19
l l 42A01NE0130 2 16432 TECK GEOPHYSICAL SURVEY REPORT ON THE PERRON GROUP TECK TOWNSHIP LARDER LAKE MINING DIVISION DISTRICT OF TliUSKAdlNG, ONTARIO FOR ALEXANDER H. PERRON 010 2. 164 32 'RECEIVED re P 2 O 1996 •VIIMNG LANDS BRANCH FEBRUARY 16, 1996 WENDY K. WELLER GEOTECH IN-TRAINING

TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

l l42A01NE0130 2 16432 TECK

GEOPHYSICAL SURVEY REPORT

ON THE

PERRON GROUP

TECK TOWNSHIP

LARDER LAKE MINING DIVISION DISTRICT OF TliUSKAdlNG, ONTARIO

FOR

ALEXANDER H. PERRON

010

2. 164 32

'RECEIVED

re P 2 O 1996

•VIIMNG LANDS BRANCH

FEBRUARY 16, 1996WENDY K. WELLER GEOTECH IN-TRAINING

Page 2: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

42A01NE0130 2 16432 TECK

TABLE OF CONTENTS

SUMMARY. . . . . . . . . . . . . . . . . . . . . . . . . . 1)

INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . l

GENERAL GEOLOGY. .....................1,2

1996 FIELD RESULTS, OBSERVATIONS AND CONCLUSIONS . . . . . 2, 3

CONCLUSIONS AND RECOMMENDATIONS. . . . . . . . . . . . . . 3

BIBLIOGRAPHY . . . , . . . . . . . . . , . . , . . . . . . 4

TECHNICAL DATA . . . . . . . . . . . . . . . . . . . . . . 5

ASSESSMENT DATA FORM . . . . . . . . . . . . . . . . . . . 6

CERTIFICATE. . . . . . . . . . . . . . . . . . . . . . . . 7

MAPS

CLAIM LOCATION MAP - (FIGURE la) . . . . . . . . . . . . . l a)

LOCATION MAP - (FIGURE Ib) . . . . . . . . . . . . . . . . l b)

GROUND MAGNETOMETER MAP No. %-PN-l . . . . . . . . . . . . BACK POCKET

GROUND VLF-EM SURVEY NAA PROFILED MAP NO. 96-PN-2 . . . . BACK POCKET

Page 3: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

SUMMARY: i)

This report is a Geophysical Survey, as required by The Ministry of Northern Development and Mines for assessment work purposes.

The report includes an introduction to the property, general geology and field results and conclusions and recom mendations, based on the field survey.

Technical data and assessment forms can be found in the back of this report. Field data is compiled on the accom panying plan map found in the back of this report.

Page 4: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

GEOPHYSICAL SURVEY REPORT

ON THE

PERRON GROUP

TECK TOWNSHIP

LARDER LAKE MINING DIVISION

DISTRICT OF TIMISKAMING, ONTARIO

INTRODUCTION

The claim group consists of five (5) contiguous unpatented mining claims. The claims are located in the western central part of Teck township, along side the Grenfell-Teck township line between the two and three mile posts. The property is accessible via the Old Goldthorpe Road and extends westward approximately four miles from the town of Chaput Hughes, which is two miles west of the town of Kirkland Lake. (See Figure la) and Ib).

Ownership of the claims has been attested to by Mr. Alex H. Perron, 103 Government Road East, Kirkland Lake, Ontario, and was not independently ascertained by the writer.

A east/west baseline was established at the #3 claim post of claim L-1185308 and the #2 claim post of claim L-1185310 for a distance of 2,410 feet. Picket lines were cut every 200 feet along the baseline, stations were established every 100 foot intervals along the lines.

The line cutting and chaining was performed by AJ Perron Gold Corporation.

The magnetometer survey was performed by Uendy K. Weller.

The electromagnetic survey was performed by Wendy K. Weller.

The drafting, contouring and report were done by Wendy K. Weller.

GENERAL GEOLOGY

O.D.M. Geological Map, 1945-1, covering Teck Township, at a scale of one inch to 1000 feet, indicates that the predominant bedrock of the Perron Group is diorite and gabbro. These Algoman rocks are altered basic intrusives and are intermediate to coarse tezture and dark green to black in colour.

Page 5: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

-l a)-

Claim Location MapScale: l inch to 1/4 mile

aken from a March 1986 Figure la

Page 6: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

BJimt Hit 300' \FRE( Lfbhtflt

SiA H C•Bto^JtnCs^M, N

tJRRISETTE

r IJake?

5"o ithtvest Arm

Location-O 20 Figure Ib

Page 7: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

-2-

There are basic to intermediate volacm'cs occurring on the fringes of the property. These rock types are fine to medium grained, dark green rocks and the texture will vary with the thick ness of the flow.

Syenite porphyry may be exposed as dikes or small irregular shaped bodies. Quartz-eyes may be found in the syenite porphry classi fying the porphyry as quartz feldspar porphyry. The porphyry is usually pink to bright red in colour, showing a presence of conspicu ous crystals of feldspar.

i) Electromagnetic Survey:

The field data is presented on a map #96-PN-l found in the back of this report.

The VLF-EM is illustrated as profiled data along the survey lines and plotted at a vertical scale of one inch = - 4(^ with the in-phase to the left and quadrature to the right.

Further information on the survey and Geonics EM-16 can be found on the technical data forms which are at the back of this report.

ii) Magnetometer Survey:

The field data is presented on a map /K96-PN-2. The magnetic data is illustrated as isomagnetic contours. Contour interval: 50 to 100 gammas on a map of corrected magnetic values recorded at each station.

Further information about the survey can be found on the Technical data form found at the back of this report.

1996 FIELD RESULTS, OBSERVATIONS AND CONCLUSIONS

Electromagnetic Survey 1996;

The field data from this survey shows five (5) possible VLF-EM conductors.

CI Conductor: Found on picket lines pllOU, pl8W, p!6W going in a north-east direction. The vegetation is jack pine and white birch. The area is a very large outcrop showing. M. Mahood-Greer mapped this outcrop (1992 Geological Survey) as Keewatin, intermediate and basic volcanics. Greer states ((there appears to be chlorited mineralization present in the matrix and minor pyrite)).

C2 Conductor: Found on picket lines p!4E and p!6E. The direction of the conductor is also in the north-east direction.

Page 8: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

-3-

C3 Conductor:

C4 Conductor:

C5 Conductor:

Also found along the east edge of a large outcrop showing, covered with jack pine and birch.

Found on picket lines pl8W, p!6W and p!4W also in the north-east direction. The vegetation of the area is a large tagalder swamp between the large outcrop showings. This conductor also sits just north of one of the low magnetic anomalies in this report.

Found on picket lines p!2W to p!4E. The conductor is found in tagalder swamp area. The in-phase response is low but this is probably caused by the influence of - the surrounding material.

Found on picket lines p!4E and pl6E. The direction of the conductor is north-east. The area is the east edge of a small outcrop with jack pine and birch growth. This conductor could possibly be showing the outline of the outcrop.

Magnetic Survey:

The magnetic relief ranged from a low 57,081 gammas to a high of 57,934 gammas. The higher relief is found diagonally across the property extending north-east. There are two magnetic high trends found in this survey:

1) crosses p!12W to p!6W, 2100 north2) crosses p!12W to pllOW, 900 north.

The area for both the magnetic trends are two large outcrop showings with jack pine and birch growth.

The one large low magnetic trend found in this survey crossespllOW to pllOE found at 200 north to 500 north in a east direction.The area is covered with alder and balsam boggs and swamps.

There was not a great difference in the magnetic relief in this survey. The area was mapped in April 1992, by M. Mahood-Greer as basic volcanics, primarily basalt and pillowed basalt flows.

CONCLUSIONS AND RECOMMENDATIONS

Due to the number of VLF-EM conductors found in this survey along the outcrop showings, a trenching program is being looked at to try and help identify the conductors. The magnetometer survey did not really show any real difference in the underlying rock.

Respectfully submitted,

February 16, 1996 Uendy K. Weller

Page 9: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

-4-

BIBLIOGRAPHY

Jas. E. Thomson

1948: Geology of Teck Township and the Kenogami Lake Area, Kirkland Lake Gold Belt: Ont. Pept. Mines

F. R. Ploeger

1980:

Annual Report . . ... . . Page 1-53

No. S24 Kirkland Lake Gold Study,District of Tirolskamlng, . . . Page 188 - 190

Geol. Surv. Can. M.P.-96

L.S. Jensen

1980:.

M.J. Downes

1980:

M. Mahood-Greer

1992

Gold Mineralization In the Kirkland Lake-

Larder Lake' Areas' . . . ... . Page 59-65

Geol. Siirv. Can. M.P.-97

Structural and Stratigraphic Aspects of Gold Mineralization 1n the Larder

Lake Area, Ontario.. . . . . . Page 66 - 69

Geol. Surv. Can. M.P.-97

Geological Survey Report on The Perron Group April l, 1992

Page 10: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

-5-

Technical Data:PICKET 1^5=5.625 MILESZgL.Q5 KM. *9 .776, KM

Line (miAm):.BASESJAUON?,4SM5x7.aiaL- ^-ine traversed:..........................

No. of samples/stations-....:^.......... Line/picket spaclng:M.2po.fLEJ........

ELECTROMAGNETIC SURVEY: Operator:.. 0̂.^:.^1:^._........

Instrument: GEONICS EMki6.......M ..—.^ Accuracy:......".;*..._^._.-....__,

Coil configuration:.V.^mi?ONiAL.- Coil separation:J^l^

Verticarscaier"i""ScH-*w .......^.. Horizontal 8ca1e:.JL.!?S!!:?!?Ji!!.....

Operational technique:

MAGNETIC SURVEY: Operatori

lnstrument:......MC.PHAR.GP:8........__' AccuracyL...;

Base station L.Ih!!?i——...—.— Diurnal meth

Base station time:^.40J:n.NU!ES . .^ . Localion/value:....13.1:?!??/.0...........

Contour intervah.^5P.-lPJD.fiAMMAS._. Datumn subtracted:..JZ. 0̂.9P..?.^MA.s..

Contoured by:..JL.K-JiELLER....,^.^ Horizontal scale:.JJJliH.I??.0.JlEI..

Operational

INDUCED POLARIZATION SURVEY

Transmitter used'.__..._.._..^. Receiver used:_..

Method^..................,............^..... Frequency:.__.....

On time:_......_.....^.................. Range:........^..._....

Off time:.^...............^...........^..... Delay time:.^..........

Power source:____.___.___... Output:._____....

Electrode array:_____.____,. Electrode spacing:.

Readings taken:...__......_...._. Other data:_........

Operational technique:.....^...........______._.__.

Page 11: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

-6-

Assessment Data FormType of Work:Prospecting:........................_.... Geological'..............

Physical: L INECUTTING, ELECTROMAGNETIC AND MAGNETOMETER SURVEY

Geophysical J...._._................^,.M...M..................

Geochemical:.____....____. Drilling:_______.

Assays/Analyses:___.______ Other work:____ ^

Cost of Work:..,,.!4 '53!-.00,,,, Dollars Applied:

Recorded Holden Survey Company:

Address-- 103 GOVERNMENT ROAD EAST,

KIRKLAND LAKE, ONTARIO P2N IA9

Start Of WOrk:..^ANU^RY^^1996^^^ End Of WOrk:.FEBRUARY 14, 1996

Draughting time^.f^.^^fE^.^/Sfi... Report" tlme*.™;.}5^^l6,

Completion of report^jFEBRUARYje/gs^ Author ̂ WENDY^K^WELLER^ ̂

Work performed on claim(s)..^.-^9064^^L-j^^55A^^ L-1185309,

L-1185310

Work applied to claimfej...^^^^-^ L-599065,

L-858028, L-858029, L-1185308, L-1185309, L-1185310

Persons who performed work (supervisor first):

AJ PERRON GOLD CORPORATION *

— ..MICHAEL JBUfiMS..

Page 12: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

-7-

CERTIFICATE

I, Wendy K. Weller, of Kirkland Lake, Ontario, do hereby certify:

1) That I am a Geotech in Training and reside at:71 Second Street, Apartment #2, Kirkland Lake, Ontario P2N IR6,

2) That I graduated from the Hail'eybury School of Mines as a

certified Diamond Driller in 1982. I have had a staking licence for the past 6 years.

3) That I was employed as a Diamond Driller for Heath tt Sherwood for l year.

4) That I have been practising as a Geotech Trainee for a period of (6) years and I am qualified to write this report.

5) That I supervised and participated in this survey.

Date Wend)Geotech Trainee

C (A. fctf. (JQVJLndy^ K. Weller l

Page 13: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

Mini:.Northern Development and Mines

i VI iffwirx

Ontario

After Recording ClaimMining Act

Personal information collected on this form Is obtained under the authority of the Mining Act. This Information will be used for correspondence Questions abou1

this collection should be directed to the Provincial Manager. Mining Lands. Ministry of Northern Development and Mines. Fourth Floor. 159 Cedar Street

Sudbury. Ontario. P3E GAS. telephone (70S) 670-7264.

Instructions: - Please type or print and submit in duplicate.- Refer to the Mining Act and Regulation

Recorder.- A separate copy of this form must be c- Technical reports and maps must acco- A sketch, showing the claims the work

2.'ling

42A01NE0130 2 16432 T ECK 900

Recorded Hotder(s)ALEXANDER H. PERRON J -f^ "P^/^o^v fao^ G 6pof* C^-c *^

Address

103 GOVERNMENT ROAD EAST, KIRKLANDMining Division

LARDER LAKE

LAKE, ONTARIO P2N IA9Township/Area

TECK TOWNSHIP

CHent No.1181257, ,?oo9x-ZL

'ivwpnont no.(705) 567-7057M or G Plan No.

Date*wofc^ P™ JANUARY 29, 1996 To: FEBRUARY 14, 1996

Work Performed (Check One Work Group Only)

Work Group

V Geotechnical Survey

Physical Work. Including Drilling

Rehabilitation

Other Authorized Work

Assays

Assignment from Reserve

Type

LINECUTTING. MAGNETOMETER SURVEY AND VLF SURVEY

FR*^P C ; \ i r- rO

———————————— 1 —— FEB ?o ^996 ——

LMINING LANDS BRAMPU

Total Assessment Work Claimed on the Attached Statement of Costs t 4 , 535. 00

Note: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded

holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.

Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)

Name

AJ PERRON GOLD CORPORATION

WENDY K.

MICHAEL

WELLER

BURNS

Address

103

103

103

GOVERNMENT

GOVERNMENT

GOVERNMENT

ROAD

ROAD

ROAD

EAST,

EAST,

EAST,

KIRKLAND

KIRKLAND

KIRKLAND

LAKE,

LAKE,

LAKE,

ONTARIO

ONTARIO

ONTARIO

P2N

P2N

P2N

IA9

IA9

IA9

(attach a schedule ri necessary)

Certification of Beneficial Interest * See Note No. 1 on reverse side

l certify that at the time the work was performed, the claims covered in this work report were recorded in the current holder's name or held under a beneficial interest by the current recorded holder.

Date

FEBRUARY 16/96

Recorded Holder or

Certification of Work Reportl certify that l have a personal knowledge of the facts set forth In this Work report, having performed the work or witnessed same during and/or after

its completion and annexed report Is true.Name and Address of Pereon Certifying

MISS WENDY K. WELLER, 103 GOVERNMENT ROAD EAST, KIRKLAND LAKE, ONTARIO P2N IA9

TeleponeNo.(705) 567-7057

Date

0241 (03/91)

Page 14: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

fi

t-'

r~ i

COen8

L-858029 L-599065 L-599063 en o* en enCO10

t-*

L-565538 L-1185310

N

L-1185309

*

L-1 185308r— i

CTl

COeo en en

^

i-*

r—

en *O

14k

fffj"

Iffi1

cO o |fff^l

4*^^encoeno0

woroo*

8

COgo o

fa*

4k 0

8

4k O O

8io o

i8

0o

8

**I-""o*ro4k

8

18

co1-*enOo

•fa*

o0

8

?en

Oo

•fa*4kO OOo

COro

8

9

t-*

roOo

CO

8oo

1^fi.*-

Oo|cfsfSr3.fo

ir

i•d*ro

w

o enO O

enen

8 •^

-**ien

O O

•fa*

4k

0 O

•fa*

^j

Oo o

•fa*

•VJ o0

~CO0oo o

fa*

ro

o O

"

COo oeo o

•fa*

ro o0

Value Assigned from this Claim

m "n o^Ti

if

ri

Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (^) one of the following:

1. ^Credits are to be cut back starting with the claim listed last, working backwards.

2. G Credits are to be cut back equally over all claims contained in this report of work.

3. G Credits are to be cut back as priorized on the attached appendix.

In the event that you have not specified your choice of priority, option one will be implemented.

Note 1: Examples of beneficial Interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect

to the mining claims.

Note 2: If work has been performed on patented or leased land, please complete the following:{Date

l certify that the recorded holder had a beneficial interest in the patented or leased land at the time the work was performed.

Signature

Page 15: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

(S)Ontario

Wl.:i.s;.r ) O

Northern Devek)pment and Mines

Ministers du Devetoppement du Nord el des mines

uifor Assessment Credit

ttat des couts aux fins du credit devaluation

Mining Act/Loi sur les mines

Transaction No IN" ae t ransaction

Personal information collected on this form is obtained under the authority of the Mining Act. This information will be used to maintain a record and ongoing status of the mining claim(s). Questions about this collection should be directed to the Provincial Manager. Minings Lands. Ministry of Northern Development and Mines. 4th Floor. 159 Cedar Street. Sudbury. Ontario P3E 6A5. telephone (705) 670-7264.

-i r*i G 32•esenteTWmuLes renseignements personnels contenus dans la present*" IWmule son

recueillis en vertu de la Lot aur lea mines at serviront a tenlr li Jour un registr* des concessions minieres. Adresser toute quesiton sur la collece de ce' renseignements au chef provincial des terrains miniers. minister di Developpement du Nord ei des Mines. 159. rue Cedar. 4* etage. Sudbun (Ontario) P3E 6A5. telephone (705) 670-7264.

1. Direct Costs/CoOts directs

Type

Wegea Salalrea

Contractor's and Consultant's Fee* Drottsde I'entrepreneur et de I'expert- consetl

Supplies Used Foumttures utlHsee*

Equipment Rental Location de materiel

Description

Labour Main-d'oeuvreField Supervision Supervision sur to terrain

Type LINECUTTING

MAGNETOMETER SURVFY

VLF SURVEYTyp*

Typ*

Amount Montan!

2,512.

997.

1,026.

Total Direct Costs Total des coOts directs

Totals Total global

4.535.

"V*^:

4,535.

2. Indirect Costs/CoOts Indirects* * Note: When claiming Rehabilitation work Indirect costs are not

allowable as assessment wont.Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibtes en tant que travaux d'evaluation.

Type

Transportation Transport

Food and Lodging Nourrtture etItAhAVMAJMAMtiwuvi yvinvtn

Mobilization and Demobntaatton Mobnisatlon et Otmoblllsatlon

Description

Type

Amount Montant

Sub Total of Indirect Costa Total partlel des coOts Indirects

Amount Allowable (not greater than 20H of Direct Costs) Montant admissible (n'excedant pas 20 H des couts directs)

Total Value of Assessment Credit Valeur totale du credH (Tetu of Direct and Atombie d'evahiatton Indkvet coMa) (Tom do eeOto dbwte

d Mb*ctl admlMMM

Totals Total global

Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of iverification is not made, the Minister may r all or part ol the assessment work submit!

WEXSEftlEDNote : Le trtulaire enregistre sera tenu de verifier les ddpenses de-nandees dans

le present etat des couts dans les 30 jours survant une demande b eel effet. Si la verification n'est pas effectuee. le ministre peut rejeter tout ou une partie des travaux d'evaluation presentes.

20Filing Discounts Rer ilses pour depot

1.MINING LANDS BRANCH

Work filed within two years ol completion ij UuiinuO al 166*4) ul l. lthe above Total Value of Assessment Credit.

*s travaux deposes dans les deux ans suivant leur achievement sontrembourses a 100 to de la vateur totaJe susmentionnee du crMt (revaluation

2. Work filed three, four or five years after completion is claimed at 50*M) of the above Total Value of Assessment Credit. See calculations below:

Total Value of Assessment Credit Total Assessment Claimed

x 0.50

2. Les travaux deposes trois, quatre ou cinq ans apres leur achievement sont rembourses a 50 to de la valour totale du credit d'evaluation susmentionne. Voir les calculs ct-dessous.

Valeur tolale du credit d'evaluation

x 0.50

Evaluation totale demandee

Certification Verifying Statement of Costs Attestation de I'etat des couts

l hereby certify.that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.

that as ——(Recorded Holder.

to make this certification

Position in Company)

J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont et6 engagees pour etfectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint

l am authorized Et qu'a litre de . je suis autorise(titulairc enregtslr*. represantant, poste occup* dans la compagne)

a'faire cette attestation.

j Data- F EBRUARYSignature

Nota Dans cede ' le. lorsqu'il ^'s des pe/sonnes. le rr.ascuiin esi uM *- c- au SP-S

Page 16: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

OntarioMimstry of Ministere du Geoscience Assessment OfficeNorthern Development Developpement du Nord 9 33 Ramsey Lake Roadand Mines et des Mines

Sudbury, Ontario P3E 6B5

Telephone: (705) 670-5853 Fax: (705) 670-5863

May 15, 1996Our File: 2.16432 Transaction /: W9680. 00101

Mining RecorderMinistry of Northern Development 6 Mines4 Government Road EastKirkland Lake, OntarioP2N 1A2

Dear Mr. Spooner:

SUBJECT: APPROVAL OF ASSESSMENT WORK CREDIT ON MINING LAND, CLAIMS L. 599064 BT AL IN TECK TOWNSHIP

Assessment work credit has been approved as outlined on the Declaration of Assessment Work Form accompanying this submission. The credit has been approved under Section 14, Geophysics (MAG 6 VLF) , of the Assessment Work Regulation.

The approval data is May 14, 1996.

If you have any questions regarding this correspondence, please contact Lucille Jerome at (705) 670-5858.

Yours sincerely, ORIGINAL SIGNED BY:

Ron C. GashinskiSenior Manager, Mining Lands SectionMines and Minerals Division

jLBJ/jl

cc: Resident Geologist Assessment Files Library Kirkland Lake, Ontario Sudbury, Ontario

Page 17: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

r

BERNHARDT

5288 Q

1187136

~ - T \ Lx" ^ LL 'L .\r-

4M

^ KIRKLAND

3034 \ T738 982356 \ L 98235789228T l 89228-f-- -i--^ '1748aoos

-•p,,*lO^C- . -7.09.

——' Lake

A 26071 l l 084^7-77

^-8427^8 V f i 5! L 858027 \\ L^ y -**--** m 2830

34283219862 \\ L 858029 J\ 1 9861 3428561B l 342855 B

•Z 837 HUGHES jjra,

^r^oj^p^^'/ T "-"^tL&;. .^AJ-^fKMr l INS679 'f L i

2641 J, ^ 2640l

6679" ^ 6 680L IHI439

6682 l 6681 \ L 1 ,1,440

[49,50V ,^^ ANSL 1049642 l 7778447913 t-f — —

L 6)79 a O13,54

L 491662 O

' -L _.

L 6^6798 \L\636799 Je

HR |735* 4266 Lo

476846H ' 1B7, HS 1181 8187 l ,^^i^

HR 748 HR 7470 It.. ,..

* I |L '345729

118

TC '58 -.l .1 TC 57SWASTIKA.",! ST."

if 11 U H R S44 '476602 49 " 77 H

OTTO TOWNSH

Ministry ofNaturalResources

Ministry ofNorthern Developmentand Mines

Ontarioo00

INDEX TO LAND DISPOSITION

PUN

G-3719TOWNSHIP

TECK

M.N.R. ADMINISTRATIVE DISTRICT

KIRKLAND LAKt*MINING DIVISION

LARDER LAKELAND TITLES/REGISTRY DIVISION

TIMISKAMING

O-UJ^LUD

LUo:

en 02i — iCNJ

Q-UJ CO

l

a03V,O3ozI

Scale 1:20 000

1000Metres

1000 lFeel M M M H h-n

1000—l 2000

——i Metres

1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 I^J Feet

Contour Interval 10 Metres

AREAS WITHDRAWN FROM DISPOSITIONMRO- Mining Rights OnlySRO- Surface Rights OnlyM + S - Mining and Surface Rights

SYMBOLSBoundary

Township, Meridian, Baseline

Road allowance, surveyed shoreline.

Lot/Concession, surveyed . unsurveyed

Parcel, surveyedunsurveyed .

Right-of-way, r^ad . railway utility.

Reservation

Cliff, Pit, Pile . .

ContourInterpolated .ApproximateDepression

Control point (horizontal)

Flooded land

Mine head frame

Pipeline (above ground)

Railway, single track .. double track abandoned

Road; highway, county, township access . . . trail, bush

Shoreline (original)

Transmission line

Wooded area... . . ... ..

Description

SEC 36/8O

SEC 36/80

^) SEC 43/7 O

(FM) SECJ6/8O

Order No.

W IO8/82

Date Disposition

MSS

File

W.-22/88 MRO^fDER NO. 0-L-Z8/92 MER OPENS W-22/88NR W76/80 SRO

W9/86 MBS

A

DISPOSITION OF CROWN LANDSPatent

Surface S Mining Rights Surface Rights Only . . Mining Rights Only ..

LeaseSurface S Mining Rights .. Surface Rights Only . . Mining Rights Only

Licence of Occupation . ..

Order-in-Council

Cancelled .. .. . . .

Reservation. ... .

Sand 8. Gravel . ..

eo

Toc

THE INFORMATION THAT APPEARS ON THIS MAP HAS BEEN COMPILED. FROM VARIOUS SOURCES, AND ACCURACY IS NOT GUARANTEED THOSE WISHING TO STAKE MIN ING CLAIMS SHOULD CON SULT WITH THE MINING RECORDER, MINISTRY OF NORTHERN DEVELOP MENT AND MINES, FOR AD DITIONAL INFORMATION ON THE STATUS OF THE LANDS SHOWN HEREON

CIRCULATED SEPT. 23/93 D. McKEAN

Map base and land disposition drafting by Surveys and Mapping Branch, Ministry of Natural Resources

The disposition of land, location of lot fabric and parcel boundaries on this index was compiled for administrative purposes only.

Ol

OJ-JCD

Hm o

H

•Tl

l

l CM

CD42A01NE0130 2 16432 TECK 200

Page 18: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

565539

565538

42A01NE0130 2 16432 TECK

858029

858027

N

642642

BASELINE

210

SYMBOLSClaim line— — Claim post

Access road

Inphase —̂ ———

Quadrature -̂ ———

Creek/

Conductor axis •CI

INSTRUMENTATIONInstrument usedflEONICS EM 16 Station used Cutler, Maine

Frequency 24.0kHz

Vertical scale l inch s 40 0Xo

Positive

Negative Inphate

Quadrature

Base line

16432

PERRON GROUP

GROUND VLF-EM SURVEY NAA Profiled

TECK TOWNSHIP LARDER LAKE MINING DIVISION200feet 2OO 400

Scale- Imch - 200 feet

Report by WK Weller Drafted by WKW

Date 02/96 Map n*

Page 19: TECK TOWNSHIP FOR - Ontario · 2017-01-17 · l l 42a01ne0130 2 16432 teck geophysical survey report on the perron group teck township larder lake mining division district of tliuskadlng,

^5539

- r--- -t--"r

j l

L r-

-^

, -t

ri

i4.1

i

trc

Vfi

S7V

i'fl

SYMBOLS

Base station A

Contour interval 50-lOOgammas

- S

•c GPe

2.164 RECEIVED!

FEB 2 O 1996 rV*'w

•VIINING LANDS BRANCH

l42A01NE0130 2 16432 TECK 220