TEMPLATE EXPLANATION
This template must be used by the TNSP to report service performance information for the previous calendar year. Yellow worksheets ('Inputs - Performance' and 'Inputs - Exclusions') are for inputs, including performance and exclusion information. The TNSP only needs to enter data on these worksheets. Purple worksheets 'S1' to 'S6' are the s-factor results based on the performance inputs from the 'Inputs - Performance' worksheet. Blue worksheet 'Revenue Calculation' quantifies the appropriate revenue to be applied to the s-factor results adjusted for CPI. Red worksheet 'Outcomes' shows the total performance, s-factor and financial incentive results based on the TNSP's performance in 'Inputs-Performance' and 'Revenue Calculation' worksheets.
ElectraNet - SERVICE STANDARDS PERFORMANCE
S Performance parameter Collar Target Cap Revenue at Risk
Performance
(Without
exclusions)
Performance (With
exclusions)
S1Total transmission circuit
availability99.02% 99.52% 99.68% 0.30% 99.143041% 99.602450%
S2Critical circuit availability –
peak97.36% 99.12% 99.96% 0.10% 99.221130% 99.555676%
S3Critical circuit availability –
non-peak (zero weighting)98.25% 99.37% 99.87% 0.00% 99.508289% 99.697604%
S4
Loss of supply event
frequency ( >0.05 system
minutes )
9 7 4 0.20% 6 4
S5
Loss of supply event
frequency ( >0.2 system
minutes )
4 2 0 0.20% 1 1
S6Average outage duration
(minutes)323 203 83 0.20% 181.17 130.71
TNSP: ElectraNetAssessment
Period 2014
STPIS version:March, 2011
Financial year to
affect revenue: 2015/16
Regulatory Determination 2013/14 - 2017/18 Date prepared:
Base Year Allowed Revenue 284,000,000$ Revision date:
Base Year2013–14
X-factor
-2.99%
Number of critical
circuits22
Number of
connection point
events 23
Number of
excluded
connection
point events 6
Commencement of
regulatory year
1-Jul-13
Number of non-
critical circuits
91
Total unplanned
outage duration
(system minutes)
4167
Total
unplanned
outage
duration
(system
minutes) 2222
Total circuits
113
Total number
of connection
point events 17
Annual revenue adjusted for CPI Mar-13 Mar-14 Mar-15 Mar-16 Mar-17 Mar-18
CPI 102.4 105.4
Average outage duration
information - performance with
exclusions
Performance Inputs
Revenue Determination Inputs Other inputs
Other Inputs
Circuit informationAverage outage duration information -
performance without exclusions
ElectraNet - Proposed exclusions availability
Event proposed for exclusion Description of the event and its impact on the
network and performanceCause of the event Start date Start time End date End time
Total hours
unavailableCircuits affected
Reactive plant or
transformer
Quantitative
impactFurther references Supporting Documents
Name of the eventDetail of the event. Such as: the action of any third parties, the
actions of the TNSP, assets damaged or interrupted.A description of the cause of the event Name of circuits or plant affected
Name of any
equipment affected
Impact of exclusion
event on availability
sub-parameter
A TNSP may provide further details of an exclusion event. TNSP to provide reference.
S1 ARDROSSAN WEST - DALRYMPLE 132KV LINE FORCE MAJEURE ENVIRONMENTAL / BUSHFIRE 13/01/14 13:19:00 13/01/14 14:55:00 1.60 ARDROSSAN WEST - DALRYMPLE 132KV LINE N/A -0.000162% FORCED MAJEURE EVENT AS PER THE AER STIPS DEFINITIONS 3099 Event_Investigation_Technical_Report.pdf
S1 DALRYMPLE - WATTLE POINT 132KV LINE OUTAGE OF ARDROSSAN WEST - DALRYMPLE
132KV LINE DUE TO BUSHFIRE
ENVIRONMENTAL / BUSHFIRE 13/01/14 13:19:00 13/01/14 15:42:00 2.38 DALRYMPLE - WATTLE POINT 132KV LINE N/A N/A OUTAGE DUE TO BUSHFIRE ON THE ARDROSSANE WEST - DALRYMPLE 132KV LINE
S1 PARA - BLYTH WEST 275KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 14/01/14 14:43:00 14/01/14 14:43:00 0.00 PARA - BLYTH WEST 275KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 DAVENPORT - BUNGAMA 275KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 14/01/14 14:51:00 14/01/14 14:51:00 0.00 DAVENPORT - BUNGAMA 275KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 PARA - BLYTH WEST 275KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 14/01/14 14:55:00 14/01/14 14:55:00 0.00 PARA - BLYTH WEST 275KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 BLYTH WEST - BUNGAMA 275KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 14/01/14 15:08:00 14/01/14 15:08:00 0.00 BLYTH WEST - BUNGAMA 275KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 BLYTH WEST - BUNGAMA 275KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 14/01/14 15:16:00 14/01/14 15:16:00 0.00 BLYTH WEST - BUNGAMA 275KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 BLYTH WEST - BUNGAMA 275KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 14/01/14 15:25:00 14/01/14 15:25:00 0.00 BLYTH WEST - BUNGAMA 275KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 BLYTH WEST - BUNGAMA 275KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 14/01/14 15:27:00 14/01/14 15:27:00 0.00 BLYTH WEST - BUNGAMA 275KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 BERRI - NORTH WEST BEND 132KV LINE 2 OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 14/01/14 17:24:00 14/01/14 17:24:00 0.00 BERRI - NORTH WEST BEND 132KV LINE 2 N/A N/A SUCCESSFUL RECLOSE
S1 SLEAFORD - PORT LINCOLN 132KV LINE OUTAGE DUE TO STORMS ENVIRONMENTAL / STORM / WIND 17/01/14 19:06:00 17/01/14 22:34:00 3.47 SLEAFORD - PORT LINCOLN 132KV LINE N/A N/A OUTAGE DUE TO STORM / WIND
S1 TUNGKILLO - ROBERTSTOWN 275KV LINE OUTAGE FOR BUSHFIRE ENVIRONMENTAL / BUSHFIRE 17/01/14 13:10:00 18/01/14 21:44:00 32.57 TUNGKILLO - ROBERTSTOWN 275KV LINE N/A -0.003290% DIRECTED BY THE CFS TO ENABLE FIRE FIGHTING BUSHFIRE CFS Event Log Entry.pdf
S1 PARA - ROBERTSTOWN 275KV LINE OUTAGE FOR BUSHFIRE ENVIRONMENTAL / BUSHFIRE 17/01/14 13:13:00 18/01/14 21:37:00 32.40 PARA - ROBERTSTOWN 275KV LINE N/A -0.003273% DIRECTED BY THE CFS TO ENABLE FIRE FIGHTING BUSHFIRE CFS Event Log Entry.pdf
S1 BELALIE - PORCUPINE RANGE WINDFARM 275KV
LINE
ISOLATION FOR PORCUPINE RANGE WIND FARM
PERSONNEL
CUSTOMER REQUEST 23/01/14 08:41:00 24/01/14 18:26:00 33.75 BELALIE - PORCUPINE RANGE WINDFARM 275KV LINE N/A N/A OUTAGE FOR WINDFARM PERSONNEL SSP 51726 Approved.pdf
S1 BERRI - NORTH WEST BEND 132KV LINE 2 OUTAGE < 1 MINUTE PLANT FAILURE / OVERHEAD LINE / UNDERGROUND CABLE 19/02/14 16:10:00 19/02/14 16:10:00 0.00 BERRI - NORTH WEST BEND 132KV LINE 2 N/A N/A SUCCESSFUL RECLOSE
S1 PLAYFORD - NORTHERN POWER STATION 132KV
LINE
CT SAMPLE INSTRUMENT TRANSFORMER 5/03/14 08:30:00 5/03/14 10:05:00 1.58 PLAYFORD - NORTHERN POWER STATION 132KV LINE N/A N/A OUTAGE OF AN UNREGULATED TRANSMISSION ASSET
S1 PORT LINCOLN TERMINAL - SLEAFORD 132KV
LINE
OUTAGE FOR CULTANA PROJECT PROJECT WORK 19/03/14 02:41:00 19/03/14 23:34:00 20.88 PORT LINCOLN TERMINAL - SLEAFORD 132KV LINE N/A N/A OUTAGE OF AN UNREGULATED TRANSMISSION ASSET
S1 YADNARIE - MOUNT MILLAR 132KV LINE OUTAGE FOR CULTANA PROJECT PROJECT WORK 19/03/14 02:53:00 19/03/14 23:22:00 20.48 YADNARIE - MOUNT MILLAR 132KV LINE N/A N/A OUTAGE OF AN UNREGULATED TRANSMISSION ASSET
S1 REDHILL - CLEMENTS GAP WF 132KV LINE OUTAGE FOR WIND FARM CUSTOMER REQUEST 24/03/14 07:53:00 24/03/14 16:10:00 8.28 REDHILL - CLEMENTS GAP WF 132KV LINE N/A N/A OUTAGE FOR WINDFARM PERSONNEL SSP 51935 Approved.pdf
S1 DAVENPORT - PLAYFORD A HOUSE 132KV LINE INADVERTANT TRIP BY ALINTA 3RD PARTY 25/03/14 10:13:00 25/03/14 11:35:00 1.37 DAVENPORT - PLAYFORD A HOUSE 132KV LINE N/A N/A INADVERTANT TRIP BY ALINTA 3161 Event_Investigation_Technical_Report.pdf
S1 MURRAYLINK REDCLIFFS C/S - MURRAYLINK
BERRI C/S 150KV LINE
SHUTDOWN BY GRAYLING PERSONNEL CUSTOMER REQUEST 26/03/14 06:11:00 26/03/14 21:21:00 15.17 MURRAYLINK REDCLIFFS C/S - MURRAYLINK BERRI C/S 150KV LINE N/A N/A OUTAGE FOR GRAYLING PERSONNEL FOR SUPERVISORY SHUTDOWN SSP 8301 Approved.pdf, SSP 8301 Log Entry.JPG
S1 REDHILL - CLEMENTS GAP WF 132KV LINE INADVERTANT TRIP 3RD PARTY 26/03/14 08:48:00 26/03/14 12:03:00 3.25 REDHILL - CLEMENTS GAP WF 132KV LINE N/A N/A INADVERTANT TRIP BY WIND FARM 3163 Event_Investigation_Technical_Report.pdf
S1 ARDROSSAN WEST - DALRYMPLE 132KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / STORM / WIND 26/03/14 19:35:00 26/03/14 19:35:00 0.00 ARDROSSAN WEST - DALRYMPLE 132KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 BUNGAMA - REDHILL - BRINKWORTH 132KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / STORM / WIND 26/03/14 22:16:00 26/03/14 22:16:00 0.00 BUNGAMA - REDHILL - BRINKWORTH 132KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 BUNGAMA - REDHILL - BRINKWORTH 132KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / STORM / WIND 27/03/14 15:00:00 27/03/14 15:00:00 0.00 BUNGAMA - REDHILL - BRINKWORTH 132KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 LADBROKE GROVE - PENOLA WEST 132KV LINE ISOLATION FOR ORIGIN ENERGY CUSTOMER REQUEST 3/04/14 15:38:00 3/04/14 16:41:00 1.05 LADBROKE GROVE - PENOLA WEST 132KV LINE N/A N/A OUTAGE FOR ORIGIN ENERGY SSP 51936 Approved.pdf
S1 NEW OSBORNE - OCPL 66KV LINE 2 ISOLATION FOR OCPL CUSTOMER REQUEST 5/04/14 07:14:00 7/04/14 14:08:00 54.90 NEW OSBORNE - OCPL 66KV LINE 2 N/A N/A OUTAGE FOR OCPL SSP 52100 Approved.pdf
S1 MAYURRA - LAKE BONNEY WIND FARM STAGE 2B
33KV LINE
ISOLATION FOR INFIGEN PERSONNEL CUSTOMER REQUEST 7/04/14 08:41:00 7/04/14 19:46:00 11.08 MAYURRA - LAKE BONNEY WIND FARM STAGE 2B 33KV LINE N/A N/A ISOLATION FOR INFIGEN PERSONNEL SSP 52464 Approved.pdf
S1 MAYURRA - LAKE BONNEY WIND FARM STAGE 2A
33KV LINE
ISOLATION FOR INFIGEN PERSONNEL CUSTOMER REQUEST 7/04/14 08:41:00 7/04/14 19:46:00 11.08 MAYURRA - LAKE BONNEY WIND FARM STAGE 2A 33KV LINE N/A N/A ISOLATION FOR INFIGEN PERSONNEL SSP 52464 Approved.pdf
S1 MAYURRA - LAKE BONNEY WIND FARM STAGE 1
33KV LINE
ISOLATION FOR INFIGEN PERSONNEL CUSTOMER REQUEST 7/04/14 08:41:00 7/04/14 09:02:00 0.35 MAYURRA - LAKE BONNEY WIND FARM STAGE 1 33KV LINE N/A N/A ISOLATION FOR INFIGEN PERSONNEL SSP 52464 Approved.pdf
S1 DAVENPORT - OLYMPIC DAME WEST 275KV LINE SECONDARY SYSTEMS PLANT FAILURE PLANT FAILURE / SECONDARY SYSTEMS 10/04/14 09:50:00 10/04/14 11:25:00 1.58 DAVENPORT - OLYMPIC DAME WEST 275KV LINE N/A N/A SECONDARY SYSTEMS PLANT FAILURE
S1 KILBURN - TIPS A 66KV LINE REPLACE AND TEST INSTRUMENT TRANSFORMERS PROJECT WORK 12/04/14 07:40:00 17/04/14 16:50:00 129.17 KILBURN - TIPS A 66KV LINE N/A N/A REPLACE AND TEST CT'S FOR TIPS A 275KV SECONDARY SYSTEMS
REPLACEMENT PROJECT (11303)S1 PELICAN POINT - PELICAN POINT GT12 275KV
LINE
ISOLATION FOR PELICAN POINT FOR PROTECTION
MAINTENANCE
CUSTOMER REQUEST 30/04/14 11:43:00 2/05/14 14:36:00 50.88 PELICAN POINT - PELICAN POINT GT12 275KV LINE N/A N/A ISOLATION FOR PELICAN POINT
S1 PELICAN POINT - PELICAN POINT GT11 275KV
LINE
PROTECTION MAINTENANCE PROTECTION 6/05/14 08:34:00 7/05/14 13:16:00 28.70 PELICAN POINT - PELICAN POINT GT11 275KV LINE N/A N/A ISOLATION FOR PROTECTION MAINTENANCE
S1 DAVENPORT - PLAYFORD A HOUSE 132KV LINE SWITCHING FOR ALINTA CUSTOMER REQUEST 11/05/14 11:50:00 15/05/14 17:14:00 101.40 DAVENPORT - PLAYFORD A HOUSE 132KV LINE N/A N/A ISOLATION FOR ALINTA SSP 53180 Approved.pdf
S1 DAVENPORT - PLAYFORD 275KV LINE 1 ISOLATION AT REQUEST OF ALINTA CUSTOMER REQUEST 16/05/14 12:17:00 1/01/15 00:00:00 5507.72 DAVENPORT - PLAYFORD 275KV LINE 1 N/A N/A ISOLATION FOR ALINTA SSP 50541 Approved.pdf , SSP 50541 NOS Entry.pdf
S1 EAST TERRACE - MAGILL 275KV LINE ISOALTION FOR SAPN WORK CUSTOMER REQUEST 16/05/14 20:03:00 16/05/14 22:18:00 2.25 EAST TERRACE - MAGILL 275KV LINE N/A N/A ISOLATION FOR SOUTH AUSTRALIAN POWER NETWORKS SSP 53300 Approved.pdf
S1 OLYMPIC DAM NORTH - PIMBA 132KV LINE ISOLATION FOR INSULATOR WASHING CUSTOMER REQUEST 21/05/14 11:20:00 21/05/14 12:11:00 0.85 OLYMPIC DAM NORTH - PIMBA 132KV LINE N/A N/A ISOLATION FOR BHP BILITON SSP 53241 Approved.pdf
S1 YADNARIE - MOUNT MILLAR 132KV LINE ISOLATION TO REPAIR CB4557 CIRCUIT BREAKERS 22/05/14 07:02:00 26/05/14 14:12:00 103.17 YADNARIE - MOUNT MILLAR 132KV LINE N/A N/A ISOALTION TO INVETIGATE AND REPAIR CB4557
S1 MONASH - MURRAYLINK BERRI 132KV LINE RUNBACK SEVER TRIP PLANT FAILURE 26/05/14 12:49:00 26/05/14 20:18:00 7.48 MONASH - MURRAYLINK BERRI 132KV LINE N/A N/A RUNBACK SEVER TRIP OPERTION DUE TO COMMUNICATION FAILURE
S1 KILBURN - TIPS A 66KV LINE OUTAGE FOR BLACK START TEST CUSTOMER REQUEST 7/06/14 07:56:00 7/06/14 12:16:00 4.33 KILBURN - TIPS A 66KV LINE N/A N/A ISOLATION FOR BLACK START TEST
S1 NEW OSBORNE - TIPS A 66KV LINE 3 OUTAGE FOR BLACK START TEST CUSTOMER REQUEST 7/06/14 07:58:00 7/06/14 12:15:00 4.28 NEW OSBORNE - TIPS A 66KV LINE 3 N/A N/A ISOLATION FOR BLACK START TEST SSP 53460 Approved.pdf
S1 NEW OSBORNE - TIPS A 66KV LINE 4 OUTAGE FOR BLACK START TEST CUSTOMER REQUEST 7/06/14 07:59:00 7/06/14 12:15:00 4.27 NEW OSBORNE - TIPS A 66KV LINE 4 N/A N/A ISOLATION FOR BLACK START TEST SSP 53460 Approved.pdf
S1 DAVENPORT - NORTHERN POWER STATION
275KV LINE 2
OUTAGE FOR ALINTA TO WORK ON TF2 AT NPS CUSTOMER REQUEST 18/06/14 08:13:00 26/06/14 15:01:00 198.80 DAVENPORT - NORTHERN POWER STATION 275KV LINE 2 N/A N/A ISOLATION FOR ALINTA SSP 54206 Approved.pdf
S1 PORT LINCOLN TERMINAL - SLEAFORD 132KV
LINE
LOW GAS DEFECT CIRCUIT BREAKERS 4/07/14 09:59:00 4/07/14 11:49:00 1.83 PORT LINCOLN TERMINAL - SLEAFORD 132KV LINE N/A N/A ISOLATION FOR CB6010 LOW GAS DEFECT
S1 HUMMOCKS - SNOWTOWN - BUNGAMA 132KV
LINE
OUTAGE < 1 MINUTE ENVIRONMENTAL / STORM / WIND 5/07/14 23:47:00 5/07/14 23:47:00 0.00 HUMMOCKS - SNOWTOWN - BUNGAMA 132KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 OUTAGE CAUSED BY ORIGIN PERSONNEL 3RD PARTY 19/07/14 23:04:00 20/07/14 00:20:00 1.27 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 N/A N/A UNPLANNED OUTAGE DUE TO ORIGIN PERSONNEL TESTING 3219 Event_Investigation_Technical_Report.pdf
S1 TORRENS ISLAND NORTH 66KV LINE 1 - QPS GT5
66KV LINE
OUTAGE CAUSED BY ORIGIN PERSONNEL 3RD PARTY 20/07/14 10:01:00 20/07/14 14:36:00 4.58 TORRENS ISLAND NORTH 66KV LINE 1 - QPS GT5 66KV LINE N/A N/A UNPLANNED OUTAGE DUE TO ORIGIN PERSONNEL TESTING 3221 Event_Investigation_Technical_Report.pdf
S1 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 OUTAGE CAUSED BY ORIGIN PERSONNEL 3RD PARTY 20/07/14 10:01:00 20/07/14 14:36:00 4.58 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 N/A N/A UNPLANNED OUTAGE DUE TO ORIGIN PERSONNEL TESTING 3221 Event_Investigation_Technical_Report.pdf
S1 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 OUTAGE CAUSED BY ORIGIN PERSONNEL 3RD PARTY 21/07/14 11:31:00 21/07/14 17:11:00 5.67 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 N/A N/A UNPLANNED OUTAGE DUE TO ORIGIN PERSONNEL TESTING 3223 Event_Investigation_Technical_Report.pdf
S1 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 OUTAGE CAUSED BY ORIGIN PERSONNEL 3RD PARTY 21/07/14 17:18:00 21/07/14 17:55:00 0.62 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 N/A N/A UNPLANNED OUTAGE DUE TO ORIGIN PERSONNEL TESTING 3225 Event_Investigation_Technical_Report.pdf
S1 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 OUTAGE CAUSED BY ORIGIN PERSONNEL 3RD PARTY 21/07/14 18:13:00 23/07/14 15:38:00 45.42 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 N/A N/A UNPLANNED OUTAGE DUE TO ORIGIN PERSONNEL TESTING 3227 Event_Investigation_Technical_Report.pdf
S1 MONASH - MURRAYLINK BERRI 132KV LINE ERROR WHILST WORKING ON DC PANEL DESIGN/CONSTRUCTION 24/07/14 14:51:00 24/07/14 15:26:00 0.58 MONASH - MURRAYLINK BERRI 132KV LINE N/A N/A ERROR WHILST WORKING ON DC PANEL
S1 MURRAYLINK REDCLIFFS C/S - MURRAYLINK
BERRI C/S 150KV LINE
SHUTDOWN BY GRAYLING PERSONNEL 3RD PARTY 3/08/14 19:57:00 4/08/14 12:44:00 16.78 MURRAYLINK REDCLIFFS C/S - MURRAYLINK BERRI C/S 150KV LINE N/A N/A OUTAGE FOR GRAYLING PERSONNEL FOR SUPERVISORY SHUTDOWN
S1 MURRAYLINK REDCLIFFS C/S - MURRAYLINK
BERRI C/S 150KV LINE
SHUTDOWN BY GRAYLING PERSONNEL 3RD PARTY 13/08/14 03:53:00 13/08/14 21:54:00 18.02 MURRAYLINK REDCLIFFS C/S - MURRAYLINK BERRI C/S 150KV LINE N/A N/A OUTAGE FOR GRAYLING PERSONNEL FOR SUPERVISORY SHUTDOWN
S1 MURRAYLINK REDCLIFFS C/S - MURRAYLINK
BERRI C/S 150KV LINE
SHUTDOWN BY GRAYLING PERSONNEL 3RD PARTY 20/08/14 03:30:00 20/08/14 18:17:00 14.78 MURRAYLINK REDCLIFFS C/S - MURRAYLINK BERRI C/S 150KV LINE N/A N/A OUTAGE FOR GRAYLING PERSONNEL FOR SUPERVISORY SHUTDOWN
S1 DAVENPORT - NORTHERN POWER STATION
275KV LINE 2
OUTAGE FOR ALINTA FOR INSULATOR WASHING CUSTOMER REQUEST 28/08/14 09:09:00 28/08/14 14:18:00 5.15 DAVENPORT - NORTHERN POWER STATION 275KV LINE 1 N/A N/A ISOLATION FOR ALINTA SSP 55904 Approved.pdf
S1 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 DISCONNECTOR HEAD REPLACEMENT PROJECT WORK 1/09/14 10:53:00 4/09/14 12:01:00 73.13 TIPS A - TORRENS ISLAND NORTH 66KV LINE 1 N/A N/A REPLACE DISCONNECTOR HEADS FOR TIPS 66KV SECTION SECONDARY SYSTEMS
PLUS MINOR PRIMARY PLANT (11109)S1 MURRAYLINK REDCLIFFS C/S - MURRAYLINK
BERRI C/S 150KV LINE
SHUTDOWN BY GRAYLING PERSONNEL CUSTOMER REQUEST 4/09/14 06:54:00 5/09/14 21:32:00 38.63 MURRAYLINK REDCLIFFS C/S - MURRAYLINK BERRI C/S 150KV LINE N/A N/A OUTAGE FOR GRAYLING PERSONNEL FOR SUPERVISORY SHUTDOWN
S1 TIPS A - TORRENS ISLAND NORTH 66KV LINE 2 DISCONNECTOR HEAD REPLACEMENT PROJECT WORK 7/09/14 08:24:00 7/09/14 14:05:00 5.68 TIPS A - TORRENS ISLAND NORTH 66KV LINE 2 N/A N/A REPLACE DISCONNECTOR HEADS FOR TIPS 66KV SECTION SECONDARY SYSTEMS
PLUS MINOR PRIMARY PLANT (11109)S1 PELICAN POINT - PELICAN POINT GT11 275KV
LINE
UNPLANNED OUTAGE DUE TO FAULTY PROTECTION PLANT FAILURE / SECONDARY SYSTEMS 8/09/14 08:45:00 8/09/14 19:10:00 10.42 PELICAN POINT - PELICAN POINT GT11 275KV LINE N/A N/A UNPLANNED OUTAGE DUE TO FAULTY PROTECTION
S1 MURRAYLINK REDCLIFFS C/S - MURRAYLINK
BERRI C/S 150KV LINE
SHUTDOWN BY GRAYLING PERSONNEL CUSTOMER REQUEST 9/09/14 04:00:00 9/09/14 19:30:00 15.50 MURRAYLINK REDCLIFFS C/S - MURRAYLINK BERRI C/S 150KV LINE N/A N/A OUTAGE FOR GRAYLING PERSONNEL FOR SUPERVISORY SHUTDOWN
S1 MONASH - MURRAYLINK BERRI C/S 132KV LINE OUTAGE FOR ISOLATOR MAINTENANCE ISOLATORS 9/09/14 07:19:00 9/09/14 17:37:00 10.30 MONASH - MURRAYLINK BERRI C/S 132KV LINE N/A N/A OUTAGE OF UNREGULATED LINE FOR ISOLATOR MAINTENANCE
S1 BRINKWORTH - DAVENPORT 275KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / STORM / WIND 9/09/14 15:01:00 9/09/14 15:01:00 0.00 BRINKWORTH - DAVENPORT 275KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 MURRAYLINK REDCLIFFS C/S - MURRAYLINK
BERRI C/S 150KV LINE
SHUTDOWN BY GRAYLING PERSONNEL CUSTOMER REQUEST 11/09/14 04:00:00 11/09/14 17:27:00 13.45 MURRAYLINK REDCLIFFS C/S - MURRAYLINK BERRI C/S 150KV LINE N/A N/A OUTAGE FOR GRAYLING PERSONNEL FOR SUPERVISORY SHUTDOWN
S1 MONASH - MURRAYLINK BERRI C/S 132KV LINE OUTAGE FOR ISOLATOR MAINTENANCE ISOLATORS 11/09/14 07:16:00 11/09/14 16:57:00 9.68 MONASH - MURRAYLINK BERRI C/S 132KV LINE N/A N/A OUTAGE OF UNREGULATED LINE FOR ISOLATOR MAINTENANCE
S1 PELICAN POINT - PELICAN POINT GT12 275KV
LINE
ISOLATION FOR INTERNATIONAL POWER 3RD PARTY 29/09/14 06:23:00 22/10/14 16:34:00 562.18 PELICAN POINT - PELICAN POINT GT12 275KV LINE N/A N/A ISOLATION FOR INTERNATIONAL POWER SSP 56044 Approved.pdf, SSP 56044 NOS Entry.pdf
S1 PELICAN POINT - PELICAN POINT GT11 275KV
LINE
ISOLATION FOR INTERNATIONAL POWER 3RD PARTY 29/09/14 06:40:00 13/10/14 16:29:00 345.82 PELICAN POINT - PELICAN POINT GT11 275KV LINE N/A N/A ISOLATION FOR INTERNATIONAL POWER SSP 56045 Approved.pdf, SSP 56045 NOS Entry.pdf
S1 PELICAN POINT - PELICAN POINT GT18 275KV
LINE
ISOLATION FOR INTERNATIONAL POWER 3RD PARTY 29/09/14 07:27:00 22/10/14 16:08:00 560.68 PELICAN POINT - PELICAN POINT GT18 275KV LINE N/A N/A ISOLATION FOR INTERNATIONAL POWER SSP 55986 Approved.pdf, SSP 55986 (Part A&B) NOS Entry.pdf
S1 PELICAN POINT - PELICAN POINT GT11 275KV
LINE
UNPLANNED OUTAGE DUE TO FAULTY PROTECTION PLANT FAILURE / SECONDARY SYSTEMS 10/10/14 12:04:00 10/10/14 16:12:00 4.13 PELICAN POINT - PELICAN POINT GT11 275KV LINE N/A N/A UNPLANNED OUTAGE DUE TO FAULTY PROTECTION
S1 PELICAN POINT - PELICAN POINT GT11 275KV
LINE
UNPLANNED OUTAGE CAUSED BY INTERNATIONAL
POWER
3RD PARTY 10/10/14 19:55:00 10/10/14 21:11:00 1.27 PELICAN POINT - PELICAN POINT GT11 275KV LINE N/A N/A UNPLANNED OUTAGE CAUSED BY INTERNATIONAL POWER 3257 Event Investigation Technical Report.pdf
S1 SNOWTOWN - SNOWTOWN WINDFARM 33KV
LINE
TRIPPED WHILST WORKING ON COMMS
EQUIPMENT
DESIGN/CONSTRUCTION 15/10/14 14:45:00 15/10/14 14:56:00 0.18 SNOWTOWN - SNOWTOWN WINDFARM 33KV LINE N/A N/A TRIPPED WHILST WORKING ON COMMS EQUIPMENT
S1 HUMMOCKS - SNOWTOWN - BUNGAMA 132KV
LINE
OUTAGE < 1 MINUTE ENVIRONMENTAL / STORM / WIND 26/10/14 19:06:00 26/10/14 19:06:00 0.00 HUMMOCKS - SNOWTOWN - BUNGAMA 132KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 HUMMOCKS - SNOWTOWN - BUNGAMA 132KV
LINE
OUTAGE < 1 MINUTE ENVIRONMENTAL / STORM / WIND 26/10/14 21:53:00 26/10/14 21:53:00 0.00 HUMMOCKS - SNOWTOWN - BUNGAMA 132KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 BUNGAMA - BAROOTA 132KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / POLLUTION 30/10/14 05:57:00 30/10/14 05:57:00 0.00 BUNGAMA - BAROOTA 132KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 REDHILL - CLEMENTS GAP WF 132KV LINE OUTAGE FOR SUBSTATION PLANT ISOLATOR
REFURBISHMENT PROJECT
PROJECT WORK 31/10/14 08:09:00 31/10/14 18:48:00 10.65 REDHILL - CLEMENTS GAP WF 132KV LINE N/A N/A OUTAGE OF AN UNREGULATED TRANSMISSION ASSET
S1 PELICAN POINT - PELICAN POINT ST18 275KV
LINE
ISOLATION FOR INTERNATIONAL POWER CUSTOMER REQUEST 31/10/14 16:09:00 1/11/14 10:39:00 18.50 PELICAN POINT - PELICAN POINT GT18 275KV LINE N/A N/A ISOLATION FOR INTERNATIONAL POWER SSP 51150 Approved.pdf
S1 PELICAN POINT - PELICAN POINT ST18 275KV
LINE
ISOLATION FOR INTERNATIONAL POWER CUSTOMER REQUEST 3/11/14 08:30:00 3/11/14 21:29:00 12.98 PELICAN POINT - PELICAN POINT GT18 275KV LINE N/A N/A ISOLATION FOR INTERNATIONAL POWER SSP 51150 Approved.pdf
S1 DAVENPORT - LEIGH CREEK 132KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / BIRDS/ ANIMALS 10/11/14 16:52:00 10/11/14 16:52:00 0.00 DAVENPORT - LEIGH CREEK 132KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 TIPS A - TORRENS ISLAND NORTH 66KV LINE 2 INSTALLATION OF EARTHING POINTS EARTHING 17/11/14 09:51:00 17/11/14 18:25:00 8.57 TIPS A - TORRENS ISLAND NORTH 66KV LINE 2 N/A N/A INSTALLATION OF EARTHING POINTS
S1 KILBURN - TIPS A 66KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / STORM / WIND 22/11/14 10:38:00 22/11/14 10:38:00 0.00 KILBURN - TIPS A 66KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 PELICAN POINT - PELICAN POINT GT18 275KV
LINE
UNPLANNED OUTAGE CAUSED BY INTERNATIONAL
POWER
3RD PARTY 22/11/14 10:52:00 22/11/14 11:09:00 0.28 PELICAN POINT - PELICAN POINT GT18 275KV LINE N/A N/A UNPLANNED OUTAGE CAUSED BY INTERNATIONAL POWER 3287 Event Investigation Technical Report.pdf
S1 PARA - BLYTH WEST 275KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / STORM / WIND 22/11/14 11:02:00 22/11/14 11:02:00 0.00 PARA - BLYTH WEST 275KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 DAVENPORT - LEIGH CREEK 132KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / STORM / WIND 23/11/14 13:31:00 23/11/14 13:31:00 0.00 DAVENPORT - LEIGH CREEK 132KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 MURRAYLINK REDCLIFFS C/S - MURRAYLINK
BERRI C/S 150KV LINE
SUPERVISORY SHUTDOWN / SWITCHING BY
GRAYLING PERSONNEL
CUSTOMER REQUEST 10/12/14 04:03:00 10/12/14 19:41:00 15.63 MURRAYLINK REDCLIFFS C/S - MURRAYLINK BERRI C/S 150KV LINE N/A N/A OUTAGE FOR GRAYLING PERSONNEL FOR SUPERVISORY SHUTDOWN
S1 MAYURRA - LAKE BONNEY WIND FARM STAGE 2A
33KV LINE
OUTAGE FOR ISOLATOR MAINTENANCE ISOLATORS 10/12/14 08:38:00 11/12/14 19:05:00 34.45 MAYURRA - LAKE BONNEY WIND FARM STAGE 2A 33KV LINE N/A N/A OUTAGE OF UNREGULATED LINE FOR ISOLATOR MAINTENANCE
S1 MAYURRA - LAKE BONNEY WIND FARM STAGE 1
33KV LINE
OUTAGE FOR ISOLATOR MAINTENANCE ISOLATORS 10/12/14 08:38:00 10/12/14 13:39:00 5.02 MAYURRA - LAKE BONNEY WIND FARM STAGE 1 33KV LINE N/A N/A OUTAGE OF UNREGULATED LINE FOR ISOLATOR MAINTENANCE
S1 ROBERTSTOWN - NORTH WEST BEND 132 KV
LINE 1
OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 10/12/14 16:04:00 10/12/14 16:04:00 0.00 ROBERTSTOWN - NORTH WEST BEND 132 KV LINE 1 N/A N/A SUCCESSFUL RECLOSE
S1 HUMMOCKS - SNOWTOWN - BUNGAMA 132KV
LINE
OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 10/12/14 19:06:00 10/12/14 19:06:00 0.00 HUMMOCKS - SNOWTOWN - BUNGAMA 132KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 DALRYMPLE - WATTLE POINT 132KV LINE TRIPPED DUE TO AUTOMATIC TRIPPING SCHEME ENVIRONMENTAL / LIGHTNING 10/12/14 19:06:00 10/12/14 20:13:00 1.12 DALRYMPLE - WATTLE POINT 132KV LINE N/A N/A TRIPPED DUE TO AUTOMATIC TRIPPING SCHEME TO MAINTAIN VOLTAGE STABILITY
S1 HUMMOCKS - KADINA EAST 132KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 10/12/14 19:58:00 10/12/14 19:58:00 0.00 HUMMOCKS - KADINA EAST 132KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 MURRAYLINK REDCLIFFS C/S - MURRAYLINK
BERRI C/S 150KV LINE
SUPERVISORY SHUTDOWN / SWITCHING BY
GRAYLING PERSONNEL
CUSTOMER REQUEST 11/12/14 04:00:00 11/12/14 19:13:00 15.22 MURRAYLINK REDCLIFFS C/S - MURRAYLINK BERRI C/S 150KV LINE N/A N/A OUTAGE FOR GRAYLING PERSONNEL FOR SUPERVISORY SHUTDOWN
S1 MAYURRA - LAKE BONNEY WIND FARM STAGE 1
33KV LINE
OUTAGE FOR ISOLATOR MAINTENANCE ISOLATORS 11/12/14 09:58:00 11/12/14 19:05:00 9.12 MAYURRA - LAKE BONNEY WIND FARM STAGE 1 33KV LINE N/A N/A OUTAGE OF UNREGULATED LINE FOR ISOLATOR MAINTENANCE
S1 MURRAYLINK REDCLIFFS C/S - MURRAYLINK
BERRI C/S 150KV LINE
SUPERVISORY SHUTDOWN / SWITCHING BY
GRAYLING PERSONNEL
CUSTOMER REQUEST 17/12/14 04:00:00 17/12/14 21:18:00 17.30 MURRAYLINK REDCLIFFS C/S - MURRAYLINK BERRI C/S 150KV LINE N/A N/A OUTAGE FOR GRAYLING PERSONNEL FOR SUPERVISORY SHUTDOWN
S1 BELALIE - MOKOTA 275KV LINE OUTAGE < 1 MINUTE ENVIRONMENTAL / LIGHTNING 22/12/14 18:01:00 22/12/14 18:01:00 0.00 BELALIE - MOKOTA 275KV LINE N/A N/A SUCCESSFUL RECLOSE
S1 MURRAYLINK REDCLIFFS C/S - MURRAYLINK
BERRI C/S 150KV LINE
SUPERVISORY SHUTDOWN / SWITCHING BY
GRAYLING PERSONNEL
CUSTOMER REQUEST 23/12/14 06:49:00 23/12/14 12:21:00 5.53 MURRAYLINK REDCLIFFS C/S - MURRAYLINK BERRI C/S 150KV LINE N/A N/A OUTAGE FOR GRAYLING PERSONNEL FOR SUPERVISORY SHUTDOWN
S1 DAVENPORT - NORTHERN POWER STATION 275
KV LINE 2
ISOLATION FOR ALINTA CUSTOMER REQUEST 30/12/14 08:52:00 30/12/14 16:59:00 8.12 DAVENPORT - NORTHERN POWER STATION 275 KV LINE 2 N/A N/A ISOLATION FOR ALINTA SSP 57049 Approved.pdf
S1
S1
S1 MAGILL TELECOMS BEARER (11543) Accumulated hours from previous years 469.78 PREVIOUS YEARS ACCUMULATED HOURS Project 11543 sample report.jpg
S1 PARA - MAGILL 275KV LINE CAPITAL PROJECT MAGILL TELECOMS BEARER (11543) 18/01/2014 8:30:00 23/01/2014 16:23:00 127.88 PARA - MAGILL 275KV LINE N/A -0.012919% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - MAGILL 275KV LINE CAPITAL PROJECT MAGILL TELECOMS BEARER (11543) 1/02/2014 7:16:00 2/02/2014 13:55:00 30.65 PARA - MAGILL 275KV LINE N/A -0.003096% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - MAGILL 275KV LINE CAPITAL PROJECT MAGILL TELECOMS BEARER (11543) 8/02/2014 8:08:00 12/02/2014 07:36:00 95.47 PARA - MAGILL 275KV LINE N/A -0.009644% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - MAGILL 275KV LINE CAPITAL PROJECT MAGILL TELECOMS BEARER (11543) 13/02/2014 8:15:00 16/02/2014 15:28:00 79.22 PARA - MAGILL 275KV LINE N/A -0.008003% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - MAGILL 275KV LINE CAPITAL PROJECT MAGILL TELECOMS BEARER (11543) 8/04/2014 8:48:00 16/04/2014 15:08:00 198.33 PARA - MAGILL 275KV LINE N/A -0.020036% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - MAGILL 275KV LINE CAPITAL PROJECT MAGILL TELECOMS BEARER (11543) 22/04/2014 8:28:00 22/04/2014 15:46:00 7.30 PARA - MAGILL 275KV LINE N/A -0.000737% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1
S1
S1 CULTANA 275_132kV AUGMENTATION (11101) Accumulated hours from previous years 1389.18 PREVIOUS YEARS ACCUMULATED HOURS Project 11101 sample report.jpg
S1 CULTANA - WHYALLA TERMINAL 2 132KV LINE CAPITAL PROJECT CULTANA 275_132kV AUGMENTATION (11101) 15/02/2014 8:08:00 15/02/2014 15:40:00 7.53 CULTANA - WHYALLA TERMINAL 2 132KV LINE N/A -0.000761% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 WHYALLA CENTRAL - DAVENPORT 132KV LINE CAPITAL PROJECT CULTANA 275_132kV AUGMENTATION (11101) 12/03/2014 8:56:00 7/05/2014 12:34:00 1347.63 WHYALLA CENTRAL - DAVENPORT 132KV LINE N/A -0.136141% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 WHYALLA TERMINAL - MIDDLEBACK - YADNARIE
132 KV LINE
CAPITAL PROJECT CULTANA 275_132kV AUGMENTATION (11101) 19/03/2014 3:57:00 19/03/2014 23:12:00 19.25 WHYALLA TERMINAL - MIDDLEBACK - YADNARIE 132 KV LINE N/A -0.001945% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 WUDINNA - YADNARIE 132 KV LINE CAPITAL PROJECT CULTANA 275_132kV AUGMENTATION (11101) 19/03/2014 22:53:00 19/03/2014 22:56:00 0.05 WUDINNA - YADNARIE 132 KV LINE N/A -0.000005% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 BRINKWORTH - DAVENPORT 275KV LINE CAPITAL PROJECT CULTANA 275_132kV AUGMENTATION (11101) 17/09/2014 10:01:00 17/09/2014 14:48:00 4.78 BRINKWORTH - DAVENPORT 275KV LINE N/A -0.000483% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 BELALIE - DAVENPORT 275KV LINE CAPITAL PROJECT CULTANA 275_132kV AUGMENTATION (11101) 18/09/2014 8:16:00 18/09/2014 09:39:00 1.38 BELALIE - DAVENPORT 275KV LINE N/A -0.000140% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 DAVENPORT - NORTHERN POWER STATION 275
KV LINE 2
CAPITAL PROJECT CULTANA 275_132kV AUGMENTATION (11101) 23/12/2014 8:06:00 23/12/2014 14:26:00 6.33 DAVENPORT - NORTHERN POWER STATION 275 KV LINE 2 N/A -0.000640% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 0.00
S1 WHYALLA TERMINAL SUBSTATION REPLACEMENT (10509) Accumulated hours from previous years 736.12 PREVIOUS YEARS ACCUMULATED HOURS Project 11509 sample report.jpg
S1 WHYALLA TERMINAL - MIDDLEBACK - YADNARIE
132 KV LINE
CAPITAL PROJECT WHYALLA TERMINAL SUBSTATION REPLACEMENT (10509) 20/03/2014 10:21:00 4/04/2014 13:21 363.00 WHYALLA TERMINAL - MIDDLEBACK - YADNARIE 132 KV LINE N/A -0.036671% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 WHYALLA CENTRAL - WHYALLA TERMINAL 132KV
LINE
CAPITAL PROJECT WHYALLA TERMINAL SUBSTATION REPLACEMENT (10509) 18/07/2014 7:33:00 18/07/2014 12:43 5.17 WHYALLA CENTRAL - WHYALLA TERMINAL 132KV LINE N/A -0.000522% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 WHYALLA CENTRAL - WHYALLA TERMINAL 132KV
LINE
CAPITAL PROJECT WHYALLA TERMINAL SUBSTATION REPLACEMENT (10509) 8/12/2014 12:18:00 12/12/2014 10:02 93.73 WHYALLA CENTRAL - WHYALLA TERMINAL 132KV LINE N/A -0.009469% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 0.00
S1 0.00
S1 WATERLOO SUBSTATION REPLACEMENT (10503) Accumulated hours from previous years 1835.60 PREVIOUS YEARS ACCUMULATED HOURS Project 10503 sample report.jpg
S1 WATERLOO EAST - WATERLOO 132KV LINE CAPITAL PROJECT WATERLOO SUBSTATION REPLACEMENT (10503) 1/04/2014 8:07:00 17/04/2014 22:28:00 398.35 WATERLOO EAST - WATERLOO 132KV LINE N/A -0.040242% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 0.00
S1 PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) Accumulated hours from previous years 618.77 PREVIOUS YEARS ACCUMULATED HOURS Project 11302 sample report.jpg
S1 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 30/05/2014 16:54:00 30/05/2014 17:52:00 0.97 PARA - ROBERTSTOWN 275KV LINE N/A -0.000098% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARS
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.2 3RD PARTY OUTAGES
1.1 UNREGULATED TRANSMISSION ASSETS
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
1.2 3RD PARTY OUTAGES
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.2 3RD PARTY OUTAGES
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.2 3RD PARTY OUTAGES
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
1.2 3RD PARTY OUTAGES
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.2 3RD PARTY OUTAGES
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
1.1 UNREGULATED TRANSMISSION ASSETS
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
1.6 FORCE MAJEURE
1.2 3RD PARTY OUTAGES
CIRCUIT AVAILABILITY Reasons for exclusion request
Name of any circuit availability
parametersStart date and time of event End date and time of event
Full details of the reason/s for excluding this event. Should include a
reference to the defined exclusions and explain how it meets this exclusion
definition (see Exclusion definition tab). Eg. Exclusion 1.2 Third party event.
Total transmission
circuit availability
1.6 FORCE MAJEURE
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.2 3RD PARTY OUTAGES
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.2 3RD PARTY OUTAGES
1.1 UNREGULATED TRANSMISSION ASSETS
1.6 FORCE MAJEURE
TRANSIENT INTERUPTIONS LESS THAN ONE (1) MINUTE
1.1 UNREGULATED TRANSMISSION ASSETS
Single transmission line/substation redevlopment projects
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
S1 PARA - TIPS A 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 30/05/2014 16:58:00 30/05/2014 17:05:00 0.12 PARA - TIPS A 275KV LINE N/A -0.000012% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 5/08/2014 6:27:00 5/08/2014 23:00:00 16.55 PARA - ROBERTSTOWN 275KV LINE N/A -0.001672% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 7/08/2014 5:56:00 7/08/2014 16:47:00 10.85 PARA - ROBERTSTOWN 275KV LINE N/A -0.001096% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 18/08/2014 7:58:00 19/08/2014 18:08:00 34.17 PARA - ROBERTSTOWN 275KV LINE N/A -0.003452% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 21/08/2014 7:42:00 22/08/2014 13:48:00 30.10 PARA - ROBERTSTOWN 275KV LINE N/A -0.003041% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 26/08/2014 7:44:00 27/08/2014 17:51:00 34.12 PARA - BLYTH WEST 275KV LINE N/A -0.003447% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 28/08/2014 7:44:00 28/08/2014 19:43:00 11.98 PARA - BLYTH WEST 275KV LINE N/A -0.001211% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 10/09/2014 7:56:00 12/09/2014 18:20:00 58.40 PARA - BLYTH WEST 275KV LINE N/A -0.005900% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - PARAFIELD GARDENS WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 27/09/2014 7:33:00 27/09/2014 11:04:00 3.52 PARA - PARAFIELD GARDENS WEST 275KV LINE N/A -0.000355% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - ROSEWORTHY 132KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 16/10/2014 7:32:00 18/10/2014 8:27:00 48.92 PARA - ROSEWORTHY 132KV LINE N/A -0.004942% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA-BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 22/10/2014 10:26:00 30/10/2014 11:38:00 193.20 PARA-BLYTH WEST 275KV LINE N/A -0.019518% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - ROSEWORTHY 132KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 3/11/2014 7:36:00 3/11/2014 09:02:00 1.43 PARA - ROSEWORTHY 132KV LINE N/A -0.000145% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - ANGAS CREEK 132KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 4/11/2014 8:06:00 4/11/2014 18:52:00 10.77 PARA - ANGAS CREEK 132KV LINE N/A -0.001088% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - ANGAS CREEK 132KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 9/11/2014 7:47:00 9/11/2014 16:58:00 9.18 PARA - ANGAS CREEK 132KV LINE N/A -0.000928% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - ROSEWORTHY 132KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 10/11/2014 8:08:00 25/11/2014 14:00:00 365.87 PARA - ROSEWORTHY 132KV LINE N/A -0.036961% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1 PARA - ANGAS CREEK 132KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 25/11/2014 10:18:00 25/11/2014 14:00:00 3.70 PARA - ANGAS CREEK 132KV LINE N/A -0.000374% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1
S1
S1 CHERRY GARDENS - MT BARKER 132KV LINE CAPITAL PROJECT SUBSTATION PLAN TRANSFORMER MINOR REFURBISHMENT (ORP0012) Metro 30/05/2014 8:49:00 13/06/2014 16:10:00 343.35 CHERRY GARDENS - MT BARKER 132KV LINE N/A -0.000743% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1
S1 MONASH - BERRI 132KV LINE 1 CAPITAL PROJECT SUBSTATION PLAN TRANSFORMER MINOR REFURBISHMENT (ORP0012) Riverland 5/08/2014 8:19:00 6/08/2014 16:03:00 31.73 MONASH - BERRI 132KV LINE 1 N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 MONASH - BERRI 132KV LINE 2 CAPITAL PROJECT SUBSTATION PLAN TRANSFORMER MINOR REFURBISHMENT (ORP0012) Riverland 23/08/2014 8:30:00 24/08/2014 14:17:00 29.78 MONASH - BERRI 132KV LINE 2 N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1
S1 MOBILONG - MURRAY BRIDGE HAHNDORF 132 KV LINE 1CAPITAL PROJECT SUBSTATION PLAN TRANSFORMER MINOR REFURBISHMENT (ORP0012) Eastern Hills 21/10/2014 8:20:00 21/10/2014 16:36:00 8.27 MOBILONG - MURRAY BRIDGE HAHNDORF 132 KV LINE 1 N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1
S1
S1 MONASH - BERRI 132KV LINE 1 CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Riverland 7/04/2014 10:56:00 8/04/2014 18:03:00 31.12 MONASH - BERRI 132KV LINE 1 N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 MONASH - BERRI 132KV LINE 2 CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Riverland 9/04/2014 7:36:00 10/04/2014 11:39:00 28.05 MONASH - BERRI 132KV LINE 2 N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1
S1 PARA - MAGILL 275KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Metro 19/05/2014 8:49:00 20/05/2014 14:55:00 30.10 PARA - MAGILL 275KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Metro 3/06/2014 10:32:00 5/06/2014 15:50:00 53.30 PARA - ROBERTSTOWN 275KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 LEFFEVRE - TIPS B 275 KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Metro 14/10/2014 11:49:00 17/10/2014 17:12:00 77.38 LEFFEVRE - TIPS B 275 KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 HAPPY VALLEY - MORPHETT VALE EAST 275 KV LINECAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Metro 20/11/2014 7:29:00 20/11/2014 13:18:00 5.82 HAPPY VALLEY - MORPHETT VALE EAST 275 KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 CHERRY GARDENS - MORPHETT VALE EAST 275 KV LINECAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Metro 4/12/2014 8:10:00 8/12/2014 12:54:00 100.73 CHERRY GARDENS - MORPHETT VALE EAST 275 KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1
S1 BELALIE - DAVENPORT 275KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Upper North 28/05/2014 8:01:00 29/05/2014 15:15:00 31.23 BELALIE - DAVENPORT 275KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 DAVENPORT - BUNGAMA 275KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Upper north 10/06/2014 9:51:00 12/06/2014 10:55:00 49.07 DAVENPORT - BUNGAMA 275KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 CANOWIE - DAVENPORT 275KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Upper North 12/06/2014 12:35:00 14/06/2014 15:41:00 51.10 CANOWIE - DAVENPORT 275KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 DAVENPORT - NORTHERN POWER STATION 275KV LINE 2CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Upper North 18/08/2014 9:19:00 24/08/2014 14:00:00 148.68 DAVENPORT - NORTHERN POWER STATION 275KV LINE 2 N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1
S1 BLANCHE - MOUNT GAMBIER 132KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) South East 13/06/2014 9:16:00 13/06/2014 20:03:00 10.78 BLANCHE - MOUNT GAMBIER 132KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 BLANCHE - MT GAMBIER 132KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) South East 14/06/2014 7:25:00 14/06/2014 19:20:00 11.92 BLANCHE - MT GAMBIER 132KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1
S1 CLARE NORTH - MINTARO 132KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Mid North 29/07/2014 9:13:00 29/07/2014 17:20:00 8.12 CLARE NORTH - MINTARO 132KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 CLARE NORTH - BRINKWORTH 132KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Mid North 29/07/2014 9:13:00 29/07/2014 17:20:00 8.12 CLARE NORTH - BRINKWORTH 132KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 MINTARO - WATERLOO 132 kV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Mid North 29/07/2014 9:13:00 29/07/2014 17:20:00 8.12 MINTARO - WATERLOO 132 kV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 CLARE NORTH - MINTARO 132KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Mid North 30/07/2014 8:11:00 1/08/2014 14:24:00 54.22 CLARE NORTH - MINTARO 132KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 MINTARO - WATERLOO 132KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Mid North 30/07/2014 8:13:00 1/08/2014 14:21:00 54.13 MINTARO - WATERLOO 132KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 BUNGAMA - BRINKWORTH 132KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Mid North 31/10/2014 8:10:00 31/10/2014 18:48:00 10.63 BUNGAMA - BRINKWORTH 132KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1
S1 MANNUM - MOBILONG 132 KV LINE CAPITAL PROJECT SUBSTATION PLANT ISOLATOR REFURBISHMENT (ORP0011) Eastern Hills 27/11/2014 8:10:00 27/11/2014 17:08:00 8.97 MANNUM - MOBILONG 132 KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1
S1
S1 HAPPY VALLEY - MAGILL 275KV LINE CAPITAL PROJECT MAGILL - HAPPY VALLEY 275KV INSULATOR REPLACEMENT (EC11447) 8/09/2014 7:37:00 8/09/2014 13:37:00 6.00 HAPPY VALLEY - MAGILL 275KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS Project 11447 sample report.jpg
S1 HAPPY VALLEY - MAGILL 275KV LINE CAPITAL PROJECT MAGILL - HAPPY VALLEY 275KV INSULATOR REPLACEMENT (EC11447) 22/09/2014 7:57:00 1/10/2014 15:08:00 223.18 HAPPY VALLEY - MAGILL 275KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 HAPPY VALLEY - MAGILL 275KV LINE CAPITAL PROJECT MAGILL - HAPPY VALLEY 275KV INSULATOR REPLACEMENT (EC11447) 7/10/2014 7:07:00 16/10/2014 12:06:00 220.98 HAPPY VALLEY - MAGILL 275KV LINE N/A -0.011533% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 HAPPY VALLEY - MAGILL 275KV LINE CAPITAL PROJECT MAGILL - HAPPY VALLEY 275KV INSULATOR REPLACEMENT (EC11447) 20/10/2014 7:18:00 29/10/2014 11:02:00 219.73 HAPPY VALLEY - MAGILL 275KV LINE N/A -0.022198% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 HAPPY VALLEY - MAGILL 275KV LINE CAPITAL PROJECT MAGILL - HAPPY VALLEY 275KV INSULATOR REPLACEMENT (EC11447) 2/11/2014 7:19:00 16/11/2014 11:30:00 340.18 HAPPY VALLEY - MAGILL 275KV LINE N/A -0.034366% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1
S1
S1 TIPS 66KV SECTION SECONDARY SYSTEMS PLUS MINOR PRIMARY PLANT (11109) Accumulated hours from previous years 500.53 PREVIOUS YEARS ACCUMULATED HOURS Project 11109 sample report.jpg
S1 NEW OSBORNE - TIPS A 66KV LINE 3 CAPITAL PROJECT TIPS 66KV SECTION SECONDARY SYSTEMS PLUS MINOR PRIMARY PLANT (11109) 1/09/2014 10:53:00 4/09/2014 10:58:00 72.08 NEW OSBORNE - TIPS A 66KV LINE 3 N/A -0.007282% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS - 14 DAY CAP APPLIED TO
PREVIOUS YEARSS1
S1
S1 CLARE NORTH NEW 132_33kV SUBSTATION (10370) Accumulated hours from previous years 2468.65 PREVIOUS YEARS ACCUMULATED HOURS Project 10370 sample report.jpg
S1 CLARE NORTH - MINTARO 132KV LINE CAPITAL PROJECT CLARE NORTH NEW 132_33kV SUBSTATION (10370) 26/11/2014 9:33:00 28/11/2014 14:48:00 53.25 CLARE NORTH - MINTARO 132KV LINE N/A -0.005379% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 CLARE NORTH - BRINKWORTH 132KV LINE CAPITAL PROJECT CLARE NORTH NEW 132_33kV SUBSTATION (10370) 26/11/2014 9:34:00 28/11/2014 14:48:00 53.23 CLARE NORTH - BRINKWORTH 132KV LINE N/A -0.005378% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 CLARE NORTH - MINTARO 132KV LINE CAPITAL PROJECT CLARE NORTH NEW 132_33kV SUBSTATION (10370) 15/12/2014 9:58:00 15/12/2014 10:32:00 0.57 CLARE NORTH - MINTARO 132KV LINE N/A -0.000057% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1 CLARE NORTH - BRINKWORTH 132KV LINE CAPITAL PROJECT CLARE NORTH NEW 132_33kV SUBSTATION (10370) 15/12/2014 9:58:00 15/12/2014 10:32:00 0.57 CLARE NORTH - BRINKWORTH 132KV LINE N/A -0.000057% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S1
S1
S2
S2
S2 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 30/05/2014 16:54:00 30/05/2014 17:52:00 0.97 PARA - ROBERTSTOWN 275KV LINE N/A -0.001453% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S2 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 5/08/2014 6:27:00 5/08/2014 23:00:00 12.00 PARA - ROBERTSTOWN 275KV LINE N/A -0.018038% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S2 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 7/08/2014 5:56:00 7/08/2014 16:47:00 8.78 PARA - ROBERTSTOWN 275KV LINE N/A -0.013202% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S2 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 18/08/2014 7:58:00 19/08/2014 18:08:00 22.13 PARA - ROBERTSTOWN 275KV LINE N/A -0.033269% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S2 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 21/08/2014 7:42:00 22/08/2014 13:48:00 17.80 PARA - ROBERTSTOWN 275KV LINE N/A -0.026756% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S2 PARA - BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 26/08/2014 7:44:00 27/08/2014 17:51:00 21.85 PARA - BLYTH WEST 275KV LINE N/A -0.032843% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S2 PARA - BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 28/08/2014 7:44:00 28/08/2014 19:43:00 11.72 PARA - BLYTH WEST 275KV LINE N/A -0.017612% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S2 PARA - BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 10/09/2014 7:56:00 12/09/2014 18:20:00 34.33 PARA - BLYTH WEST 275KV LINE N/A -0.051607% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S2 PARA - BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 22/10/2014 10:26:00 30/10/2014 11:38:00 73.20 PARA - BLYTH WEST 275KV LINE N/A -0.110029% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S2
S2
S2 BRINKWORTH - DAVENPORT 275KV LINE CAPITAL PROJECT CULTANA 275_132kV AUGMENTATION (11101) 17/09/2014 10:01:00 17/09/2014 14:48:00 4.78 BRINKWORTH - DAVENPORT 275KV LINE N/A -0.007190% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S2 BELALIE - DAVENPORT 275KV LINE CAPITAL PROJECT CULTANA 275_132kV AUGMENTATION (11101) 18/09/2014 8:16:00 18/09/14 9:39:00 1.38 BELALIE - DAVENPORT 275KV LINE N/A -0.002079% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S2
S2 TUNGKILLO - ROBERTSTOWN 275KV LINE OUTAGE FOR BUSHFIRE ENVIRONMENTAL / BUSHFIRE 17/01/14 13:10:00 18/01/14 21:44:00 6.83 TUNGKILLO - ROBERTSTOWN 275KV LINE N/A -0.010271% DIRECTED BY THE CFS TO ENABLE FIRE FIGHTING BUSHFIRE CFS Event Log Entry.pdf
S2 PARA - ROBERTSTOWN 275KV LINE OUTAGE FOR BUSHFIRE ENVIRONMENTAL / BUSHFIRE 17/01/14 13:13:00 18/01/14 21:37:00 6.78 PARA - ROBERTSTOWN 275KV LINE N/A -0.010196% DIRECTED BY THE CFS TO ENABLE FIRE FIGHTING BUSHFIRE CFS Event Log Entry.pdf
S2
S3
S3
S3 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 30/05/2014 16:54:00 30/05/2014 17:52:00 0.00 PARA - ROBERTSTOWN 275KV LINE N/A 0.000000% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S3 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 5/08/2014 6:27:00 5/08/2014 23:00:00 4.55 PARA - ROBERTSTOWN 275KV LINE N/A -0.003606% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S3 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 7/08/2014 5:56:00 7/08/2014 16:47:00 2.07 PARA - ROBERTSTOWN 275KV LINE N/A -0.001638% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S3 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 18/08/2014 7:58:00 19/08/2014 18:08:00 12.03 PARA - ROBERTSTOWN 275KV LINE N/A -0.009536% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S3 PARA - ROBERTSTOWN 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 21/08/2014 7:42:00 22/08/2014 13:48:00 12.30 PARA - ROBERTSTOWN 275KV LINE N/A -0.009747% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S3 PARA - BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 26/08/2014 7:44:00 27/08/2014 17:51:00 12.27 PARA - BLYTH WEST 275KV LINE N/A -0.009721% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S3 PARA - BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 28/08/2014 7:44:00 28/08/2014 19:43:00 0.27 PARA - BLYTH WEST 275KV LINE N/A -0.000211% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S3 PARA - BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 10/09/2014 7:56:00 12/09/2014 18:20:00 24.07 PARA - BLYTH WEST 275KV LINE N/A -0.019071% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S3 PARA - BLYTH WEST 275KV LINE CAPITAL PROJECT PARA 275KV SECONDARY SYSTEMS AND MINOR PRIMARY PLANT REPLACEMENT ONLY (11302) 22/10/2014 10:26:00 30/10/2014 11:38:00 120.00 PARA - BLYTH WEST 275KV LINE N/A -0.095093% CAPPED AGGREGRATE OUTAGE DURATION TO 336HRS
S3
S3 TUNGKILLO - ROBERTSTOWN 275KV LINE OUTAGE FOR BUSHFIRE ENVIRONMENTAL / BUSHFIRE 17/01/14 13:10:00 18/01/14 21:44:00 25.73 TUNGKILLO - ROBERTSTOWN 275KV LINE N/A -0.020392% DIRECTED BY THE CFS TO ENABLE FIRE FIGHTING BUSHFIRE CFS Event Log Entry.pdf
S3 PARA - ROBERTSTOWN 275KV LINE OUTAGE FOR BUSHFIRE ENVIRONMENTAL / BUSHFIRE 17/01/14 13:13:00 18/01/14 21:37:00 25.62 PARA - ROBERTSTOWN 275KV LINE N/A -0.020300% DIRECTED BY THE CFS TO ENABLE FIRE FIGHTING BUSHFIRE CFS Event Log Entry.pdf
S3
S3
Exclusion calculation data
Peak start Peak finish Public holidays 2014 No of weekdays in year (excl public holidays)
8:00 20:00 1/01/2014 1/01/2014 31/12/2014 252
27/01/2014
Off peak finish Off peak start 10/03/2014 No of weekend days
8:00 20:00 18/04/2014 1/01/2014 31/12/2014 113
19/04/2014
21/04/2014 Availability Circuit Hours 989880
25/04/2014 Critical Circuit Avail - Peak Circuit Hours 66528
9/06/2014 Critical Circuit Avail - Non Peak Circuit Hours 126192
6/10/2014
25/12/2014 Capped Duration 336
26/12/2014
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
Single transmission line/substation redevlopment projects
Single transmission line/substation redevlopment projects
Total transmission
circuit availability
1.6 FORCE MAJEURE
1.5 CAPPED OUTAGES
1.6 FORCE MAJEURE
1.6 FORCE MAJEURE
1.6 FORCE MAJEURE
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
1.5 CAPPED OUTAGES
NOTE: This worksheet should include a list all events that are proposed for exclusion. Each proposed exclusion should include a description of the event, a description of the impact and quantification of the impa ct on the network and performance. The descriptive elements should also include reasons for the exclusion request making referen ce to the "Exclusion Definitions" worksheet. Each exclusion should be entered onto one row for each parameter. Where one exclusion event applies to more than one paramete r, the relevant details of the event should be entered under each of the measure headings. The TNSP must provide details for all events requested for exclusion in this template. In the event that the TNSP wishes to p rovide further details of an exclusion, this should be provided with the TNSP's performance report. The source of information s hould be referenced in this template.
ElectraNet - Proposed exclusions - Loss of supply events
Event proposed for
exclusion
Description of the event and its
impact on the network and
performance
Cause of the event Start dateStart
time End date
End
time Circuits affected
Maximum system
demand
Demand shed and
timeQuantitative impact Reasons for exclusion request Further references Supporting Documentation
Name of the event
Detail of the event. Such as: the action of
any third parties, the actions of the TNSP,
assets damaged or interrupted.
A description of the cause of the
event
Name of circuits or
plant affected
The max system
demand that occurred
up until the time of the
event
The (MW) demand
shed and the duration it
was shed for.
Impact of exclusion
event on LOS
Parameter
Full details of the reason/s for excluding this event.
Should include a reference to the defined exclusions
and explain how it meets this exclusion definition (see
Exclusion definition tab). Eg. Exclusion 1.2 Third party
event
A TNSP may provide further
details of an exclusion event.
TNSP to provide reference.
S4
S4 Event 3099 Bushfire
On Monday 13 January 2014 at
1319, the Ardrossan West -
Dalrymple 132kV line tripped as
a bushfire passed under the line.
Approximately 4 MW of load was
lost at Dalrymple for 96 minutes
resulting in a 0.11 SM event.
Bushfire events have typically
been excluded in the past
therefore this event will also seek
exclusion.
13/01/2014 13:19 13/01/2014 14:55 Dalrymple 3413 4 for 96 minutes 1 5.6 Force MajeureBushfire under the
transmission line3099 Event_Investigation_Technical_Report.pdf
S4
S4 Event 3147 3rd Party
On Friday 14 February 2014 at
1830, a fault occurred on
SAPN's 33kV network. Their
protection was too slow in
clearing the fault and
ElectraNet's protection operated
in a backup manner by the
operation of two of the three
phase fuses. The connection
point was still energised via a
single phase and majority of the
load was still supplied. SAPN
isolated the fault and made
repairs. Once the repairs were
complete SAPN crews contacted
SMSC to isolate the Neuroodla
transformer and replace fuses.
This event has been classified
as 3rd Party
14/02/2014 18:30 15/02/2014 13:33 Neuroodla 3413 0.5 for 19hrs 1 3.4 3rd Party Outages 3rd Party 3147 Event_Investigation_Technical_Report.pdf
S4
S5
S5
S5
S5
S5
S5
S5
Loss of supply event
frequency ( >0.2
system minutes )
LOSS OF SUPPLY EVENT
FREQUENCY
Name of any loss of supply
parameters
Start date and time of
event
End date and time of
event
Loss of supply event
frequency ( >0.05
system minutes )
NOTE: This worksheet should include a list all events that are proposed for exclusion. Each proposed exclusion should include a description of the event, a description of the impact and quantification of the impa ct on the network and performance. The descriptive elements should also include reasons for the exclusion request making reference to the "Exclusion Definitions" worksheet. Each exclusion should be entered onto one row for each parameter. Where one exclusion event applies to more than one paramete r, the relevant details of the event should be entered under each of the measure headings. The TNSP must provide details for all events requested for exclusion in this template. In the event that the TNSP wishes to p rovide further details of an exclusion, this should be provided with the TNSP's performance report. The source of information should be referenced in this template.
ElectraNet - Proposed exclusions - Average outage duration
Event proposed for
exclusion
Description of the event and its
impact on the network and
performance
Cause of the event Start dateStart
time End date
End
time
Quantitative
impact
Capped impact (if
applicable)Reasons for exclusion request Further references Supporting Documentation
Name of the event
Detail of the event. Such as: the action of
any third parties, the actions of the TNSP,
assets damaged or interrupted.
A description of the cause of the event
Impact of exclusion
event on AOD
Parameter
Impact of capped
exclusion event on
AOD parameter
Full details of the reason for excluding this event.
Should include a reference to the defined exclusions
and explain how it meets this exclusion definition (see
Exclusion definition tab). Eg. Exclusion 1.2 Third party
event
A TNSP may provide further
details of an exclusion event.
TNSP to provide reference.
S6 Event 3099 Bushfire
On Monday 13 January 2014 at 1319, the
Ardrossan West - Dalrymple 132kV line
tripped as a bushfire passed under the line.
Approximately 4 MW of load was lost at
Dalrymple for 96 minutes resulting in a 0.11
SM event. Bushfire events have typically been
excluded in the past therefore this event will
also seek exclusion.
13/01/2014 13:19 13/01/2014 14:55 Dalrymple 96.00 1 5.6 Force MajeureBushfire under the
transmission line3099 Event_Investigation_Technical_Report.pdf
S6
S6 14/01/2014 15:22 14/01/2014 17:29Mannum-Adelaide #2
pump127.00 1 4.7 Pumping station supply interruptions
The pumping station was not
pumping at the time of the
event.
S6 14/01/2014 15:22 14/01/2014 17:29Mannum-Adelaide #3
pump127.00 1 4.7 Pumping station supply interruptions
The pumping station was not
pumping at the time of the
event.
S6
S6 Event 3147 3rd Party
On Friday 14 February 2014 at 1830, a fault
occurred on SAPN's 33kV network. Their
protection was too slow in clearing the fault
and ElectraNet's protection operated in a
backup manner by the operation of two of the
three phase fuses. The connection point was
still energised via a single phase and majority
of the load was still supplied. SAPN isolated
the fault and made repairs. Once the repairs
were complete SAPN crews contacted
SMSC to isolate the Neuroodla transformer
and replace fuses. This event has been
classified as 3rd Party
14/02/2014 18:30 15/02/2014 13:33 Neuroodla 1143.00 1 5.3 3rd Party Outages 3rd Party 3147 Event_Investigation_Technical_Report.pdf
S6
S6
S6
S6
S6 Event 3295 Maintenance
On Saturday 6 December 2014 at 0641, the
132/3.3kV TF2 tripped due to low oil. Ganged
Interuptor G613 was opened causing the loss
of connection point at Mannum -Adelaide
Pumping Station No.2 for 6.15 hours.
However, this event will be excluded as the
pumping station was not pumping at the time
of the event.
6/12/2014 6:41 6/12/2014 12:50Mannum-Adelaide #2
pump369.00 1 4.7 Pumping station supply interruptions
The pumping station was not
pumping at the time of the
event.
3295 Event_Investigation_Technical_Report.pdf
S6
3111 Event_Investigation_Technical_Report.pdf
Average outage
duration (minutes)
AVERAGE OUTAGE
DURATIONCircuits affected
Name of any average outage
duration parameters
Start date and time of
eventEnd date and time of event Name of circuits or plant affected
Event 3111 Storm
On Tuesday 14 January 2014 at 1522, the
Angas Creek - Mannum 132kV line tripped as
a result of a storm passing over the line. No
load was lost at each Mannum-Adelaide
#2&3 pump stations as they were not
pumping at the time
3rd Party initiating cause,
however supporting document
explain cause for delay in
supply restoration
3245 Event_Investigation_Technical_Report.pdf
On Friday 12 September 2014 at 2157, the
Davenport - Leigh Creek 132kV line tripped
due to CB4483 (Alinta asset) failure at Leigh
Creek Coalfield. However, the line did not
reclosed due to Electranet protection failure.
Approximately 0.4MW of load lost at
Neuroodla and 0.6MW of load lost at Leigh
Creek South for 83 minutes resulting in a
0.03SM event.
3rd PartyEvent 3245 5.3 3rd Party Outages12/09/2014 21:57 12/09/2014 23:20Leigh Creek
Coalfield83.00 1
NOTE: This worksheet should include a list all events that are proposed for exclusion. Each proposed exclusion should include a description of the event, a description of the impact and quantification of the impact on the network and performance. The descriptive elements should also include reasons for the exclusion request making reference to the "Exclusion Definitions" worksheet. Each exclusion should be entered onto one row for each parameter. Where one exclusion event applies to more than one parameter, the relevant details of the event should be entered under each of the measure headings. The TNSP must provide details for all events requested for exclusion in this template. In the event that the TNSP wishes to provide further details of an exclusion, this should be provided with the TNSP's performance report. The source of information should be referenced in this template.
ElectraNet - S1 - Total transmission circuit availability
Performance TargetsGraph
startCollar Target Cap
Graph
end
Total transmission circuit availability98.80% 99.02% 99.52% 99.68% 99.90%
Weighting -0.30% -0.30% 0.00% 0.30% 0.30%
Performance Formulae Conditions S- Calc 1 S- Calc 2
Performance = -0.003000 Availability < 99.02% -0.003000 -0.003000
= 0.600000 x Availability + -0.597120 99.02% ≤ Availability ≤ 99.52% -0.002262 0.000495
= 1.875000 x Availability + -1.866000 99.52% ≤ Availability ≤ 99.68% -0.007068 0.001546
= 0.003000 99.68% < Availability 0.003000 0.003000
Performance Outcomes
Performance
(Without
Exclusions)
Performance
(Exclusions)
Total transmission circuit availability = 99.143041% 99.602450%
S-Factor = -0.226175% 0.154594%
Formulae
-0.30%
-0.25%
-0.20%
-0.15%
-0.10%
-0.05%
0.00%
0.05%
0.10%
0.15%
0.20%
0.25%
0.30%
99.00% 99.30% 99.60%
Fin
an
cia
l In
cen
tiv
e
(Perc
en
tag
e o
f A
nn
ual
Rev
en
ue)
Total transmission circuit availability
ElectraNet Service Standards S1 - Total transmission circuit availability
Service standardsincentive curve
Performance(Without Exclusions)
Performance(Exclusions)
NOTE: This sheet will automatically update based on data in input sheets Blue cells show the TNSP's performance targets and weightings Yellow/Green cells show the TNSP's performance formulae and related formula conditions based on performance targets and weightings Pink cells show the TNSP's performance outcomes without any events excluded from performance data Orange cells show the TNSP's performance outcomes with events excluded from performance data
ElectraNet - S2 - Critical circuit availability – peak
Performance TargetsGraph
startCollar Target Cap
Graph
end
Critical circuit availability – peak97.20% 97.36% 99.12% 99.96% 100.20%
Weighting -0.10% -0.10% 0.00% 0.10% 0.10%
Performance Formulae Conditions S- Calc 1 S- Calc 2
Performance = -0.001000 When: Availability < 97.36% -0.001000 -0.001000
= 0.056818 x Availability + -0.056318 97.36% ≤ Availability ≤ 99.12% 0.000057 0.000248
= 0.119048 x Availability + -0.118000 99.12% ≤ Availability ≤ 99.96% 0.000120 0.000519
= 0.001000 99.96% < Availability 0.001000 0.001000
Performance Outcomes
Performance
(Without
Exclusions)
Performance
(Exclusions)
Critical circuit availability – peak = 99.221130% 99.555676%
S-Factor = 0.012039% 0.051866%
Formulae
-0.20%
-0.15%
-0.10%
-0.05%
0.00%
0.05%
0.10%
0.15%
0.20%
97.3% 97.7% 98.1% 98.5% 98.9% 99.3% 99.7%
Fin
an
cia
l In
cen
tive
(Perc
en
tag
e o
f A
nn
ua
l R
even
ue)
critical circuit availability - peak
ElectraNet Service Standards S2 - critical circuit availability - peak
Service standardsincentive curve
Performance(Without Exclusions)
Performance(Exclusions)
NOTE: This sheet will automatically update based on data in input sheets Blue cells show the TNSP's performance targets and weightings Yellow/Green cells show the TNSP's performance formulae and related formula conditions based on performance targets and weightings Pink cells show the TNSP's performance outcomes without any events excluded from performance data Orange cells show the TNSP's performance outcomes with events excluded from performance data
ElectraNet - S3 - Critical circuit availability – non-peak (zero weighting)
Performance TargetsGraph
startCollar Target Cap
Graph
end
Critical circuit availability – non-peak (zero weighting)98.10% 98.25% 99.37% 99.87% 100.10%
Weighting 0.00% 0.00% 0.00% 0.00% 0.00%
Performance Formulae Conditions S- Calc 1 S- Calc 2
Performance = 0.000000 When: Availability < 98.25% 0.000000 0.000000
= 0.000000 x Availability + 0.000000 98.25% ≤ Availability ≤ 99.37% 0.000000 0.000000
= 0.000000 x Availability + 0.000000 99.37% ≤ Availability ≤ 99.87% 0.000000 0.000000
= 0.000000 99.87% < Availability 0.000000 0.000000
Performance Outcomes
Performance
(Without
Exclusions)
Performance
(Exclusions)
Critical circuit availability – non-peak (zero weighting)= 99.508289% 99.697604%
S-Factor = 0.000000% 0.000000%
Formulae
-0.075%
-0.050%
-0.025%
0.000%
0.025%
0.050%
0.075%
98.80% 99.00% 99.20% 99.40% 99.60% 99.80% 100.00%
Fin
an
cia
l In
ce
nti
ve
(P
erc
en
tag
e o
f A
nn
ua
l R
ev
en
ue
)
Critical circuit availability - non-peak
ElectraNet Service Standards S3 - Critical circuit availability - non-peak (zero weighting)
Service standardsincentive curve
Performance(Without Exclusions)
Performance(Exclusions)
NOTE: This sheet will automatically update based on data in input sheets Blue cells show the TNSPt's performance targets and weightings Yellow/Green cells show the TNSP's performance formulae and related formula conditions based on performance targets and weightings Pink cells show the TNSP's performance outcomes without any events excluded from performance data Orange cells show the TNSP's performance outcomes with events excluded from performance data
ElectraNet - S4 - Loss of supply event frequency ( >0.05 system minutes )
Performance Targets Graph start Collar Target Cap Graph end
Loss of supply event frequency ( >0.05 system minutes ) 11 9 7 4 -
Weighting -0.20% -0.200% 0.00% 0.200% 0.20%
Performance Formulae Conditions S- Calc 1 S- Calc 2
Performance = -0.002000 9 < No. of events -0.002000 -0.002000
= -0.001000 x No. of events + 0.007000 7 ≤ No. of events ≤ 9 0.001000 0.003000
= -0.000667 x No. of events + 0.004667 4 ≤ No. of events ≤ 7 0.000667 0.002000
= 0.002000 No. of events < 4 0.002000 0.002000
Loss of supply event frequency ( >0.05 system minutes ) =
Performance
(Without
Exclusions)
Performance
(Exclusions)
Loss of supply event frequency ( >0.05 system minutes ) = 6 4
S-Factor 0.066667% 0.200000%
Formulae
-0.20%
-0.15%
-0.10%
-0.05%
0.00%
0.05%
0.10%
0.15%
0.20%
1 2 3 4 5 6 7 8 9 10
Fin
an
cia
l In
ce
nti
ve
(Pe
rce
nta
ge
of
An
nu
al
Re
ve
nu
e)
Loss of supply event frequency (events > 0.05 system minutes)
ElectraNet Service Standards S4 - Loss of supply event frequency (events > 0.05 system minutes)
Servicestandardsincentive curve
Performance(WithoutExclusions)
Performance(Exclusions)
NOTE: This sheet will automatically update based on data in input sheets Blue cells show the TNSP's performance targets and weightings Yellow/Green cells show the TNSP's performance formulae and related formula conditions based on performance targets and weightings Pink cells show the TNSP's performance outcomes without any events excluded from performance data Orange cells show the TNSP's performance outcomes with events excluded from performance data
ElectraNet - S5 - Loss of supply event frequency ( >0.2 system minutes )
Performance Targets Graph start Collar Target Cap Graph end
Loss of supply event frequency ( >0.2
system minutes )6 4 2 0 0
Weighting -0.20% -0.200% 0.00% 0.200% 0.20%
Performance Formulae Conditions S- Calc 1 S- Calc 2
Performance = -0.002000 4 < No. of events -0.002000 -0.002000
= -0.001000 x No. of events + 0.002000 2 ≤ No. of events ≤ 4 0.001000 0.001000
= -0.001000 x No. of events + 0.002000 0 ≤ No. of events ≤ 2 0.001000 0.001000
= 0.002000 No. of events = 0 0.002000 0.002000
Loss of supply event frequency ( >0.2
system minutes )=
Performance
(Without
Exclusions)
Performance
(Exclusions)
Loss of supply event frequency ( >0.2
system minutes )= 1 1
S-Factor 0.100000% 0.100000%
Formulae
-0.20%
-0.15%
-0.10%
-0.05%
0.00%
0.05%
0.10%
0.15%
0.20%
0 1 2 3 4 5
Fin
an
cia
l In
cen
tiv
e
(Perc
en
tag
e o
f A
nn
ual
Rev
en
ue)
Loss of supply event frequency (events > 0.2 system minutes)
ElectraNet Service Standards S5 - Loss of supply event frequency (events > 0.2 system minutes)
Service standardsincentive curve
Performance(Without Exclusions)
Performance(Exclusions)
NOTE: This sheet will automatically update based on data in input sheets Blue cells show the TNSP's performance targets and weightings Yellow/Green cells show the TNSP's performance formulae and related formula conditions based on performance targets and weightings Pink cells show the TNSP's performance outcomes without any events excluded from performance data Orange cells show the TNSP's performance outcomes with events excluded from performance data
ElectraNet - S6 - Average outage duration (minutes)
Performance Targets Graph start Collar Target Cap Graph end
Average outage duration (minutes) 523 323 203 83 -
Weighting -0.20% -0.200% 0.00% 0.200% 0.20%
Performance Formulae Conditions S- Calc 1 S- Calc 2
Performance = -0.002000 323 < Duration -0.002000 -0.002000
= -0.000017 x Duration + 0.003387 203 ≤ Duration ≤ 323 0.000367 0.001208
= -0.000017 x Duration + 0.003387 83 ≤ Duration ≤ 203 0.000367 0.001208
= 0.002000 Duration < 83 0.002000 0.002000
Average outage duration (minutes) =
Performance
(Without
Exclusions)
Performance
(Exclusions)
Average outage duration (minutes) = 181.173913 130.705882
S-Factor 0.036710% 0.120824%
Formulae
-0.20%
-0.15%
-0.10%
-0.05%
0.00%
0.05%
0.10%
0.15%
0.20%
80 100 120 140 160 180 200 220 240 260 280 300 320
Fin
an
cia
l In
cen
tiv
e
(Perc
en
tag
e o
f A
nn
ual
Rev
en
ue)
Average outage duration (minutes)
ElectraNet Service Standards S6 - Average outage duration (minutes)
Service standardsincentive curve
Performance(Without Exclusions)
Performance(Exclusions)
NOTE: This sheet will automatically update based on data in input sheets Blue cells show the TNSP's performance targets and weightings Yellow/Green cells show the TNSP's performance formulae and related formula conditions based on performance targets and weightings Pink cells show the TNSP's performance outcomes without any events excluded from performance data Orange cells show the TNSP's performance outcomes with events excluded from performance data
ElectraNet - Revenue Calculation
X-factor from AER final decision
Revenue cap information
2008-09 to
2009-10
Base year allowed revenue
(2008-09) $284,000,000
Base year 2013–14
X-factor -2.99%
Commencement of regulatory
period 1-Jul-13
Annual revenue adjusted for
CPI Mar-13 Mar-14 Mar-15 Mar-16 Mar-17 Mar-18
CPI 102.4 105.4 - - - -
Nominal annual revenue 2013-14 2014-15 2015-16 2016-17 2017-18
Allowed Revenue $284,000,000 $301,060,690
Calendar year revenue 2H 2013 2014 2015 2016 2017 2018
Revenue $142,000,000 $292,530,345
NOTE: This sheet will automatically update based on data on input sheets. Grey cells show calendar year revenue Green cells are for formula
ElectraNet - Performance outcomes
Revenue calendar year $292,530,345
Performance S-Factor Final Incentive Performance S-Factor Final Incentive
S1 Total transmission circuit availability 99.52% 99.143041% -0.226175% -$661,632 99.602450% 0.154594% $452,235 0.380770%
S2 Critical circuit availability – peak 99.12% 99.221130% 0.012039% $35,219 99.555676% 0.051866% $151,724 0.039827%
S3 Critical circuit availability – non-peak (zero weighting) 99.37% 99.508289% 0.000000% $0 99.697604% 0.000000% $0 0.000000%
S4 Loss of supply event frequency ( >0.05 system minutes ) 7 6 0.066667% $195,020 4 0.200000% $585,061 0.133333%
S5 Loss of supply event frequency ( >0.2 system minutes ) 2 1 0.100000% $292,530 1 0.100000% $292,530 0.000000%
S6 Average outage duration (minutes) 203.2 181 0.036710% $107,388 131 0.120824% $353,445 0.084113%
TOTALS -0.010759% -$31,474 0.627284% $1,834,996 0.638043%
Aggregate outcome
S-factor 0.627284%
Financial Incentive $1,834,996
Financial year affected by financial incentive 2015/16
S
Performance with exclusionsImpact of
exclusions Performance parameter Target
Performance without exclusions
NOTE: This sheet will automatically update based on data in input sheets. Grey cell shows relevant calendar year revenue Green cells show performance measure targets Pink cells show performance, s-factor results and financial incentive without exclusions Orange cells show performance, s-factor results and financial incentive with exclusions Blue cells show the impact of exclusions on revenue