Temp Crane Study at Module 1

Embed Size (px)

Citation preview

  • 8/16/2019 Temp Crane Study at Module 1

    1/5

    Overall module 1 condition as shown below :

     

    Module 1 

    Module 1 skid beam 

  • 8/16/2019 Temp Crane Study at Module 1

    2/5

    Bekok C Platform Layout : 

    Assumption made in this study : 

    1) 

    Crane load

     (weight

     plus

     lifting

     object

     = 50

     tonnes)

     in

     vertical

     direction

     only,

     no

     moment

     loads

     in

     

    consideration 

    2)  This structural simulation was based on “non‐drilling condition” 

    Preliminary study results : 

    1)  Crane position B is best location for handling material in platform west side. However, 

    strengthening (one vertical column) is required as indicated. 

    2)  Crane position C is close to existing piping (MOPU tie‐in area) crossing wellhead module and 

    current MOPU

     position.

     

    3) 

    Crane position A is quite far/should crossing module 5 wall to reach new electrical room. 

    Furthermore, it is  just close to existing well slots. 

    Structure hard points 

    B C 

  • 8/16/2019 Temp Crane Study at Module 1

    3/5

    Analysis result based on proposed temporary crane position A : 

  • 8/16/2019 Temp Crane Study at Module 1

    4/5

    Analysis result based on proposed temporary crane position B : 

  • 8/16/2019 Temp Crane Study at Module 1

    5/5

    Analysis result based on proposed temporary crane position C :