197
TECHNICAL REPORT 43-101 ON THE FEASIBILITY STUDY FOR THE INCREASE IN PRODUCTION FROM 8Mtpy TO 16Mtpy OF CONCENTRATE FOR THE BLOOM LAKE PROJECT PREPARED FOR CONSOLIDATED THOMPSON IRON MINES LIMITED Prepared by: Michel Bourassa, Engineer, Soutex John Lemieux, Engineer, Amec Patrice Live, Engineer, BBA Inc. Nicole Rioux, Geologist, GENIVAR Réjean Foisy, Engineer, CIMA+ 3385 King Street West Sherbrooke, Quebec J1L 1P8 Telephone: (819) 565-3385 Fax: (819) 821-4283 JUNE 22 th , 2010 Feasibility Study– BLOOM LAKE, QUEBEC, CANADA TECHNICAL REPORT 43-101 PROJECT N o 3001-S05351A

Technical Report June 22 10

Embed Size (px)

Citation preview

Invalid document format