16
Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Embed Size (px)

Citation preview

Page 1: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Technical Support Team Meeting

October 12-13, 2011Asheville, NC

Page 2: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Agenda: Day One

Welcome and IntroductionsOpening ActivityVISTA PresentationUpdate on SOSY ActivitiesData and Performance Measures DiscussionCurriculum and Material Review Bob, Brenda, Kelsey, Lupe and DeeReview Agricultural and OSY Literature Review JessicaDiscussion of SOSY Pilot ProcessGroup Discussion and Input• Redesign of the SOSY website• Technology Ideas/SOSY Video/TOT Video Clips TimWorking Lunch: Meeting of the Dissemination Event Planning CommitteeWork Group Time

Page 3: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Update on OSY Activities

• Share one success story with the group.

• Reflect back on one thing you would do differently this year.

• How have you used materials/resources from the Consortium?

Page 4: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Data and Performance Measures Discussion

• How are states collecting the data?• Do additional tracking tools need to

be created?• Are states using the SOSY tracking

form? SOSY student evaluation form?

Page 5: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

OSY STUDENT PROFILE

Date: MEP Project: COE# or MEP ID:

Name: □Male □Female Age:

Address/Camp: Phone: How long is youth planning on being in the area?

Last grade attended: Where: Year:

English oral language proficiency: □High □Medium □Low □None

Home language: □English □Spanish □Other:

Health needs: □Medical □Vision □Dental □Urgent □Other:

Check all that apply in the categories below. Expressed interests in: □Learning English □Job training □GED □Earning a diploma □Not sure □No interests □Other:

Availability: □Days □Evenings □Weekends □Other:

Has access to transportation: □Yes □No

Reason for leaving school: □Lacking credits □Needed to work □Missed State test □Other:

Housing – Youth lives: □With a crew □With friends outside of work □With his/her parents/family □With spouse & kids □With kids □Alone Youth is a candidate for: □HS diploma □Health ED □GED □Job training □HEP □Career exploration □Adult Basic Ed. □Life skills □ESL □PASS □CAMP □iPOD □Other:

At interview, youth received: □Educational materials □Support services □OSY welcome bag □Referral(s) (list in comments) □Other:

Comments:

Solutions for Out-of-School Youth (SOSY) OSY STUDENT PROFILE

Based on the information collected above, the youth is: □Here-to-work □Recovery

Page 6: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Uses of the OSY Profile• Individual Level

Plan educational and supportive services to address needs and interests

Leads to SOSY Services Plan

• State LevelDevelop statewide (and local) profile of

characteristics and needs of OSYLeads to update of State CNA and MPOs targeted to

OSY (recovery and here-to-work)

Page 7: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

SOSY STUDENT SERVICES PLANSOSY Student Services Plan

Name Date

Location

Here-to-Work Recovery

Instructional ESL Instruction Focus/Goal(s):

Materials:

Life Skills Focus/Goal(s):

Materials:

Career Awareness/Vocational Training Focus/Goal(s):

Materials:

Pre-GED Preparation Focus/Goal(s):

Materials:

GED Preparation Focus/Goal(s):

Materials:

Credit Recovery Focus/Goal(s):

Materials:

Other Focus/Goal(s):

Materials:

Supportive Nutrition Dental check-ups

Transportation Hearing Screenings

Translation Vision Exams

Material Resources Other_________________________

Counseling leading to re-enrollment in School

Other_________________________

Planned Methods of Supportive Service Delivery

Schedule of Planned Support Days: Monday Tuesday Wednesday Thursday Friday Saturday Saturday

Times:

Page 8: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

MAINTAINING GOOD RECORDS: SOSY TRACKING FORM

• An easy way to document services by youth served

• Helpful for developing a state profile• Essential for SOSY Consortium reporting• Data will be incorporated into the SOSY annual

performance report

Page 9: Technical Support Team Meeting October 12-13, 2011 Asheville, NC
Page 10: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Curriculum and Material Review

• Bob, Brenda, Kelsey, Lupe and Dee• Legal Lessons• Career Exploration Lessons• Parent Lessons• Reading on the Move

– Welcome to Olga– Discussion of the pilot process with HEP/CAMP

Page 11: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Literature Review

• Agricultural Trends Jessica• Update OSY Literature Review

• What additional information needs to be addressed in the reviews?

• How will the information be used?• How will it be disseminated?

Page 12: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Discussion of SOSY Pilot Process

• How will materials be piloted in year 2?• What states are willing to pilot the materials?• How will the information be tracked?• How will be feedback be submitted?• How will materials be revised as a result?

Page 13: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Group Discussion and Input

• Redesign of SOSY website• Use of technology• SOSY video/TOT video clips Tim

Page 14: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Work Group Assignments

• ID&R- Review and discuss the creation of 2 new documents

• TA- Review and finalize the HTW and Recovery Matrices (including introduction)

• Training- Review current materials, develop trainer guides and develop timeline for remaining work

• Curriculum-Review and update Educational Resource Rubric. Prepare report for SSST meeting and discuss input from TST.

Page 15: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Agenda: Day Two

8:00 am Working Breakfast- TOT Planning Committee Meeting

8:30 am Networking and Technical Assistance Topic: Safety and Professionalism TJ and TracieCheck in with work groupsReport to SSST meeting on November 15Discuss conference call scheduleOther issues

Page 16: Technical Support Team Meeting October 12-13, 2011 Asheville, NC

Networking and Technical Assistance Topic

Topic: Safety and Professionalism• What are the issues around safety you are seeing in

your state?• What are the issues around professionalism you are

seeing in your state?• How do you set boundaries for OSY and staff?

Expectations for OSY and staff? • What training is currently provided to staff?• What training or tools need to be developed in the

future by the Consortium?