Repsol Sinopec Resources UK
Decommissioning in Practice – Getting the Job Done
Colin Hopkins – Project Manager
1
Technology Integration + Innovative Thinking = Optimised Post-CoP Management
Repsol Sinopec Resources UK
RSRUK has one of the largest decommissioning portfolio of assets in the UKCS
Asset Summary
8 No. in Operation
4 No. in Late Life / Decommissioning
2 No. in NNA Mode of Operation
CoP 2017
CoP 2015
CoP 2016
CoP 2018
FULMAR PUMPING STATION
Late Life / Decommissioning Assets
2
Assets in NNA Mode of Operation
Repsol Sinopec Resources UK
Value Creation
3
Creative Out of the Box Thinking
Challenging the Norm / Changing the mindset
Leveraging the right Technology / Innovation
Leveraging People knowledge / Experience
Robust Project Management & Delivery
Supply Chain Collaboration / Contracting Strategies
Select / Define Phase: Front end loading
Leveraging Value through Operator Collaboration
Overall Business Value Creation
Repsol Sinopec Resources UK
Not Normally Attended (NNA)
4
Beatrice Field (Alpha, Bravo, Charlie & WTG)
Beatrice Alpha in Warm Suspension; NNA
Alpha Mech’ Plugged, Bravo / Charlie Decom
Manned during Spring / Summer Seasons
Non-platform based
100% Renewable (Wind / Solar)
Via Nigg / Repsol Office
Vessel
87% Reduction
Saltire Platform
Platform in Warm Suspension; NNA
Saltire Wells Mechanically Plugged
3 / 3 Rotation; Unmanned every three weeks
Platform Based
Tethered by Piper Bravo
Via Piper Bravo / Repsol Offices
Helicopter
79% Reduction
Platform:
Operating Mode:
Wells Status:
Manning Status:
Well Decommissioning Strategy:
Primary Power Generation:
Remote Monitoring:
Primary Access:
Post CoP Savings Realised:
Two Projects, two different Solutions to Cost Reduction
Repsol Sinopec Resources UK
Beatrice Alpha: Technology and Integration
5
Wireless Well Monitoring
Navigation Aids
Weather MonitoringSolar Power Generation / AIS
Guides Wave RadarPower Gen Re-charge
Beatrice Alpha –Production Platform (AP)
Beatrice Alpha –Drilling Platform (AD)
Accommodation Module
Boat Landing Platform
Security Systems
Navigation Aids / AIS
Wind Power Generation
Derrick Removal
Repsol Sinopec Resources UK
Beatrice Alpha and Saltire: Remote Monitoring
6
Repsol Sinopec Resources UK
Roadmap of Savings – Post-CoP Value Creation
7
Saltire & Beatrice roadmap of savings from warm stack to NNA mode
100%
-52%
-87% -87%
0
5
10
15
20
25
30
35
40
2014 202020172015 2016 2018 2019
-52% -87%
Post-CoP Running Cost actuals (%)
Post-CoP Running Cost forecast (%)
Actuals – Warm stack Forecast – NNA mode
Beatrice Post-CoP Running Cost reduction glide path
100%
-60%
-79% -79%
0
2
4
6
8
10
12
14
16
18
20
22
24
26
20182014 20202015 2016 2017 2019
-60% -79%
Post-CoP Running Cost actuals (%)
Post-CoP Running Cost forecast (%)
Actuals – Warm stack
Saltire Post-CoP Running Costsreduction glide path
NNA modifications
Installed in 2018
NNA modifications
Installed in 2018
Formal CoPapproved
November 2016
Forecast – NNA mode
-60% OGUK Guidelines-60% OGUK Guidelines
Saltire Beatrice
Repsol Sinopec Resources UK
Roadmap of Savings – Post-CoP Value Creation
8
Saltire & Beatrice roadmap of savings from warm stack to NNA mode
‣ Optimize management of maintenance and integrity fit for Post CoP asset purpose allow massive reduction on safety critical and overall backlog
‣ Improved risk profile of assets by reducing personnel exposure by converting the platforms to Normally Not Attended mode of operations
‣ Using Enabling Technologies and Digital Solutions to enhance operations management of Post CoP assets
2015 2016 2017 2018 2019
(ho
urs
)
Post CoP Assets Maintenance and Integrity Evolution Enacted NNA
mode on both
Beatrice and
Saltire
7383
66 62
12.5
2015 2016 2017 2018 2019
Post CoP Assets POB Evolution
Repsol Sinopec Resources UK
Conclusions
9
‣ Innovative Thinking
‣ Technology Integration
‣ Optimised Post-CoP Management
‣ Getting the job done