BUSINESS BLUEPRINT ADDENDUM
MATERIALS MANAGEMENT (MM)
Release Version: V1.0
Document Changed: 23 May 2013
Client: Tel.One
Document Number: MM -002
7/30/2019 TelOne MM Addendum
2/6
Blueprint Addendum Materials Management
DOCUMENT APPROVAL SHEET
The signatures below signify acceptance by all parties of the terms and conditions as
stipulated in this document.
AGREED AND ACCEPTED:
For Client:
Name: Mr. D Muyambo Name: Mr. B Kazengura
Position: Project Director Position: Project Manager
Signature: Signature:
Date: Date:
Name: Mr. B Zvinavashe
Position: Team Leader
Signature:
Date:
For Twenty Third Century Systems:
Name: Mr. A Marufu Name: Mrs. E Sahondo
Position: Project Director Position: Project Manager
Signature: Signature:
Date: Date:
Name: Miss. T Zhande
Position: Team Leader
Signature
Date:
Page 2 of6
7/30/2019 TelOne MM Addendum
3/6
Blueprint Addendum Materials Management
DOCUMENT HISTORY
Document History
Version State / ChangesDate (dd.mm.yyyy) /
Author
1.0 Initial version 13.05.2009/TafadzwaZhande
Page 3 of6
7/30/2019 TelOne MM Addendum
4/6
Blueprint Addendum Materials Management
The following table elaborates the changes which have been done to the document
version V1.0 to create the current version
Page Changes12 -19 Organisational Structure:
Split Lab Stores into 2 storage locations: Electro Mechanical Store and ElectronicComponents Store
22 -23 Master Data:1. The following material groups were added under different Material Types:
General: Added material group gas
Apparatus: sockets, batteries, phone, VDU teleprinters, solder resins,
Wooden apparatus, PCB cards
Motor Spares: oils and lubricants, tune up kits, bulbs
Tools: protective clothing, photocopier parts
Overhead Lines: Base Plates, Insulators, Bow stay, stay rod
2. Material Group 2000 was adjusted to faxcartridges
3. Additional material groups for ElectroMechanical Stores:
Iron Sheets
Angle Irons
Flat Bars Galvanised Sheets
Metal Tubes
Aluminium Sheets
Steel Rods
Mesh Wires
Paints
Lubricants
Thinners
Chemicals (PCB)
Cleaning Materials
Strawger Exchange Spares
Bolts, nuts, washers
Factory tools
Electronic cards
Switchboard Cables
Exchange tools
Exchange Installation brackets
Electrical components
Exchange Rakes
Page 4 of6
7/30/2019 TelOne MM Addendum
5/6
Blueprint Addendum Materials Management
4. Additional material groups for Electronic Components Stores:
Integrated circuits
Transistors
Diodes
Resistors
Terminal wires Connectors
PCBs
Telephone spares
Coil winding spares
PCB spares
Volume control spares
Rectifiers
Laminations
Transformer core
Crystals
Capacitors
Terminal strips
5. Materials Groups found in Radio & Carrier and Electronic Repair Centre are thesame as those found in Electronic Components Stores.
28 Roles and Responsibilities: Chief BuyerThe following additional roles and responsibilities were added for thechief buyer
Select suppliers and create request for quotations.
Prepare comparative schedules and evaluation reports. Create, Change Vendors
30 Business Process Master List:Added the following processes
Create Service Master Record
Processing a Purchase Requisition for a
service item
42 MM-02-01 Processing a Purchase Requisition for non-stock itemsProcess Steps Table Steps 5,6,7,8,9
Add Chief Buyer
51 MM-02-04 Request for Quotation and Vendor SelectionProcess Steps Table Steps 2,3,4,5,6For values up to 35 000USD quotations are dropped off in the competitive tenderbox. For quotations from 35000USD - 50000USD are dropped in the informaltender box and Quotations above 50000USD are dropped in the formal tenderbox.
68 MM-03-02 Processing Goods Rejected VoucherProcess Steps Table Steps 2,3
Stores sends the defective goods back to the supplier
84 MM-03-08 Stock Take Variance Posting
Page 5 of6
7/30/2019 TelOne MM Addendum
6/6
Blueprint Addendum Materials Management
Principles and Policies
Stock Take team must carry out a comprehensive stock take that shows
actual stock quantities in stock
96 MM-04-02 Variation of Purchase Orders
Process Steps Table Steps 3,4,5If there a variations between the Purchase Order and the invoice, the variation issent for approval first before being made to the Purchase order. These variationsmight affect the authorities that approve depending on the limits similar to those ofthe Business Process MM-02-04
97 Integration PointsPurchasing
delete FI Asset procurement
101 ReportsFor the following reports there are additional columns of the item full description
and the item key word: Stock Age analysis
Fast/Slow/ Non-Moving stock
Stock Usage/Consumption
Stock Replenishment
Page 6 of6