Upload
reynold-mcdaniel
View
215
Download
0
Embed Size (px)
Citation preview
Template for the Operational Programme under the Investment for Growth and Jobs goal
Morten GreveDirectorate General for Regional and Urban Policy01.03.2013 1
Shortcomings of 2007-2013 period
16.01.2013 2
• Double encoding• Information provided in both tables and documents• Information already provided is not used automatically
• Unclear or insufficient reporting requirements• Templates lacking in details and clarity
• Cumbersome modification and decision processes• Lack of programme and data structure led to inefficient
assessments and analysis• Minor modification require assessment and full decision
A long term investment
• Providing everything in a structured way through pre-defined templates and forms• Fast programme modification process• Clear reporting• Enhanced data quality
• Detailed specifications• More work now but more clarity in the future
• Harmonisation• Long term efficiency gains
16.01.2013 3
More structure (templates and SFC2014)
• Everything is structured and organised• Data fields and tables
• Selection Lists(Drop down menus)
• Check boxes + yes/no
• Text fields
16.01.2013 4
1 2 3 4 5xx xx xx xx xx
yy yy zz zz vv
Text box titleProvide a description of no more than x characters of the following items: …
Common Indicators
Additional waste recycling capacity - tonsEstimated reduction in leakage - m3
Total length of new railway line – kmEstimated decrease of GHG in CO2 equivalent - tons
❑✓
More structure (templates and SFC2014)
• Documents are optional and for information• Except where specifically required by regulation
• En-ante evaluation etc.
• In case of inconsistency between documents and data the structured data in the forms prevails
• Links and references cannot be used
• Complete reference documents are produced by the system based on the information• A complete PDF version of the programme with a single click• Will not include information supplied through documents
• Changes compared to previous versions are identified automatically• Correct treatment ensured automatically• Amendments with or without a Commission decision• Text changes are highlighted
16.01.2013 5
Technical details of the template
16.01.2013 6
• Purpose of the template• To identify all elements of a programme• To provide definitions for all elements• To define the relationship between elements• To remove any ambiguity
• The template will not• Define the graphical layout of the SFC2014 input screens
Technical details of the template
16.01.2013 7
• Each field has an identifier• <ID type=" " maxlength=" " input=" " Decision=" " PA=" ">
Description
ID Unique identifier of the element
type N=Number, D=Date, S=String, C=Checkbox, P=Percentage, B=Boolean
maxlength Maximum number of characters including spaces in a text field
input M=Manuel, S=Selection, G=Generated by the system
decision N=Not part of the Decision - article 87(10)
PA Y=Element can be covered solely by the Partnership Agreement – article 87(8)
Defining the priorities
16.01.2013
Defining the priorities
16.01.2013
Defining the priorities
16.01.2013 10
• Simple case:• As a general rule a priority should be mono-fund, cover only
one thematic objective and a single category of region
Priority axis Thematic objective
Category of region Investment priorities
Specific objectives corresponding to the investment priorities
Fund (specify the Fund: ERDF, Cohesion Fund, ESF)
Union support - EUR
Co-financing rate
1 1 Less developed1.1 Obj. 1
ERDF € 89 000 000 70.00 %1.3 Obj. 2
2 3 More developed 3.2 Obj. 3 ERDF € 15 000 000 75.00 %
Defining the priorities
16.01.2013 11
• Complex case:• Can cover more than one fund, more than one thematic
objective and more than one category of region
Priority axis Thematic objective
Category of region Investment priorities
Specific objectives corresponding to the investment priorities
Fund (specify the Fund: ERDF, Cohesion Fund, ESF)
Union support - EUR
Co-financing rate
1
1 Less developed1.1 Obj. 1
ERDF €22 300 00070.00 %1.3 Obj. 2
2 Less developed 2.2 Obj. 3 ERDF€73 000 000
3 More developed 3.2 Obj. 4 ERDF €59 000 000 50.00 %
10 Less developed 10.1 Obj. 5 ESF €163 000 000 75.00 %
1 N.A. 1.2 Obj. 6 CF €19 700 000 85.00 %
2 … … … … … … …
Indicators and other elements
16.01.2013 12
• Priority axis and indicators• All information in particular output and result indicates will
follow the structure of the priority axis• Simple priorities will have a simple indicator table• Complex priorities will have complex indicator tables broken
down in accordance with the intervention logic.• All tables will be created and wherever possible pre-filled on
the basis of the intervention logic
Pre-filled tables
16.01.2013 13
Automatically generated tables
16.01.2013 14
Elements not subject to a Commission decision
16.01.2013 15
Elements that can be provided solely in the Partnership Agreement
16.01.2013 16