Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
E-183, SECTOR 63, NOIDA, U.P., Distt : GAUTAM BUDH NAGAR – 201301 INDIA +91120-4345549, +91 120-4226549, +91 9810157703 FAX – +91120-2511025 E.MAIL : [email protected], [email protected]
WEB : www.telecon-systems.com
▸ CUSTOM BUILT ELECTRICAL & INSTRUMENTATION PACKAGES ON TURNKEY BASIS
▸ PLC BASED CONTROL SYSTEMS / SCADA / DATA TRANSMISSION SERVICES
▸ INSTALLATION & COMMISSIONING SERVICES▸ CALIBRATION CONFORMING TO ISO 9000 / NABL NORMS▸ ACCREDITION TO NABL _ APPLIED▸ DETAILED / RESIDUAL ENGINEERING▸ CONTROL PANEL SUPPLY, INSTALLATION, SERVICING & REPAIR▸ INTEGRATION OF TELEMETRY OUTPUT DATA WITH SCADA SYSTEMS▸ INSTRUMENTATION MAINTENANCE CONTRACTS
S No CUSTOMER / PROJECT CONSULTANT VALUE (INR)in 00,000
YEAR OF COMPLETION
REMARKS
1 SVC SUPERCHEM IND LTD(a) PTA PLANT (b) HOT FURNACE OIL( C) CAPTIVE POWER PLANT
• TATA CONSLT ENGG.
92.00 1994-98
2 PUNJ LLOYD LTDGas Processing Facility -OIL INDIA LTD-JAISALMER
Triune Projects 34.45 1995-98
3 PUNJ LLOYD LTDSulphur recovery unit – IOCL Mathura
E.I.L. 31.00 1999
4 RELIANCE INDUSTRIES LTD –L&T ECC JAMNAGAR Instrumentation & Electrical installation for Alkylation Plant & CPP
Bechtel 222.50 2010
5 HMEL REFINERY / L&T ECC– BATHINDAInstrumentation installation & commissioning for FCC Plant
EIL 105.00 2012 .
S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS
YEAR OF COMPLETION
REMARKS
6 INDIAN OIL TANKAGES LIMITED, NAVI MUMBAI / BIRLA TECHNICAL SERVICESInstrumentation & Automation for Tankages in JNPT
EIL 38.95 2004
7 INDIAN OIL CORPORATION LIMITED, NAPTHA CRACKER COMPLEX, PANIPAT / NAFTOGAZ INDIA LIMITEDInstrumentation & Electrical Installation & Commissioning for Off sites & Utilities
EIL 92.00 2011
8 INDIAN OIL CORPORATION LIMITED, NAPTHA CRACKER COMPLEX, PANIPAT /Nicco Corporation LimitedInstrumentation Installation & Commissioning for Effluent treatment plant
EIL 41.00 2011
9 Corrtech International Limited / Gas Pipe Line Project of GAIL & IOCLInstrumentation Installation & Commissioning for Gas Pipeline & Compressor Station
34.45 2011
10 Bharat Petroleum Corporation Limited, Kochi/ L&T CAD, MumbaiInstrumentation Installation & Commissioning of Propane Recovery Unit
EIL 70.00 2010
S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS
YEAR OF COMPLETION
REMARKS
11 Hindustan Petrochemical Industries Limited, Mumbai / BHPV LimitedInstrumentation Installation & Commissioning for Steam Generator Package
EIL 67.00 2009
12 KOA Limited / KSS Engineering (I) LimitedProviding supervising engineers for Electrical & Instrumentation for Installation & Commissioning services at Kazak Oil Company – Gas Compressor Station
120.00 2012
13 SRF LIMITED, BHIWADIInstrumentation Installation jobs for HFCL Plant
68.00 2009
14 GAIL (I) Limited, VIJAIPURInstrument and electrical Installation & Commissioning works for Rail Gantry
30.00 2003
15 Indian Oil Corporation Limited/ L&T CAD, MumbaiInstrument Installation & Commissioning jobs for Piyala & Bijwasan Terminals
35.00 2009
S No PROJECT / CUSTOMER CONSULTANTS VALUE (Rs.) in Lacs
YEAR OF COMPLETION
REMARKS
16 Indian Oil Corporation Limited/ L&T CAD, MumbaiInstrument Installation & Commissioning jobs for Piyala & Bijwasan Terminals
55.00 2009
17 EGYPT – NORTH BAHARIYA PETROCHEMICAL Co./ TYCO THERMAL CONTROLS, BELGIUMDesign, supply, installation & commissioning of Instrumentation for Gas Separators
344,000 (euro) 2007
18 SUDAN – PETRODAR OPERATING Co./ TYCO THERMAL CONTROLS, BELGIUMDesign, supply, installation & commissioning of Instrumentation for Chemicals injection skids
186,000 (EURO)
2008
19 EGYPT – QARUN PETROCHEMICALS LTD. / TYCO THERMAL CONTROLS, BELGIUMa.Design, supply, installation & commissioning of Instrumentation for Chemical injection skidsb.Design, supply, installation & commissioning of Instrumentation for Test separator skids
195,760 (EURO)
2008
S No PROJECT / CUSTOMER CONSULTANTS YEAR OF COMPLETION
VALUE (Euro) REMARKS
20 IRAN OIL COMPANY / TYCO TEHRMAL CONTROLS, BELGIUMDesign, supply, installation & commissioning of Instrumentation for Gas Separators
2007 193,200 (EURO)
21 BHARAT PETROLEUM CORPORATION LIMITED- MANGALIYA / ALSTOM PROJECTS INDIA LIMITEDInstrumentation & Commissioning jobs for RAIL Gantry
2005 INR 98.00 Lacs
22 GREAT EASTERN ENERGIES LIMITED- ASANSOL / UNIVERSAL ENGINEERS LIMITEDInstrument Installation & Commissioning jobs for gas processing & distribution network
2009 INR 39.00 Lacs
23 Indian Oil Corporation Limited- Paradip Oil Refinery Thru KSS (I) LimitedInstrumentation Jobs for Off-sites & Utilities
Foster Wheeler Under Progress
INR 355.00 Lacs
24 Indian Oil Corporation Limited- Paradip Oil Refinery Thru Fernas Construction (I) Limited -Instrumentation Jobs for South Jetty & Pipelines
Engineers India Limited
Under Progress
INR 100.00 Lacs
S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS
YEAR OF COMPLETION
REMARKS
1. UNILEVER SRILANKA LTD - HORANASupply, installation & Commissioning of Instruments for MORPH Project
AKER POWER GAS
467,760 (USD)
2011
2. HINDUSTAN UNILEVER LTDSupply, installation & Commissioning of Instruments for CLS2 Project at Haridwar
AKER POWER GAS
215.00 2010
3. CENTURY PULP & PAPER LIMITED, LALKUANInstallation & commissioning of Instrumentation & Electrical Systems for Machine no. 6
AKER POWER GAS & METSO
69.00 2011
4. ABC PAPERS LIMITED, HoshiarpurElectrical & Instrumentation Installation & commissioning jobs
33.00 2008
5. BAJAJ HINDUSTHAN LTD, KUNDARKIInstrument Installation & Commissioning of Sugar Plant
42.00 2010
6. DSCL LTD, HARDOIInstrument Installation & Commissioning of Sugar Plant
38.00 2009
7 VISION INDUSTRIES LIMITED, JAMMUInstrumentation jobs for Chemical Unit
34.00 2007
S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS
YEAR OF COMPLETION
REMARKS
7. CONTINENTAL CARBON INDIA LIMITED, GHAZIABADInstrumentation & Electrical jobs for expansion project
23.00 2006
8. ORIENTAL CARBON INDIA LIMITED, DHARUHEDAInstrumentation Jobs for Pure Sulphur Project
28.00 2008
9. GODREJ SOAPS LIMITED, GWALIORInstrumentation for Fatty Acids & Soaps Project
26.59 2000
10. HINDUSTAN ZINC LIMITEDAnnual maintenance contracts for plant Instrumentation- 3 years
46.00 1998-2000
11. KBJNL / OM METALS & MINERALS LIMITED- Almatti DamAutomation of DAM Operations using PLC/ SCADA & CCTV
42.00 2000
12. IRRIGATION DEPTT- GOVT OF RAJASTHAN- KOTAAutomation of DAM Operations using PLC/ SCADA & CCTV
World Bank 39.00 1998
MAJOR PROJECTS COMPLETED MAJOR PROJECTS COMPLETED CHEMICALS, SUGAR & PAPER CHEMICALS, SUGAR & PAPER
S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS
YEAR OF COMPLETION
REMARKS
13. Unilever Industries India (P) Limited-KhamgaonSupply, Installation & Commissioning of Instrumentation for AeroAsia Project
CH2M / Jacobs 98 2013
14. IRRIGATION DEPTT- GOVT OF Himachal PradeshAutomation of DAM Operations using PLC/ SCADA
45.00 2010
15. GODREJ SOAPS LIMITED, Ambernath , MumbaiElectrical & Instrumentation for Fatty Acids & Soaps Project
MIL India 56.59 2013
16. Public Health Engineering Deptt, GOVT of RajasthanAutomation of DANG Area Water Treatment Plant & Water Supply Distribution Scheme using PLC/ SCADA
120.00 2013
17 Hindustan Unilever Limited-Doom Dooma- AssamSupply, Installation & Commissioning of Instrumentation for CSL3 Project
31.00 Under Progress
MAJOR PROJECTS COMPLETED MAJOR PROJECTS COMPLETED CHEMICALS, SUGAR & PAPER CHEMICALS, SUGAR & PAPER
S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS
YEAR OF COMPLETION
REMARKS
1. NUCLEAR POWER CORP. (I) LIMITED/ L&T ECC- TARAPURField Instrumentation Installation & Commissioning for TAPP 3&4 Project ( 2X540 MW)
221.00 2007
2. NUCLEAR POWER CORP. (I) LIMITED- KOTAField Instrumentation Installation & Commissioning for RAPP 3&4 Project(2X210 MW)
59.00 2001
3. VEDANTA-BALCO LIMITED/ SEPCO- KORBA ( 2X300MW)Instrumentation & Electrical Installation & Commissioning jobs- Units 1&2
290.00 2012 .
4. UPRVUNL/SIEMENS LIMITED- PARICHHA (2X210MW)Instrumentation Installation & Commissioning jobs – Units 3&4
192.00 2012
5. NTPC LIMITED- FARIDABADAnnual Maintenance Contracts for 3 years for 625 MW Gas Based Power Plant
40.00 2009
MAJOR PROJECTS COMPLETED MAJOR PROJECTS COMPLETED POWER SECTORPOWER SECTOR
S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS
YEAR OF COMPLETION
REMARKS
6. CLTS POWER LIMITED- NEYVELI/ ALSTOM PROJECTS (I) LIMITEDInstrument Installation & Commissioning jobs for 1x250 MW Power Plant
31.00 2006
7. ESSAR POWER LIMITED- SURAT / SIEMENS LIMITEDInstrument Installation & commissioning jobs for 1 x 80 MW Power Project
22.00 2007
8. GVK-II Power Project-/ ALSTOM PROJECTS INDIA LIMITEDSupply, installation & Commissioning services for 1x210 MW Power Project
48.00 2007
9. OSWAL & NAHAR SPINNING MILLS LIMITED- LUDHIANAinstallation & Commissioning services for 1x40 MW Power Projects
40.00 2005
10. ALSTOM PROJECTS INDIA LIMITEDInstrumentation Installation & Commissioning jobs for Hydro Electric Projects
48.00 2007
11. DEPTT OF ATOMIC ENERGY – KALPAKKAMSupply, Installation & Commissioning of Instruments for Waste disposal plant
39.00 2005
MAJOR PROJECTS COMPLETED MAJOR PROJECTS COMPLETED POWER SECTORPOWER SECTOR
LIST OF JOBS EXECUTED FOR UNILEVER COMPANIES
S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS
YEAR OF COMPLETION
REMARKS
1. Unilever Industries India (P) Limited-KhamgaonSupply, Installation & Commissioning of Instrumentation for AeroAsia Project
CH2M / Jacobs 98.00 2013
2. UNILEVER SRILANKA LTD - HORANASupply, installation & Commissioning of Instruments for MORPH Project
AKER POWER GAS
467,760 (USD)
2011
3. Hindustan Unilever Limited-Doom Dooma- AssamSupply, Installation & Commissioning of Instrumentation for CSL3 Project
31.00 Under Progress
4. Hindustan Unilever Limited- RajpuraInstallation & Commissioning of Instrumentation for Mayo Project
14.00 2012
5. Hindustan Unilever Limited-KhamgaonSupply, Installation & Commissioning of Instrumentation for PEERS EXPANSION Project
28.00 Under Progress
MAJOR PROJECTS COMPLETED / UNDER EXECTION MAJOR PROJECTS COMPLETED / UNDER EXECTION FOR UNILEVER GROUP COMPANIES FOR UNILEVER GROUP COMPANIES
S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS
YEAR OF COMPLETION
REMARKS
6. Avalon Cosmetics (P) Limited-HyderabadSupply, Installation & Commissioning of Instrumentation for Hyderabad Project
40.00 Under Progress
7. Aqua gel Chemicals (P) Limited- Gandhidham- Electrical Works
23.00 Under Progress
MAJOR PROJECTS COMPLETED / UNDER EXECTION MAJOR PROJECTS COMPLETED / UNDER EXECTION FOR UNILEVER GROUP COMPANIES FOR UNILEVER GROUP COMPANIES
LIST OF ELECTRICAL JOBS EXECUTED
S No CUSTOMER / PROJECT CONSULTANTS VALUE (Rs.) in LACS
YEAR OF COMPLETION
REMARKS
1. ABC Papers Limited -HoshiarpurInstallation & Commissioning of Electrical Jobs for Paper Project
18.00 2008
2. BALCO Limited- KorbaInstrumentation & Electrical Jobs for FTP-2 Project
115.00 Under Progress
3. GAIL (I) Limited- Guna Thru Multitek Engineers Limited- Electrical & Instrumentation Jobs for Truck Gantry
49.00 1998
4. Indian Oil Corporation Limited- Panipat Thru NAFTOGAZ (I) LimitedInstallation & Commissioning of Sub Station- Electrical Jobs
32.00 2009
5.
ELECTRICAL JOBS COMPLETED / UNDER EXECTION ELECTRICAL JOBS COMPLETED / UNDER EXECTION
TELECON SYSTEMS CUSTOMISED INSTRUMENTATION AUTOMATION & ELECTRICAL SYSTEM SOLUTIONSCORE COMPETENCECOMPANY PROFILETELECON SYSTEMS LIST OF MAJOR JOBS EXECUTED CUSTOMISED INSTRUMENTATION AUTOMATION & ELECTRICAL SYSTEM SOLUTIONSMAJOR PROJECTS COMPLETED PETROCHEMICAL & REFINERIESMAJOR PROJECTS COMPLETED PETROCHEMICALS & REFINERIESMAJOR PROJECTS COMPLETED PETROCHEMICALS & REFINERIESSlide 8Slide 9MAJOR PROJECTS COMPLETED CHEMICALS, SUGAR & PAPERSlide 11Slide 12Slide 13Slide 14Slide 15Slide 16Slide 17Slide 18Slide 19