6
01 10,200 m 2 of warehouse space for Marstons Brewery 02 An “over track” train manufacture structure for Vivarail 03 Temporary car showrooms for DM Keith 04 A warehouse extension for Kuehne & Nagel 05 Retractable Loading Tunnels for Marks & Spencer Welcome to the first NewSpace of 2016. In this issue, see how Spaciotempo has solved the diverse space needs for these customers: Issue 11 January 2016 NewSpace | Temporary Building Bulletin Scott Jameson, MD

Temporary Building Bulletin · 03 Temporary car showrooms for DM Keith 04 A warehouse extension for Kuehne & Nagel 05 Retractable Loading Tunnels for Marks & Spencer Welcome to the

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Temporary Building Bulletin · 03 Temporary car showrooms for DM Keith 04 A warehouse extension for Kuehne & Nagel 05 Retractable Loading Tunnels for Marks & Spencer Welcome to the

01 10,200 m2 of warehouse space for Marstons Brewery

02 An “over track” train manufacture structure for Vivarail

03 Temporary car showrooms for DM Keith

04 A warehouse extension for Kuehne & Nagel

05 Retractable Loading Tunnels for Marks & Spencer

Welcome to the first NewSpace of 2016. In this issue, see how Spaciotempo has solved the diverse space needs for these customers:

Issue 11January 2016

New

Spac

e|T

empo

rary

Bui

ldin

g Bu

lletin

Scott Jameson, MD

Newspace Newsletter_Newspace Newsletter 28/01/2016 11:47 Page 2

Page 2: Temporary Building Bulletin · 03 Temporary car showrooms for DM Keith 04 A warehouse extension for Kuehne & Nagel 05 Retractable Loading Tunnels for Marks & Spencer Welcome to the

New

Spac

e|T

empo

rary

Bui

ldin

g Bu

lletin

01 Marstons Brewery

Spaciotempo’s latest installation for Marstonsin 2015 saw storage capacity on site at theBurton Brewery increase by 45%. Emma Gilleland, Supply Chain Director forMarstons said, “More people than ever areenjoying a beer at home, so we moved to ensuresupply keeps up with demand. These new storagefacilities gives us the huge amount of extrawarehouse capacity we need.”“Spaciotempo has played a key role in helpingMarston’s to grow as a business. They’ve provideda quality, cost-effective, long-term solution thatmeets our needs perfectly.”Work to install the four warehouses took lessthan three months and enabled Marstons’operations to continue unabated duringconstruction. And once completed, Marstonswere able to give a new home onsite to theirstock of bottled beer which had beentemporarily housed in off-site warehousing, all15,000 pallets of it!

FACT FILEWho: Marstons BreweryWhere: Burton on TrentSize: 4 warehouses measuring 30m x 85m on a6m eave (10,200m2!)Use: Warehousing for 14 million bottles of beerWhy: Increase in home market bottled beer andcost savings of onsite storage. Special Features: Open plan access for forkliftsacross all 4 warehouses.

Newspace Newsletter_Newspace Newsletter 28/01/2016 11:47 Page 3

Page 3: Temporary Building Bulletin · 03 Temporary car showrooms for DM Keith 04 A warehouse extension for Kuehne & Nagel 05 Retractable Loading Tunnels for Marks & Spencer Welcome to the

FACT FILEWho: VivarailWhere: Long Marston, Warwickshire Size: 45m x 5m on a 5m eave Use: Rolling stock manufactureWhy: To enable lengths of rolling stock to beworked on, undercover, at the same time.Special Features: Bespoke 45m structurebuilt over existing train tracks.

02 Vivarail

When train manufacturer, Vivarail approached us with a short term need to increase their manufacturingspace for the duration of a special project, we had theperfect solution.Steve Rowell, General Manager at Vivarail explains,“Our existing shed was only big enough for one carriage perroad, but now we work on two or three cars set together.The requirement was only short-term (4-5 months), whichis why we needed a temporary building, and Spaciotempoprovided a structure that is an exact fit for our purposes.”Our 45m by 5m temporary structure was designedspecifically for the project, allowing rolling stock to beworked on without being uncoupled. We installed it overthe top of the rails, and linked to existing permanentfacilities, enabling rail stock and manufacturingpersonnel to move between the two buildings.

Newspace Newsletter_Newspace Newsletter 28/01/2016 11:47 Page 4

Page 4: Temporary Building Bulletin · 03 Temporary car showrooms for DM Keith 04 A warehouse extension for Kuehne & Nagel 05 Retractable Loading Tunnels for Marks & Spencer Welcome to the

FACT FILEWho: DM KeithWhere: Leeds & YorkSize: 10m x 25m on a 4m eaveUse: Temporary Car showrooms on two sites.Why: Enable trading and brand continuityduring site redevelopmentSpecial Features: Customer branding and“retail environment” finish.

When DM Keith, the UK’s largest Skoda and Seatdealership chain, needed a short term solution,providing car showrooms for their sites in Yorkand Leeds while permanent showroom facilitieswere redeveloped, they turned to Spaciotempo. Dan Barker, Area Sales Manager at Spaciotempotakes up the story, “Our track record for designingand installing temporary car showrooms is second tonone, and as a result, in 2015 we have worked withmore dealerships than ever before. DM Keith neededa solution on two sites for a six month period. Each250 m2 showroom was designed to take the place ofa permanent Skoda dealership for that six monthperiod and provide both customers and staff with apleasant and welcoming environment which doesn’tcompromise sales. When redevelopment is finished,the rented temporary showroom is simply off hiredand taken away – job done. ”

03 DM Keith

Newspace Newsletter_Newspace Newsletter 28/01/2016 11:47 Page 5

Page 5: Temporary Building Bulletin · 03 Temporary car showrooms for DM Keith 04 A warehouse extension for Kuehne & Nagel 05 Retractable Loading Tunnels for Marks & Spencer Welcome to the

For international logistics and transportation experts,Kuehne & Nagel, having the right stock in the rightplace at the right time is key to business efficiency. Itmust be in optimum condition, and stored in such away that loading for transport is made as quick andeasy as possible.Spaciotempo’s latest warehousing solution forKuehne & Nagel was designed specifically to meetthese needs.

Dan Barker, Area Sales Manager for Spaciotempoexplains, “Five warehouses, ranging from 15 x 20m to 30x 20, all on a 6m eave were linked not only to each other,but to the site’s existing warehouse. Tunnels were alsoused – both to link existing and new warehouses – andalso to create loading canopies where required. The endresult, over 2000m2 of extra warehousing space. Andbecause the customer opted to hire the space, they haveeven more flexibility in the long term!”

04 Kuehne & Nagel

FACT FILEWho: Kuehne & NagelWhere: Foston, DerbyshireSize: 5 buildings and 4 tunnels over 2,150m2 total. Use: Extension to existing warehouse Why: Storage of goods for transportation.Special Features: Gutter linking of four buildingsto create single space of 1,850m2 as well as two sets of retractable tunnels.

Newspace Newsletter_Newspace Newsletter 28/01/2016 11:47 Page 6

Page 6: Temporary Building Bulletin · 03 Temporary car showrooms for DM Keith 04 A warehouse extension for Kuehne & Nagel 05 Retractable Loading Tunnels for Marks & Spencer Welcome to the

05 Marks & Spencer Outlets

Spaciotempo UKT 01889 569 569E [email protected] www.spaciotempo.co.uk

Spaciotempo IrelandBelfast 02890 538 505Dublin 0144 75192E [email protected] www.spaciotempo.ie

Follow us on Facebook

Spaciotempo ScotlandT 01698 507 848E [email protected] www.spaciotempo.scot

Follow us on Twitter

Audas Project Management approached Spaciotempoto provide a solution for their customer, Marks &Spencer Outlets who needed to weatherproof theirloading and unloading operations at a number of theiroutlet stores nationwide.While Spaciotempo regularly offer loading canopies forpermanent and semi-permanent use, our retractabletunnels also make an ideal solution if customersrequire a canopy which can be retracted out of the waywhen not in use, freeing up valuable space on site. Andthis was the solution which M&S opted for.To hold the tunnels in place in all weather conditions,we provided countersunk ground anchors; and steel“goal posts” were also used to fix the tunnels at oneend, giving peace of mind that loading operationscould take place whenever they were needed.

FACT FILEWho: Audas Project Management forMarks & Spencer OutletsWhere: Bideford, Devon & Banbridge,Northern IrelandSize: 5m x 3m on a 3.5m eaveUse: Loading canopies for retail outlets.