12
1 Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller Village Energy Efficiency Program AEA VEEP Grant # 7520001 Administered by Alaska Building Science Network Teller Final Report Grant Amount: $150,000 Community Summary 9 community buildings and teacher housing units received energy efficient lighting, weatherization, and heating upgrades as follows: Community Hall, Traditional Council Office, Storage Building, New Clinic, Maintenance/BIA Teacher Housing Duplex, Teacher Housing 4-Plex, New Garage, School Bus Garage, Teacher Housing Duplex Retrofits Completed: November 2011 Village-Wide Energy Efficient Lighting, Weatherization and Heating Retrofit Summary: • Projected Annual Electrical Savings (kWh): 18,566 • Projected Annual Electrical Cost Savings: $11,435 1,2 • Projected Annual Heating Fuel Savings (gallons): 3,326 • Projected Annual Fuel Cost Savings: $15,898 3 • Total Projected Annual Energy Cost Savings: $27,333 • Total village wide In-kind contribution: $15,349 • Total project cost including In-kind contribution: $165,349 • Simple Payback (including In-kind contributions): 6.05 years 1 kWh Rate [used to calculate electrical cost savings] for Lighting Measures (State of AK - AEA PCE Program Report FY 2011 avg): $0.62 2 kWh Rate [used to calculate electrical cost savings] for Weatherization & Heating Measures (AkWarm Library): $0.62 3 #2 Heating Fuel Rate [used to calculate heating fuel savings] (AkWarm Library): $4.78/gal

Teller Final Report - akenergyauthority.org Final Report Grant Amount: $150,000 ... 7 Hours/day $245.74 36.34 $115.92 10 Hours/day $351.06 51.91 $165.60 500 Hours/year (Est.) $70.21

Embed Size (px)

Citation preview

1

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

Village Energy Efficiency ProgramAEA VEEP Grant # 7520001 Administered by Alaska Building Science Network

Teller Final ReportGrant Amount: $150,000

Community Summary

9 community buildings and teacher housing units received energy efficient lighting, weatherization, and heatingupgrades as follows: Community Hall, Traditional Council Office, Storage Building, New Clinic, Maintenance/BIATeacher Housing Duplex, Teacher Housing 4-Plex, New Garage, School Bus Garage, Teacher Housing Duplex

Retrofits Completed: November 2011

Village-Wide Energy Efficient Lighting, Weatherization and Heating Retrofit Summary:

• Projected Annual Electrical Savings (kWh): 18,566

• Projected Annual Electrical Cost Savings: $11,4351,2

• Projected Annual Heating Fuel Savings (gallons): 3,326

• Projected Annual Fuel Cost Savings: $15,8983

• Total Projected Annual Energy Cost Savings: $27,333

• Total village wide In-kind contribution: $15,349

• Total project cost including In-kind contribution: $165,349

• Simple Payback (including In-kind contributions): 6.05 years

1 kWh Rate [used to calculate electrical cost savings] for Lighting Measures (State of AK - AEA PCE Program Report FY 2011 avg): $0.622 kWh Rate [used to calculate electrical cost savings] for Weatherization & Heating Measures (AkWarm Library): $0.623 #2 Heating Fuel Rate [used to calculate heating fuel savings] (AkWarm Library): $4.78/gal

2

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

TELLER TRADITIONAL COUNCIL OWNED BUILDINGS

Traditional Council Office

Total Building Savings All Measures:

• Projected Annual Electrical Savings (kWh): 1,339• Projected Annual Electrical Cost Savings: $825

• Projected Annual Heating Fuel Savings (gallons): 118• Projected Annual Fuel Cost Savings: $564

• Total Projected Annual Energy Cost Savings: $1,389

Lighting Retrofit Summary:

Materials Installed QuantityFluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 26CFL-11 W 1

• Pre-retrofit energy use: 1.972 Kilowatts

• Post-retrofit energy use: 1.207 Kilowatts

• Energy savings projection: 0.765 Kilowatts

• Pre-retrofit to post retrofit energy reduction: 39%

• Estimated Annual Savings: kWh Saved: 1,339

Comparative ComparativeHours Per Day / Electrical Avoided Diesel Avoided Diesel

250 Days Per Year Savings Use (gal) Costs

4 Hours/day $471.16 69.67 $222.257 Hours/day $824.54 121.93 $388.9410 Hours/day $1,177.91 174.18 $555.64

1750 Hours/year (Est.) $824.54 121.93 $388.94

3

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

Traditional Council Office

Weatherization Retrofit Summary:

• Air sealed building to reduce air leakage.

• Annual energy savings projection: 118 gallons

• Estimated Annual Heating Fuel Cost Savings: $564

Storage Building

Lighting Retrofit Summary:

Materials Installed QuantityFluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 2CFL-14 W 1

• Pre-retrofit energy use: 0.243 Kilowatts

• Post-retrofit energy use: 0.106 Kilowatts

• Energy savings projection: 0.137 Kilowatts

• Pre-retrofit to post retrofit energy reduction: 56%

• Estimated Annual Savings: kWh Saved: 240

Comparative ComparativeHours Per Day / Electrical Avoided Diesel Avoided Diesel

250 Days Per Year Savings Use (gal) Costs

4 Hours/day $84.38 12.48 $39.807 Hours/day $147.66 21.84 $69.6510 Hours/day $210.95 31.19 $99.51

500 Hours/year (Est.) $42.19 6.24 $19.90

4

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

New Clinic

Lighting Retrofit Summary:

Materials Installed QuantityFluorescent 2-lamp existing electronic ballast, re-lamped with (2) 25 watt T8 lamps 31

• Pre-retrofit energy use: 3.720 Kilowatts

• Post-retrofit energy use: 1.426 Kilowatts

• Energy savings projection: 2.294 Kilowatts

• Pre-retrofit to post retrofit energy reduction: 62%

• Estimated Annual Savings: kWh Saved: 4,015

Comparative ComparativeHours Per Day / Electrical Avoided Diesel Avoided Diesel

250 Days Per Year Savings Use (gal) Costs

4 Hours/day $1,412.87 208.93 $666.477 Hours/day $2,472.53 365.62 $1,166.3310 Hours/day $3,532.19 522.31 $1,666.18

2000 Hours/year (Est.) $2,825.75 417.85 $1,332.94

5

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

CITY OF TELLER OWNED BUILDINGS

Community Hall

Weatherization/Heating Retrofit Summary:

• Installed R-21 batts to include Tyvek support and insulation protection to existing un-insulated floor.

• Installed new energy efficient boiler, energy efficient boiler controls, and programmable thermostats.

• Annual energy savings projection: 1,244 gallons

• Estimated Annual Heating Fuel Cost Savings: $5,946

6

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

BERING STRAITS SCHOOL DISTRICT OWNED BUILDINGS

Maintenance/BIA Teacher Housing Duplex

Total Building Savings All Measures:

• Projected Annual Electrical Savings (kWh): 3,444• Projected Annual Electrical Cost Savings: $2,121

• Projected Annual Heating Fuel Savings (gallons): 1,018• Projected Annual Fuel Cost Savings: $4,866

• Total Projected Annual Energy Cost Savings: $6,987

Lighting Retrofit Summary:

Materials Installed QuantityFluorescent 2 ft fixture, 2-lamp electronic ballast, (2) 17 watt T8 lamps 1Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 18Fluorescent 4-lamp electronic ballast, (4) 25 watt T8 lamps 4CFL-14 W 6CFL-19W 13CFL-23 W 2CFL-9 W 3

• Pre-retrofit energy use: 3.577 Kilowatts

• Post-retrofit energy use: 1.609 Kilowatts

• Energy savings projection: 1.968 Kilowatts

• Pre-retrofit to post retrofit energy reduction: 55%

• Estimated Annual Savings: kWh Saved: 3,444

Comparative ComparativeHours Per Day / Electrical Avoided Diesel Avoided Diesel

250 Days Per Year Savings Use (gal) Costs

4 Hours/day $1,212.09 179.23 $571.767 Hours/day $2,121.16 313.66 $1,000.5810 Hours/day $3,030.23 448.09 $1,429.40

1375 Hours/year (Est.) $1,666.63 246.45 $786.17

7

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

Maintenance/BIA Teacher Housing Duplex

Weatherization Retrofit Summary:

• Air sealed building to reduce air leakage.

• Insulate and seal rim joist with low expanding foam.

• Annual energy savings projection: 1,018 gallons

• Estimated Annual Heating Fuel Cost Savings: $4,866

Teacher Housing 4-PlexLighting Retrofit Summary:

Materials Installed QuantityFluorescent 2-lamp electronic ballast, (1) 25 watt T8 lamp 35Fluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 45Fluorescent 3-lamp electronic ballast, (3) 25 watt T8 lamps 1CFL-14 W 8CFL-19W 2CFL-9 W 19

• Pre-retrofit energy use: 7.713 Kilowatts• Post-retrofit energy use: 3.375 Kilowatts• Energy savings projection: 4.338 Kilowatts• Pre-retrofit to post retrofit energy reduction: 56%• Estimated Annual Savings: kWh Saved: 7,592

Comparative ComparativeHours Per Day / Electrical Avoided Diesel Avoided Diesel

250 Days Per Year Savings Use (gal) Costs

4 Hours/day $2,671.77 395.08 $1,260.317 Hours/day $4,675.60 691.39 $2,205.5510 Hours/day $6,679.44 987.70 $3,150.78

1375 Hours/year (Est.) $3,673.69 543.24 $1,732.93

8

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

Teacher Housing Duplex

Total Building Savings All Measures:

• Projected Annual Electrical Savings (kWh): 1,055• Projected Annual Electrical Cost Savings: $650

• Projected Annual Heating Fuel Savings (gallons): 905• Projected Annual Fuel Cost Savings: $4,326

• Total Projected Annual Energy Cost Savings: $4,976

Lighting Retrofit Summary:

Materials Installed QuantityFluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 2CFL-14 W 8CFL-19W 3CFL-23 W 2CFL-9 W 1

• Pre-retrofit energy use: 0.919 Kilowatts

• Post-retrofit energy use: 0.316 Kilowatts

• Energy savings projection: 0.603 Kilowatts

• Pre-retrofit to post retrofit energy reduction: 66%

• Estimated Annual Savings: kWh Saved: 1,055

Comparative ComparativeHours Per Day / Electrical Avoided Diesel Avoided Diesel

250 Days Per Year Savings Use (gal) Costs

4 Hours/day $371.39 54.92 $175.197 Hours/day $649.93 96.11 $306.5810 Hours/day $928.47 137.30 $437.97

1375 Hours/year (Est.) $510.66 75.51 $240.88

9

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

Teacher Housing Duplex

Weatherization/Heating Retrofit Summary:

• Installed new, low-mass, sealed combustion, modulating boiler and programmable thermostat controls only.

• Air sealed building to reduce air leakage.

• Annual energy savings projection: 905 gallons

• Estimated Annual Heating Fuel Cost Savings: $4,326

10

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

New Garage

Lighting Retrofit Summary:

Materials Installed QuantityCFL-14 W 6

• Pre-retrofit energy use: 0.360 Kilowatts

• Post-retrofit energy use: 0.084 Kilowatts

• Energy savings projection: 0.276 Kilowatts

• Pre-retrofit to post retrofit energy reduction: 77%

• Estimated Annual Savings: kWh Saved: 483

Comparative ComparativeHours Per Day / Electrical Avoided Diesel Avoided Diesel

250 Days Per Year Savings Use (gal) Costs

4 Hours/day $169.99 25.14 $80.197 Hours/day $297.48 43.99 $140.3310 Hours/day $424.97 62.84 $200.46

500 Hours/year (Est.) $84.99 12.57 $40.09

11

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

School Bus Garage

Lighting Retrofit Summary:

Materials Installed QuantityFluorescent 2-lamp electronic ballast, (2) 25 watt T8 lamps 6

• Pre-retrofit energy use: 0.504 Kilowatts

• Post-retrofit energy use: 0.276 Kilowatts

• Energy savings projection: 0.228 Kilowatts

• Pre-retrofit to post retrofit energy reduction: 45%

• Estimated Annual Savings: kWh Saved: 399

Comparative ComparativeHours Per Day / Electrical Avoided Diesel Avoided Diesel

250 Days Per Year Savings Use (gal) Costs

4 Hours/day $140.43 20.77 $66.247 Hours/day $245.74 36.34 $115.9210 Hours/day $351.06 51.91 $165.60

500 Hours/year (Est.) $70.21 10.38 $33.12

12

Alaska Building Science Network – Village Energy Efficiency Program – ’10-’12 Final Report – Teller

In-Kind Item DatesHoursContri-buted

HourlyWage

Value /Amount Notes

Staff time for project contact, introduction &review of intro materials 4 $20.00 $80.00 Number of entities x 1 hour each

Staff time for Attending teleconference 1 $20.00 $20.00 TC/IRAStaff time for Attending teleconference 1 $20.00 $20.00 City timeStaff time for Attending teleconference 1 $20.00 $20.00 Village Corp timeStaff time for Attending teleconference 2 $20.00 $40.00 School time

Maint. Staff time to accompany Field Manageron building assessment

10/18 -10/21/10 3 $20.00 $60.00 City staff time during 1st site vistit

Maint. Staff time to accompany Field Manageron building assessment

10/18 -10/21/10 1 $20.00 $20.00 Tribal staff time during 1st site vistit

Maint. Staff time to accompany Field Manageron building assessment

10/18 -10/21/10 4 $20.00 $80.00 School staff time during 1st site vistit

Conservative village office administrative percentageof total project cost less ABSN Admin %. Total projectcost = $180,300/village - (our admin percentage,(around 14%) Approx: $25,242) = $155,058 x 4% =$6,202.32 (this 4% village admin cost estimate is spreadacross all entities we work with for the course of thegrant for completing all energy efficiency measures).These are for cumulative, otherwise unaccounted timeexpense for village-based project support.

Aug '10through '12 $6,202.32

Each time we call, email, or fax a village entity, someonereceives the communication, reviews and/or forwards theinformation, follows-up on requests, etc. Whether it is to set-up a teleconference, verify maintenance staff participation inlighting or boiler trainings, set-up in-kind lodging andtransportation, lighting trainings, track a shipment, verifycompletion of lighting in a given building, ship lamps andballasts out of the village for recycling, request a laborreimbursement agreement, or invoice etc. Village expenses forphone charges, copying and fax costs, office supplies, etc. arepart of this amount.

Lodging for ABSN Field Managers 10/18-10/21/10 $420.00 Lodging for Matt & Dan at BSSD school - 3 nights

x 2 people x $70 each

Transportation and fuel costs 10/19-10/21/10 $100.00 4-wheeler rental from Teller Traditional Council -

2 days @ $50/day

Lodging for ABSN Field Managers $560.00 2nd site visit, Lodging at BSSD school - 4 nights x2 people x $70 each

Transportation and fuel costs $250.00 2nd site visit, 4-wheeler from City of Teller - 5days x $50

Transportation and fuel costs 3/28-4/1/11 $200.00 Use of BSSD school truck - 5 daysJerry Okbaok - Taxes, Workers Comp, Etc. July 2011 $40.00 Teller Traditional Council, Wx UpgradesJohn Okleasik - Taxes, Workers Comp, Etc. July 2011 $45.01 Teller Traditional Council, Wx UpgradesReuben Topkok - Taxes, Workers Comp, Etc. July 2011 $61.20 City Of Teller, Wx UpgradesCarlson Tingook - Taxes, Workers Comp, Etc. July 2011 $51.64 City Of Teller, Wx UpgradesJerry Okbaok - Taxes, Workers Comp, Etc. July 2011 $22.95 City Of Teller, Wx UpgradesJohn Okleasik - Taxes, Workers Comp, Etc. July 2011 $22.95 City Of Teller, Wx UpgradesRany Olanna - Taxes, Workers Comp, Etc. July 2011 $60.25 City Of Teller, Wx UpgradesReggie Ongtowasruk - Labor Wages (inclpayroll expenses) July 2011 30 $25.35 $760.50 Teller School, Wx Upgrades

Jonathan Kakaruk - Labor Wages (incl payrollexpenses) July 2011 30 $37.43 $1,122.90 Teller School, Wx Upgrades

Jerry Okbaok - Taxes, Workers Comp, Etc. 3/29-4/1/11 $60.00 Teller Traditional Council, Lighting UpgradesJohn Okleasik - Taxes, Workers Comp, Etc. 3/29-4/1/11 $60.00 Teller Traditional Council, Lighting UpgradesJN Neayuk A Ahvakana - Labor Wages 3/29-4/1/11 32 $17.61 $563.52 Teller School, Lighting UpgradesReggie Ongtowasruk - Labor Wages 3/29-4/1/11 31 $35.73 $1,107.63 Teller School, Lighting UpgradesJonathan Kakaruk - Labor Wages 3/29-4/1/11 32 $24.18 $773.76 Teller School, Lighting Upgrades

Additional In-kind Estimated Aug '10through '12 $2,525.00 All entities - estimated additional in-kind valuation

TOTAL $15,349.63

Teller, In-Kind Contribution Tracking Record - ABSN Energy Efficiency Projects: