24
CONTROL BUILDING - SHEAR WALL ALONG GRID Aa TEMPERATURE REINFORCEMENT CALCULATIONS WALL L B H Size of the wall(m) = 11.8 0.8 1.9 Thickness of the pour(H') = 1.9 Volume of concrete(V) = 17.94 Exposed surface area(A) = 57.32 Volume/EX. Sur. Area(V/A) = 0.313 m = 1.03 feet Effective V/S = 1.75 feet = 103.0 (from charts) (Fig-2) of Report on Concrete placement temperature and pour thickness TAPP-3&4/TCE-2191/DR/CV/24000/16 Cement content = 360 CALCULATION OF DESIGN TEMP DIFFERENCE Placement temp assumed = 29 Elastic modulus of rock(Ef) = 4990000 psi Grade of concrete = 25 Elastic modulus of concrete(Ec = 28500 Mpa = 4132500 psi multiplier(m) = = 0.751 L/H = 6.21 >2.5 = = for L/H>=2.5 Height of the pour from bottom = 1.9 = 0.32 = 0.241 m 3 m 2 Design temp difference(TE) o F Kg/m 3 o C 1/(1+(AgEc/AfEf) Effective degree of restraint(K mKR KR ((L/H-2)/(L/H+1)) h/H KR KRE

TEMP ACI

Embed Size (px)

DESCRIPTION

temperature calculation

Citation preview

Page 1: TEMP ACI

CONTROL BUILDING - SHEAR WALL ALONG GRID Aa

TEMPERATURE REINFORCEMENT CALCULATIONS

WALL

L B HSize of the wall(m) = 11.8 0.8 1.9

Thickness of the pour(H') = 1.9

Volume of concrete(V) = 17.94

Exposed surface area(A) = 57.32

Volume/EX. Sur. Area(V/A) = 0.313 m

= 1.03 feet

Effective V/S = 1.75 feet

= 103.0 (from charts)(Fig-2) of Report on Concrete placement temperature and pour thicknessTAPP-3&4/TCE-2191/DR/CV/24000/16

Cement content = 360

CALCULATION OF DESIGN TEMP DIFFERENCE

Placement temp assumed = 29

Elastic modulus of rock(Ef) = 4990000 psi

Grade of concrete = M 25

Elastic modulus of concrete(Ec) = 28500 Mpa

= 4132500 psi

multiplier(m) =

= 0.751

L/H = 6.21 >2.5

=

= for L/H>=2.5

Height of the pour from bottom(h) = 1.9

= 0.32

= 0.241

m3

m2

Design temp difference(TE) oF

Kg/m3

oC

1/(1+(AgEc/AfEf)

Effective degree of restraint(Ke) mKR

KR ((L/H-2)/(L/H+1))h/H

KR

KRE

Page 2: TEMP ACI

Allowable temp difference =

= 117.67

PHYSICAL PROPERTIES OF CONCRETE

=

= 323.11 psi

Co-eff of thermal expansion = 0.00000528

Crack-width factor = 0.004

clear cover = 50

Allowable crack width(w) = 0.2 mm

= 0.0079 inches

CALCULATION OF REINFORCEMENT

Dia of bar used = 36 mm

= 68 mm

= 2.68 inches

spacing of bars = 140.00 mm

Spacing of bars = 5.512 inches

Effective conc area aroundeach bar(A) = 29.51 sq, inches

for limiting value of crack width of 0.0079 instress in reinforcement

=

= 24144.85 psi

Average crack spacing(L') =

f't/Ec = 0.00015 (for Seasonal Cracking)

= -23.403 ft

L'/2H' = -1.877

B(Width of RC element) = 12 inches

Reqd area of steel(Ab) = 0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')

28.41/KRE

oF

Tensile strength(f's) 6 x sqrt(fc)

/oF

Effective cover(dc)

fs w x 106/(0.076 x (dcA)1/3) (psi)

w/18(KRECTTE-f't/Ec)

Page 3: TEMP ACI

H' is thickness of pour

NB = No of bars in width B

= 2.177

Temp Renf as per calculations = 3.2920 sq.in per given spacing of 5.512 inches

= 75.93 cm2/m

Min renf = 9.11(cl.6.4.4 of Report on concrete placement temperature and pour thickness TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)

flexure renf from output = 1.66%

cm2/m

(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)

Page 4: TEMP ACI

TEMPERATURE REINFORCEMENT CALCULATIONS

FOOTING NO

L B HSize of the footing/raft(m) = 32.1 15.7 2.25

Thickness of the pour(H') = 1.325

Volume of concrete(V) =

Exposed surface area(A) =

Volume/EX. Sur. Area(V/A) = 1.325 m

= 4.35 feet

Effective V/S = 7.40 feet

= 110.0 (from charts)(Fig-2) of Report on Concrete placement temperature and pour thicknessTAPP-3&4/TCE-2191/DR/CV/24000/16

Cement content = 360

CALCULATION OF DESIGN TEMP DIFFERENCE

Placement temp assumed = 23

Elastic modulus of rock(Ef) = 4990000 psi

Grade of concrete = M 25

Elastic modulus of concrete(Ec) = 28500 Mpa

= 4132500 psi

multiplier(m) =

= 0.751

L/H = 14.27 >2.5

=

= for L/H>=2.5

Height of the pour from bottom(h) = 2.25

= 0.80

= 0.604

Allowable temp difference =

m3

m2

Design temp difference(TE) oF

Kg/m3

oC

1/(1+(AgEc/AfEf)

Effective degree of restraint(Ke) mKR

KR ((L/H-2)/(L/H+1))h/H

KR

KRE

28.41/KRE

Page 5: TEMP ACI

= 47.07

PHYSICAL PROPERTIES OF CONCRETE

=

= 323.11 psi

Co-eff of thermal expansion = 0.00000528

Crack-width factor = 0.004

clear cover = 75

Allowable crack width(w) = 0.3 mm

= 0.0118 inches

CALCULATION OF REINFORCEMENT

Dia of bar used = 36 mm

= 93 mm

= 3.66 inches

spacing of bars = 225.00 mm

Spacing of bars = 8.858 inches

Effective conc area aroundeach bar(A) = 64.87 sq, inches

for limiting value of crack width of 0.0118 instress in reinforcement

=

= 25094.67 psi

Average crack spacing(L') =

f't/Ec = 0.00015 (for Seasonal Cracking)

= 3.272 ft

L'/2H' = 0.376

B(Width of RC element) = 12 inches

Reqd area of steel(Ab) = 0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')

H' is thickness of pour

oF

Tensile strength(f's) 6 x sqrt(fc)

/oF

Effective cover(dc)

fs w x 106/(0.076 x (dcA)1/3) (psi)

w/18(KRECTTE-f't/Ec)

Page 6: TEMP ACI

NB = No of bars in width B

= 1.355

Temp Renf as per calculations = 0.7980 sq.in per given spacing of 8.858 inches

= 22.90 cm2/m

Min renf = 23.97(cl.6.4.4 of Report on concrete placement temperature and pour thickness TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)

flexure renf from output = 32.17

Total renf reqd = 56.14

cm2/m

(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)

cm2/m

cm2/m

Page 7: TEMP ACI

TEMPERATURE REINFORCEMENT CALCULATIONS

FOOTING NO

L B HSize of the footing/raft(m) = 32.1 15.7 2.25

Thickness of the pour(H') = 1.325

Volume of concrete(V) =

Exposed surface area(A) =

Volume/EX. Sur. Area(V/A) = 1.325 m

= 4.35 feet

Effective V/S = 7.40 feet

= 97.0 (from charts)(Fig-2) of Report on Concrete placement temperature and pour thicknessTAPP-3&4/TCE-2191/DR/CV/24000/16

Cement content = 360

CALCULATION OF DESIGN TEMP DIFFERENCE

Placement temp assumed = 19

Elastic modulus of rock(Ef) = 4990000 psi

Grade of concrete = M 25

Elastic modulus of concrete(Ec) = 28500 Mpa

= 4132500 psi

multiplier(m) =

= 0.751

L/H = 14.27 >2.5

=

= for L/H>=2.5

Height of the pour from bottom(h) = 2.25

= 0.80

= 0.604

Allowable temp difference =

m3

m2

Design temp difference(TE) oF

Kg/m3

oC

1/(1+(AgEc/AfEf)

Effective degree of restraint(Ke) mKR

KR ((L/H-2)/(L/H+1))h/H

KR

KRE

28.41/KRE

Page 8: TEMP ACI

= 47.07

PHYSICAL PROPERTIES OF CONCRETE

=

= 323.11 psi

Co-eff of thermal expansion = 0.00000528

Crack-width factor = 0.004

clear cover = 75

Allowable crack width(w) = 0.3 mm

= 0.0118 inches

CALCULATION OF REINFORCEMENT

Dia of bar used = 36 mm

= 93 mm

= 3.66 inches

spacing of bars = 225.00 mm

Spacing of bars = 8.858 inches

Effective conc area aroundeach bar(A) = 64.87 sq, inches

for limiting value of crack width of 0.0118 instress in reinforcement

=

= 25094.67 psi

Average crack spacing(L') =

f't/Ec = 0.00015 (for Seasonal Cracking)

= 4.124 ft

L'/2H' = 0.474

B(Width of RC element) = 12 inches

Reqd area of steel(Ab) = 0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')

H' is thickness of pour

oF

Tensile strength(f's) 6 x sqrt(fc)

/oF

Effective cover(dc)

fs w x 106/(0.076 x (dcA)1/3) (psi)

w/18(KRECTTE-f't/Ec)

Page 9: TEMP ACI

NB = No of bars in width B

= 1.355

Temp Renf as per calculations = 0.6726 sq.in per given spacing of 8.858 inches

= 19.31 cm2/m

Min renf = 23.97(cl.6.4.4 of Report on concrete placement temperature and pour thickness TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)

flexure renf from output = 32.17

Total renf reqd = 56.14

cm2/m

(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)

cm2/m

cm2/m

Page 10: TEMP ACI

TEMPERATURE REINFORCEMENT CALCULATIONS

FOOTING NO

L B HSize of the footing/raft(m) = 32.1 15.7 2.25

Thickness of the pour(H') = 1.325

Volume of concrete(V) =

Exposed surface area(A) =

Volume/EX. Sur. Area(V/A) = 1.325 m

= 4.35 feet

Effective V/S = 7.40 feet

= 133.0 (from charts)(Fig-2) of Report on Concrete placement temperature and pour thicknessTAPP-3&4/TCE-2191/DR/CV/24000/16

Cement content = 360

CALCULATION OF DESIGN TEMP DIFFERENCE

Placement temp assumed = 29

Elastic modulus of rock(Ef) = 4990000 psi

Grade of concrete = M 25

Elastic modulus of concrete(Ec) = 28500 Mpa

= 4132500 psi

multiplier(m) =

= 0.751

L/H = 14.27 >2.5

=

= for L/H>=2.5

Height of the pour from bottom(h) = 2.25

= 0.80

= 0.604

Allowable temp difference =

m3

m2

Design temp difference(TE) oF

Kg/m3

oC

1/(1+(AgEc/AfEf)

Effective degree of restraint(Ke) mKR

KR ((L/H-2)/(L/H+1))h/H

KR

KRE

28.41/KRE

Page 11: TEMP ACI

= 47.07

PHYSICAL PROPERTIES OF CONCRETE

=

= 323.11 psi

Co-eff of thermal expansion = 0.00000528

Crack-width factor = 0.005

clear cover = 75

Allowable crack width(w) = 0.375 mm

= 0.0148 inches

CALCULATION OF REINFORCEMENT

Dia of bar used = 36 mm

= 93 mm

= 3.66 inches

spacing of bars = 225.00 mm

Spacing of bars = 8.858 inches

Effective conc area aroundeach bar(A) = 64.87 sq, inches

for limiting value of crack width of 0.0148 instress in reinforcement

=

= 31368.34 psi

Average crack spacing(L') =

f't/Ec = 0.00015 (for Seasonal Cracking)

= 2.995 ft

L'/2H' = 0.345

B(Width of RC element) = 12 inches

Reqd area of steel(Ab) = 0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')

H' is thickness of pour

oF

Tensile strength(f's) 6 x sqrt(fc)

/oF

Effective cover(dc)

fs w x 106/(0.076 x (dcA)1/3) (psi)

w/18(KRECTTE-f't/Ec)

Page 12: TEMP ACI

NB = No of bars in width B

= 1.355

Temp Renf as per calculations = 0.6710 sq.in per given spacing of 8.858 inches

= 19.26 cm2/m

Min renf = 19.18(cl.6.4.4 of Report on concrete placement temperature and pour thickness TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)

flexure renf from output = 32.17

Total renf reqd = 51.43

cm2/m

(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)

cm2/m

cm2/m

Page 13: TEMP ACI

TEMPERATURE REINFORCEMENT CALCULATIONS

FOOTING NO

L B HSize of the footing/raft(m) = 32.1 15.7 2.25

Thickness of the pour(H') = 1.325

Volume of concrete(V) =

Exposed surface area(A) =

Volume/EX. Sur. Area(V/A) = 1.325 m

= 4.35 feet

Effective V/S = 7.40 feet

= 110.0 (from charts)(Fig-2) of Report on Concrete placement temperature and pour thicknessTAPP-3&4/TCE-2191/DR/CV/24000/16

Cement content = 360

CALCULATION OF DESIGN TEMP DIFFERENCE

Placement temp assumed = 23

Elastic modulus of rock(Ef) = 4990000 psi

Grade of concrete = M 25

Elastic modulus of concrete(Ec) = 28500 Mpa

= 4132500 psi

multiplier(m) =

= 0.751

L/H = 14.27 >2.5

=

= for L/H>=2.5

Height of the pour from bottom(h) = 2.25

= 0.80

= 0.604

Allowable temp difference =

m3

m2

Design temp difference(TE) oF

Kg/m3

oC

1/(1+(AgEc/AfEf)

Effective degree of restraint(Ke) mKR

KR ((L/H-2)/(L/H+1))h/H

KR

KRE

28.41/KRE

Page 14: TEMP ACI

= 47.07

PHYSICAL PROPERTIES OF CONCRETE

=

= 323.11 psi

Co-eff of thermal expansion = 0.00000528

Crack-width factor = 0.005

clear cover = 75

Allowable crack width(w) = 0.375 mm

= 0.0148 inches

CALCULATION OF REINFORCEMENT

Dia of bar used = 36 mm

= 93 mm

= 3.66 inches

spacing of bars = 225.00 mm

Spacing of bars = 8.858 inches

Effective conc area aroundeach bar(A) = 64.87 sq, inches

for limiting value of crack width of 0.0148 instress in reinforcement

=

= 31368.34 psi

Average crack spacing(L') =

f't/Ec = 0.00015 (for Seasonal Cracking)

= 4.090 ft

L'/2H' = 0.470

B(Width of RC element) = 12 inches

Reqd area of steel(Ab) = 0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')

H' is thickness of pour

oF

Tensile strength(f's) 6 x sqrt(fc)

/oF

Effective cover(dc)

fs w x 106/(0.076 x (dcA)1/3) (psi)

w/18(KRECTTE-f't/Ec)

Page 15: TEMP ACI

NB = No of bars in width B

= 1.355

Temp Renf as per calculations = 0.5421 sq.in per given spacing of 8.858 inches

= 15.56 cm2/m

Min renf = 19.18(cl.6.4.4 of Report on concrete placement temperature and pour thickness TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)

flexure renf from output = 32.17

Total renf reqd = 51.35

cm2/m

(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)

cm2/m

cm2/m

Page 16: TEMP ACI

TEMPERATURE REINFORCEMENT CALCULATIONS

FOOTING NO

L B HSize of the footing/raft(m) = 32.1 15.7 2.25

Thickness of the pour(H') = 1.325

Volume of concrete(V) =

Exposed surface area(A) =

Volume/EX. Sur. Area(V/A) = 1.325 m

= 4.35 feet

Effective V/S = 7.40 feet

= 97.0 (from charts)(Fig-2) of Report on Concrete placement temperature and pour thicknessTAPP-3&4/TCE-2191/DR/CV/24000/16

Cement content = 360

CALCULATION OF DESIGN TEMP DIFFERENCE

Placement temp assumed = 19

Elastic modulus of rock(Ef) = 4990000 psi

Grade of concrete = M 25

Elastic modulus of concrete(Ec) = 28500 Mpa

= 4132500 psi

multiplier(m) =

= 0.751

L/H = 14.27 >2.5

=

= for L/H>=2.5

Height of the pour from bottom(h) = 2.25

= 0.80

= 0.604

Allowable temp difference =

m3

m2

Design temp difference(TE) oF

Kg/m3

oC

1/(1+(AgEc/AfEf)

Effective degree of restraint(Ke) mKR

KR ((L/H-2)/(L/H+1))h/H

KR

KRE

28.41/KRE

Page 17: TEMP ACI

= 47.07

PHYSICAL PROPERTIES OF CONCRETE

=

= 323.11 psi

Co-eff of thermal expansion = 0.00000528

Crack-width factor = 0.005

clear cover = 75

Allowable crack width(w) = 0.375 mm

= 0.0148 inches

CALCULATION OF REINFORCEMENT

Dia of bar used = 36 mm

= 93 mm

= 3.66 inches

spacing of bars = 225.00 mm

Spacing of bars = 8.858 inches

Effective conc area aroundeach bar(A) = 64.87 sq, inches

for limiting value of crack width of 0.0148 instress in reinforcement

=

= 31368.34 psi

Average crack spacing(L') =

f't/Ec = 0.00015 (for Seasonal Cracking)

= 5.155 ft

L'/2H' = 0.593

B(Width of RC element) = 12 inches

Reqd area of steel(Ab) = 0.2f't/fs(1-L'/2H')(BH')/(NB(H'-dc)H')

H' is thickness of pour

oF

Tensile strength(f's) 6 x sqrt(fc)

/oF

Effective cover(dc)

fs w x 106/(0.076 x (dcA)1/3) (psi)

w/18(KRECTTE-f't/Ec)

Page 18: TEMP ACI

NB = No of bars in width B

= 1.355

Temp Renf as per calculations = 0.4167 sq.in per given spacing of 8.858 inches

= 11.96 cm2/m

Min renf = 19.18(cl.6.4.4 of Report on concrete placement temperature and pour thickness TAPP-3&4/TCE-2191/DR/CV/24000/16 SH 19 OF 22)

flexure renf from output = 32.17

Total renf reqd = 51.35

cm2/m

(if depth<48 in, 0.12% of gross c/s area of section; if depth>48 in, (f't/fs) A or A/100)

cm2/m

cm2/m