    BUSINESS BLUEPRINT ADDENDUM

    MATERIALS MANAGEMENT (MM)

    Release Version: V1.0

    Document Changed: 23 May 2013

    Client: Tel.One

    Document Number: MM -002

  • 7/30/2019 TelOne MM Addendum

    2/6

    Blueprint Addendum Materials Management

    DOCUMENT APPROVAL SHEET

    The signatures below signify acceptance by all parties of the terms and conditions as

    stipulated in this document.

    AGREED AND ACCEPTED:

    For Client:

    Name: Mr. D Muyambo Name: Mr. B Kazengura

    Position: Project Director Position: Project Manager

    Signature: Signature:

    Date: Date:

    Name: Mr. B Zvinavashe

    Position: Team Leader

    Signature:

    Date:

    For Twenty Third Century Systems:

    Name: Mr. A Marufu Name: Mrs. E Sahondo

    Position: Project Director Position: Project Manager

    Signature: Signature:

    Date: Date:

    Name: Miss. T Zhande

    Position: Team Leader

    Signature

    Date:

    Page 2 of6

  • 7/30/2019 TelOne MM Addendum

    3/6

    Blueprint Addendum Materials Management

    DOCUMENT HISTORY

    Document History

    Version State / ChangesDate (dd.mm.yyyy) /

    Author

    1.0 Initial version 13.05.2009/TafadzwaZhande

    Page 3 of6

  • 7/30/2019 TelOne MM Addendum

    4/6

    Blueprint Addendum Materials Management

    The following table elaborates the changes which have been done to the document

    version V1.0 to create the current version

    Page Changes12 -19 Organisational Structure:

    Split Lab Stores into 2 storage locations: Electro Mechanical Store and ElectronicComponents Store

    22 -23 Master Data:1. The following material groups were added under different Material Types:

    General: Added material group gas

    Apparatus: sockets, batteries, phone, VDU teleprinters, solder resins,

    Wooden apparatus, PCB cards

    Motor Spares: oils and lubricants, tune up kits, bulbs

    Tools: protective clothing, photocopier parts

    Overhead Lines: Base Plates, Insulators, Bow stay, stay rod

    2. Material Group 2000 was adjusted to faxcartridges

    3. Additional material groups for ElectroMechanical Stores:

    Iron Sheets

    Angle Irons

    Flat Bars Galvanised Sheets

    Metal Tubes

    Aluminium Sheets

    Steel Rods

    Mesh Wires

    Paints

    Lubricants

    Thinners

    Chemicals (PCB)

    Cleaning Materials

    Strawger Exchange Spares

    Bolts, nuts, washers

    Factory tools

    Electronic cards

    Switchboard Cables

    Exchange tools

    Exchange Installation brackets

    Electrical components

    Exchange Rakes

    Page 4 of6

  • 7/30/2019 TelOne MM Addendum

    5/6

    Blueprint Addendum Materials Management

    4. Additional material groups for Electronic Components Stores:

    Integrated circuits

    Transistors

    Diodes

    Resistors

    Terminal wires Connectors

    PCBs

    Telephone spares

    Coil winding spares

    PCB spares

    Volume control spares

    Rectifiers

    Laminations

    Transformer core

    Crystals

    Capacitors

    Terminal strips

    5. Materials Groups found in Radio & Carrier and Electronic Repair Centre are thesame as those found in Electronic Components Stores.

    28 Roles and Responsibilities: Chief BuyerThe following additional roles and responsibilities were added for thechief buyer

    Select suppliers and create request for quotations.

    Prepare comparative schedules and evaluation reports. Create, Change Vendors

    30 Business Process Master List:Added the following processes

    Create Service Master Record

    Processing a Purchase Requisition for a

    service item

    42 MM-02-01 Processing a Purchase Requisition for non-stock itemsProcess Steps Table Steps 5,6,7,8,9

    Add Chief Buyer

    51 MM-02-04 Request for Quotation and Vendor SelectionProcess Steps Table Steps 2,3,4,5,6For values up to 35 000USD quotations are dropped off in the competitive tenderbox. For quotations from 35000USD - 50000USD are dropped in the informaltender box and Quotations above 50000USD are dropped in the formal tenderbox.

    68 MM-03-02 Processing Goods Rejected VoucherProcess Steps Table Steps 2,3

    Stores sends the defective goods back to the supplier

    84 MM-03-08 Stock Take Variance Posting

    Page 5 of6

  • 7/30/2019 TelOne MM Addendum

    6/6

    Blueprint Addendum Materials Management

    Principles and Policies

    Stock Take team must carry out a comprehensive stock take that shows

    actual stock quantities in stock

    96 MM-04-02 Variation of Purchase Orders

    Process Steps Table Steps 3,4,5If there a variations between the Purchase Order and the invoice, the variation issent for approval first before being made to the Purchase order. These variationsmight affect the authorities that approve depending on the limits similar to those ofthe Business Process MM-02-04

    97 Integration PointsPurchasing

    delete FI Asset procurement

    101 ReportsFor the following reports there are additional columns of the item full description

    and the item key word: Stock Age analysis

    Fast/Slow/ Non-Moving stock

    Stock Usage/Consumption

    Stock Replenishment

    Page 6 of6