19
E-183, SECTOR 63, NOIDA, U.P., Distt : GAUTAM BUDH NAGAR – 201301 INDIA +91120-4345549, +91 120-4226549, +91 9810157703 FAX – +91120-2511025 E.MAIL : [email protected], [email protected] WEB : www.telecon-systems.com

TELECON SYSTEMS CUSTOMISED INSTRUMENTATIONS, …img.tradeindia.com/fm/1406817/telecon.pdfS No CUSTOMER / PROJECT CONSULTANT VALUE (INR) in 00,000 YEAR OF COMPLETION REMARKS 1 SVC SUPERCHEM

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • E-183, SECTOR 63, NOIDA, U.P., Distt : GAUTAM BUDH NAGAR – 201301 INDIA +91120-4345549, +91 120-4226549, +91 9810157703 FAX – +91120-2511025 E.MAIL : [email protected], [email protected]

    WEB : www.telecon-systems.com

    mailto:[email protected]:[email protected]

  • ▸ CUSTOM BUILT ELECTRICAL & INSTRUMENTATION PACKAGES ON TURNKEY BASIS

    ▸ PLC BASED CONTROL SYSTEMS / SCADA / DATA TRANSMISSION SERVICES

    ▸ INSTALLATION & COMMISSIONING SERVICES▸ CALIBRATION CONFORMING TO ISO 9000 / NABL NORMS▸ ACCREDITION TO NABL _ APPLIED▸ DETAILED / RESIDUAL ENGINEERING▸ CONTROL PANEL SUPPLY, INSTALLATION, SERVICING & REPAIR▸ INTEGRATION OF TELEMETRY OUTPUT DATA WITH SCADA SYSTEMS▸ INSTRUMENTATION MAINTENANCE CONTRACTS

  • S No CUSTOMER / PROJECT CONSULTANT VALUE (INR)in 00,000

    YEAR OF COMPLETION

    REMARKS

    1 SVC SUPERCHEM IND LTD(a) PTA PLANT (b) HOT FURNACE OIL( C) CAPTIVE POWER PLANT

    • TATA CONSLT ENGG.

    92.00 1994-98

    2 PUNJ LLOYD LTDGas Processing Facility -OIL INDIA LTD-JAISALMER

    Triune Projects 34.45 1995-98

    3 PUNJ LLOYD LTDSulphur recovery unit – IOCL Mathura

    E.I.L. 31.00 1999

    4 RELIANCE INDUSTRIES LTD –L&T ECC JAMNAGAR Instrumentation & Electrical installation for Alkylation Plant & CPP

    Bechtel 222.50 2010

    5 HMEL REFINERY / L&T ECC– BATHINDAInstrumentation installation & commissioning for FCC Plant

    EIL 105.00 2012 .

  • S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS

    YEAR OF COMPLETION

    REMARKS

    6 INDIAN OIL TANKAGES LIMITED, NAVI MUMBAI / BIRLA TECHNICAL SERVICESInstrumentation & Automation for Tankages in JNPT

    EIL 38.95 2004

    7 INDIAN OIL CORPORATION LIMITED, NAPTHA CRACKER COMPLEX, PANIPAT / NAFTOGAZ INDIA LIMITEDInstrumentation & Electrical Installation & Commissioning for Off sites & Utilities

    EIL 92.00 2011

    8 INDIAN OIL CORPORATION LIMITED, NAPTHA CRACKER COMPLEX, PANIPAT /Nicco Corporation LimitedInstrumentation Installation & Commissioning for Effluent treatment plant

    EIL 41.00 2011

    9 Corrtech International Limited / Gas Pipe Line Project of GAIL & IOCLInstrumentation Installation & Commissioning for Gas Pipeline & Compressor Station

    34.45 2011

    10 Bharat Petroleum Corporation Limited, Kochi/ L&T CAD, MumbaiInstrumentation Installation & Commissioning of Propane Recovery Unit

    EIL 70.00 2010

  • S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS

    YEAR OF COMPLETION

    REMARKS

    11 Hindustan Petrochemical Industries Limited, Mumbai / BHPV LimitedInstrumentation Installation & Commissioning for Steam Generator Package

    EIL 67.00 2009

    12 KOA Limited / KSS Engineering (I) LimitedProviding supervising engineers for Electrical & Instrumentation for Installation & Commissioning services at Kazak Oil Company – Gas Compressor Station

    120.00 2012

    13 SRF LIMITED, BHIWADIInstrumentation Installation jobs for HFCL Plant

    68.00 2009

    14 GAIL (I) Limited, VIJAIPURInstrument and electrical Installation & Commissioning works for Rail Gantry

    30.00 2003

    15 Indian Oil Corporation Limited/ L&T CAD, MumbaiInstrument Installation & Commissioning jobs for Piyala & Bijwasan Terminals

    35.00 2009

  • S No PROJECT / CUSTOMER CONSULTANTS VALUE (Rs.) in Lacs

    YEAR OF COMPLETION

    REMARKS

    16 Indian Oil Corporation Limited/ L&T CAD, MumbaiInstrument Installation & Commissioning jobs for Piyala & Bijwasan Terminals

    55.00 2009

    17 EGYPT – NORTH BAHARIYA PETROCHEMICAL Co./ TYCO THERMAL CONTROLS, BELGIUMDesign, supply, installation & commissioning of Instrumentation for Gas Separators

    344,000 (euro) 2007

    18 SUDAN – PETRODAR OPERATING Co./ TYCO THERMAL CONTROLS, BELGIUMDesign, supply, installation & commissioning of Instrumentation for Chemicals injection skids

    186,000 (EURO)

    2008

    19 EGYPT – QARUN PETROCHEMICALS LTD. / TYCO THERMAL CONTROLS, BELGIUMa.Design, supply, installation & commissioning of Instrumentation for Chemical injection skidsb.Design, supply, installation & commissioning of Instrumentation for Test separator skids

    195,760 (EURO)

    2008

  • S No PROJECT / CUSTOMER CONSULTANTS YEAR OF COMPLETION

    VALUE (Euro) REMARKS

    20 IRAN OIL COMPANY / TYCO TEHRMAL CONTROLS, BELGIUMDesign, supply, installation & commissioning of Instrumentation for Gas Separators

    2007 193,200 (EURO)

    21 BHARAT PETROLEUM CORPORATION LIMITED- MANGALIYA / ALSTOM PROJECTS INDIA LIMITEDInstrumentation & Commissioning jobs for RAIL Gantry

    2005 INR 98.00 Lacs

    22 GREAT EASTERN ENERGIES LIMITED- ASANSOL / UNIVERSAL ENGINEERS LIMITEDInstrument Installation & Commissioning jobs for gas processing & distribution network

    2009 INR 39.00 Lacs

    23 Indian Oil Corporation Limited- Paradip Oil Refinery Thru KSS (I) LimitedInstrumentation Jobs for Off-sites & Utilities

    Foster Wheeler Under Progress

    INR 355.00 Lacs

    24 Indian Oil Corporation Limited- Paradip Oil Refinery Thru Fernas Construction (I) Limited -Instrumentation Jobs for South Jetty & Pipelines

    Engineers India Limited

    Under Progress

    INR 100.00 Lacs

  • S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS

    YEAR OF COMPLETION

    REMARKS

    1. UNILEVER SRILANKA LTD - HORANASupply, installation & Commissioning of Instruments for MORPH Project

    AKER POWER GAS

    467,760 (USD)

    2011

    2. HINDUSTAN UNILEVER LTDSupply, installation & Commissioning of Instruments for CLS2 Project at Haridwar

    AKER POWER GAS

    215.00 2010

    3. CENTURY PULP & PAPER LIMITED, LALKUANInstallation & commissioning of Instrumentation & Electrical Systems for Machine no. 6

    AKER POWER GAS & METSO

    69.00 2011

    4. ABC PAPERS LIMITED, HoshiarpurElectrical & Instrumentation Installation & commissioning jobs

    33.00 2008

    5. BAJAJ HINDUSTHAN LTD, KUNDARKIInstrument Installation & Commissioning of Sugar Plant

    42.00 2010

    6. DSCL LTD, HARDOIInstrument Installation & Commissioning of Sugar Plant

    38.00 2009

    7 VISION INDUSTRIES LIMITED, JAMMUInstrumentation jobs for Chemical Unit

    34.00 2007

  • S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS

    YEAR OF COMPLETION

    REMARKS

    7. CONTINENTAL CARBON INDIA LIMITED, GHAZIABADInstrumentation & Electrical jobs for expansion project

    23.00 2006

    8. ORIENTAL CARBON INDIA LIMITED, DHARUHEDAInstrumentation Jobs for Pure Sulphur Project

    28.00 2008

    9. GODREJ SOAPS LIMITED, GWALIORInstrumentation for Fatty Acids & Soaps Project

    26.59 2000

    10. HINDUSTAN ZINC LIMITEDAnnual maintenance contracts for plant Instrumentation- 3 years

    46.00 1998-2000

    11. KBJNL / OM METALS & MINERALS LIMITED- Almatti DamAutomation of DAM Operations using PLC/ SCADA & CCTV

    42.00 2000

    12. IRRIGATION DEPTT- GOVT OF RAJASTHAN- KOTAAutomation of DAM Operations using PLC/ SCADA & CCTV

    World Bank 39.00 1998

    MAJOR PROJECTS COMPLETED MAJOR PROJECTS COMPLETED CHEMICALS, SUGAR & PAPER CHEMICALS, SUGAR & PAPER

  • S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS

    YEAR OF COMPLETION

    REMARKS

    13. Unilever Industries India (P) Limited-KhamgaonSupply, Installation & Commissioning of Instrumentation for AeroAsia Project

    CH2M / Jacobs 98 2013

    14. IRRIGATION DEPTT- GOVT OF Himachal PradeshAutomation of DAM Operations using PLC/ SCADA

    45.00 2010

    15. GODREJ SOAPS LIMITED, Ambernath , MumbaiElectrical & Instrumentation for Fatty Acids & Soaps Project

    MIL India 56.59 2013

    16. Public Health Engineering Deptt, GOVT of RajasthanAutomation of DANG Area Water Treatment Plant & Water Supply Distribution Scheme using PLC/ SCADA

    120.00 2013

    17 Hindustan Unilever Limited-Doom Dooma- AssamSupply, Installation & Commissioning of Instrumentation for CSL3 Project

    31.00 Under Progress

    MAJOR PROJECTS COMPLETED MAJOR PROJECTS COMPLETED CHEMICALS, SUGAR & PAPER CHEMICALS, SUGAR & PAPER

  • S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS

    YEAR OF COMPLETION

    REMARKS

    1. NUCLEAR POWER CORP. (I) LIMITED/ L&T ECC- TARAPURField Instrumentation Installation & Commissioning for TAPP 3&4 Project ( 2X540 MW)

    221.00 2007

    2. NUCLEAR POWER CORP. (I) LIMITED- KOTAField Instrumentation Installation & Commissioning for RAPP 3&4 Project(2X210 MW)

    59.00 2001

    3. VEDANTA-BALCO LIMITED/ SEPCO- KORBA ( 2X300MW)Instrumentation & Electrical Installation & Commissioning jobs- Units 1&2

    290.00 2012 .

    4. UPRVUNL/SIEMENS LIMITED- PARICHHA (2X210MW)Instrumentation Installation & Commissioning jobs – Units 3&4

    192.00 2012

    5. NTPC LIMITED- FARIDABADAnnual Maintenance Contracts for 3 years for 625 MW Gas Based Power Plant

    40.00 2009

    MAJOR PROJECTS COMPLETED MAJOR PROJECTS COMPLETED POWER SECTORPOWER SECTOR

  • S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS

    YEAR OF COMPLETION

    REMARKS

    6. CLTS POWER LIMITED- NEYVELI/ ALSTOM PROJECTS (I) LIMITEDInstrument Installation & Commissioning jobs for 1x250 MW Power Plant

    31.00 2006

    7. ESSAR POWER LIMITED- SURAT / SIEMENS LIMITEDInstrument Installation & commissioning jobs for 1 x 80 MW Power Project

    22.00 2007

    8. GVK-II Power Project-/ ALSTOM PROJECTS INDIA LIMITEDSupply, installation & Commissioning services for 1x210 MW Power Project

    48.00 2007

    9. OSWAL & NAHAR SPINNING MILLS LIMITED- LUDHIANAinstallation & Commissioning services for 1x40 MW Power Projects

    40.00 2005

    10. ALSTOM PROJECTS INDIA LIMITEDInstrumentation Installation & Commissioning jobs for Hydro Electric Projects

    48.00 2007

    11. DEPTT OF ATOMIC ENERGY – KALPAKKAMSupply, Installation & Commissioning of Instruments for Waste disposal plant

    39.00 2005

    MAJOR PROJECTS COMPLETED MAJOR PROJECTS COMPLETED POWER SECTORPOWER SECTOR

  • LIST OF JOBS EXECUTED FOR UNILEVER COMPANIES

  • S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS

    YEAR OF COMPLETION

    REMARKS

    1. Unilever Industries India (P) Limited-KhamgaonSupply, Installation & Commissioning of Instrumentation for AeroAsia Project

    CH2M / Jacobs 98.00 2013

    2. UNILEVER SRILANKA LTD - HORANASupply, installation & Commissioning of Instruments for MORPH Project

    AKER POWER GAS

    467,760 (USD)

    2011

    3. Hindustan Unilever Limited-Doom Dooma- AssamSupply, Installation & Commissioning of Instrumentation for CSL3 Project

    31.00 Under Progress

    4. Hindustan Unilever Limited- RajpuraInstallation & Commissioning of Instrumentation for Mayo Project

    14.00 2012

    5. Hindustan Unilever Limited-KhamgaonSupply, Installation & Commissioning of Instrumentation for PEERS EXPANSION Project

    28.00 Under Progress

    MAJOR PROJECTS COMPLETED / UNDER EXECTION MAJOR PROJECTS COMPLETED / UNDER EXECTION FOR UNILEVER GROUP COMPANIES FOR UNILEVER GROUP COMPANIES

  • S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS

    YEAR OF COMPLETION

    REMARKS

    6. Avalon Cosmetics (P) Limited-HyderabadSupply, Installation & Commissioning of Instrumentation for Hyderabad Project

    40.00 Under Progress

    7. Aqua gel Chemicals (P) Limited- Gandhidham- Electrical Works

    23.00 Under Progress

    MAJOR PROJECTS COMPLETED / UNDER EXECTION MAJOR PROJECTS COMPLETED / UNDER EXECTION FOR UNILEVER GROUP COMPANIES FOR UNILEVER GROUP COMPANIES

  • LIST OF ELECTRICAL JOBS EXECUTED

  • S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS

    YEAR OF COMPLETION

    REMARKS

    1. ABC Papers Limited -HoshiarpurInstallation & Commissioning of Electrical Jobs for Paper Project

    18.00 2008

    2. BALCO Limited- KorbaInstrumentation & Electrical Jobs for FTP-2 Project

    115.00 Under Progress

    3. GAIL (I) Limited- Guna Thru Multitek Engineers Limited- Electrical & Instrumentation Jobs for Truck Gantry

    49.00 1998

    4. Indian Oil Corporation Limited- Panipat Thru NAFTOGAZ (I) LimitedInstallation & Commissioning of Sub Station- Electrical Jobs

    32.00 2009

    5.

    ELECTRICAL JOBS COMPLETED / UNDER EXECTION ELECTRICAL JOBS COMPLETED / UNDER EXECTION

    TELECON SYSTEMS CUSTOMISED INSTRUMENTATION AUTOMATION & ELECTRICAL SYSTEM SOLUTIONSCORE COMPETENCECOMPANY PROFILETELECON SYSTEMS LIST OF MAJOR JOBS EXECUTED CUSTOMISED INSTRUMENTATION AUTOMATION & ELECTRICAL SYSTEM SOLUTIONSMAJOR PROJECTS COMPLETED PETROCHEMICAL & REFINERIESMAJOR PROJECTS COMPLETED PETROCHEMICALS & REFINERIESMAJOR PROJECTS COMPLETED PETROCHEMICALS & REFINERIESSlide 8Slide 9MAJOR PROJECTS COMPLETED CHEMICALS, SUGAR & PAPERSlide 11Slide 12Slide 13Slide 14Slide 15Slide 16Slide 17Slide 18Slide 19