Important: The information contained in this bulletin is intended for use by trained, professional technicians who have the proper tools, equipment, and training to perform the required maintenance described above. This information is NOT intended for ‘do-it-yourselfers’, and you should not assume that this information applies to your equipment. If you have any questions regarding this information please visit our website at www.prestolite.com, or contact our technical service department at:
Page 1
Leece-Neville Heavy Duty Systems400 Main StreetArcade, NY 14009
Technical ServiceBulletin
Phone: (844) [email protected]
Source: Leece-Neville Heavy Duty Systems Division - Arcade, NY USA
Date: JULY 7, 2017
Bulletin No: TSB-1144
Models: 5078R, 5042R, 6014R and 6026R
Subject: Regulator retrofit procedure
This procedure was created to help convert vehicles that used our 5078R(12V) and 5042R(24V) remote regulators to our newer 8RD2041S(12V) and 8RD3043S(24V) regulators.
8RD2041S (12V)8RD3043S (24V)
8RD2041S8RD3043S
Remote regulated systems procedure: 1) Disconnect vehicle batteries.
2) Identify and label vehicles wires connecting to voltage regulator and relay as indicated in Fig 1.
3) Remove , , wires from relay and , , wires from regulator terminals. Remove both regulator and relay from vehicle. Fig 1
Note: Relay will not be needed when using the replace-ment regulator.
4) Install new 8RD style regulator.
5) Wiring, please refer to steps below. Fig 2
A) Splice wires and together and apply shrink tubing to prevent shorting. B) Connect wire to (Blue / A Pin) on voltage regulator. C) Connect wire to (Green / C Pin) on voltage regulator. D) Connect wire to (Red / D Pin) on voltage regulator. E) Connect wire to (Black / B Pin) on voltage regulator. Note: Regulator pin identifications can be found in Fig 3
6) Connect batteries and test for proper operation.
1 2
3
F
+
-
BL
G
R
B
1 2 3 + - F
Fig 2
+-
F+
F-
8RD2041S (12V)8RD3043S (24V)
B+Ign.
+ - F 32 1R B G BL
ALT
+-
F+
F-
F-+
5078R(12V)5042R (24V) Regulator
6014R (12V)6026R (24V) Relay
123
B+Ign.
Fig 1
+ - F 3 2 1
ALT
Fig 3
Important: The information contained in this bulletin is intended for use by trained, professional technicians who have the proper tools, equipment, and training to perform the required maintenance described above. This information is NOT intended for ‘do-it-yourselfers’, and you should not assume that this information applies to your equipment. If you have any questions regarding this information please visit our website at www.prestolite.com, or contact our technical service department at:
Page 2
Leece-Neville Heavy Duty Systems7585 Empire DriveFlorence, KY 41042
Technical ServiceBulletin
Phone: (844) [email protected]
Date: JULY 7, 2017
Bulletin No: TSB-1144
Remote regulated systems with battery isolator procedure:. 1) Disconnect vehicle batteries.
2) Identify and label vehicles wires connecting to voltage regulator and relay as indicated in Fig 4.
3) Remove , , wires from relay and , , wires from regulator terminals. Remove blocking diode from regulator terminal and relay terminal. Fig 4 Remove regulator, relay and blocking diode from vehicle.
Note: Relay and blocking diode will not be needed when using the replacement regulator.
4) Remove short jumper wire connecting alternator F+ and B+ terminals. Install a new (14 AWG min.)wire from the alternator F+ terminal to the battery isolator start bat-tery post. Fig 5
5) Install new 8RD style regulator.
6) Wiring, please refer to steps below. Fig 5
A) Splice wires and together and apply shrink tubing to prevent shorting. B) Connect wire to (Blue / A Pin) on voltage regulator. C) Connect wire to (Green / C Pin) on voltage regulator. D) Wire is not needed. Insulate wire or remove to prevent shorting. E) Connect wire to battery isolator start battery post. regulator. F) Connect wire to (Black / B Pin) on voltage regulator. Note: Regulator pin identifications can be found on page one Fig 3 of this document.7) Connect batteries and test for proper operation.
1 2
3
F
+
-
BL
G
R
B
1 2 3 + - F+-
F+
F-
F-+
5078R(12V)5042R (24V) Regulator
6014R (12V)6026R (24V) Relay
123
Batt 1 (+)House
Ign.
Fig 4
+ - F 3 2 1
ALT
BatteryIsolatorA
1
2Batt 2 (+)Start
+3
+-
F+
F-
Batt 1 (+)House
Ign.
Fig 5
+
- F3
2 1
ALT
BatteryIsolatorA
1
2Batt 2 (+)Start
8RD2041S (12V)8RD3043S (24V)
BLGB
R
14 AWG.Min.
X
X
Short jumperwire.
Blocking Diode
Important: The information contained in this bulletin is intended for use by trained, professional technicians who have the proper tools, equipment, and training to perform the required maintenance described above. This information is NOT intended for ‘do-it-yourselfers’, and you should not assume that this information applies to your equipment. If you have any questions regarding this information please visit our website at www.prestolite.com, or contact our technical service department at:
Page 3
Leece-Neville Heavy Duty Systems7585 Empire DriveFlorence, KY 41042
Technical ServiceBulletin
Phone: (844) [email protected]
Date: JULY 7, 2017
Bulletin No: TSB-1144
AC
F+F-
ACAC
F-+
5078R(12V)5042R (24V) Regulator
6014R (12V)6026R (24V) Relay
123
B+
Ign.
Fig 6
+ - F 3 2 1
ALT
ACACAC
+
-
1111CA1112CARecti�er
Fig 7
AC
F+F-
ACAC
8RD2041S (12V)8RD3043S (24V)
B+
Ign.
+ - F 32 1R B G BL
ALT
ACACAC
+
-
1111CA1112CARecti�er
Remote regulated and rectified systems procedure. 1) Disconnect vehicle batteries.
2) Identify and label vehicles wires connecting to voltage regulator and relay as indicated in Fig 6.
3) Remove , , wires from relay and , , wires from regulator terminals. Remove both regulator and relay from vehicle. Fig 6
Note: Relay will not be needed when using the replace-ment regulator.
4) Install new 8RG style regulator.
5) Wiring, please refer to steps below. Fig 7
A) Splice wires and together and apply shrink tubing to prevent shorting. B) Connect wire to (Blue / A Pin) on voltage regulator. C) Connect wire to (Green / C Pin) on voltage regulator. D) Connect wire to (Red / D Pin) on voltage regulator. E) Connect wire to (Black / B Pin) on voltage regulator.
Note: Regulator pin identifications can be found on page one Fig 3 of this document.
6) Connect batteries and test for proper operation.
1 2
3
F
+
-
BL
G
R
B
1 2 3 + - F
Important: The information contained in this bulletin is intended for use by trained, professional technicians who have the proper tools, equipment, and training to perform the required maintenance described above. This information is NOT intended for ‘do-it-yourselfers’, and you should not assume that this information applies to your equipment. If you have any questions regarding this information please visit our website at www.prestolite.com, or contact our technical service department at:
Page 4
Leece-Neville Heavy Duty Systems7585 Empire DriveFlorence, KY 41042
Technical ServiceBulletin
Phone: (844) [email protected]
Date: JULY 7, 2017
Bulletin No: TSB-1144
Fig 9
AC
F+F-
ACAC
8RD2041S (12V)8RD3043S (24V)
Ign.
+ - F 32 1B G BL
ALT
ACACAC
+
-
1111CA1112CARecti�er
BatteryIsolatorA
1
2Batt 1 (+)Start
Batt 2 (+)House
R
X
Fig 8
AC
F+F-
ACAC
F-+
5078R(12V)5042R (24V) Regulator
6014R (12V)6026R (24V) Relay
123
Ign.
+ - F 3 2 1
ALT
ACACAC
+
-
1111CA1112CARecti�er
BatteryIsolatorA
1
2Batt 1 (+)Start
Batt 2 (+)House
Remote regulated and rectified systems with battery isolator procedure:. 1) Disconnect vehicle batteries.
2) Identify and label vehicles wires connecting to voltage regulator and relay as indicated in Fig 8.
3) Remove , , wires from relay and , , wires from regulator terminals. Remove blocking diode from regulator terminal and relay terminal. Fig 8 Remove regulator, relay and blocking diode from vehicle.
Note: Relay and blocking diode will not be needed when using the replacement regulator.
4) Move wire originally connecting alternator F+ and rectifier + terminals to the battery isolator start battery post. Fig 9
5) Install new 8RD style regulator.
6) Wiring, please refer to steps below. Fig 9
A) Splice wires and together and apply shrink tubing to prevent shorting. B) Connect wire to (Blue / A Pin) on voltage regulator. C) Connect wire to (Green / C Pin) on voltage regulator. D) Wire is not needed. Insulate or remove wire to prevent shorting. E) Connect wire to battery isolator start battery post. regulator. F) Connect wire to (Black / B Pin) on voltage regulator. Note: Regulator pin identifications can be found on page one Fig 3 of this document.7) Connect batteries and test for proper operation.
1 2
3
F
+
-
BL
G
R
B
1 2 3 + - F
+3
XBlockingDiode