Tender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks (Cuts & Embankments) of the Comarnic – Brasov Motorway Romania Project Tunnels, cuts and embankments of the Comarnic – Brasov Motorway, Romania. Construction Cost Total Cost: approx. €. 1.5bn. hdl Proj ect Schedul e Tender Design: 2013 Construction: 2014 - Project Description Sinaia, Busteni & Predeal Twin Bore Highway Tunnels Sinaia length: 5.890m Busteni length: 6.200m Predeal length: 7.500m Predeal length: 7.500m Excavation cross section: 84m 2 -132m 2 Effective cross section: 66m 2 -81m 2 Excavation Method NATM – Mechanical excavation, drilling and blasting Final Lining Reinforced concrete Highway Cuts and Embankments (Section from Ch. 110+600-168+600) Embankments: Ltotal = 26.0km Cuts: Ltotal = 11.0km Geology • Alluvial deposits, limestones, flysch, marbles, schist and conglomerates Typical tunnels cross section • Groundwater • Max. overburden at the tunnels: 195m – 340m Our Services Tender design and preparation of the technical offer on behalf of ViStrAda Nord Client Typical embankment cross section 4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, Athens Tel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858 Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr ViStrada Nord Consortium (VINCI S.A. - VINCI Construction Grand Projects S.A.S. - VINCI Construction Terrassement S.A.S. – STRABAG A.G. - STRABAG S.E. – AKTOR Concessions S.A. - AKTOR S.A.)

Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

  • Upload
    lydat

  • View
    240

  • Download
    5

Embed Size (px)

Citation preview

Page 1: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Tender Designs of Major Infrastructure Highway Projects

Tunnels & Earthworks (Cuts & Embankments)of the Comarnic – Brasov MotorwayRomania

ProjectTunnels, cuts and embankments of the Comarnic – Brasov Motorway,Romania.

Construction CostTotal Cost: approx. €. 1.5bn.

h d lProject ScheduleTender Design: 2013Construction: 2014 -

Project Description• Sinaia, Busteni & Predeal Twin Bore Highway Tunnels

Sinaia length: 5.890mBusteni length: 6.200mPredeal length: 7.500mPredeal length: 7.500mExcavation cross section: 84m2 -132m2

Effective cross section: 66m2 -81m2

Excavation MethodNATM – Mechanical excavation, drilling and blasting

Final LiningReinforced concrete

• Highway Cuts and Embankments (Section fromCh. 110+600-168+600)Embankments: Ltotal = 26.0kmCuts: Ltotal = 11.0km

Geology• Alluvial deposits, limestones, flysch, marbles, schist

and conglomerates

Typical tunnels cross section

g• Groundwater• Max. overburden at the tunnels: 195m – 340m

Our ServicesTender design and preparation of the technical offer on behalf ofViStrAda Nord

Client

Typical embankment cross section

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

ViStrada Nord Consortium (VINCI S.A. - VINCI Construction Grand ProjectsS.A.S. - VINCI Construction Terrassement S.A.S. – STRABAG A.G. -STRABAG S.E. – AKTOR Concessions S.A. - AKTOR S.A.)

Page 2: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Railway Project Consulting services, technical review and checking of designs and Panagopoula Railway Tunnel associated detailed designsAthens - Patras High Speed Railway Line, Section Rododafni – PsathopirgosGreeceGreece

Project• Consulting services, technical review and checking of the designs of

the project: “Construction of the New Double High Speed Railway Lineat the section Rododafni – Psathopirgos from CH. 91+500 until CH.113+000 and Panagopoula Railway Tunnel design”.

• Panagopoula railway tunnel detailed designs.

Construction CostTotal cost: approx. € 293 m.

Project ScheduleDesign – Construction: 2013 – 2016

Project DescriptionConsulting services, technical review and checking for the followingstructures:

West adit’s E&S class ΣΠ2

• Four (4) Roadway Bridges• Thirty (30) Railway Bridges• Fifty (50) Retaining Walls• Panagopoula twin bore railway tunnel including entrance and exit

structures with total length ~8.500m

Panagopoula railway tunnel detailed designs:• Panagopoula railway tunnel West adit

Length: 68m, Cross section: 44m2, Overburden: 35m• Panagopoula railway tunnel West adit portal (Length 18m Piles Ø 1 20)

Bridge’s pilewall detail

• Panagopoula railway tunnel West adit portal (Length: 18m, Piles Ø 1.20)• West cavern and cross gallery of Panagopoula railway tunnel

Length: 52m, Cross section: 77m2, Overburden: 62m• Intermediate cavern and cross gallery of Panagopoula railway tunnel

Length: 55m, Cross section: 77m2, Overburden: 202m

GeologyQuaternary deposits of clayey scree from the marls weatheringencountered in the area and pliocene and pleistocene sedimentscharacterized by marls (stiff clays) and conglomerates alternations,limestones, chertstones

Our Services• Consulting services, review and checking of the designs of the project

in order to identify adequacy and incompleteness of the availabledesgns relevant to the projects’ feasibility and constructability

• Detailed design of Panagopoula railway tunnel West adit and portal• Detailed designs of the intermediate and west caverns and cross

Adit’s plan view

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

galleries of Panagopoula railway tunnel

Clients• AKTOR S.A. – J&P AVAX S.A. – INTRAKAT S.A. Joint Venture• AKTOR S.A. – J&P AVAX S.A. Construction Joint Venture

Adit’s portal pilewall

Page 3: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

RockFill Highway Embankments

Demir Kapija-Smokvica MotorwaySection of European Corridor 10 & Part of the NationalRoad M-1 (E-75)Road M 1 (E 75)Scopje

ProjectDesign of rockfill reinforced embankments for the Demir Kapija –Smokvica motorway. Construction phase design for the incorporation,utilization of suitable rock type fill materials obtained from the cuts ofth j t i th t b k tthe project in the motorway embankments.

Construction CostTotal cost of the highway: approx. € 270m

Project ScheduleDesign: 2010, 2013Construction: 2012 - 2015

Modulation of embankments’ anchoring benches

Project Description• Total highway length: 28km• Reinforced embankments’ total length: 5km• Reinforced embankments’ max. height: 40m• Reinforced embankments’ slope: 2:3 and 1:1 (v:h)

GeologyGabbro – diabase complex rock formations of Diabases and Spilites Placement and leveling of fill materialGabbro diabase complex, rock formations of Diabases and Spiliteslocally covered with soil-like superficial mantle consisting of diluviumdeposits and talus – scree materials.

Our Services• Geotechnical Design of rockfill reinforced embankments• Slope stability analysis checks, dimensioning of the rock type

embankments and determination of the necessary and appropriateper case reinforcement requirements (tensile strength of the geogrid

Placement and leveling of fill material

elements, length, vertical spacing)• Elaboration of technical reports, detailed construction drawings,

calculation notes, technical and constructability issues• Consultancy Services

ClientAKTOR S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Typical cross section and construction details for the rock fill embankments

Page 4: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Rockfall Protection & Slope Support WorksDemir Kapija-Smokvica Motorway / Celevecka GorgeSection of European Corridor 10 & Part of the National Road (E-75) S j75), Scopje

ProjectRockfall protection works design and slope support-stabilizationmeasures design at the Celevecka river gorge. The alignment of TunnelT1 crosses the rivers’ stream with very steep, adverse rocky morphologybringing about high risk of potential rockfalls.

Construction CostConstruction CostTotal cost of the highway: approx. € 270m

Project ScheduleDesign: 2010, 2013Construction: 2013-2014

Project Description• Gorge crossing length: ~120m• Four (4) gorge portals of tunnel T1 examined: North left and right, South

left and right• Rocky slopes’ height above the portal areas: max. 250m• Mountainous region under extremely unfavorable geomorphological

conditions, very steep rocky terrain (almost subvertical slopes), potentialrockfall source areas along the entire cliff rocky face

• Very high kinetic energies and bounce heights expected, highlyhazardous area

GeologyJurassic Limestone, slightly weathered and karstified with more intenseweathering and fracturing limited in the vicinity of faults and fault zones.Structural fracturing of the rockmass from major discontinuity sets.

Our Services• Geotechnical Design for rockfall protection and slope support works –Works Method StatementId tifi ti d l ti f t ti l f il h i

Rockfall protection and slope support measures at the south right gorge portal of tunnel T1

• Identification and evaluation of potential failure mechanisms• Stability analysis checks (rockfalls, planar and wedge type modes of

failure)• Determination of the necessary and appropriate per portal case rockfallprotection/mitigation systems (type of rockfall barriers, energyabsorption capacity, post height) and slope support-stabilizationmeasures (type of steel wire mesh, rockbolts, bearing capacity, length,pattern)

• Elaboration of technical reports, detailed construction drawings and

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

p , gcalculation notes

• Consultancy Services

ClientAKTOR S.A. Rockfall protection barriers at the north right and left

gorge portals of tunnel T1

Page 5: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Embankments – Cuts - Structures

Final geotechnical designs for Poligiros – UranoupoliMotorwayGreece

ProjectEarthworks final geotechnical designs (embankments and cuts)and foundation designs for overpasses, underpasses, culverts,bridges, cut & covers of a 38 km motorway stretch at Poligiros –Uranoupoli motorway, Greece.

D i C tDesign CostDesign cost: approx. € 321 k.

Project ScheduleDesign: 2010 – on going

Project Description• Total highway length: 38km• Embankments’ total length: 1km

Cut & cover’s longitudinal section

g• Embankments’ height: 14 – 21m• Cuts’ total length: 0,5km• Cuts’ height: 9 - 13m

GeologyGneisses, peridotites and dunites, recrystallised limestones ormarbles, phyllites, red clays, alluvial deposits and alluvial fans

Our ServicesOur Services• Geotechnical surveys programming• Geological – geotechnical interpretation and evaluation• Earthworks final geotechnical designs (cuts and embankments)• Foundation designs for overpasses, underpasses, bridges,culverts, cut & covers

• Elaboration of technical reports, construction drawings,calculation notes

• The project was undertaken in the frames of the Design

Bridge’s plan view

p j gConsortium “Prisma Consulting Engineers S.A. – Omikron KappaConsulting S.A. – Markos Liras – Ioannis Pantekis – KonstantinaMichalopoulou”

ClientMINISTRY OF INFRASTRUCTURE, TRANSPORTATION AND NETWORKS(GR)

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Underpass’s longitudinal section

Page 6: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Cut Slopes

DUBAI – FUJAIRAH FREEWAYSlope Stability Audit - Slope Stabilization and RockfallProtection Design, United Arab EmiratesProjectSlope stabilization and rockfall protection design at the Dubai-Fujairah Freeway. Geotechnical evaluation and determination of the required preventative and protective measures, as well as repair and remedial works

Construction CostTotal cost: approx. 300 m AED

Project ScheduleDesign: 2009 - 2010Construction: 2009 - 2011

Project DescriptionAssessment of the cut slope stability and determinationof the necessary slope stabilization works and rockfallprotection measuresDesign Length: 22.0 km

Geomorphology - Geologyp gy gyMountainous terrain with steep rocky slopes of significantheight (exceeding 50m up to 110m)Ophiolite complex (gabbros, basalts, dunites, peridotites,serpentinites, breccia)

Our Services• Technical advisor - consultant services and special expertise

in geotechnical engineering and rock-soil mechanics• Geotechnical design

Existing rocky cut slopes

• Identification of the encountered geotechnical problems and evaluation of the potential slope failure mechanisms –elaboration of detailed stability audit

• Execution of stability analysis (planar, wedge, rockfalls, composite failures)

• Determination of the necessary support - stabilization measures

• Detailed dimensioning of the mitigation systems, technical specifications and construction method statementspecifications and construction method statement

• Elaboration of technical report, construction drawings and BOQ’s

• On site technical expertise and consulting services• Inspection, monitoring and maintenance plan

Construction Details• Cut slope re-profile• Scaling works• Reinforced concrete, shotcrete, anchored buttress

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

• Pre-stressed anchors• Rockfall barriers (low, medium, high energy absorption capacity)• Slope surface stabilization systems (anchored wire mesh, spider net)

Client UAE - MINISTRY OF PUBLIC WORKS, AL AHMADIAH AKTOR

View of the freeway after the completion of the construction works

Page 7: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Cut Slopes

Rockfall Protection Design ATHINEO – LEFKTRO (RAPSOMATI)ATHINEO LEFKTRO (RAPSOMATI)TRIPOLI – KALAMATA ROADWAYSouthern Greece

ProjectRockfall protection design at Athineo – Lefktro section (Rapsomatiarea) of the Tripoli – Kalamata road axis (Peloponnese)

Construction CostTotal cost: approx. 0.5 m. €

Project ScheduleDesign: 2008Construction: 2009

Project DescriptionProject DescriptionAssessment of the cut slope stability and determination of thenecessary support and rockfall protection measuresLength: 450m

GeologyRocky slopes of medium inclination with height up to 50mThin to medium bedded Limestones

O S i

Typical cross section with installation of rockfall barrier

Our Services• Detailed geotechnical design• Identification and evaluation of the potential slope failure

mechanisms – elaboration of detailed stability audit• Execution of stability analysis (rockfalls)• Determination of the necessary support - stabilization measures• Detailed dimensioning of the mitigation systems, technical

specifications and construction method statement• Elaboration of technical report, construction drawings and bill of

Design area general view

p , gquantities (BOQ)

• Consulting services during on site application• Designs jointly elaborated by OMIKRON KAPPA CONSULTING SA

and EDR GmbH, Munich

Construction DetailsInstallation of approx. 400m of rockfall protection barriers

Client

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

ClientMINISTRY OF E.PP.PW. - GENERAL SECRETARIAT OF PUBLIC WORKS,GENERAL DEPARTMENT OF TRANSPORTATION WORKS

Rockfall protection area

Page 8: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Cut Slopes

TEMPI VALLEY - Slope Stabilizationand Rockfall Protection DetailedDesign, PATHE SECTION MALIAKOS– KLEIDI MOTORWAY, CONCESSIONPROJECT,Central GreeceProjectSlope stabilization and rockfall protection detailed design at TempiValley (National Roadway of Athens – Thessaloniki)

Construction CostTotal Cost: approx. 3m. €

Project ScheduleDesign: 2008 - 2009Construction: 2010 - 2011

Project DescriptionAssessment of the cut slope stability and determination of thenecessary slope stabilization works and rockfall protection measuresLength: 5.0km

Geomorphology - GeologyMountainous terrain, very steep rocky slopes of significant height upto 150mThick to medium bedded crystalline limestones, Phyllites, soil likeformations (limestone boulders, scree – debris materials)

Our Services• Detailed geotechnical design

Rockfall protection barriers Installation

g g• Identification and evaluation of the potential slope failure

mechanisms – elaboration of detailed stability audit• Execution of stability analysis (rockfalls, planar failure, rock wedge

formation, toppling, circular slip failure)• Determination of the necessary support - stabilization measures• Detailed dimensioning of the mitigation systems, technical

specifications and construction method statement• Elaboration of technical report, construction drawings and BoQ’s• Consulting services during on site application• Consulting services during on site application

Construction Details• Scaling works performed manually or/and with the use of

mechanical means• Installation of approx. 1,900m of rockfall protection barriers• Installation of approx. 5,500m2 slope stabilization systems

(fully anchored Tecco type mesh, Spider type net)• Application of approx. 1,350m of permanent, fully grouted rock

bolts

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

bolts• Rehabilitation of the existing fences and the drainage ditches

ClientMALIAKOS KLEIDI CONSTRUCTION J/V(HOCHTIEF – AKTOR – J& P AVAX– VINCI CGP – AEGEK – ATHENA) Slope stabilization systemapplication

Page 9: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Cut Slopes

PANTELEIMONAS AREA (PLATAMONAS)PATHE SECTION MALIAKOS – KLEIDI MOTORWAY, Concession Project Slope Stabilization and Rockfall

ProjectSlope stabilization and rockfall protection detailed design atPanteleimonas area (Platamomas) of the National Roadway Athens– Thessaloniki

Concession Project, Slope Stabilization and RockfallProtection Detailed DesignCentral Greece

Construction CostTotal Cost: approx. 0.5 m. €

Project ScheduleDesign: 2008Construction: 2010

Project DescriptionAssessment of the cut slope stability and determination of theAssessment of the cut slope stability and determination of thenecessary stabilization works and rockfall protection measuresLength: 2.5km

Geomorphology - GeologySteep rocky slopes of average height 10 - 20mCrystalline Limestones, soil formations (limestone boulders, screematerials)

Typical cross section with installation of rockfall barrier and mesh

Our Services• Detailed geotechnical design• Identification and evaluation of the potential slope failure

mechanisms – elaboration of detailed stability audit• Execution of stability analysis (rockfalls, wedge failure)• Determination of the necessary support and stabilization measures• Detailed dimensioning of the mitigation systems, technical

specifications and construction method statement• Elaboration of technical report construction drawings and bill of• Elaboration of technical report, construction drawings and bill of

quantities (BOQ)• Consulting services during on site application

Construction Details• Scaling works performed manually or/and with the use of

mechanical means• Installation of approx. 100m of rockfall protection barriers• Installation of approx. 2,500m2 slope stabilization systems

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

(fully anchored Tecco type mesh, drape, Spider type net)

ClientMALIAKOS KLEIDI CONSTRUCTION JV(HOCHTIEF - AKTOR – J&P AVAX – VINCI CGP – AEGEK – ATHENA)

Slope stabilization systems application

Page 10: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Slopes, Cuts and Embankments

Slope Stability Audit of existing highway cuts and embankments Elefsina – Korinthos – Patras – Pyrgos – TsakonaMotorway Concession projectMotorway, Concession projectSouthern Greece

+119.45Permanent f ully grouted spot rock bolts withantiox idant protection c oating Φ25, S500length 4 00m bearing capac ity 2 00kN

ProjectDetailed design of slope repair and remedial works for the existingembankments and cuts of Elefsina – Korinthos – Patras – Pyrgos –Tsakona Motorway

Construction Costs

Left

bran

chΑριστερός

κλάδος

Rig

ht b

ranc

hΔεξιός κλάδος

35.30

+87.87+88.04

TerrainΦυσικ ό ανάγλυφο

Existing Rock trap wallΥφιστάμενος τοίχοςβραχοπαγίδας

0.50

+98.67 2.00

+86.74

11.9

4

l ength 4.00m, bearing capac ity 2 00kNΜόνιμες σποραδικ ές ηλώσεις βράχου Φ 25,S500 πλήρους ενεμάτωσης μεαντιοξειδωτική προστασία, μήκους 4.00m,φέρουσας ικανότητας 200kN

Indicative positions of anchors(where required acc ording tothe in situ conditions)Ενδεικτικές θέσεις αγκυρίων(όπου απαιτείται από τις επίτόπου συνθήκες )

20.7

8

Existing TerrainΥφιστάμενοφυσικό ανάγλυφο

Indicative positions of anchors(where required according tothe in si tu condi tions)Ενδεικτικ ές θέσεις αγκυρίων(όπου απαιτε ίται από τις επίτόπου συνθήκες )

Construction CostsTotal Costs: approx. € ~5 m €

Project ScheduleDesign: 2008 –Construction: 2009 – 2011

Project DescriptionRehabilitation of existing cuts and embankments

G l

Indicative cross section with the appropriate repair and remedial measures

GeologyLimestones, marly limestones, conglomerates and artificialembankment bodies

Our Services• Detailed geotechnical design• Identification and registration of all problems and hazards• Geological mapping and assessment of the geotechnical

parameters• Stability analysis to determine the potential failures and to work on

the protection measures• Determination of all necessary protection and rehabilitation

measures (installation of rock fall barriers, slope support)• Construction Drawings• Bill of Quantities - Budget

Construction Details• Scaling with the use of light mechanical means

Existing cut view

• Installation of rockfall barriers• Installation of slope protection measures• Application of permanent rock bolts• Installation of 3-D protection geogrid• Application of hydroseeding• Rehabilitation of damaged drainage culvert• Construction of drainage ditch at the top of existing retaining wall• Construction of support walls

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

ClientAPION KLEOS Construction JV(VINCI CONSTRUCTION GRANDS PROJETS S.A.S. - HOCHTIEFConstruction AG - J&P-AVAX S.A. - ATHENA S.A. – AKTOR S.A. –GEK/TERNA S.A.)

Page 11: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Rockfall Protection

Kakia Skala Section PATHE HighwayCentral Greece

ProjectHighway protection from rockfalls

Construction CostTotal cost: approx. € 2 m.

Project ScheduleDesign: 2003Construction: 2003

Project DescriptionTotal length of barriers: approx. 2000m

GeologyLimestones and dolomitic limestonesVery steep morphology

Construction MethodSpecial barriers installed to prevent rockfalls and to absorb kinetic energy

Our ServicesGeotechnical analysis and design of rockfall barriersGeotechnical analysis and design of rockfall barriers

ClientAKTOR S.A.

…………………

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 12: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Rockfall Protection WallPATHE Highway, Kakia Skala SectionCentral Greece

ProjectRockfall protection wall in a highway

Construction CostTotal cost: approx. € 0,5m.

Project ScheduleDesign: 2003Construction: 2003 - 2004

Project DescriptionRockfall protection wallLength: 1.455mHeight: 1.80m

GeologyLimestones, scree in a seismically active area

Our ServicesDetailed geotechnical & structural design

Construction Details• Rockfall concrete wall with surface foundation• Rockfall concrete wall with surface foundation• 3 typical cross sections

ClientAKTOR S.A.

Typical cross sections

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 13: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Confrontation of geotechnical hazards in earthworks

New National Road Agios Nikolaos – Kalo ChorioCrete, Southern Greece

ProjectRoadway cuts and embankments

Construction costTotal cost: approx. € 4 m.

Project ScheduleProject ScheduleDesign: 2010Construction: 2011 –

Project DescriptionTechnical inspection of geotechnical hazards forincomplete earthworks, as well as, for earthworks to beconstructed

Geology

Cuts – embankments general view

GeologyLimestones, marls formations, debris materials

Our Services• Review and technical audit of existing geotechnical

designs• Geotechnical evaluation of incomplete earthworks• Proposal of documented technical design solutions for

all the earthworks of the roadway stretchy

ClientJ/V AKTOR S.A. – ELTER S.A.

Cut’s general view

Indicative typical cross section with protection measures

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 14: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Project

Slopes Rehabilitation

Rapsomati Tunnel of Road AxisTripoli - KalamataSouthern Greece

ProjectRehabilitation of existing open cut slopes of the highway

Construction CostTotal cost: approx. € 0,9 m.

Project ScheduleDesign: 2005Construction: 2005 - 2006

Project Description• Rehabilitation of failures in the slopes of open cuts in a

highway section of approx. 3km length• One-sided and two-sided open cuts constructed from a

previous contractor with medium uniformly gradient 2:3 andfluctuant height from 1m up to 10m, which were appearingserious hydraulic mining problems, surface erosions andfailures of small depth

Open cut slopes view prior to rehabilitation

failures of small depth

GeologyMarls of clay and consistence and sand marlsAlluvial

Our Services• Detailed geotechnical design• Identification and registration of the slopes problems• Execution of stability back-up analyses for the assessment of

the geotechnical engineering characteristics of soils• Assessment of the necessary earth works interventions for

the rehabilitation of failures• Assessment of flood protection and anti-corrosion measures• Construction drawings• Bill of Quantities, Budget

Construction DetailsConstruction Details• Installation of loose material of the existing failures with

granular crust material• Installation of 3-D Geogrids ENKAMAT type for the anti-

corrosion slopes protection• Turfgrass planting over the slopes surface• Planting of small trees• Installation of drainage wholes at the foot of the slope• Construction of drainage trenches over the slopes crown

Open cut slopes view after rehabilitation

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

ClientJ/V KASTOR S.A. – ELTER S.A.

Page 15: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Tender designs – services

Concession project for the Construction, Operation &Maintenance of «Milot-Morine» highwayAlbania

ProjectTender design and consultancy services for the Milot – Morine highwaywith respect to the conditions of the cuts and embankments and theexisting Thirra tunnel, as well as, the new construction elements of thehighway referring to the earthworks for the dualization of the firstsection of the highway from Milot to Rreshen and the new twin boreKukes Tunnel

Construction CostTotal cost: approx. € 258m

Project ScheduleDesign: 2012 - 2013Construction – Operation - Maintenance: 2013 - 2043

Project Description

Highway cut slopes view

Project Description• Total highway length: 114km• Existing cuts max. height: ~170m• Existing embankments max. height: ~60m• Existing Thirra tunnel: 2* 5.50km= 11km, effective cross

section:61.15m2

• New Kukes Tunnel: 2*250m=500m, effective cross section: 50m2

GeologyRock formations, mostly ophiolites and limestones, with differentialRock formations, mostly ophiolites and limestones, with differentialdegree of weathering, fracturing and tectonic deformation. Soft rockand soil-like formations are also encountered, especially in the firstsection from Milot to Reps and the last section from Kukes to Morine

Our Services• Independent diagnosis on the conditions of the entire existing

alignment of the highway with respect to the earthworks andpreliminary definition of the required works to decrease thegeotechnical risk associated with landslides and rockfalls and the

Existing Thirra tunnel

geotechnical risk associated with landslides and rockfalls and thecurrent status of the existing earthworks / environmental concerns –Safety assessment of the existing Thirra tunnel

• Method statement with qualitative future maintenancerequirements for the existing earthworks (cuts - embankments) andthe existing Thirra tunnel

• Tender designs for the construction elements• BoQ estimates for the interventions required to decrease the

geotechnical risk of the existing earthworks, the new earthworks ofth hi h ti t b d li d d th K k t l

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

the highway section to be dualized and the new Kukes tunnel

Client• VINCI CONCESSIONS SAS - AKTOR CONCESSIONS S.A.• AKTOR S.A.

Highway embankment slopes view

Page 16: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Feasibility Studies and General Design

SEETO Road Route 4 Investment Plan Feasibility Studies for earthworks (cuts, embankments,ground improvements, rock fall & avalanches), tunnelsg pand other structuresMontenegro

ProjectFeasibility studies and general design for Road Route 4 connectingthe port of Bar with Corridor 10 in Serbia.P t f M t ’ hi h t k li R t 4 t t h f thPart of Montenegro’s highway network lies on Route 4 stretch of thecore road network defined by the South East Europe TransportObservatory (SEETO). SEETO road route 4 runs for 597 km betweenVatin (Romanian border) – Belgrade (Serbia) – Podgorica(Montenegro) - Bar (Montenegro). The Montenegrin portion, runs forabout 180 km, generally North – South, from the Serbian border to thecoast at Djurmani where it intersects SEETO road route 1, or Adriatichighway.

Design: 2012- 2013

Project DescriptionFeasibility studies and general designs for the alternative alignmentsof the project, for earthworks (cuts, embankments, groundimprovements, rock fall & avalanches), the tunnels (approx.29km ofroad tunnels per branch with cross section approx. 90-120m2) andother structures.

Route 4: Montenegrin portion

GeologyAt the beginning of the route mainly limestone and dolomiteformations with some conglomerates and peridotites. After Uvac andup to the Serbian border, the geology changes and flysch, clayeymarls, sandstone formations and marly limestones are met.

Our Services• Inception reportp p• Geotechnical surveys• Preliminary geotechnical designs• General geotechnical design and Bidding documents for the

construction works• Operations & maintenance plan• Environmental and social impact assessments according to the

Montenegrin law and the IFIs requirements

Client

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Client• MINISTRY OF TRANSPORT & MARITIME AFFAIRS-MONTENEGRO

EBRD FINANCED PROJECT• URS SCOTT WILSON – UK Mountainous terrain typical view

Page 17: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Cuts, Embankments, MSEW, Culverts, Retaining Structures, Drainage –Hydraulic Works, Ground Improvement WorksConstruction of Segment No 1 in Tirana-Elbasan Road (Km 0 till Krabbe Tunnel Entrance Km 13) / FIDIC Conditions

f C t t Alb iof Contract, AlbaniaProjectHighway earthworks, retaining structures, culverts, hydraulic works

Construction CostTotal cost: approx. 84m $

Project ScheduleDesign - Construction: 2012- 2013

Project DescriptionFinal detailed designs of permanent open cuts, embankments, mechanicallystabilized earth walls, retaining structures, culverts, gabion walls, piles,dewatering-drainage measures, ground improvement, treatment &rehabilitation worksEmbankments: Ltotal = 10km, Hmax =50.0mCuts: Ltotal = 7.5km, Hmax =60.0mMSEW: Ltotal = 2.5km, Hmax =30.0mPile walls: Ltotal = 0.7km, Hmax =22.0mGabion walls: Ltotal = 1 5km Hmax = 7 0mGabion walls: Ltotal = 1.5km, Hmax = 7.0mCulverts: Ltotal =1.0km, Smax = 2x(3.0mx4.0m)

GeologyMollasic formations sandstone, siltstone, conglomerates), Quaternary deposits(silt, clay, sand, gravels, limestone and sandstone boulders)

Our Services• Detailed geotechnical, structural & foundation designs• Geotechnical interpretation reports. Evaluation of the in situ conditions,

establishment of the foundation profile, the geotechnical engineeringti th d i t d l dproperties, the design parameters and loads

• Execution of stability analysis checks under the provisions of InternationalStandards and Guidelines (BS standards, Eurocodes, AASHTO standards),e.g. rotational check, sliding, bearing capacity, settlement, overturning,planar failure, wedge failure etc.

• Detailed dimensioning of the earthworks and structures and determinationof the necessary reinforcements, retaining, supports and stabilizationmeasures (strength, bearing capacity, spacing, length, technical specs ofmaterial, quality & durability needs)

• Elaboration of technical reports, detailed construction drawings, calculationElaboration of technical reports, detailed construction drawings, calculationnotes, instrumentation-geotechnical monitoring reports

• Quality, longevity & serviceability assurance of the designed works• Constructability issues, technical specifications, requirements, construction

standards & guidelines• Designer on site services & Technical Consultancy Services

Construction Details• Geogrid reinforcement elements, MSEW facing with Terramesh system or

gabions, drainage foundation improvement layers, permanent rockbolts-soilnails, pre-stressed anchors, concrete pile walls, gabion walls, reno

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

, p , p , g ,mattresses, separation geotextiles, drainage holes, drainage ditches, slopeerosion protection geomats, steel wire mesh, thickened hydroseeding,monitoring instruments

ClientJV AKTOR – COPRI (Albania)

Construction works

Page 18: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Cuts, Embankments, MSEW, Culverts, Retaining Structures, Drainage – Hydraulic Works, Ground Improvement Works

Construction of Segment No 3 in Tirana-Elbasan Road (Krabbe Tunnel Exit Km 15.2 till Elbasan city Km 27) / FIDICConditions of Contract AlbaniaConditions of Contract, AlbaniaProjectHighway earthworks, retaining structures, culverts, hydraulic works

Construction CostTotal cost: approx. 86m $

Project ScheduleDesign - Construction: 2012- 2013

Project DescriptionFinal detailed designs of permanent open cuts, mechanicallystabilized earth walls, embankments, retaining structures, culverts,gabion walls, piles, dewatering-drainage measures, groundimprovement, treatment & rehabilitation worksEmbankments: Ltotal = 10.0km, Hmax = 40.0mCuts: Ltotal = 5.0km, Hmax = 60.0mMSEW: Ltotal = 1.0km, Hmax =20.0mGabion walls: Ltotal = 0.35km, Hmax = 9.0m C l t Lt t l 0 5k S 2 0 2 5Culverts: Ltotal =0.5km, Smax = 2.0mx2.5m

GeologyMollasic formations sandstone, siltstone, conglomerates), Quaternarydeposits (silt, clay, sand, gravels, limestone and sandstone boulders)

Our Services• Detailed geotechnical, structural & foundation designs• Geotechnical interpretation reports. Evaluation of the in situ conditions

and establishment of the foundation profile, the geotechnicalengineering properties, the design parameters and loadsengineering properties, the design parameters and loads

• Execution of stability analysis checks under the provisions ofInternational Standards and Guidelines (BS standards, Eurocodes,AASHTO standards), e.g. rotational check, sliding, bearing capacity,settlement, overturning, planar failure, wedge failure etc.

• Detailed dimensioning of the earthworks and structures anddetermination of the necessary reinforcements, retaining, supportsand stabilization measures (strength, bearing capacity, spacing,length, technical specs of material, quality & durability needs)

• Elaboration of technical reports, detailed construction drawings,l l ti t i t t ti t h i l it i tcalculation notes, instrumentation-geotechnical monitoring reports

• Quality, longevity & serviceability assurance of the designed works• Constructability issues, technical specifications, requirements,

construction standards & guidelines• Designer on site services & Technical Consultancy Services

Construction Details• Geogrid reinforcement elements, MSEW facing with Terramesh system

or gabions, drainage foundation improvement layers, permanentrockbolts-soil nails, pre-stressed anchors, concrete pile walls, gabion

ll tt ti t til d i h l

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

walls, reno mattresses, separation geotextiles, drainage holes,drainage ditches, slope erosion protection geomats, steel wire mesh,thickened hydroseeding, monitoring instruments

ClientJV AKTOR – COPRI (Albania) Construction works

Page 19: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Embankments

“Construction of “Struma” Lot 4 Highway, section “Sandanski-Kulata” from km 423+800 to km 438+500, Bulgaria” gBulgaria

ProjectFinal designs, techniques, mechanical mixing guidelines anddocumentation for the construction of the embankments of themotorway project “Struma” Lot 4, section “Sandanski-Kulata”from km 423+800 to km 438+500, Bulgaria, g

Construction CostTotal cost: approx. € 35m

Project ScheduleDesign: 2012- 2013Construction: 2012- 2013

Project Description

Graphical representation of PI, LL estimates of resulting soil mixtures

Project DescriptionEarthworks aggregate excavation volume 2,000,000m3 andembankment fills volume 1,700,000m3 (out of which animportant portion consists of upgrading the existing alignmentthrough lateral extension to a four lanes motorway)Embankments mainly low in heightMax. embankment height: 8m

Geology Trial embankment (H=8m) cross sectionAlignment crossing plains featured with alluvial deposits(consisting of clays, silts and sands and mixtures) and hills ofweathered peridotites

Our Services• Evaluation of available laboratory tests on the parent

(“unsuitable”) soil materials for embankment’s fill use• Evaluation of available laboratory tests on the potential

“borrow” materials for embankment’s fill use

Trial embankment (H 8m) cross section

borrow materials for embankment s fill use• Substantiated design, for mechanical mixing of the

“unsuitable” materials of the project with the “borrow”materials (mixing proportions, laboratory tests, field trials etc.)

• Substantiated design for the construction of two (2) testembankments and monitoring instrumentation program

• Interpretation of the monitoring results of the two testembankments

Typical cross section of the motorway at embankment’s position

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

ClientAKTOR JOINT-STOCK CONSTRUCTION COMPANY

Page 20: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Railway Project

Railway Embankments Design for the New Double High Speed Railway Line Liakokladi - DomokosCentral GreeceCentral Greece

ProjectDesigns of reinforced embankments for the project: “Design ofinfrastructure Works from CH 25+000 until CH 52+000 of theNew Double High Speed Railway Line at the section Lianokladi– Domokos”

Project ScheduleProject ScheduleDesign: 2007 - 2009Construction: 2008 - 2011

Project DescriptionTotal length of excavation works: 4000mEmbankments : soil or rock fill material reinforced with geogridsModulation geometry: one or double sidedReinforced slopes with gradient 2:3D k idth 13 0 13 5Deck width: 13.0m – 13.5 mMaximum height: 20m

GeologyRecent disposals, scree, serpentinized peridodites, limestone’sflysh formations, weathered mantle, schistosed serpentinites,ophicalcites (encountered as highly weathered or as rockyformations)

Our Services• Detailed design• Construction drawings

Construction Details• Construction of drainage – foundation improvement layer and

application of separation geotextile• Construction of embankments with soil fill materials• Foundation of the embankments with reinforced geogrids• Installation of 3-D protection geogrid for slope protection

ClientConstruction J/V AKTOR S.A. - TERNA S.A.

Embankment typical cross sections

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 21: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Railway Project – Subbase and Trackbed Reinforcement

Earthworks at North Portal of KallidromoRailway Tunnel of the New Double High

d l h kl d

ΡΟΣ ΑΞΟ

ΝΑΣ Σ/Γ

Σ ΔΙΠΛΗΣ Σ/Γ

ΑΞΟΝΑΣ Σ/Γ

S_GR_K

Speed Railway Line Tithorea - LianokladiFthiotida Providence, Komnina Region

ProjectSubbbase and trackbed reinforcement of the new double track highspeed railway line Tithorea-Lianokladi at section 14+300 – 19+000

C i C

ΑΡΙΣΤΕ

Ρ

ΑΞΟ

ΝΑΣ

ΔΕΞΙΟΣ Α

Construction CostTotal Cost: approx. 1,2 m. €

Project ScheduleDesign: 2009 - 2010Construction: 2011 -

Project DescriptionDetermination of the subbase requirements of the new double trackDetermination of the subbase requirements of the new double trackhigh speed railway line Tithorea-Lianokladi at section 14+300 –19+000

Geomorphology – Geology• Clayey-marl formations, with scattered intercalations of sandy-

marl• The presence of the sand layers in combination with the

inclination of the layers acts as a water bank, creating confinedt f hi h it d h d t ti

Subbase reinforcement with geogrids typical cross section

water masses of high capacity and hydrostatic pressure• During slope excavation, intense water flow was monitored from

the sand layers of the “champagne” effect type and creation ofmudflow

Our Services• Investigation of the in-situ geotechnical conditions of the subbase• Qualitative classification of the subbase according to UIC719R

2008• Selection of the required subbase reinforcement according to

UIC719R 2008• Appropriate reinforcement of the subbase with geogrids and soil

replacement in sections of the project where the minimumrequirements of the UIC719R 2008 are not met.

ClientConstruction Joint Venture AKTOR S.A. – TERNA S.A. – J&P AVAX S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 22: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Special Geotechnical Applications –Landslide Rehabilitation

Earthworks at North Portal of Kallidromo Railway Tunnel

ΟΡΙΟ ΑΠΑΛΛΟΤΡΙΩΣΗΣ

σκυρόδεμα C20/25 διαστάσεων1.40m(πλάτος)x1.20m(ύψος)

Πάσσαλοι διάτμησης απόοπλισμένο σκυρόδεμα C20/25διαστάσεων O100/2.00m, L=12.00m

Πόδας αναβαθμού

Πόδας αναβαθμού

Πόδας αναβαθμού

Πόδας αναβαθμού

Στέψη αναβαθμού

Στέψη αναβαθμού

Στέψη αναβαθμού

Αρμός 2εκ.

1.40

1.40

Τμήμα Πασσάλων Διάτμησης

L=61.20m

Χ .Θ

.

2.00

5 .00

2.00

5.00

2.00

5 .00

2.00

5.00

2.0 0

6.5 0

2 .00

6 .50

2.00

7.0 0

2 .00

3.3 2

Αρμός 2εκ.

23

45

67

89

1011

1213

1415

1617

1819

2021

2223

2425

2627

2829

3031

1

4%

4%

4%

3 :4

4%

4%

4%

4%4%

4%

4%

4%

3 :4

3 :4

3:4

1 :1

1:1

1 :1

1:1

1:1

1:1

1:1

1:3

1:3

Χ.Θ

.

K-ê

K-ð

Αποστραγγιστική τάφροςσύμφωνα με υδραυλική μελέτη

DSR6

2.00

1:1

Kallidromo Railway TunnelFthiotida Providence, Komnina Region

ΑΞΟΝΑΣ ΔΙΠΛΗΣ ΣΙΔ. ΓΡΑΜΜΗΣ

Αποστραγγιστική τάφροςσύμφωνα με υδραυλική μελέτη

Πόδας αναβαθμού

Πόδας αναβαθμού

Πόδας αναβαθμού

Πόδας αναβαθμού

Στέψη αναβαθμού

Στέψη αναβαθμού

Στέψη αναβαθμού

Στέψη αναβαθμού

27.1

0

25.6

42.

005.

002.

005.

0 02 .

00

41.3

5

22. 0

62.

0 0

1 :3

1:3

1 :3

1:3

4%

4%

4 %4%

4%

4 %

4%

4%4%

4%

1:3

1:1

1 :1

1 :1

1:1

1:1

1:1

1:1

1:1

1:1

1:1

1:1

1:1

4%

4%

1:1

BH1

BH2

2:3

Εγκάρσια κανάλια εκροήςσύμφωνα με υδραυλική μελέτη

Εγκάρσια κανάλια εκροήςσύμφωνα με υδραυλική μελέτη

ΙΧΝΟΣ ΟΡΙΟΥ ΑΣΤΟΧΙΑΣ ΕΠΙΥΦΙΣΤΑΜΕΝΟΥ ΑΝΑΓΛΥΦΟΥX.Θ. 15+714 - X.Θ. 15+820(07/2009)

Σχεδιασμός μόνιμων πρανώνσύμφωνα με εγκεκριμένεςγεωτεχνικές μελέτες

DSR6

4 5.2

4

Excavation layout for the partial removal of landslided masses

ProjectLandslide rehabilitation and slope protection in 3 areas of the projectfrom Ch. 15+365 up to Ch. 15+665from Ch. 15+710 up to Ch. 15+835from Ch. 16+651 up to Ch. 16+804

Construction Cost

DSR6

1

3130

2928

2726

2524

2322

2120

1918

1716

1514

1312

1110

98

76

54

32

BH2

K-ê

K-ð

ΙΧΝΟΣ ΟΡΙΟΥ ΑΣΤΟΧΙΑΣ ΕΠΙΥΦΙΣΤΑΜΕΝΟΥ ΑΝΑΓΛΥΦΟΥX.Θ. 15+714 - X.Θ. 15+820(07/2009)

ΟΡΙΟ ΑΠΑΛΛΟΤΡΙΩΣΗΣ

Σχεδιασμός μόνιμων πρανώνσύμφωνα με εγκεκριμένεςγεωτεχνικές μελέτες

Κεφαλόδεσμος από οπλισμένοσκυρόδεμα C20/25 διαστάσεων1.40m(πλάτος)x1.20m(ύψος)

Πάσσαλοι διάτμησης απόοπλισμένο σκυρόδεμα C20/25διαστάσεων O100/2.00m, L=12.00m

Αρμός 2εκ.

Τμήμα Πασσάλων Διάτμησης

L=61.20m

Τ ΕΛΟΣ ΜΕΛ Ε

Τ ΗΣ

Χ.Θ

. 15+

835

ΠΕΡΙΟΧΗ ΕΦΑΡΜΟΓΗΣΤΥΠΙΚΗΣ ΔΙΑΤΟΜΗΣ 787

2.50

2.50

4.00

14.9

6

4.0 0

20.6

2

4%

4%

4%

2:3

1:3

1:3

1:3

1:3

1:3

1:3

1:3

1:3

ΕΠΙΧΩΜΑ ΜΕ ΟΠΛΙΣΗΓΕΩΠΛΕΓΜΑΤΩΝ

ΕΠΙΧΩΜΑ ΧΩΡΙΣ ΟΠΛΙΣΗ

Αποστραγγιστική τάφροςσύμφωνα με υδραυλική μελέτη

Όριο επιχώματοςσταθεροποίησης -αποκατάστασης

Αρμός 2εκ.

ΕΠΙΧΩΜΑ ΧΩΡΙΣ ΟΠΛΙΣΗ

ΟΡΙΟ ΜΟΝΙΜΗΣ ΕΚΣΚΑΦΗΣ

ΠΕΡΙΟΧΗ ΕΦΑΡΜΟΓΗΣΤΥΠΙΚΗΣ ΔΙΑΤΟΜΗΣ 784

ΑΡΧΗ

ΜΕΛΕΤΗ

ΣΧ

.Θ. 1

5 +71

0 .00

ΠΕΡΙΟΧΗ ΕΦΑΡΜΟΓΗΣΤΥΠΙΚΗΣ ΔΙΑΤΟΜΗΣ 786

DSR6

DSR6

Αποστραγγιστική τάφροςσύμφωνα με υδραυλική μελέτη

Á

B

Ã

Χ.Θ

. 15+

725.

0 0

Χ.Θ

. 15+

770 .

00

Construction CostTotal Cost: approx. 4 m. €

Project ScheduleDesign: 2009 - 2010Construction: 2011 -

Project DescriptionWorks for the stabilization of the landslide phenomena and the finalrehabilitation of the area, taking into account the in-situ conditions andminimizing any destabilization risks

BH1

1:3

ΑΞΟΝΑΣ ΔΙΠΛΗΣ ΣΙΔ. ΓΡΑΜΜΗΣ

Αποστραγγιστική τάφροςσύμφωνα με υδραυλική μελέτη

13.3

1

47.5

047.5

0

1:3

1:3

1:3

1:3

1:3

Εγκάρσια κανάλια εκροήςσύμφωνα με υδραυλική μελέτη

Όριο επ ιχώματοςσταθεροποίησης -αποκατάστασης

ΕΠΙΧΩΜΑ ΜΕ ΟΠΛΙΣΗΓΕΩΠΛΕΓΜΑΤΩΝ

Εγκάρσια κανάλια εκροήςσύμφωνα με υδραυλική μελέτη

ΙΧΝΟΣ ΟΡΙΟΥ ΑΣΤΟΧΙΑΣ ΕΠΙΥΦΙΣΤΑΜΕΝΟΥ ΑΝΑΓΛΥΦΟΥX.Θ. 15+714 - X.Θ. 15+820(07/2009)

Σχεδιασμός μόνιμων πρανώνσύμφωνα με εγκεκριμένεςγεωτεχνικές μελέτες

45.2

4

Surface final layout and rehabilitation

minimizing any destabilization risks.Total affected area ~ 28,000m2

Geology• Clayey-marl formations, with scattered intercalations of sandy-marl• The presence of the sand layers in combination with the inclination of

the layers acts as a water bank, creating confined water masses ofhigh capacity and hydrostatic pressure

• During slope excavation, intense water flow was monitored from thesand layers of the “champagne” effect type and creation of mudflow

4%4%

4% 4%

4%

4%

4%

4%

4%

ΛΕΠΤ. "B"

ΛΕΠΤ. "Α"

Í .Ó. ÃÑÁÌ Ì Ç

DSR6

Slope failure rehabilitation typical cross section

y p g yp

Our Services• Geotechnical investigation program and geotechnical interpretation of

the landsliding mechanism• Drainage works design• Design of the best possible slope layout and removal of the landslide

materials• Stabilization and rehabilitation embankments• Landslide retaining pilewalls• Long term anticorrosion slope protection• Long-term anticorrosion slope protection• Execution of back analysis and determination of the potential sliding

surfaces

Design Details• Excavation layout for partial removal of landslide material on 1:3 slopes• Geometrical and reinforcement calculation of the necessary pilewall

systems for the protection of the excavations and strengthening of thesubbase

• Application of reinforced embankment for stabilization and

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Terrain slide failure signs

pprehabilitation of the area with 1:3 slope

• Application of 3D geocomposite and adequate hydraulic protection ofthe slopes

ClientConstruction Joint Venture AKTOR S.A. – TERNA S.A. – J&P AVAX S.A.

Page 23: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Technical WorksRetaining Walls with Strip FoundationElefsina – Korinthos – Patra – Pyrgos –Tsakona Motorway, Concession Project Central & Southern Greece

ProjectRetaining walls at embankments’ toesRetaining structures at open cuts’ toes

Construction CostTotal cost: approx. € 8m.

Project ScheduleRetaining wall general view

Project ScheduleDesign: 2009 - 2011Construction: 2009 -

Project DescriptionRetaining wallsTotal length: 2.290mHeight: 2,0m-9,75mRetaining structuresT l l h 820Total length: 820mHeight: 2,0m-8.00m

GeologyMarls, conglomerates, limestones, scree materials, alluvialdeposits, gravels, clays, silts, sands

Our Services• Estimation of the input geotechnical design parameters

Retaining wall construction

Estimation of the input geotechnical design parameters• Definition of the geometry of the structures (cross section,

height etc.)• Elaboration of all the necessary analysis and checks for

structures dimensioning• Detailed construction drawings• Detailed geotechnical & structural design

Construction DetailsR i f d t C20/25 C30/37

Embankment construction behind the retaining wall• Reinforced concrete C20/25, C30/37• Surface foundation• Additional components at walls crest (safety barriers,

sound barriers etc.)

Clients• APION KLEOS Construction JV

(VINCI CONSTRUCTION GRANDS PROJETS S.A.S. –HOCHTIEF Construction AG - J&P-AVAX S.A. - ATHENA

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

S.A. – AKTOR S.A. – GEK/TERNA S.A.)• OLYMPIA JOINT VENTURE

(HOCHTIEF Construction AG - AKTOR S.A.)• AKTOR S.A.• VINCI CONSTRUCTION GRANDS PROJETS S.A.S.

Retaining structure typical cross section

Page 24: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Technical WorksUnderpassesElefsina – Korinthos – Patra – Pyrgos –Tsakona Motorway, Concession Project Central & Southern Greece

ProjectDetailed design of nineteen (19) Underpasses

Construction CostTotal cost: approx. € 6,5m.

Project ScheduleGeneral view

Project ScheduleDesign: 2009 - 2011Construction: 2009 -

Project DescriptionThree (3) types of underpasses• Underpasses founded in two cast in situ reinforced concrete

pile series• Underpasses with surface (pad) foundation (box type)

U d i i f ll b f d d• Underpasses consisting of two wall-type abutments foundedin reinforced concrete piles

GeologyConglomerates, marls, scree materials, alluvial deposits,gravels, clays, silts, sands

Our Services• Estimation of the geotechnical design parameters and the

Typical cross section

Estimation of the geotechnical design parameters and themaximum groundwater level

• Definition of the geometry of the underpasses (cross section,height etc.)

• Elaboration of all the necessary analysis and checks forstructures dimensioning

• Detailed construction drawings• Detailed geotechnical & structural design

C t ti D t ilConstruction Details• Reinforced concrete C20/25, C30/37• Surface foundation• Foundation in piles

Clients• OLYMPIA JOINT VENTURE

(HOCHTIEF Construction AG – AKTOR S.A.)• AKTOR S.A.

Simulation analysis model

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Typical cross section

Page 25: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Special Geotechnical Applications

Reinforced Embankment Final Designs and Mechanically Stabilized Earth Wall Detailed Designs Elefsina – Korinthos – Patras – Pyrgos - TsakonaMotorway Concession ProjectMotorway, Concession Project Central & Southern Greece

ProjectDetailed designs of mechanically stabilized earth walls withheight up to 15m and reinforced embankments of height upto 26m for treating with adverse geometries during theg g gconstruction of highway embankments

Construction CostTotal project’s cost: approx. € 80 m.

Project ScheduleDesign 2009 2010

AXI

S MO

ΑΞΟ

ΝΑΣ

SR4

Design: 2009 - 2010Construction: -

Project DescriptionTotal reinforced embankment and MSEW length: ~8300mMaximum height: 26mMSEW slope: 1:1 up to verticalReinforced embankment slope: 2:3 up to 1:1

Reinforced embankment cross section

Αξονα

ς αυτοκ

/μου

Mot

orw

ay ax

is

ΛΕΠΤΟΜΕΡΕΙΑ "C"DE TAIL " C"

GeologyPliocene and Plio-pleistocene Marls, Conglomerates,Alternations of Marl-Conglomerates, Alluvial Deposits,Weathered slope materials, Sands, Gravels, Clay-Silts

Our Services

+60.46

+58.54

+56.62

+54.70

+52.78

+50.86

+50.34

+61.68

+53.73

+60.12

+51.12

+50.00

+50.10

+51.30

+59.87

+50.12

'Α M

ΛΕΠΤΟΜΕΡΕΙΑ "A"DE TAIL " A"

Our Services• Geotechnical interpretation and design parameter

assessment• Stability evaluation of MSEW with specialized software• Internal and external stability checks• Appropriate geogrid application according to fill material

characteristics• Gabion walls layout in geometrically complex areas• Detailed design

Composite mechanically stabilized earth-wall with foundation support cross section

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

ClientAKTOR S.A.

Page 26: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Special Geotechnical Applications

Complex Retaining Systems and StructuresElefsina – Korinthos – Patras – Pyrgos - TsakonaMotorway, Concession Project Central & Southern GreeceCentral & Southern Greece

ProjectDetailed designs for construction of retaining wall system withsingle or double pile-walls and application of permanentprestressed anchors for the secure execution of highwayworks in adverse geotechnical and geometrical areas

Construction CostTotal project’s cost: approx. € 9 m.

Project ScheduleDesign: 2009 - 2011Construction: -

Project DescriptionT t l l th f l t i i t 1000

Retaining wall at geometrically adverse areas cross section

Existing ground level from Road Design

Λεπτομερής τοπογραφική απότύπωση από επιτόπου εργολάβο AW1D t il d t hi l b AW1 t tTotal length of complex retaining systems: ~1000m

Maximum height of retaining systems: 35 m

GeologyPliocene and Plio-pleistocene Marls, Conglomerates,Alternations of Marl-Conglomerates, Alluvial Deposits,Weathered slope materials, Sands, Gravels, Clay-Silts

Our Services

Κεφαλόδεσμος από οπλισμένο σκυρόδεμα C30/37διαστάσεων 1.35mX1.10m (πλάτος X ύψος)Pile Cap 1.35mX1.10m (width X height)with C30/37 reinforced concreteαπόστραγγιστική τάφρος

Dra inage trench

Πέτασμα οπλισμένου σκυροδέματοςC30 /37 στατικού πάχους 25cmFinal lin ing of reinforced concreteC30 /37, 25cm static thickness

Τοίχος προστασίας επίχωσηςαπό οπλισμένο σκυρόδεμα C30/37Protection wall o f backfillingwith C30/37 reinforced concrete

ΕπίχωσηBackfil

Detailed topographical survey by AW1 contractor

Μόνιμες περιφραγματικές απόστραγγιστικές οπές μήκους 10.0m,ονομαστικής διαμέτρου 3 '', ενδιαμέσως των πασσάλων, μεανωφερική κλίση 10°, με δύο απόστραγγιστικούς σωλήνες απόPVC (π.χ. διπλοί σωλήνες DURVINIL ), με υλικό φίλτρουαπότελούμενο από θερμοπλαστικές σφαίρες ή χαλαζιακή άμμο.Permanent double wall screen drainage holes, 10.0m long,nominal d iameter 3'', between the piles, with 10° minimum upwardinclination, consisting o f two concentric drainage PVC pipes (e.g.DURVINIL double wall screen), with filtering material which iscomposed by thermoplastic spheres or quartz sand.

1.551.60

11.45

14.984.20

3:2

11.0

0

.50

1.10

1.35

.30

2.80

.60

1.30

50

.25

.39

.58

1 0°

3.00

5° or 15°

.50

Σκυρόδεμα διαμόρφωσης κλίσεων C8/10 10εκConfigu ration concrete C8/10 10cm

Φράχτης ανάσχεσης βραχοπτώσεων ο οποίοςθα καθοριστεί σε επόμενη φάση μελέτηςRockfall protection barrier which should bedefined a t a next design phase

Εγκοπή επί του πετάσματος (Λεπτ."Α")Slot on the pile lining (Detail "A")

Σκυρόδεμα εξομάλυνσης C8/10 10εκLean concrete C8/10 10cm

3.50

9.00

8.50

9.50

7.00

16.50

17.50

• Geotechnical interpretation and design parameterassessment

• Geotechnical parameters optimization with slope stabilityback analysis

• Specific load check of the retaining system from randomsliding surfaces

• Serviceability check of the retaining system• Check and dimensioning of prestressed anchors

according to EC7

hydraulic arrangementsΔιάτρητος τσιμεντοσωλήνας Φ200με ελάχιστη κλίση 1%Perforated cement p ipe Φ200with minimum 1% inclina tion

Στραγγιστήριο με γεωύφασμα κα ι χονδρόκοκκουλικό σύμφωνα με παρ.38 της Τ.Σ.Υ.Drain from big size granu la r material coveredwith geotextile according to pa r. 38 of T.C.C.

Φρεατοπάσσαλο ι από οπλισμένο σκυρόδεμα C20/25διαστάσεων Ø1.0 0/1.50 m, μήκους 11 .00mBored piles Ø1.00/1.50m, length 11.00mwith C20/25 reinforced concrete

38

1.00

.25

.75

.5

Μόνιμα προεντεταμένα αγκύρια μήκους , αριθμού τενόντωνκαι φορτίου προέντασης ως σχετικό πίνακα.Εναλλάξ εφαρμογή κλίσης αγκυρίων 5° και 15° ανά πάσσαλο.P ermanent p re-stressed anchors with length, number ofstrands and p restressed load according to the relevant table.Varia tion of anchor inclination from 5° to 15° per pile.

SR

30L

Composite retaining system with prestressed anchors cross section

according to EC7• Assessment and determination of the seismic load

according to the area’s geotechnical profile• Detailed design

Clients• OLYMPIA JOINT VENTURE

(HOCHTIEF Construction AG - AKTOR S.A.)• AKTOR S.A.

8

69

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

64

Composite triple retaining system with prestressedanchors cross section

Page 27: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway General Excavation WorksEarthworks DesignsElefsina – Korinthos – Patras – Pyrgos - Tsakona Motorway, Concession Project, Central & Southern Greece

ProjectDetailed geotechnical earthwork designs in the Korinthos PatrasDetailed geotechnical earthwork designs in the Korinthos – Patrasstretch from C.P. 20 up to C.P. 80 (Cuts & Embankments)

Construction CostTotal project’s cost: approx. € 180 m.

Project ScheduleDesign: 2008 - 2011Construction: 2008 -

Project Description

14.8

9

8. 00

8.00 4.50

1.00

Αύλακα αποσ τράγγ ι σης αναβαθμούBench drai nage trench

1.50

2:1

Αγκύρωση μεταλλι κού πλέγματοςAnc hor i ng of t he s teel wire mesh net

10°

7. 44

Μόν ι μα αγκύρι α ολόσωμης πάκ τωσ ης , με τσιμεντένεμα σε όλο το μήκοςτους , φ έρουσας εφ ελκυσ τι κής ι κανότητας 250kN, B500c, Ø28, απόγαλβανι σμέ νο χάλυβα, μήκους 12. 00m , σε διάτρημα Ø3'', σε πεσσοειδήκάνναβο 2.0m x 2.0m, με κατωφερική κλίση 10°P erm anent soi l nai l s ful l y grouted, tensile bearing capacity 250kN,B 500c, Ø28, f rom gal vani s ed s teel , 12.00m length, in drill hole Ø3'', instaggered grid 2.0m x 2. 0m, at downward i nclination 10°

8.00

10°

4.00

2.00

Εφαρμογή εύκαμπτου τρι σ δι άσ τατου γεώπλεγματος ενισχυμένο με διπλής περιέλιξης,ατσάλ ι νο πλέγμα με βαρύ γαλβάνι σ μα (τύπου Gal fan), με ελάχιστη διάμμετρο 2.7mm,τύπου 8x 10 (ελάχι σ το άνοι γμα καννάβου D=8cm ), ελάχιστης εφελκυστικής αντοχής45kN/m, ή γ εωσ ύνθε του πλέγματος τύπου MACMAT R (R1 8127GN) ή αντίστοιχοA ppl i cat i on of rei nforced Geom at, wi th doubl e twisted, woven steel wire mesh with Galfanc oat i ng, wi re di ameter 2.7m m or m ore, type 8x10 (minimum mesh opening D=8cm), ofm i ni m um tensi l e st rength 45kN/m, or s teel reinforced geomat type MACMAT R (R18127GN) or equivalent

Εφ αρμογή εύκαμπτου τρι σ δι άσ τατου γ εώπλεγματος ενισχυμένο με διπλής περιέλιξης,ατσ άλι νο πλέγμα με βαρύ γαλβάνι σμα (τύπου Gal fan), με ελάχιστη διάμμετρο 2.7mm,τύπου 8x10 (ελάχι σ το άνοι γμα καννάβου D=8c m), ελάχιστης εφελκυστικής αντοχής45k N/m , ή γεωσύνθε του πλέγματος τύπου MA CMAT R (R1 8127GN) ή αντίστοιχοAppl i cat i on of rei nforc ed Geomat , wi th doubl e twisted, woven steel wire mesh with Galfan

Αγκύρωσ η μεταλλι κού πλέγματοςA nchori ng of the steel wire mesh net

Αποσ τραγγ ι σ τι κή τριγωνική τάφροςT ri angul ar drainage ditch

Τοπ ι κή εφαρμογή μόνι μων πε ρι φραγματικών απόστραγγιστικών οπώνμήκους 8.0m , ονομασ τι κής δι αμέ τρου 3'', σε κάνναβο 4.00mx4.00m, μεανωφερι κή κλί σ η 10°, με δύο απόσ τραγγιστικούς σωλήνες από PVC(π .χ . δι πλοί σωλήνες DURVINIL), εάν απαιτείταιLoc al appl i cat i on of permanent doubl e wall screen drainage holes, 8.0ml ong, nom i nal di am eter 3'', in grid 4.00mx 4.00m, w ith 10° mi ni mumupward i ncl i nat i on, consi s t i ng of two concentric drainage PVC pipes(e.g. DURV INIL doubl e wal l screen), if required

Μόνι μα προε ντε ταμέ να αγκύρι α μήκους, αριθμού τενόντωνκαι φ ορτί ου προέ ντασης ως σχετικό πίνακα.Εναλλάξ εφαρμογή κλί σ ης αγκυρίων 5° και 10°,σ ε κάνναβο 4.0m x 2. 0m (ύψος x μήκος)P erm anent pre-s t res sed anc hors with length, number ofs t rands and pres t res sed l oad ac cordi ng to the relevant table.V ari at i on of anc hor i ncl i nation from 5° to 10°, everys uccessi ve pre-s t ressed anchor,i n grid 4.0m x 2. 0m (hei ght x length)

5° ή/or 10°

Δοκός από οπλι σ μένο σκυρόδεμα C 30/37γι α τη σύνδεσ η των προε ντεταμένων αγκυρίων(Βλέπε σχέδι ο Λεπτομερειών 1OK F01323A- )Rei nf orced concrete beam C 30/37 for the connectionof the pre-st ressed anchors(S ee drawi ng of details 1OK F 01323A-)

2.50

22.00

30.00

22.00

30.00

4.00

+45. 67

+30.87

Project DescriptionTotal length of Excavation WorksCuts: 12,000mBare or partially reinforced embankments: 23,000 mOpen Cuts:• Slope layout and reinforcement of open cuts• Use of fully grouted permanent or prestressed anchors• Slopes with gradient 2:3~ 3:1• Maximum slope height: 12m

7.64

1 .553.00

1.50

.30

1.50

8.00

8.00

8.00

. 50

2.30

1.00

Αύλακα αποσ τράγγι σης αναβαθμούB enc h drai nage trench

4. 50

Αγκύρωσ η μεταλλι κού πλέγματοςA nchori ng of the steel wire mesh net

2.50

10°

3.82

Μόνι μα αγκύρι α ολόσ ωμης πάκτωσης , με τσιμεντένεμα σε όλο το μήκοςτους , φέρουσ ας ε φελκυσ τι κής ι κανότητας 250kN, B500c, Ø28, απόγαλβανι σ μένο χάλυβα, μήκους 12.00m, σε διάτρημα Ø3'', σε πεσσοειδήκάνναβο 2.0m x 2.0m , με κατωφερική κλίση 10°Permanent soi l nai l s ful l y grouted, tensile bearing capacity 250kN,B500c , Ø28, f rom gal vani sed steel , 12.00m length, in drill hole Ø3'', inst aggered grid 2.0m x 2. 0m, at downward i nclination 10°

5.15

10°

2.00

coat i ng, wi re di am eter 2.7mm or more, t ype 8x10 (minimum mesh opening D=8cm), ofm i ni mum t ens i l e s t rength 45k N/m , or steel reinforced geomat type MACMAT R (R18127GN) or equivalent

1.11

4.00

Τ οπι κή ε φαρμογή μόνι μων περι φραγματικών απόστραγγιστικών οπώνμήκους 8.0m , ονομασ τι κής δι αμέ τρου 3'', σε κάνναβο 4.00mx4.00m, μεανωφ ερι κή κλί σ η 10°, με δύο απόσ τραγγιστικούς σωλήνες από PVC(π .χ. δι πλοί σωλήνες DURVINIL), εάν απαιτείταιLocal appl i c at i on of permanent doubl e wall screen drainage holes, 8.0ml ong, nom i nal di am eter 3'', in grid 4.00mx4.00m , w ith 10° mi ni mumupward i ncl i nat i on, consi st i ng of two concentric drainage PVC pipes(e.g. DURVI NIL doubl e wal l screen), if required

Μόνι μα προεν τε ταμένα αγκύρι α μήκους, αριθμού τενόντωνκαι φορτί ου προέν τασ ης ως σχετικό πίνακα.Εναλλάξ ε φαρμογή κλ ί σ ης αγκυρίων 5° και 10°,σε κάνναβο 4.0 m x 2.0m (ύψος x μήκος)Permanent pre-st ress ed anchors with length, number ofst rands and prest ress ed l oad acc ordi ng to the relevant table.Vari at i on of anchor i ncl i nation from 5° to 10°, ev erysucces si v e pre-st ressed anchor,i n grid 4.0 m x 2.0m (hei ght x length)

Μόνι μα προεν τε ταμένα αγκύρι α μήκους, αριθμού τενόντωνκαι φορτί ου προέν τασ ης ως σχετικό πίνακα.Εναλλάξ ε φαρμογή κλ ί σ ης αγκυρίων 5° και 10°Permanent pre-st ress ed anchors with length, number ofst rands and prest ress ed l oad acc ordi ng to the relevant table.Vari at i on of anchor i ncl i nation from 5° to 10°, ev erysucces si v e pre-st ressed anchor

2:1

5° ή/or 10°

2.00

17.00

25.00

1.50

4.22

1.50

30. 00

22.00

30. 00

22.00

4.00

+23. 41

+18.17

2:1

Open cut with prestressed anchors and fully bonded permanent anchors cross section

• Maximum total cut height: 65mEmbankments:• Soil fill material• Bare or partially reinforced embankments with geogrids due to

seismic design• Modulation Geometry: one or double sided• Slopes with gradient 2:3• Deck width: 30m - 50m• Maximum height: 14m 4.00

4. 00

6.00

4.00

1. 00

1. 00

1. 00

1. 00

Αύλακα αποσ τράγγ ισ ης αναβαθμούBench drai nage trench

M ε ταλλι κό πλέγμα τύπου Galfan8/2. 4 ή αναλόγουSt eel wi re mesh net Gal fan8/2.4 t ype or equivalent

Αγκύρωση μεταλλ ι κού πλέγματοςAnchori ng of t he s teel wire mesh net

Α γκύρωσ η μεταλλι κού πλέγματοςA nchoring of t he st eel wire mesh net

2:1

2:1

2:1

2:1

10 . 0°

2.50

3. 00

1.50

10 . 0°

2.50

3. 00

1.50

1 0 .0 °

2.50

3 .00

1.50

10 . 0°

2.50

3 . 00

1.50

6 .0° 6. 00

6 .0° 6. 00

6.0 ° 6. 00

6.0°

Αγκύρωση μεταλλ ι κού πλέγματος με αγκύρια ολόσωμης πάκτωσης, μετσ ιμε ντένεμα σ ε όλο το μήκος τους, φέ ρουσας εφελκυστικής ικανότητας 200kN,B500c, Ø25, από γαλβανι σμένο χάλυβα, μήκους 3.00m, σε διάτρημα Ø3'', σεπε σσοε ιδή κάνναβο 2.5m x 2. 5m , με κατωφ ερική κλίση 10°Anchorage of t he st eel wi re m esh net wi th soil nails fully grouted, tensilebeari ng capaci t y 200kN, B 500c , Ø25, f rom galvanised steel, 3.00m length, indri l l hol e Ø3'', i n staggered grid 2.5m x 2.5m , at downward i nclination 10°

Τ οπ ική ε φαρμογή μόν ι μων πε ρι φραγματικών αποστραγγιστικών οπώνμήκους 6. 0m , ονομασ τικής δι αμέ τρου 3'', σε κάνναβο 2.0mx4.0m(ύψος x μήκος ), με ελάχι σ τη ανωφε ρική κλίση 6°, εάν απαιτείταιLocal appl i cat i on of perm anent doubl e wall screen drainage holes,6. 0m l ong, nom i nal di am et er 3'', i n a 2.0mx4.0m (height x length)pat t ern, wi t h 6° m i nim um upward inclination, if required

Αποσ τραγγ ισ τι κή τριγωνική τάφροςT ri angul ar drainage ditch

11.1

6

10.0

0

11.0

0

6. 00

Αύλακα αποσ τράγγ ισ ης αναβαθμούBench drai nage trench

M ε ταλλ ι κό πλέ γμα τύπου Galfan8/ 2.4 ή αναλόγουSt eel w i re mesh net Gal fan8/ 2.4 type or equivalent

Αύλακα αποσ τράγγ ι σης αναβαθμούB ench drai nage trench

M εταλλ ι κό πλέ γμα τύπου Galfan8/ 2. 4 ή αναλόγουS teel wi re mesh net Gal fan8/ 2.4 t ype or equivalent

Αύλακα αποσ τράγγ ι σης αναβαθμούBench drai nage trench

M ε ταλλ ι κό πλέ γμα τύπου Galfan8/ 2.4 ή αναλόγουSt eel w i re mesh net Gal fan8/ 2.4 type or equivalent

M εταλλ ι κό πλέ γμα τύπου Galfan8/ 2. 4 ή αναλόγουSt eel w i re mesh net Gal fan

Α γκύρωσ η με ταλλι κού πλέ γματος με αγκύρια ολόσωμης πάκτωσης, μετσ ι μεντέ νε μα σε όλο το μήκος τους , φέ ρουσας εφελκυστικής ικανότητας 200kN,B 500c , Ø25, από γαλβαν ισ μέ νο χάλυβα, μήκους 3.00m, σε διάτρημα Ø3'', σεπεσ σοε ι δή κάνναβο 2.5m x 2. 5m , με κατωφε ρι κή κλίση 10°A nchorage of t he s t eel w i re m esh net w i th soil nails fully grouted, tensilebearing capac i ty 200kN B500c Ø25 f rom galvanisedsteel 300m length in

Αγκύρωση με ταλλ ι κού πλέγματοςAnchori ng of the s teel wire mesh net

Τοπ ι κή ε φαρμογή μόνι μων πε ριφ ραγματικών αποστραγγιστικών οπώνμήκους 6. 0m , ονομασ τι κής διαμέ τρου 3'', σε κάνναβο 2.0mx4.0m(ύψος x μήκος), με ε λάχι σ τη ανωφε ρική κλίση 6°, εάν απαιτείταιLocal appl i cat i on of perm anent double wall screen drainage holes,6. 0m l ong, nom i nal di am et er 3'', i n a 2.0mx4.0m (height x length)patt ern, w i t h 6° m ini m um upward inclination, if required

Υφ ισ τάμενο φυσικό ανάγλυφοEx is t i ng ground level

Εκτοξ ευόμενο σ κυρόδε μα γι α την πλήρωση τωνκοι λοτήτων που δημι ουργούνται από υπερεσκαφέςή από τοπι κέ ς ασ τοχί ες (εάν απαιτείται)Guni t e f or t he f i l l i ng of cavities formed byoverexcavat i ons or l ocal f ailures (if required)

11.2

0

ΠερίφραξηF encing

ΚΛ ./SC: 1:50

1. 25 1. 25 1. 25 1.25 1. 25

2.50

2.50

4.50

4.50

• Maximum height: 14m

GeologyPliocene and Plio-pleistocene Marls, Conglomerates, Alternations ofMarl-Conglomerates, Alluvial Deposits, Weathered slope materials,Sands, Gravels, Clay-Silts, Limestones

Our Services• Geotechnical interpretation and design parameter assessment• Geotechnical parameters optimization with slope stability back

l i

.50. 601. 20

4.85 . 375

13. 47.375

AX

IS M

OTO

RW

AYΑΞΟΝΑΣ

ΑΥΤ/ΔΡΟΜΟΥ

4.00

.50

1. 00

3:1

3:1

Τ α χαρακτηρισ τι κά της στρώσηςέ δρασης οδοσ τρωσ ί ας θα καθοριστούναπό τη σχε τι κή Μ ελέτη ΟδοστρωμάτωνT he charac t eri st i cs of the pavementbedding l ayer wi l l be determined by therelevant Pavement Design

Ενδε ι κτι κή δι αμόρφωση οδοποιίαςI ndi cat i ve roadway configuration

10. 0°

2.50

6.0 ° 6. 00

3. 00

1.00

1 0 .0 °

2.50

3. 00

1.50

6 .0° 6. 00

Τοίχος αναχαί τι σ ης καταπτώσεωνRock s l i des int ercepting walls

1.30

11.0

0

11.0

0

Αύλακα αποσ τράγγ ισ ης αναβαθμούBench drai nage trench

8/ 2.4 t ype or equivalentbearing capac i ty 200kN, B500c, Ø25, f rom galvanised steel, 3.00m length, indri l l hol e Ø3'', i n staggered grid 2.5m x 2. 5m , at downward i nclination 10°

Αγκύρωση με ταλλι κού πλέ γματος με αγκύρια ολόσωμης πάκτωσης, μετσ ι μεν τέ νε μα σε όλο το μήκος τους , φέ ρουσας εφελκυστικής ικανότητας 200kN,B 500c , Ø25, από γαλβαν ισ μέ νο χάλυβα, μήκους 3.00m, σε διάτρημα Ø3'', σεπεσ σοε ι δή κάνναβο 2.5m x 2.5m, με κατωφερική κλίση 10°Anchorage of the s teel wi re m esh net w i th soil nails fully grouted, tensilebearing capac i ty 200kN, B500c, Ø25, f rom galvanised steel, 3.00m length, indri l l hol e Ø3'', i n staggered grid 2.5m x 2. 5m , at downward i nclination 10°

Α γκύρωσ η μεταλλ ικού πλέγματοςA nchoring of t he st eel wire mesh net

Τοπι κή εφ αρμογή μόνι μων περιφ ραγματικών αποστραγγιστικών οπώνμήκους 6. 0m , ονομασ τι κής διαμέτρου 3'', σε κάνναβο 2.0mx4.0m(ύψος x μήκος), με ε λάχι σ τη ανωφε ρική κλίση 6°, εάν απαιτείταιLocal appl i cati on of perm anent double wall screen drainage holes,6. 0m long, nom inal di am eter 3'', i n a 2.0mx4.0m (height x length)pat tern, wi th 6° m i ni m um upward inclination, if required

"Β λέ πε παρατήρηση No 19""S ee rem ark No 19"

High open cut with appropriate slope protection with anchored wire mesh cross section

analysis• Stability evaluation with specialized software• Appropriate geogrid application according to fill material

characteristics• Check and dimensioning of prestressed anchors according to EC7• Assessment and determination of the seismic load according to

the area’s geotechnical profile• Application of geocomposites for hydraulic erosion control as well

as rock barrier – rock fall systems

Α A

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

as rock barrier rock fall systems• Detailed design

Clients• OLYMPIA JOINT VENTURE

(HOCHTIEF Construction AG – AKTOR S.A.)• AKTOR S.A.

Partially reinforced embankment (due to seismic design) cross section

Page 28: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway General Excavation WorksHighway Excavation Works, PATHE SECTION, Maliakos –Kleidi Motorway, Concession ProjectCentral Greece

ProjectHighway excavation works for Maliakos Kleidi Motorway GU 10Highway excavation works for Maliakos Kleidi Motorway GU 10 ~14, GU 16 ~ 19, GU 24 ~ 25

Construction CostTotal Cost: approx. € ~600 m.

Project ScheduleDesign: 2007 - 2009Construction: 2007-

Project DescriptionProject DescriptionTotal length of excavation works:GU 10 ~ 14: 5,350m / GU 16 ~ 19: 6,050m / GU 24 ~ 25: 17,200m1. Embankments : soil fill or rock fill material

reinforced or loose with geogridsModulation geometry: one or double sidedReinforced slopes with gradient 2:1 ~ 2:3Deck width: 30m - 50 mMaximum Height: 11m

Geotechnical evaluation model

2. Open Cuts :Modulation and support of open cutsSlopes with gradient 2:3Maximum height: 10m

GeologyGU 10 ~ 14: Recent disposals, PhyllitesGU 16 ~ 19: Recent Disposals, ophiolithic sequence, Limestones,

marblesGU 24 ~ 25: Disposals, ophiolithic sequence

Our Services• Ground geotechnical interpretation report• Geotechnical drawings of longitudinal and cross sections• Detailed geotechnical design• Construction drawings

Construction Details1. Embankments :• Construction of drainage trenches at the foot of the slope

Embankment ‘s typical cross section

• Construction of drainage trenches at the foot of the slope• Construction of embankments with soil fill or rock fill materials• Foundation of the embankments with reinforced geogrids• Construction of support walls• Construction of embankments with severe gradient and gabion

facing• Foundation of the embankments with the use of piles2. Open Cuts:• Installation of anchors

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

• Installation of meshes• Construction of support walls

ClientMALIAKOS KLEIDI CONSTRUCTION JV(HOCHTIEF - AKTOR – J&P AVAX – VINCI CGP – AEGEK – ATHENA)

Page 29: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Special Geotechnical Applications

Retaining Works inside a Landslided AreaPathe Section Maliakos – Kleidi Motorway, Concession Project Central Greece

ProjectConstruction of retaining wall system with single or doublepile-walls for the secure execution of highway works insidelandslided area

Construction Costl

Layout depicting the landslided areas

Total project’s cost: approx. € 1,5 m.

Project ScheduleDesign: 2010 - 2011Construction: -

Project DescriptionConstruction of retaining wall system with single or doubleconcrete cantilever pilewalls for the secure execution of

Excavations and the retaining system structure plan view

concrete cantilever pilewalls for the secure execution ofhighway works inside a landslided areaTotal length of pilewall system: ~300mMaximum height of pilewall system: 10mTotal slope height: 30m

GeologyThe bedrock of the landslide area includes ophiolite rocksThe overlying soil materials consist of a sequence of slidedmasses

Our Services – Design Details• Detailed design of permanent open cut• Geotechnical interpretation and design parameter

assessment• Special design and dimensioning of the pile system with

finite elements software• Specific load check of the retaining system from random

Foot-wall founded on conventional embankment in combination with EPS fill

Cross Section with double retaining wall pile series

p g ysliding surfaces

• Serviceability check of the retaining system• Assessment and determination of the landslided area’s

seismic load

ClientMALIAKOS KLEIDI CONSTRUCTION JV(HOCHTIEF - AKTOR – J&P AVAX – VINCI CGP – AEGEK –ATHENA)

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

ATHENA)

Page 30: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Special Geotechnical Applications

Embankment Designs with lightweight materials,Pathe Section Maliakos – Kleidi Motorway,Concession ProjectCentral Greece

ProjectBridge replacement by Embankment with lightweightmaterials (EPS) in combination with special protectionstructures for the protection of the central natural gas pipelineand the high speed railway line from Athens to Thessaloniki

C i CComposite embankment with conventional and lightweight

materials and protection structure for the natural gas pipeline

Construction CostTotal project’s cost: approx. € 18 m.

Project ScheduleDesign: 2009 - 2011Construction: -

Project DescriptionCombination of conventional and lightweight embankment

Retaining wall founded on piles with EPS fill

Combination of conventional and lightweight embankmentwith EPS application for the protection of the central naturalgas pipeline and the high speed railway line from Athens toThessaloniki and optimization of the construction conditionsTotal embankment length: ~700mTotal lightweight embankment length: ~120mMaximum lightweight embankment height: 10-16mLightweight embankment slopes: 2:3 up to vertical

GeologyGeologyAlluvial deposits, silt-clay of low to medium plasticityBedrock formation from weathered layers of amphiboliticschist

Our Services – Design Details• Detailed geotechnical design• Geotechnical investigation and pile loading tests• Trial embankment monitoring for a 3-month time period

Foot-wall founded on conventional embankment in combination with EPS fill

g p• Technoeconomic design for minimizing construction cost• Geotechnical foundation design and optimization of the

protection structures of the central natural gas pipeline,the National Road and the high speed railway from Athensto Thessaloniki

• Structural and seismic protection design of theconventional and lightweight embankment

• Design of retaining wall for lightweight and conventionalembankment with mixed foundation on piles and slab

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Composite embankment with conventional and lightweight materials and protection structure for natural gas pipeline as well as railway underpass

embankment with mixed foundation on piles and slab-type footing

ClientAKTOR S.A.

Page 31: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Special Geotechnical Applications

Mechanically Stabilized Earth WallsPathe Section Maliakos – Kleidi Motorway,Concession ProjectCentral Greece

ProjectMechanically stabilized earth walls with height 10-16mconstructed by gabions as retaining walls or bridgeabutments

MSEW foundation area excavation layout

Construction CostTotal project’s cost: approx. € 5 m.

Project ScheduleDesign: 2009 - 2011Construction: 2011 –

Project DescriptionMechanically stabilized earthwWalls with height 10 16mMechanically stabilized earthwWalls with height 10-16mconstructed by gabions as retaining walls or bridgeabutmentsTotal MSEW length: ~500mMaximum height: 10-16mMSEW slope: 85o up to vertical

GeologyGU 10 ~ 14: Recent deposits, Phyllites

Grid and gabion connection plan view and details

GU 16 ~ 19: Recent deposits, ophiolithic sequence,limestones

Our Services – Design Details• Detailed geotechnical design• Geotechnical interpretation and design parameter

assessment• Stability evaluation of MSEW with specialized software• Internal and External stability checks• Internal and External stability checks• Appropriate geogrid application according to fill

material characteristics• Gabion modulation in geometrically complex areas

ClientMALIAKOS KLEIDI CONSTRUCTION J/V(HOCHTIEF – AKTOR – J&P AVAX – VINCI CGP – AEGEK –ATHENA)

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

MSEW bridge abutment longitudinal section

Page 32: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Project

Open Cuts

Rapsomati Tunnel of Road AxisTripoli - KalamataSouth Greece

jHighway general excavation works

Construction CostTotal cost: approx. € 1,5 m.

Project ScheduleDesign: 2005Construction: 2005 - 2009

Project Description• Permanent one-sided and two-sided slopes of the u-turn

road in the entrance of Rapsomati tunnelLength of open cut: 314mMax. height: 25mModulation of left open cut slopes in 1 slope with gradient 1:1 (height: width)Modulation of right open cut slopes in 2 slopes with gradient 2:1 and intermediate benches

• One-sided open cut slope of the open road in the area of• One-sided open cut slope of the open road in the area of the exit of Rapsomati tunnelLength: 60mMax. height: 37mSlope modulation in 4 open cut slopes with gradient 2:1 with intermediate benches, 4m width

GeologyThin-bedded medium-bedded limestonesIntercalations of clayey schists red pelites and limestones

Open cut area view in Rapsomati tunnel exit

Intercalations of clayey schists, red pelites and limestones

Our Services• Detailed geotechnical design• Execution of geotechnical investigation program• Assessment of design geotechnical parameters• Geometric project design• Execution analysis of slopes stability• Technical report• Bill of Quantities, BudgetBill of Quantities, Budget

Construction Details• Installation of fully grounded rockbolts in combination with

reinforced connecting beams• Installation of prestressed anchors on the slopes at the

area of the exit of the Rapsomati tunnel• Surface protection of permanent slope with GEOBRUGG

grids, TECCO G65 type• Construction of perimetrical drainage trenches and

Open cut typical cross section

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

p gdrainage wholes

• Planting of small trees

ClientJ/V KASTOR S.A. – ELTER S.A.

Page 33: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Excavation Works

Metsovo Connecting RoadEgnatia Highway, Section 3.2 – 3.3Northern Greece

ProjectHighway general excavation works

Construction CostTotal cost: approx. € 1,5 m.

Installation of rock bolts and special grids for the slope protection against corrosion

Project ScheduleDesign: 2000 - 2001Construction: 2003 - 2005

Project DescriptionPermanent one-sided and two-sided slopes withsupport measures and retaining walls, according tothe stability conditionsMax length: 430mMax. length: 430mMax. height: 11m - 40m

GeologyFlysch formation consisting of thick – beddedsandstones, siltstones and red pelites

Our ServicesDetailed geotechnical & structural design

Typical excavation cross section

Construction Details• Design of special rockfall protection barriers• Installation of prestressed anchors and special grids

for the protection of the slopes against corrosion• Design of retaining walls and pile walls

ClientEGNATIA ODOS S AEGNATIA ODOS S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 34: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Railway Excavation Works

Railway Cut DesignHigh Speed Railway Line, PATHE Axis,Kakia Skala SectionCentral GreeceCentral Greece

ProjectExcavation of permanent slopes for the highspeed railway line

Construction CostTotal cost: approx. € 0,9 m.

Slopes view during construction

Project ScheduleDesign: 2002Construction: 2002-2003

Project DescriptionLength: 100mMax. height: 40mModulation geometry:4 slopes with gradient 3:1 and intermediate4 slopes with gradient 3:1 and intermediatebenches with 4m width

Construction MethodMechanical excavation due to the vicinity with theexisting railway line

Geology• Brecciated limestones, in a seismically active

area• Steep morphology with loose limestone blocks,

probably unstable

Our Services• Detailed geotechnical design• Construction drawings

Construction DetailsTypical cross section • Elaboration of a special excavation method in

distinct phases with application of rockbolts inthe ground of each excavation phase

• Design of rockfall barriers• Protection wall and special barriers installed to

prevent rockfalls and to absorb kinetic energy,for the protection of the existing Railway Line

• Design of prestressed anchors for the supportof the permanent slopes

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

of the permanent slopes

ClientALTE S.A.

Page 35: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Excavation WorksEgnatia Highway, Section 5.2 – 5.3Northern Greece

ProjectGeneral excavation works for the foundation of bridges

Construction CostTotal cost: approx. € 0,3 m.

Project ScheduleDesign: 2002Construction: 2002

Project DescriptionModulation of slopes of height up to 15m

Geology

Excavated slopes in the area of the foundation of G1 bridge

Blocky phyllites, sandstones and limestones

Our ServicesDetailed geotechnical design of excavation and support

Construction Details• Installation of prestressed anchors• Installation of geobrugg TECCO grids for the protectionagainst corrosion of the slopes and to prevent looseagainst corrosion of the slopes and to prevent loosematerial movement

ClientAKTOR S.A.

Geobrugg TECCO type grids installation works

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 36: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Embankment

High Embankment of Metsovo InterchangeEgnatia Highway, Section 3.2Northern Greece

ProjectHighway embankment

Construction CostTotal cost: approx. € 1,0 m.

Project ScheduleDesign: 2000Construction: 2002-2005

Project DescriptionReinforced embankment with gabions combined withgeogridsModulation geometry:

Western view of the embankment

• Modulation of reinforced slopes with gradient 2:1 & 1:1• All other slopes were modulated with gradient 1:2

Length: 110mMax. width: 90mMax. height: 50m

GeologyFlysch formation consisting of thick – bedded sandstonesand red pelitesand red pelites

Our Services• Detailed geotechnical design• Construction drawings

Construction Details• Construction of the embankment with use of sandstone

materialh f d

South view of the embankment

• Strength of geogrids 400KNm• Gabions dimensions 1m x 1m x 2m & 1m x 0,5m x 2m• Length of the reinforcement bars 20m & 25m

ClientEGNATIA ODOS S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Reinforced earth in the upper slope

Page 37: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

EmbankmentsEgnatia Highway, Section 5.2-5.3Northern Greece

ProjectHighway embankments

Construction CostTotal cost: approx. € from 0,15 to 0,6 m.

Project ScheduleDesign: 2001-2002Construction: 2000-2003

Project DescriptionEmbankments constructed with rock fill orreinforced with geotextiles, geogrids andpreconstructed elements

G6 rock fill embankment, maximum height 50m

Maximum heights: 30-70m

GeologyPhyllites, travertine, sandstones

Our ServicesDetailed geotechnical design

ClientsClients• AKTOR S.A.• AEGEK S.A.

G3 reinforced embankment, maximum height 70m

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Reinforced earth embankment constructed with travertine materials and preconstructed reinforced elements, maximum

height 38m

Page 38: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Embankment

G3 EmbankmentEgnatia Highway, Section 5.2-5.3Northern Greece

ProjectHighway embankment

Construction CostTotal cost: approx. € 0,6 m.

Project ScheduleDesign: 2001Construction: 2002-2003

Project DescriptionReinforced embankment with geotextilesModulation geometry:• Slopes with gradient 2:3 in the lower 25m

View of the embankment during the construction phase

• Slopes with gradient 1:1 with benches per 10m ofslope height, up to the embankment crestLength: 140mWidth: 50mMax. height: 70m

GeologyPhyllites, sandstones, schists

p

Our Services• Detailed geotechnical design• Construction drawings

Construction Details• Placement of reinforced earth in the upper three

slopes of the embankment• Maximum length of geotextiles 50m

Downstream view of the embankment after the completion of works

• Placement of geotextiles per 0.5m up to 1,0m

ClientAEGEK S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Upstream view of the embankment after the completion of works

Page 39: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Embankment

Travertine Embankment Egnatia Highway, Section 5.2-5.3Northern Greece

ProjectHighway embankment

Construction CostTotal cost: approx. € 0,4 m.

Project ScheduleDesign: 2000Construction: 2000 -2002

Project DescriptionReinforced embankment with pre-constructedelementsModulation Geometry:Slopes with gradient 2:3Vertical slope of reinforced earth with height 10mLength: 180mWidth: 30mMax height: 38m

GeologyTravertine, loose soil materials

Embankment view during construction

Our Services• Detailed geotechnical design• Construction drawings

Construction Details• Embankment construction with travertine materials• Use of reinforced earth of VSL type constituted of

steel bars and pre-constructed concrete elementsEmbankment view after construction

p• Reinforced earth length 10m• Placement of reinforcements per 75cm

ClientAKTOR S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 40: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Embankment

Asomaton EmbankmentEgnatia Highway, Section 5.2-5.3Northern Greece

ProjectHighway embankment

Construction CostTotal cost: approx. € 1 m.

Project ScheduleDesign: 2003Construction: 2003 -2004

Project DescriptionTwo-sided soil embankment for the replacement ofa previous – failed embankmentModulation geometry:O l ith di t 1 3 ( t ti ) d View of the embankment failureOne slope with gradient 1:3 (upstream section) andwith gradient 2:3 (downstream section)Length: 90mWidth: 27mMax. height: 25m

GeologyTravertine, peridotite, loose soil materials,groundwater flows

View of the embankment failure

groundwater flows

Our Services• Detailed geotechnical design• Final geological and hydrogeological design• Evaluation of previous failure• Design of foundation works for the new

embankment• Design and support of the new embankment

Typical cross section after the failure rehabilitation

Construction Details• Embankment foundation in one row of piles

Ø1,00/1,30, with 16m length combined with capbeam, in the area of the failure surface

• Construction of a riprap layer of thickness 1,5m inthe embankment base for the drainage of thegroundwater

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

ClientAKTOR S.A.

Page 41: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Embankment

G6 EmbankmentEgnatia Highway, Section 5.2-5.3Northern Greece

ProjectHighway embankment

Construction CostTotal cost: approx. € 0,15 m.

Project ScheduleDesign: 2000Construction: 2001-2002

Project DescriptionRock fill embankmentModulation GeometrySlopes with gradient 2:3 of maximum height 20mwith intermediate bench with 4m widthLength: 141mWidth: 40mMax. height: 50m

GeologyAlterations of gneisses and mica schists

Our ServicesOur Services• Detailed geotechnical design• Construction drawings

ClientAEGEK S.A.

Downstream view of the embankment

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 42: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Embankments

Rapsomati Tunnel of Road AxisTripoli - KalamataSouth Greece

ProjectHighway embankments

Construction CostTotal cost: approx. € 1,6 m

Project ScheduleProject ScheduleDesign: 2005Construction: 2005 - 2006

Project Description• One-sided and two-sided embankments of highway

Length: 380mMax. height: 12mCrown width: 31mModulation of the embankment in 1 slope withgradient 2:3 (height: width)

• Widening of the existing embankment due to theconstruction of Megalopoli interchangeLength: 820mMax. height: 7mModulation of the embankment in 1 slope withgradient 2:3 (height: width)

Embankment construction works

GeologyMarls and sand marlsAlluvial flabellum

Our Services• Detailed geotechnical design• Geometric project design• Check of the embankment settlements and

l dEmbankment typical cross section

consolidations• Assessment of the embankment and open cut

stability• Technical description of works for the embankment

construction• Construction drawings• Technical report• Bill of Quantities, Budget

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

ClientJ/V KASTOR S.A. – ELTER S.A.

Page 43: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Project

Failure Rehabilitation

Rapsomati Tunnel of Road AxisTripoli - KalamataSouth Greece

jHighway open cuts with significant failures

Construction CostTotal cost: approx. € 2,4 m.

Project ScheduleDesign: 2005Construction: 2005 - 2006

Project DescriptionD liti f l t il ll hi h d t f il Existing failure of the open cuts with material removal• Demolition of slope support pile wall, which due to failuremoved inside the road traffic sidewalk outline

• Design of 2 new pile walls of 80m length in combination withcap beam and wall construction at the face of the pile walls

• Data piles: Φ1,2 of 11m length up to 13m• Support of the existing slope in which was indicated in

progress instabilitySlope length: 250mMax. slope height: 11m

Existing failure of the open cuts with material removal inside the road traffic sidewalk outline

p g• Design of support pile wall of 162m length in combination with

cap beam and wall construction at the face of pile walls.• Data piles: Φ1,2 of 12m length• Rehabilitation of the existing slope’s failure and modulation of

new geometrySlope length: 600mMax. slope height: 35mModulation of new geometry of slopes with gradient 1:2(height: width) 8m length with intermediate benches of 6m(height: width), 8m length with intermediate benches of 6mwidth

GeologyMarls, sand marlsClayey scree

Our Services• Detailed geotechnical design• Geometrical design of rehabilitation works

D i d di i i f t d t ti

Support pile wall construction

• Design and dimensioning of support and protection measures• Execution of stability analyses• Construction drawings• Bill of Quantities, Budget

Construction Details• Installation of rip rap behind the pile walls and the lower open

cut bench• Construction of drainage trenches over the slopes and wholes

crown

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

crown• Installation of 3-D geogrid against corrosion at the slopes

surface, in combination with slopes planting

ClientJ/V KASTOR S.A. – ELTER S.A.

Page 44: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Special Geotechnical Applications

Jet Grouting Diaphragm Wall Egnatia Highway, Section 2.4 – 3.1Northern Greece

ProjectJet grouting diaphragm wall, for the reduction of waterinflows in order to construct the foundations of M2 to M6piers of T10 bridge at Metsovitikos River

Construction CostTotal cost: approx.€ 6 m.

Project ScheduleDesign: 2007Construction: 2007-2008

Project Descriptiond h ll h d l• Jet grouting diaphragmatic wall with secant ground piles

• Central diaphragm wall, with 3 rows ground piles• 4 additional diaphragm walls at the foundation areas of

the piers• Diameter: Ø 80, Length 10m-20m• Total walls length: 365m

Geology• Riverbed deposits (sands, breccia argillaceous materials)Riverbed deposits (sands, breccia argillaceous materials)• Conglomerates with high permeability• High river flood discharge• High groundwater table

Our ServicesDetailed geotechnical design

Construction DetailsD t ti f th t f th i b d

Jet grouting construction stages

• Dam construction for the arrangement of the riverbed• Rip - rap construction for the protection of the main

diaphragm wall

ClientAKTOR S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 45: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Highway Works

Earth and Structural WorksRomaniaCentral Europe

ProjectTechnical & earthworks in a 60km road

Construction CostTotal cost: approx. € 4 m.

Project ScheduleDesign: 2005Construction: 2005 – today

Project Description• Retaining walls• Pilewalls• Reinforced embankments

Retaining wall typical cross section

• Stream bed modulations with gabions• Slope support

Our Services• Audit of existing designs• Elaboration of construction method statements

Clients• AKTOR S A• AKTOR S.A.• MOCHLOS S.A.

Embankment typical cross section

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 46: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Underground Parking

Store Building with two underground parking facilitiesAttiki

Project2-floor underground parking facilities in 2-floorstore building

Construction CostTotal cost: approx. € 0,3 m.

Project ScheduleProject ScheduleDesign: 2005Construction: 2005 - 2006

Project DescriptionLength: 65mWidth: 40mDepth: 8m

C t ti M th d

Building excavations plan view

Construction MethodPile anchored wallsModulation of excavation slopes with gradient 1:1 in1 or 2 benches

GeologySoil materials (clay, clayey sand)Clayey marlAquifer

Excavation section

Aquifer

Our Services• Detailed design• Construction drawings of the retaining structures

Construction Details• Construction of 3 pile walls: 15m up to 29m

length with reinforced concrete piles Φ0,8 of totallength 6 8m in combination with cap beams oflength 6-8m, in combination with cap beams ofheight 1,1m and width 0,9m

• Installation of shotcrete over the piles surface• Construction of drainage wholes• Construction of 6 pumping shafts with cross

section Φ800

ClientΑΚΤΟR S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 47: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Underground Parking

Viohalko BuildingAthens, Greece

ProjectUnderground parking facilities in nine-floor building

Construction CostTotal cost: approx. € 15 m.

Project ScheduleDesign: 2003Construction: 2003-2004

Project DescriptionWidth: 37mTotal length: 100mDepth: 28m

Construction MethodRetaining structure with pile walls and prestressedanchors

GeologyMan-made deposits, soils, Athenian schist

Our ServicesDetailed geotechnical design

ClientELLINIKI TECHNODOMIKI S.A.

Construction sire NE view

Construction sire north view

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 48: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Underground Parking

Building IONIA S.A.Athens

Project3-floor underground parking facilities in a 4-floorbuilding

Construction CostTotal cost: approx € 1 5 mTotal cost: approx. € 1,5 m.

Project ScheduleDesign: 2005Construction: 2005

Project DescriptionWidth: 48mLength: 53mD th 13 Building modelDepth: 13m

Construction MethodPile anchored wall

GeologyMan made deposits, soil materials

Our Services

Building model

• Detailed design• Construction drawings of the retaining structures

Construction Details• Retaining structures with steel piles Ø600

consisted of pair of steel beams and reinforcedconcrete piles Ø800

• Placement of 2 to 3 rows of prestressed anchorswith length 10m to 21m with 1 or 2 tendons Ø0 6΄΄

NE construction viewwith length 10m to 21m with 1 or 2 tendons Ø0,6 ,connected with horizontal beams UPN 200

ClientAKTOR S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 49: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Culvert

Culvert OA9PATHE Highway, Kakia Skala SectionCentral Greece

ProjectHighway hydraulic work

Construction CostTotal cost: approx. € 0,21 m.

Project ScheduleDesign: 2003Construction: 2003 - 2004

Project DescriptionRectangular culvertLength: 79m (closed cross section)

37m (open cross section)Height: 2,0mWidth: 2,5m

GeologyLimestonesSeismically active area

Our ServicesDetailed geotechnical & structural designDetailed geotechnical & structural design

ClientAKTOR S.A.

Open and closed type culvert typical cross sections

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr

Page 50: Tender Designs of Major Infrastructure Highway Projects ... · PDF fileTender Designs of Major Infrastructure Highway Projects Tunnels & Earthworks ... Works Method Statement ... Earthworks

Culvert

Culvert OA3PATHE Highway, Kakia Skala SectionCentral Greece

ProjectHighway hydraulic work

Construction CostTotal cost: approx. € 0,4 m.

Project ScheduleDesign: 2003Construction: 2003 - 2004

Project DescriptionRectangular culvertUpstream section:Length: 221m (closed cross section)

Culvert plan view

11m (open cross section)Height: 2,5mWidth: 2,0mDownstream section:Length: 30m (closed cross section)

45m (open cross section)Height: 2,5m-7,6mWidth: 2,0m

GeologyLimestonesSeismically active area

Our ServicesDetailed geotechnical & structural design

Client

Culvert longitudinal section

AKTOR S.A.

4, Thalias Str. & 109, Kimis Ave., P.C. 151 22, Maroussi, AthensTel.: + 30 210 6837490, + 30 210 6897040, + 30 210 6835858

Fax: + 30 210 6837499, e-mail: [email protected], www.omikronkappa.gr