Goggles = issued & stock available at store
Grinding Goggles = issued & stock available at store
General Goggles = issued & stock available at store
- Nos. of hand gloves = issued & stock available at store
- No. of safety shoe / gum boot = issued & stock available at store
- Length of barricading tapes = stock available at store
- Status of warning tags (like =radiography, road blocking, no entry
etc. use)
C. INCIDENT REPORT
Name of safety representative =
- Nos. of Incidents (Near miss, Hazards, Environment) reported =
- Nos. of minor injuries =
- Nos. of man days lost due to injuries =
- Nos. of major injuries =
- Nos. of fatalities (if any) =
D. INSPECTION RECORD
- Technological vehicles= inspected on & by as per safety check list provided
- Gas cutting set & welding = machine inspected on & by
- List of LT & Tackles updated & certificate issued by competent authority.
- Hand tools inspected on & by =
- Ladders & lifting tools inspected =on & by
- Waste Generation = (Category, Qty)
- Office/Storage Area of Service Provider = (Safety, Hygiene)
E. TRAINING RECORD:
Training Need Identification
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 25 of 32 Year 2018
Training Calendar
No of Training Conducted & Topics Covered-
No of People Trained with Details of Trainer-
Signature of Site In charge
Name of the Service provider:
Report will be submitted in the format provided by Safety department.
Any additional report to be submitted will be decided by our Safety HOD's at the site.
14 Responsibility: Ensuring Safety and prevention of any accident /incident of the
employees of the service provider will be the sole responsibility of the service
provider.
The service provider shall adopt Balco Vision Mission ,code of conduct
sustainability policies & relevant technical & management standards
15 Vehicle Norms :The service provider shall comply with legal statutory requirement
in respect to Vehicle Emission Norms, Permits, Driving License, Registration
number, Insurance, Working condition of Rear Lights, Brake Lights, Indictors,
Reverse Horn etc., as per motor vehicle act 1988. The Service provider shall also
comply with prescribed speed limit of 30 Km/Hr within the premises of the Owner.
1. Driver must have always kept driving license with him.
2. Eye test of driver must be completed by ophthalmologist in form 35 in frequency of
every 6 months.
3. Driver must wear Reflective- jacket on duty.
4. No vehicle movement is allowed during safety hours except technological vehicles.
5. Vehicle checklist must be filled by driver and ensure compliance by the site in charge
of the same then only allow driving.
16. Violation & Penalties: In case of any violation of safety measures by the service
provider or his employees will be taken seriously and in such situation our plant reserves
it's right to cancel this contract and /or suitably penalize the service provider as under
In Balco Safety Code of conduct for all the employees defined in case of violation
disciplinary action must be taken against the person/service provider as per
norms.
Sr.
No. Type of Violation
1 Non use of safety PPEs
2 Using welding machine without proper plug pin, earthing & ELCB
3 Taking power by inserting naked wires instead of appropriate plug
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 26 of 32 Year 2018
Penalty to be imposed:- 1st time -Rs 500,
2nd time onwards: 1st Violation: Rs 1000/.
Note: Any injury causing fatal or non-fatal injury to the employee(s) of the
service provider, shall be the exclusive responsibility of the service provider and
also liable to pay any additional compensation as directed by legal state
authorities.
4 Taking electrical supply from DB without ELCB / RCCB & not having single
line diagram along with connection
5 Not using earth connection for electrical gadgets like grinder, drilling machines,
pump motors, blowers, etc.
6 Non use of welding shield during welding & non use of safety goggles during
cutting / grinding / drilling.
7 Not following safety work permit system
8 Not following the safety advice/instruction of our safety official
9 Bypassing safety interlocks or removal of safety guards
10 Operating Hydra without Balco Safety Guideline
11 Using chain blocks or lifting tackles which are not tested or not meeting safety
standards
12 Rolling of gas cylinders on the ground during transportation from one place to
another place
13 Using gas cutters without flash back arrestors, damaged hose, and leaky
cylinders
14 Adopting short cut methods (Any Un-safe Act)
15 Violation of Road Safety norms
16 Non availability of Gate passes at site
17 Starting the job without work methodology or risk assessment (HIRADeC)
18 Not posting of qualified safety officer if required to appoint as per existing
manpower
19 Non submission of monthly inspection of lifting tools , tackles, pressure vessels,
welding machines, portable tools, Cranes, etc.
20 Non compliance to morning tool box talk
21 Any non compliance to SOP's / SMP's
22 Providing & Up keep of First-Aid box / medicines & periodic changing of same.
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 27 of 32 Year 2018
In the event Balco and /or its employee are prosecuted by any other authority
under law of accident causing fatal or non fatal accident service provider
undertake to reimburse Balco all ,fines ,penalties and expenditure incurred in
connections with defending such prosecution by balco and towards this the
service provider irrevocably agrees to Balco deducting such amounts from its
pending bills.
11) Damages: Charges towards any damage of equipment/material at our site caused
due to miss handling by service provider's workers/vehicle shall be deducted from
service provider's bill after assessment by our Engineer in Charge .The assessment of
our Engineer In charge shall be final and binding on the service provider. All of the
service provider's vehicle entering into factory premises must be comprehensively
insured.
12) No worker of service provider/contracting farm and the service provider himself
shall be allowed to consume alcoholic drinks or any narcotics within the plant
premises. If found under the influence of the above, the service provider /contracting
firm shall have to change /replace him, failing which we may terminate the contract.
13) Smoking within the plant premises s strictly prohibited as per Supreme court
Guidelines.. Violators of the no smoking rules shall be discharged immediately.
Handling of flammable materials inside plant premises should be dealt with adequate
protection so as to avoid fire & Explosion .Instruction from respective Department
and Safety Department should be followed strictly for compliance of the same.
14) The service provider /contracting firm shall not deploy any person suffering from
any contagious, loathsome or infectious disease. The service provider should ensure
high standard of Hygiene in his workplace to prevent out break /spreading of
contagious disease.
15) Reporting of Accidents & Dangerous Occurrences: The service provider shall
immediately upon knowing of any accident, damage or losses in which he is involved
on the site should inform the area in charge.
ENVIORNMENT:
All the scrap generated after execution of the jobs shall be disposed in appropriated
identified bins. Contractor shall comply with all applicable provisions of Environment
Protection Act, 1986 along with Hazardous Wastes (Management, Handling and
Transboundary Movement)
Rules, 2008 and all other applicable Environmental Laws. Discipline atwork area:
Contractor has to maintain discipline at work area. He has tokeep the area neat and
clean after work is over .All the spares , waste material ,like oil grease etc has to be
kept at designated area and
cleaned the work place after job is over.In case, maintenance activities are found to be
suffering due to non-performance bycontractor's employees or job negligence, then
suitable punitive actionwill be taken by Balco for the same.
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 28 of 32 Year 2018
HOUSEKEEPING:
Balco is followed 5S system to enhance the visibility of housekeeping across all the
units, in the same manner service provider will maintained their work place as well as
office area.The contractor shall ensure that its employees while on BALCO premises
or while carrying out their obligations under this contract, observe the standards of
cleanliness, decorum and general discipline laid down by BALCO shall be the sole
judge as to whether or not, the contractor and or its employees have observed the
same. Immediately after job completion is over the area should be cleaned.
The cleaning of dust, Oil Spillages, Welding butts, Metal Scraps, used nut
bolts & all other scrap removal shall be in contractor's scope.
Handling of Scrap generated arises on account of activities or any kind of
material handling will be in contractor’s scope.
Contractor shall ensure to discharge scrap only at designated place by his own
The contractor shall also participate to achieve the 5-S standards along with
BALCO. If contractor will not follow the 5S, penalty may be put by BALCO up to
1% of the total value.
WORK TIMINGS:
The Contractor shall ensure that no employee of the Contractor will enter to
remain on BALCO premises unless necessary for fulfilling Contractor's
obligations under this contract. In order to maintain proper co-ordination at the
plant the workmen deployed by the Contractor shall adhere to the work timings
mutually agreed by the parties. These timings may change and when required by
BALCO.
Contractor shall ensure proper leave planning (if any) of workmen with prior
intimation to EIC, Balco.
OCCUPATIONAL HEALTH & SAFETY (OH & S) :
The contractor shall be responsible to take all precautions to ensure safety of the
labours / workers at work. The contractor will supply his labours / workers safety
equipment as per rules. If you are bringing your own equipment to carryout of job in
side the plant such equipment should be subject to hazard identifications and risk
assessment prior to commencing of work.
The persons engaged by you shall be given appropriate awareness on OH&S; those
personal who will carry out jobs affecting OH&S shall be properly trained and made
competent for the job performed by them.
During emergency situation which may be faced in the plant your personal should
move to the emergency shelters. They should not spread any rumor. (An OH &S
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 29 of 32 Year 2018
booklet is available in Safety Deptt and is required to be signed by the contractor
agreeing to comply with the same)
Service Provider’s RESPONSIBILITY
The Service Provider has to make his own arrangement for skilled / semi-
skilled labour, tools, tackle, & any other equipment etc.
Service Provider will make in triplicate list of tools, tackles, equipment's
etc. required for completing this job inside our premises. The list will be
certified by our Security In charge at Factory Main gate before the materials
are allowed inside our works. The first Copy of this material pass will be
given to the Security Incharge, 2nd Copy to the Officer responsible for the
execution of work and 3rd copy to be retained by the contractor.
Whenever, the Service Provider wishes to take out his any of the material
brought inside by him earlier, he shall have to get item checked by the area
engineer incharge as per the details certified at the time of entry. Gate Passes
for outgoing Material will be issued by competent authority of BALCO.
Withdrawal of all the materials to be supplied by BALCO either from our
main stores or any other places within the BALCO premises, transportation
to work site and returning of all scrap to scrap yard will be in the Service
Provider's scope.
For electrical connection of the Service Provider's equipment, Service
Provider shall have to arrange his own switch boards with fuses etc. for full
care and safety as per regulations of Electrical safety.
Service Provider shall submit materials reconciliation statement for the
materials to be issued by BALCO free of cost after completing the work.
During shut-down or to meet exigencies, extra manpower free of cost , if
required, shall be arranged by the Service Provider and the work will have to
be carried out on round the clock to complete the jobs within time period
allotted by our Engineers Incharge.
All rubbish, Wastage, debris generated is to be collected and dumped in
the nearest Vat/Pit or after completion of the job / or the place as indicated
by Engineer Incharge. Area to be made clean & neat with necessary
brooming etc. at Service Provider's area of works.
All works are to be carried out in running condition of plant. Work is to be
carried out as per the requirement & BALCO does not guarantee continuous
work.
All tools, tackles, lifting tools should be load tested for which photocopy
of test certificate is to be produced by the party before starting of job. The
Service Provider shall strictly follow the rules specified by BALCO while
carrying out operations under the work contract.
While carrying out operations under the contract, the Service Provider
shall strictly adhere to the security and safety norms. The speed of the
vehicles while inside the factory should not exceed the limit prescribed by
BALCO.
The Service Provider shall arrange to deploy the requisite skilled
manpower in each shift as may be required for the smooth functioning and
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 30 of 32 Year 2018
maintenance of the equipment and vehicles and also for discharging of other
responsibilities.
Ensuring safety and prevention of any accident / incident of the employees
of the Service Provider will be the sole responsibility of the Service
Provider.
The Service Provider shall provide all safety PPEs to all his workers,
supervisors, site in-charge & managerial staff and shall comply with all
safety and statutory rules and regulations.
The Service Provider should have a valid contract license.
UNIFORM: The contractor shall provide appropriate safety dress to all
the labor/staff personnel engaged by him for fulfilling contractual obligation.
The uniform shall prominently carry the contractor's name &logo and all of
contractor's personnel shall remain in uniform during duty period.
The contractor shall particularly take care of all liaisoning required with
local civic and Government authorities only to the extent it is related to the
execution of the contractor's scope of work for ensuring smooth progress of
work.
Contractor shall prepare a Quality Assurance Plan and get approval by the
Engineer in-charge, which will form the basis for stage wise inspections and
final inspections. The contractor shall comply and ensure that its Sub-
Supplier/ contractor and Consultants comply with the provisions of the
Technical Specifications in connection with quality assurance and quality
control arrangements in the carrying out of the Works. Contractor should
maintain separate log book for recording the work done with hours of
engagement and adherence to quality standards. The same will be verified
by BALCO engineers every day / shift. The contractor shall also maintain
log sheet to record maintenance activities, spares consumption and repairs
etc. wherever applicable. Contractor's staff daily attendances should be
maintained regularly wherever applicable. All such records maintained by
the Contractor, its Consultants and/or its Sub-Supplier/ contractor's pursuant
to such quality assurance and quality control obligations shall be made
available for our inspection upon notice.
26. LABOUR LAWS: The contractor shall be fully responsible for observing all
statutory laws in respect of the contract labour engaged by him as applicable under
payment of wage, minimum wages act. Contract Labour engaged by him as
applicable under payment of wage minimum wages act. Contract Labour
(Regulation Abolition Act 1970) FACTORIES Act 1965, Payment of Gratuity Act
1972, Maternity benefit Act 1961, retrenchment benefit, Industries employment
(standing order) act CG Industrial relation act and amendment thereof. The
contractor will discharge various liabilities relating to employee PF, Misc. provisions
act 1952 contract labours as per procedure of Balco enforce. Contractor having valid
labour license for 20 or more than 20 workers shall be considered for award for
which contractor are required to submit photocopy of Labour license along with the
tender.
BALCO COMMERCIAL Butt Crushing Inside the BALCO Plant
Page 31 of 32 Year 2018
27. OTHER LAWS OF THE LAND: The contractor shall observe all laws of the land
including those of Local, State and Central Government.
28. ASSINGNMENT OR SUBLETTING: The contractor shall not assign or sublet the
contract or any part thereof, without prior permission of Balco in writing.
29. INDEMINITY: The contractor shall keep Balco indemnified from and against all
actions, suits, proceedings, losses, costs, damage, claim and demands of every nature
and descriptions due to any acts of the contractor.
30. INSURANCE: The contractor will taken workmen compensation insurance policy
from the Insurance Company so as to enable him to discharge various liabilities
under workmen compensation act and submit documents within seven days of its
start of work. The contractor shall be required to obtain Group Insurance Policy for
the labours to be engaged in the work.
31. ILLEGAL GRATIFICATION: This contract can be terminated if any bribe,
commission, gift or advantage given, promised or offered by the contractor to any
employee of Balco.
32. FORCE MAJURE: For failure of execution of any work due to war, restraint,
imposed by government, earthquake, fire, explosion, riot, lockout, etc, beyond
human control directly interfering with the work, Balco shall only allow such
additional time as may be considered justified by the circumstances of the case. No
claim whatsoever of compensation from the contractor for loss etc. on this account
shall be entertained. Direct or indirect loss, if any, to Balco due to negligence of the
contractor during this period, on this account can however be recovered from the
contractor.
33. TERMINATION: Balco reserves the right to terminate the contract at any time with
or without notice if the work is found unsatisfactory and also get the work done
through any other any agency at the risk and cost of the contractor. Violation of any
of the above terms may also lead to cancellation of the contract and liabilities of the
contractor, if any, shall be deducted from his pending bills.
34. OBSTRUCTION OF WORK: Contractor shall ensure all timely payment of dues
to their workmen. In case contractors staff or workmen or are found obstructing the
normal working of Balco, the same shall be viewed seriously and shall make this
contract liable for termination.
35. JURISDICTION: The competent courts in Korba, Chhattisgarh, India only shall
have jurisdiction with regard to any question or matter arising out of this contract and
any other document that may be executed by the parties hereto or any of them in
pursuance hereof or arising here from.
36. Grievance: The service provider can submit their grievances through SRM and will
maintained a register in the department in which their employees can register their
grievances .