59
GHD | Report for North East Link Project - North East Link Environment Effects Statement, 31/35006 Appendices

Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

GHD | Report for North East Link Project - North East Link Environment Effects Statement, 31/35006

Appendices

Page 2: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,
Page 3: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

GHD | Report for North East Link Project - North East Link Environment Effects Statement, 31/35006

Appendix A – Stakeholder engagement

Page 4: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

| GHD | Report for North East Link Project - North East Link Environment Effects Statement, 31/35006

Appendix A – Stakeholder engagement The landscape and visual impact assessment has been partly informed by the stakeholder engagement program. Stakeholders and the community were consulted to support the preparation of the project EES and to inform the development of the project and understanding of potential impacts.

Table 1 lists specific engagement activities that have occurred in relation to the landscape and visual impact assessment, with more general engagement activities occurring at all stages of the project.

Feedback relevant to the landscape and visual impact assessment is summarised in Table 2, along with where these topics are addressed in this report.

Table 1 Stakeholder engagement undertaken for the landscape and visual impact assessment

Activity When Matters discussed Outcome

Urban Design Advisory Panel

Fortnightly from the 12 January 2018

Context, community and design matters

Facilitating outcomes focused on community benefit

Meeting with Whitehorse City Council

17 April 2018 Introduction to the landscape and visual impact assessment, planning

Additional studies and policies identified relevant to the landscape and visual impact assessment

Meeting with Manningham City Council

27 April 2018 Introduction to the landscape and visual impact assessment., planning

Additional studies and policies identified relevant to the landscape and visual impact assessment

Meeting with Banyule City Council

1 May 2018 Introduction to the landscape and visual impact assessment, planning

Additional studies and policies identified relevant to the landscape and visual impact assessment

Meeting with Yarra City Council

1 May 2018 Introduction to the landscape and visual impact assessment, planning

Additional studies and policies identified relevant to the landscape and visual impact assessment

Meeting with Boroondara City Council

22 May 2018 Introduction to the landscape and visual impact assessment, planning

Additional studies and policies identified relevant to the landscape

Page 5: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

GHD | Report for North East Link Project - North East Link Environment Effects Statement, 31/35006 |

Activity When Matters discussed Outcome

and visual impact assessment

Meeting with Nillumbik Shire Council

31 May 2018 Introduction to the landscape and visual impact assessment, planning

Additional studies and policies identified relevant to the landscape and visual impact assessment

Melbourne Water 3 July 2018 Yarra Strategic Plan, Healthy Waterways Strategy, Cultural Values Study, North East Link Urban Design Strategy with respect to the landscape and visual impact assessment, Planning and Heritage.

Overview of where Melbourne Water is at in the process for the Yarra Strategic Plan and findings so far were distributed including key views identified during stakeholder consultation.

Table 2 Community feedback received for the landscape and visual impact assessment

Issues raised during community consultation How it’s been addressed

Concerns from residents along the project alignment about:

Noise walls moving closer to homes

Tunnel ventilation structures being dominant features

New pedestrian bridges, viaducts and/or ramps changing views

Loss of trees, planting and mounds that screen and filter existing views of road infrastructure

Loss of views of open space

Loss of natural light

This report provides an assessment of the potential landscape and visual impacts due to project infrastructure including noise walls, elevated structures, tunnel ventilation structures, bridges and flood walls. There were 69 public domain and 12 private domain viewpoints assessed across the project corridor. Section 9 provides the findings of this assessment.

The shading impacts of the project are considered from a landscape and visual impact assessment perspective in Section 9.5 of this report. Technical report E – Land use planning and Technical report I – Social provide an assessment of the shading impacts in relation to planning policy provisions regarding amenity.

Page 6: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

| GHD | Report for North East Link Project - North East Link Environment Effects Statement, 31/35006

Issues raised during community consultation How it’s been addressed

Concerns about the loss of mature trees across the project area and requests to keep or replace the existing tree scape. Locations frequently mentioned include Koonung Creek parklands and Simpson Barracks.

The construction of the project would require the removal of vegetation at locations across the project corridor. Section 9 identifies the loss of vegetation at each viewpoint and describes replanting/landscaping proposed. The photomontages and sections show the proposed replanting. This includes viewpoints at Koonung Creek Reserve, Koonung Creek wetlands, Koonung Creek trail and Koonung Creek Linear Park (VP39, VP40, VP49, VP50, VP51, VP55 and VP59).

Viewpoint 15 considers views towards Simpson Barracks.

Concerns about visual impacts on users of sporting fields, community facilities, schools and parklands from raising Bulleen Road and building new elevated ramps between the Eastern Freeway and North East Link, new flood walls and tunnel ventilation structures.

The impacts on views from within sporting facilities and schools adjacent to Bulleen Road are considered in the report, with the change described. This includes viewpoints from Carey Bulleen Sports Complex, VP65 Trinity Marles Playing Fields and VP68 Freeway Public Golf Course.

Concerns about light spill from the road onto residential areas and request for this to be considered in impact assessments and project design.

Section 9.5 of this report discusses the potential light spill impacts. While there is currently no lighting design, this report does identify those locations that have potential to have medium to high light spill as a result of the project. EPR LV3 and LV4 are proposed to manage these impacts during construction and operation.

Concerns about visual impacts as a result of the project on Bolin Bolin Billabong.

The impacts on Bolin Bolin Billabong are discussed in the report (VP30). The impacts are impacts are expected to be negligible.

Concerns about views of work sites during construction and requests for more information about how visual impacts will be managed. This issue was frequently raised by residents on both sides of Greensborough Road at the Lower Plenty Road interchange.

The visual impacts during construction are discussed in Section 9.1.25, 9.2.24 and 9.3.25.

There would be construction fencing along the boundaries of project work areas. Viewers located directly adjacent to the construction compounds would have their views to open space interrupted and some viewers from streets and properties located further away, but elevated above the project would have views into the construction compounds.

Concerns the architectural style of bridges and natural look and feel (i.e. textured concrete) of existing noise walls on the Eastern Freeway will change and requests for the project design to maintain the existing look and feel of the road.

The design of bridges and other elements of the project are yet to be determined. However, the project’s Urban Design Strategy provides guidance to the contractor in terms of the performance requirements and benchmarks that must be achieved.

Requests for more information about how new planting will be maintained to a high-standard.

Section 4.7 discusses the arboriculture EPRs which refer to planting requirements.

Page 7: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

GHD | Report for North East Link Project - North East Link Environment Effects Statement, 31/35006

Appendix B – Legislation, policy and guidelines

Page 8: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Appendix B1.1 Commonwealth legislation

1.1.1 Environmental Protection and Biodiversity Conservation Act 1999

Environment Protection and Biodiversity Conservation Act 1999

1.2 State legislation

Table 1 Key Victorian Government legislation of relevance to the landscape and visual assessment

Planning and Environment Act 1987

Yarra River Protection (Wilip-gin Birrarung murron) Act 2017

Major Transport Projects Facilitation Act 2009 (Vic)

1.2.1 Planning Policy Framework

Page 9: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Table 2 State and regional planning policies of relevance to the landscape and visual assessment

12 Environmental and Landscape Values

12.03-1S River corridors, waterways, lakes and wetlands 12.05-2S Landscapes

12.03-1R Yarra River protection

13 Environmental Risks and Amenity

13.05-1S Noise abatement 13.07-1S Land use compatibility

Page 10: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

15 Built Environment and Heritage

15.01-1S Urban design 15.01-2S Building design 15.01-5S Neighbourhood character

18 Transport

18.01-1S Land use and transport planning 18.01-2S Transport system

Page 11: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Yarra River Action Plan 2017

Protecting the Yarra River (Birrarung)

1.3 Local policy

1.3.1 Local planning policy framework

Table 3 Local planning policies relevant to the landscape and visual assessment

Banyule MSS and LPP

Page 12: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Boroondara MSS and LPP

Manningham MSS and LPP

Nillumbik MSS and LPP

Whitehorse MSS and LPP

‘To protect and enhance areas with special natural, environmental, cultural or historic significance for the future enjoyment of the community’ ‘To develop main thoroughfares as attractive boulevards with improved advertising signage, landscaping and building design’.

Page 13: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Yarra MSS and LPP

PCRZ - Public Conservation and Resource Zone

PPRZ - Public Park and Recreation Zones

DDO1 - Design and Development Overlay (Boroondara)

DDO1 - Design and Development Overlay (Manningham)

Page 14: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

DDO1 – Design and Development Overlay (Yarra (Brirrung) River Corridor Protection) DDO2 - Design and Development Overlay (Manningham - Yarra (Birrarung) River Corridor Protection) DDO31 - Design and Development Overlay (Boroondara)

DDO8 - Design and Development Overlay (Banyule)

ESO1 – Environmental Significance Overlay (Banyule)

ESO5 – Environmental Significance Overlay (Banyule)

ESO2 – Environmental Significance Overlay (Manningham)

ESO3 – Environmental Significance Overlay (Manningham)

Page 15: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

ESO3 – Environmental Significance Overlay (Nillumbik)

ESO2 – Environmental Significance Overlay (Yarra)

SLO1 – Significant Landscape Overlay (Banyule) SLO1 – Significant Landscape Overlay (Boroondara) SLO2 – Significant Landscape Overlay (Manningham) SLO1 – Significant Landscape Overlay (Yarra (Birrarung) River Corridor Environs)

SLO5 – Significant Landscape Overlay (Manningham)

Page 16: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

SLO9 – Significant Landscape Overlay (Whitehorse)

VPO1 – Vegetation Protection Overlay (Banyule)

VPO5 – Vegetation Protection Overlay (Banyule)

VPO1 – Vegetation Protection Overlay (Boroondara)

VPO – Vegetation Protection Overlay (Whitehorse)

Page 17: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

1.4 Local strategies

Table 4 Local strategies relevant to the landscape and visual assessment

Metropolitan Planning Strategy 2017-2050

Plan Melbourne 2017-2050

Page 18: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Yarra Strategic Plan

‘Nhanbu narrun ba ngarqunin twarn Birrarung : Ancient Spirit and Lore of the Yarra’ - Wurundjeri Input into the Yarra Strategic Plan

ooo

o

oo

Page 19: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

1.5 State guidelines

Table 5 State guidelines of relevance to the landscape and visual assessment

Urban Design Charter for Victoria

Landscapes of Cultural Heritage Significance: Assessment Guidelines 2015

1.6 Other guiding documents

Page 20: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Table 6 Other guiding documents of relevance to the landscape and visual assessment

Banyule City Council

Public Open Space Plan 2016-2031

Public Open Space Plan

A green City that provides high quality, sustainable, accessible and well maintained public open space within five minutes walk of residents’

Urban Forest Strategic Plan 2014

Urban Forest Strategic Plan

Landscape Assessment for Significant ridgelines in Banyule 2012

Heidelberg Structure Plan 2010

Heidelberg Structure Plan

Melbourne 2030 Plan Melbourne 2017-20150

Page 21: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Neighbourhood Character Strategy 2012

Neighbourhood Character Strategy

Natural environment

Built environment

Transport and infrastructure

Land use

Natural environment

Built environment

Page 22: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Picture Watsonia Picture Watsonia

DRAFT Strategy for Substantial Trees in Banyule’s Garden Court and Garden Suburban Neighbourhoods 2013

Greensborough Activity Centre – Urban Landscape Design Guidelines 2015

City of Boroondara

Boroondara Open Space Plan Strategy 2013

Open Space Strategy

‘A vibrant, liveable city which fosters the cultural, environmental, economic and personal wellbeing of our community’

Page 23: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Urban Biodiversity Strategy 2013-2023

Urban Biodiversity Strategy‘….provide a dynamic example of integrating biodiversity and habitat into an intense urban environment. Boroondara’s residents value the City’s natural assets and appreciate opportunities to explore and experience nature in the City.’

City of Yarra

Open Space Strategy 2006

Open Space Strategy

Yarra's waterways, inner city location, diverse social mix and heritage character all contribute to a unique landscape. Council seeks to respond to this landscape through the establishment of a quality open space system that meets the recreational and environmental needs of the local community and enhances cultural, social and ecological values. This will be delivered in a sustainable management framework so that the long-term economic, cultural and environmental viability of Yarra's open space network is protected and enhanced for current and future generations.

Open Space

Page 24: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Urban Design Strategy 2011

Urban Design Strategy

Manningham City Council

Draft Koonung Park Management Plan 2016

Draft Koonung Park Management Plan

Page 25: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Open Space Strategy 2014 Open Space Strategy

Our vision is for an accessible and well connected open space network that supports a healthy community and healthy environment.

Streetscape Character Study 2009

Streetscape Character Study

Manningham Residential Character Guidelines 2005

Manningham Residential Character Guidelines

Page 26: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

City of Whitehorse

Neighbourhood Character Study Preferred Character Statements and Guidelines

Neighbourhood Character Study

Neighbourhood Character Study

Neighbourhood Character Study

Whitehorse Open Space Strategy

Open Space Strategy

provides visual interest and diversity in the open space reserves with some reserves located on elevated hilltops offering good views towards the City and the Dandenongs, for example Simpson Park.”

Elgar Park Master Plan

Municipal Wide Tree Study 2016

Box Hill Structure Plan 2007

Page 27: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Nunawading MegaMile and Mitcham Structure Plan 2008 (east Plan)

Megamile (west Plan) and Blackburn Activity Centres for Urban Design Framework 2010

Neighbourhood Activity Centre Urban Design Guidelines 2014

Whitehorse Urban Biodiversity Strategy

Page 28: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Melbourne Water

Draft Healthy Waterways Strategy 2018

Healthy Waterways Strategy 2013

Healthy Waterways StrategyHealthy and valued waterways are integrated with the broader

landscape and enhance life and liveability. They: Connect diverse and thriving communities of native plants and animals.Provide amenity to urban and rural areas and engage communities with their environment.Are managed sustainable to balance environmental, economic and social values.

Healthy Waterways Strategy 2018-2028

Page 29: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Middle Yarra Concept Plan Burke Road to Watsons Creek 1991

Page 30: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Department of Environment, Land, Water and Planning

Lower Yarra Corridor Study

Page 31: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,
Page 32: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Lower Yarra River Corridor StudyLandscape and Environmental Values

Protecting views

Built form siting and design

Public open space and access

Page 33: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Middle Yarra Corridor Study

Page 34: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Landscape and environmental values:

Protecting views:

Page 35: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Built form siting and design:

River health and conservation:

Public open space and access:

Page 36: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,
Page 37: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

GHD | Report for North East Link Project - North East Link Environment Effects Statement, 31/35006

Appendix C – Photomontages

Page 38: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

GHD | Report for North East Link Project - North East Link Environment Effects Statement, 31/35006

Appendix D – Risk assessment

Page 39: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Appendix D1.1 Risk assessment methodology

Ministerial guidelines for assessment of the environmental effects under the Environment Effects Act 1978

1.2 Risk assessment process

Page 40: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Figure 1 Risk-analysis approach

1.2.1 Rating risk

1.2.2 Assigning the consequences of risks

1.2.3 Assigning the likelihood of risk

Page 41: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

Table 1 Likelihood of an event occurring

1.2.4 Risk matrix and risk rating

Table 2 Risk matrix

Page 42: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

1.3 Summary of risk assessment

Table 3 Landscape and visual impact assessment risks

Page 43: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,
Page 44: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

GHD | Report for North East Link Project - North East Link Environment Effects Statement, 31/35006

Appendix E – Existing conditions maps

Page 45: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,
Page 46: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

180 Lonsdale Street Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W www.ghd.com

STO

NY

CR

EE

K

YARRA R IVER

PL

ENTY

RIVER

DONCASTER

BLACKBURN

DIAMONDCREEKPLENTY

BRIARHILL

WATSONIA

KEW

TEMPLESTOWE

TEMPLESTOWELOWER

NORTHCOTE

KINGSBURY

YALLAMBIE

VIEWBANK

WARRANDYTE

ALPHINGTON

IVANHOE

CLIFTONHILL

PRESTON

IVANHOEEAST

KEWEAST

RESEARCH

MONTMORENCY

FITZROYNORTH

MACLEOD

BOX HILLNORTH

NORTHWARRANDYTE

ROSANNA

BULLEEN

NUNAWADING

ELTHAM

RESERVOIR

HEIDELBERG

DONCASTEREAST

BLACKBURNNORTH

BALWYN

GREENSBOROUGH

BALWYNNORTH

MITCHAM

MONTALBERTNORTH

DONVALE

BUNDOORA

Plen

ty R

d

Bulle

enR

d

Banksia St

Chand ler

Hwy

Reynolds Rd

Eastlink

Lower PlentyRd

Sprin

g val

eR

d

Metropolitan Ring RdMetropolitan Ring Rd

Bla

ckbu

rn

Rd

Elga

r R

d

Bur

ke R

d

Manningham

Rd

Eastern Fwy

Eastern Fwy

Eastern FwyDoncaster Rd

Doncaster Rd

Sxm

Sxm

Sxa

Sxa

Sxm

Sxa

Sxm

Sxa

Sxa

Neo2 Nug

Nxp

Sxm

Sxm

Nbr

Qa1

Nxp

NxpQc1

Qc1

Qc1

Neo2

Qc1

Qc1

Nxp

Qa1

Qc1

Qa1

Nbr

Qa1

Nxp

Nxp

Sxm

Qa1

Nxp

Nxp

Nug

Qc1

Nxp

Sxa

Sxm

Nbr

Nbr

Nxp

Nuu

Nxp

Nbr

Qa2

Qa2

Sxm

Qc1

Qc1

Qa2

Qa1

Nbr

Nuu

Nuu

Sxa

Sxa

Qa2

Qa2

Nug

Qa1

Nug

Qa1

Sxm

Sxa

Qc1

Qc1

Qc1

Qyp

Nxp

Qc1

Qa2Nuu

Sxa

Sxa

Nbr

Qc1

Sxm

NbrSxa

Sxa

Nxp

Qa1

Nxp Nxp

Qa1

Nbr

Sxa

Qc1Qc1

Qc1

Nbr

Nbr

Sxm

Neo

Qyc

Qyc

Sxm

Nbr

Nxp

Nbr

Sxm

Sxm

NxpQc1

Sxm

Sxm

Qa1

Qa2

Qc1

Nbr

Sxa

Sxa

Nug

Qa2 Nxp

Nbr

Nug

Nbr

Sxm

Nuu

Sxm

Sxm

Nbr

Qc1

Qa1

Nxp

Qa1

Nbr

Qc1

Nxp

Nbr

Nuu

Nug

Qa1

Nug

Sxm

Nug

Qa1

Qc1

Qa1

Qa2

Nbr

Qa2Nbr

Nxp

Qc1Neo2 Nug

Qa2

Sxm

Qa2

Sxa

Sxm

Qa1

Sxm

Sxm

QyjNeo

Qm1 Qc1

Nuu

Sxm

Sxm

Qa2

Nxp

Nug

Sxa

Sxm

Neo

Neo

Sxm

Qa2

Nug

Nbr

Nxp

Nxp

Nbr

Qa1

Qa1

Sxa

Qa2

Sxm

Nug

Nxp

Sxm

Sxm

Qa2

Nbr

Sxa

Nuu

Sxm

Sxm

Nbr

Qa1

Sxa

Sxa

Nbr

Sxm

Qa1

Nbr

Qa2

Nug

Sxa

Qa2 Nug

Qc1

Sxm

Nxp

Nbr

Qa1

G:\31\35006\GIS\Maps\Working\Specialist Submission\EES\Land and Visual Impact\3135006_7_1_Geology_A3L_RevL.mxd

© 2019. Whilst every care has been taken to prepare this map, GHD (and DATA CUSTODIAN) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.

LEGEND

0 0.75 1.5 2.25 3

Kilometres

Map Projection: Transverse MercatorHorizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 55

North East Link ProjectEnvironment Effects Statement (EES)

Job NumberRevision L

31-35006

25 Feb 2019

Geology mapo Date

Data source: CIP Imagery - DELWP - 2018 | roads, watercourses, parks, rail, localities - Vicmap - 2019 | project infrastructure, viewpoints, character areas, study areas - GHD, AECOM - 2019. Created by:trighetti

Paper Size A3Study Area

Ventilation Structures

Noise Walls and Viaduct Structures

Project boundary - sub-surface

Project boundary - surface

Geological Unit 50k LegendNbr

Neo

Neo2

Nug

Nuu

Nxp

Qa1

Qa2

Qc1

Qhw

Qm1

Qyc

Sxa

Sxm

Page 47: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

180 Lonsdale Street Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W www.ghd.com

STO

NY

CR

EE

K

YARRA R IVER

YARRA RIVER 40

140

160

140

80

160

120

180

140

140

80

120

100

100

40

80

40

200

40

120

100

80

100

140120

120

80

100

140

140

80

80

140

80

100

160

180

140

140

120

120

60

210

120

100

80

100

140

100

80

120

80

80

120 160

120

20

18080

140

40

100

140

100

80

140

100

60

160

80

20

80

140

140

100

100

180

20

80

60

140

100

40

230

120

100

100

120

120

100

100

80

100

120

100

160

100

60

20

100

80

40

40

140

80

140

60

100

160

140

100

100

120

20

100

120

16060

60

80

120140

60

100

180

80

140

140

120

100

180

80

120

80

140

140

120

100

120

120

120

220

120

100

120

120

120

80

100

80

80

80

180

120

60

140

120

100

120

100

40

120

80

20

160

120

120

40

100

20

80

60

80

120

140100

60

80

160

40

180

120

60

140

160

140

120

140

100

120

210

100

80

120

120

60120

140

100

120

100

100

160

140

80

80

100

100

100

140

60

140

140

60

120

200

100

120

60

100

80

80

140

40

80

120

80

120

60

20

120

100

2080

180

DONCASTER

BLACKBURN

DIAMONDCREEKPLENTY

BRIARHILL

WATSONIA

KEW

TEMPLESTOWE

TEMPLESTOWELOWER

NORTHCOTE

KINGSBURY

YALLAMBIE

VIEWBANK

WARRANDYTE

ALPHINGTON

IVANHOE

CLIFTONHILL

PRESTON

IVANHOEEAST

KEWEAST

RESEARCH

MONTMORENCY

FITZROYNORTH

MACLEOD

BOX HILLNORTH

NORTHWARRANDYTE

ROSANNA

BULLEEN

NUNAWADING

ELTHAM

RESERVOIR

HEIDELBERG

EAGLEMONT

DONCASTEREAST

BLACKBURNNORTH

BALWYN

GREENSBOROUGH

BALWYNNORTH

MITCHAM

MONTALBERTNORTH

DONVALE

BUNDOORA

Plen

ty R

d

Bulle

enR

d

Banksia St

Chand le r

Hwy

Reynolds Rd

Eastlink

Lower PlentyRd

Spri

ngva

leR

d

Metropolitan Ring RdMetropolitan Ring Rd

Bla

ckbu

rn

Rd

Elga

r R

d

Bur

ke R

d

Manningham

Rd

Eastern Fwy

Eastern Fwy

Eastern FwyDoncaster Rd

Doncaster Rd

G:\31\35006\GIS\Maps\Working\Specialist Submission\EES\Land and Visual Impact\3135006_7_2_Existing_Conditions_A3L_RevL.mxd

© 2019. Whilst every care has been taken to prepare this map, GHD (and DATA CUSTODIAN) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.

LEGEND

0 0.75 1.5 2.25 3

Kilometres

Map Projection: Transverse MercatorHorizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 55

North East Link ProjectEnvironment Effects Statement (EES)

Job NumberRevision L

31-35006

25 Feb 2019

Topography and waterwayso Date

Data source:CIP Imagery - DELWP - 2018 | roads, watercourses, parks, rail, localities - Vicmap - 2019 | project infrastructure, viewpoints, character areas, study areas - GHD, AECOM - 2019. Created by:trighetti

Paper Size A3Study Area

Ventilation Structures

Noise Walls and Viaduct Structures

Project boundary - sub-surface

Project boundary - surface

Contour (20m)

Freeway

Highway

Major road

Watercourses

River

Parks & reserves

Figure 7-2

Page 48: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

180 Lonsdale Street Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W www.ghd.com

STO

NY

CR

EE

K

MARI BYRN

ON

G

RIVER

YARRA R IVER

PL

ENTY

RIVER

DONCASTER

BLACKBURN

DIAMONDCREEKPLENTY

BRIARHILL

WATSONIA

KEW

TEMPLESTOWE

TEMPLESTOWELOWER

NORTHCOTE

KINGSBURY

YALLAMBIE

VIEWBANK

WARRANDYTE

ALPHINGTON

IVANHOE

CLIFTONHILL

PRESTON

IVANHOEEAST

KEWEAST

RESEARCH

MONTMORENCY

FITZROYNORTH

MACLEOD

BOX HILLNORTH

NORTHWARRANDYTE

ROSANNA

BULLEEN

NUNAWADING

ELTHAM

RESERVOIR

HEIDELBERG

EAGLEMONT

DONCASTEREAST

BLACKBURNNORTH

BALWYN

GREENSBOROUGH

BALWYNNORTH

MITCHAM

MONTALBERTNORTH

DONVALE

BUNDOORA

Plen

ty R

d

Bulle

enR

d

Banksia St

Chandler

Hwy

Reynolds Rd

Eastlink

Lower PlentyRd

Sprin

gval

eR

d

Metropolitan Ring RdMetropolitan Ring Rd

Bla

ckbu

rn

Rd

Elga

r R

d

Bur

ke R

d

Manningham

Rd

Eastern Fwy

Eastern Fwy

Eastern Fwy

Doncaster Rd

Doncaster Rd

300

641

127

928

61

47

164

56

125

22

172

932

89753

656

83

851

132

74

934

992

55

175

126

937

68

636

3

18

23

895

9

G:\31\35006\GIS\Maps\Working\Specialist Submission\EES\Land and Visual Impact\3135006_7_3_Vegetation_A3L_RevL.mxd

© 2019. Whilst every care has been taken to prepare this map, GHD (and DATA CUSTODIAN) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.

LEGEND

0 0.75 1.5 2.25 3

Kilometres

Map Projection: Transverse MercatorHorizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 55

North East Link ProjectEnvironment Effects Statement (EES)

Figure 7-3

Job NumberRevision L

31-35006

25 Feb 2019

Vegetation coverage mapo Date

Data source: CIP Imagery - DELWP - 2018 | roads, watercourses, parks, rail, localities - Vicmap - 2019 | project infrastructure, viewpoints, character areas, study areas - GHD, AECOM - 2019. Created by:trighetti

Paper Size A3Study Area

Ventilation Structures

Noise Walls and Viaduct Structures

Project boundary - sub-surface

Project boundary - surface

EVC 1750125 Plains Grassy Wetland

126 Swampy Riparian Complex

127 Valley Heathy Forest

132 Plains Grassland

164 Creekline Herb-rich Woodland

172 Floodplain Wetland Aggregate

175 Grassy Woodland

18 Riparian Forest

22 Grassy Dry Forest

23 Herb-rich Foothill Forest

3 Damp Sands Herb-rich Woodland

300 Reed Swamp

47 Valley Grassy Forest

53 Swamp Scrub

55 Plains Grassy Woodland

56 Floodplain Riparian Woodland

61 Box Ironbark Forest

636 Brackish Lake Aggregate

641 Riparian Woodland

656 Brackish Wetland

68 Creekline Grassy Woodland

74 Wetland Formation

83 Swampy Riparian Woodland

851 Stream Bank Shrubland

895 Escarpment Shrubland

897 Plains Grassland/Plains Grassy Woodland Mosaic

9 Coastal Saltmarsh

928 Riparian Woodland/Stream-bank Shrubland Mosaic

932 Wet Verge Sedgeland

934 Brackish Grassland

937 Swampy Woodland

992 Water Body - Fresh

Page 49: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

180 Lonsdale Street Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W www.ghd.com

PlentyGorge

Parklands

GresswellForest (part

b) NCR

Yan

Yea n

Rd

Plenty Rd

Plenty

Rd

Plen

tyRd

Plen

ty R

d

Gre

ensb

orou

gh R

oad

Mckimmies Rd

St Helena Rd

Ple ntyRi

ver D

r

KingsburyD

r

D arebin

Dr

Childs Rd

Dal

ton

Rd

Settle m ent Rd

Grimshaw St

Grimshaw St

Metropolitan Ring Rd

Metropolitan Ring Rd

Main Dr

Wat

soni

aR

d

Greenwoo

d Dr

Main Rd

Bol

drew

ood

Pde

Sherbourne Rd

Mai

nR

d

ParaRd

Main

St

Sprin

gtho

rpe

Bvd

Mai

s S

t

Weid

lich Rd

Mac

orna

St

Rya

ns R

d

Gre

ensb

orou

ghBy

pa

Inve

rmay

St

Cameron Pde

Civic Dr

Bet

ula

Av

Mill Park Dr

Delta

Rd

Rattray Rd

Wallowa Rd

Bent

St

Mountain View

Rd

Blossom ParkDr

Bol

ton

St

Look

erR

d

Car

war

pSt

Yallambie Rd

Lower Plenty Rd

Hen

ry S

t

Mcd

owel

l St

Karingal Dr

Albert St

Elon

era

Av

Diamon

dCr

eek

Rd

Marsha ll Dr

St Clems St

Elder St

Wun

gan

St

Greenhill

Rd

Aqueduct

Rd

Dole Av

Bridge St

Wai

ora

Rd

Mcn

amar

aSt

Pano

ram

aA

v

Glen Katherine Dr

Dev

onshire

Rd

Wood St

Torbay St

Dunne St

Burbank Dr

Dumbarton St

Gre

ensb

orou

ghB

ypas

s

Wattletree

Rd

Progress Rd

BAN

YU

LEC

RE

EK

PLENT

YRI

VER

DIA

MO

NDCR

EEKDAREBIN CREEK

SPORTSFIELDS LAKE

UPPER LAKE

BIOLOGICALLAKE

KALPARRIN LAKE

BLUELAKE

DIAMOND CREEK

PLENTY

BRIAR HILL

WATSONIA

KINGSBURY

YALLAMBIE

LOWER PLENTY

BUNDOORA

THOMASTOWN

MONTMORENCY

MACLEOD

LALOR

ELTHAM NORTH

WATSONIANORTH

ELTHAM

RESERVOIR

GREENSBOROUGH

ST HELENA

MILL PARK

BUNDOORA

G:\31\35006\GIS\Maps\Working\Specialist Submission\EES\Land and Visual Impact\3135006_7_4-7_6_Land_Use_A3L_RevL.mxd

© 2019. Whilst every care has been taken to prepare this map, GHD (and DATA CUSTODIAN) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.

LEGEND

0 0.25 0.5 0.75 1

Kilometres

Map Projection: Transverse MercatorHorizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 55

North East Link ProjectEnvironment Effects Statement (EES)

Planning Zones and Overlays: LandscapeM80 to Lower Plenty Road Figure 7-4

Job NumberRevision L

31-35006

25 Feb 2019o Date

Data source: CIP Imagery - DELWP - 2018 | roads, watercourses, parks, rail, localities - Vicmap - 2019 | project infrastructure, viewpoints, character areas, study areas - GHD, AECOM - 2019. Created by:trighetti

Paper Size A3

Planning overlayVegetation Protection Environmental SignificanceDesign And DevelopmentSpecial Building

Planning zonePublic Conservation & ResourcePublic Park and Recreation

Study AreaVentilation Structures

Noise Walls and Viaduct Structures

Project boundary - sub-surface

Project boundary - surface

Page 50: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

180 Lonsdale Street Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W www.ghd.com

YarraValley

Parklands

YarraValley

Parklands

YarraValley

Parklands

Uppe

r Heidelb

erg Rd

Cap

e St

Studley R d

Ayr

St

Lower Heidelberg Rd

Wood St

Thompsons Rd

Thom

pson

s Rd

Wat

erda

le R

d

Wat

erda

le R

d

Tyler St

High

St

High St

King St

George St

Gower St

Murray Rd

Will

iam

sons

Rd

Darebin Rd

Foote St

Eastern Fwy

Serpells Rd

Chi

fley

Dr

Vict

oria

St

ManninghamRd

Manningham Rd

Ros

anna

Rd

Bul

leen

Rd

Raglan St

Ruthven St

Lower Plenty Rd

Lower Plenty Rd

Mar

shal

lSt

Main Rd

Dougharty Rd

Wai

ora

Rd

Boldrewood Pde Plenty Rd

Martins Lane

Jika St

MainRd

Burgundy St

Bell St

Bell St

Erskine Rd

Orie

l Rd

Bell- BanksiaLink

Orie

l Rd

Southern Rd

Outhwaite Rd

Nor manSt

Station Rd

Gre

ensb

orou

gh

Roa

dSeparation St

Heide

lber

g Rd

Alb

ert S

t

Gra

nge

Rd

Carron St

Bol

ton

St

Look

er R

d

Carw

arp

St

Yalla mb ie

Rd

Hen

ders

ons

Rd

Libe

rty

Pde

And

erso

nSt

Para

Rd

Dundas St

Templestowe Rd

Gro

ve R

d

Banksia St

Porter St

Livingstone St

Chu

rch

Rd

Mcn

amar

aSt

Pano

ram

aA

v

Mcarthur Rd

Kingsbury Dr

Stat

ion

St

James StParker St

Lynnwood Pde

Wun

gan

St

Ba n yule Rd

Fitz

sim

ons

Lane

HentyRd

Maltravers Rd

Bond

s Rd

Clev

elan

d Av

Elle

smer

ePd

e

BANYULE

CREEK

YARRA RIVER

MO

ND

C

DAREBINCREEK

PLENT YRIVER

KOONUNG CREEK

SPORTSFIELDS LAKE

RUFFEY LAKE

BONVIEWSEDIMENT

POND

BOLIN BOLINBILLABONG

BANYULESWAMP

IRVINE RDDRAIN

DONCASTER

BELLFIELD

TEMPLESTOWE

TEMPLESTOWELOWER

FAIRFIELD

YALLAMBIE

LOWER PLENTY

BUNDOORA

VIEWBANK

HEIDELBERGWEST

ALPHINGTON

HEIDELBERGHEIGHTS

IVANHOE

PRESTON

IVANHOE EAST

MONTMORENCYMACLEOD

ROSANNA

BULLEEN

ELTHAM

RESERVOIR

HEIDELBERG

EAGLEMONT

BALWYN NORTH

THORNBURY

BUNDOORA

G:\31\35006\GIS\Maps\Working\Specialist Submission\EES\Land and Visual Impact\3135006_7_4-7_6_Land_Use_A3L_RevL.mxd

© 2019. Whilst every care has been taken to prepare this map, GHD (and DATA CUSTODIAN) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.

LEGEND

0 0.25 0.5 0.75 1

Kilometres

Map Projection: Transverse MercatorHorizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 55

North East Link ProjectEnvironment Effects Statement (EES)

Planning Zones and Overlays: LandscapeTunnel Figure 7-5

Job NumberRevision L

31-35006

25 Feb 2019o Date

Data source: CIP Imagery - DELWP - 2018 | roads, watercourses, parks, rail, localities - Vicmap - 2019 | project infrastructure, viewpoints, character areas, study areas - GHD, AECOM - 2019. Created by:trighetti

Paper Size A3

Planning overlayVegetation Protection Environmental SignificanceDesign And DevelopmentSpecial Building

Planning zonePublic Conservation & ResourcePublic Park and Recreation

Study AreaVentilation Structures

Noise Walls and Viaduct Structures

Project boundary - sub-surface

Project boundary - surface

Page 51: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

180 Lonsdale Street Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W www.ghd.com

YarraValley

Parklands

YarraBend Park

YarraValley

Parklands

George St

Eliz

abet

h St

Lower H e idelbe

rg

Rd

Hod

dle

St

Punt

Rd

Wat

erda

leR

d

Upp

er

Heid

elberg

Rd

King St

Heidelberg Rd

St G

eorg

es R

d

Bal

wyn

Rd

Canterbury Rd

Canterbury Rd

Thompsons Rd

High

St

Swan St

Chu

rch

St

Olympic Bvd

Stat

ion

St

Mid

dleb

orou

gh R

d

Queens Pde

Burwood Rd

Riversdale Rd

Uni

on

Rd

Batma n

Av

Eastern Fwy

EasternFwy

EasternFwy

Eastern Fwy

Gle

nfer

rie

Rd

Hig

h St

Hig

h St

Darebin Rd

Sprin

g St

Cotham Rd

Separation St

Mont Albert Rd

Murray Rd

Bur

ke R

d

BurkeR

d

Doncaster Rd

Doncaster Rd

Banksia St

Mitcham Rd

Will

iam

sons

Rd

Nic

hols

on S

t

Surr

ey

Rd

Wai

ora

Rd

Wellington Pde

Hig

hfie

ld R

d

Foote St

Whitehorse Rd

Whitehorse RdWhitehorse Rd

Johnston St

Dundas St

Bridge Rd

Lower Plenty Rd

Elga

rR

d

Elgar

Rd

And

erso

nsC

reek

Rd

Arthurton Rd

Victoria Pde

Livingstone St

Tram R

d

Normanby Av

Vict

oria

St

Bell St

Bell St

Gilb

ert R

d

Pow

er

St

Bru

nsw

ick

St

Southern Rd

Manningham Rd

Plen

ty R

d

Spri

ngva

le R

d

Sprin

gval

e R

d

Den

mar

kS

t

Ros

anna

Rd

Bla

ckbu

rn R

d

Bul

leen

Rd

Smith

St

Aub

urn

Rd

Lans

dow

ne S

t

Westgarth St

High St

Harp Rd

Burnley Tunl

He idelberg - Warrandyte Rd

Victoria St

Ruth ven St

OldW

arra

nd

yteRd

Camberwell

Rd

Alexandra Pde

Chandl er

Hwy

Barkers Rd

Porter St

Albert St

Parker St

Alexandra

Av

Prin

cess

S t

Nic

hols

on S

t

Bur

nley

S

t

Belmore Rd

Erskine Rd

Rathmines Rd

Vict

oria

Rd

F itz

sim

ons

Lane

High

St S

outh

Bol

ton

St

Alb

ert

St

Stat

ion

St

Park

Rd

Tind

als

Rd

Holden St

Gertrude St

Lynnwood Pde

Merr i Pde

Main Rd

Templestowe Rd

Asquith StWills

mere

Rd

Melba Tunl

War

rigal

Rd

Studley Park Rd

Burgundy St

Orie

lR

d

Blyth St

Reynolds Rd

Gre

ytho

rn R

d Wet

her b

yR

d

Gra

nge

Rd

Springfield Rd

Miller St

EarlSt

Brunton Av

Kingsbury Dr

KOO NUNG CREEK

BANYULE CREEK

DAR

EBIN

CRE

EK

ME

RRI CRE

EK

YARRA RIVER

PLEN

TY RI VER

MELBOURNE

DONCASTER

VERMONT

TOORAK

BURNLEY

BLACKBURN

DEEPDENE

MONT ALBERT

BLACKBURNSOUTH

BELLFIELD

BOX HILLSOUTH FOREST HILL

RICHMOND

KEW

HAWTHORN

BOX HILL

SURREY HILLS

EASTMELBOURNE

TEMPLESTOWE

TEMPLESTOWELOWER

HAWTHORNEAST

NORTHCOTE

FAIRFIELD

YALLAMBIE

LOWER PLENTY

ABBOTSFORD

BUNDOORACOBURGNORTH

VIEWBANKHEIDELBERG

WEST

WARRANDYTE

ALPHINGTON

HEIDELBERGHEIGHTS

IVANHOE

CLIFTON HILL

PRESTON

IVANHOE EAST

KEW EAST

FITZROY

FITZROYNORTH

MACLEOD

BOX HILLNORTH

ROSANNA

BULLEEN

NUNAWADING

ELTHAM

RESERVOIR

HEIDELBERG

EAGLEMONT

DONCASTEREAST

BLACKBURNNORTH

CANTERBURY

CAMBERWELL

BALWYN

BALWYN NORTH

MITCHAM

MONTALBERTNORTH

THORNBURY

PARKORCHARDS

DONVALE

CREMORNE

BUNDOORA

G:\31\35006\GIS\Maps\Working\Specialist Submission\EES\Land and Visual Impact\3135006_7_4-7_6_Land_Use_A3L_RevL.mxd

© 2019. Whilst every care has been taken to prepare this map, GHD (and DATA CUSTODIAN) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.

LEGEND

0 0.5 1 1.5 2

Kilometres

Map Projection: Transverse MercatorHorizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 55

North East Link ProjectEnvironment Effects Statement (EES)

Planning Zones and Overlays: LandscapeEastern Freeway upgrades Figure 7-6

Job NumberRevision L

31-35006

25 Feb 2019o Date

Data source: CIP Imagery - DELWP - 2018 | roads, watercourses, parks, rail, localities - Vicmap - 2019 | project infrastructure, viewpoints, character areas, study areas - GHD, AECOM - 2019. Created by:trighetti

Paper Size A3

Planning overlayVegetation Protection Environmental SignificanceDesign And DevelopmentSpecial Building

Planning zonePublic Conservation & ResourcePublic Park and Recreation

Study AreaVentilation Structures

Noise Walls and Viaduct Structures

Project boundary - sub-surface

Project boundary - surface

Page 52: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

GHD | Report for North East Link Project - North East Link Environment Effects Statement, 31/35006

Appendix F – Zone of theoretical visibility maps

Page 53: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,
Page 54: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

180 Lonsdale Street Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W www.ghd.com

YARRA RIVER

YARRA RIVER

P LENTYRIVER

JUM

PIN

GC

RE

EK

DONCASTER

BLACKBURNRICHMOND

DIAMONDCREEK

PLENTY

BRIARHILL

WATSONIA

KEW

TEMPLESTOWELOWER

NORTHCOTE

KINGSBURY

YALLAMBIE

VIEWBANK

WARRANDYTE

ALPHINGTON

IVANHOE

CLIFTONHILL

PRESTON

IVANHOEEAST

KEWEAST

RESEARCH

MONTMORENCY

FITZROYNORTH

MACLEOD

BOX HILLNORTH

NORTHWARRANDYTE

BULLEEN

NUNAWADING

ELTHAM

RESERVOIR

HEIDELBERG

EAGLEMONT

DONCASTEREAST

BLACKBURNNORTH

BALWYN

GREENSBOROUGH

BALWYNNORTH

MITCHAM

MONTALBERTNORTH

DONVALE

BUNDOORA

Plen

ty R

d

Bulle

enR

d

Banksia St

Chandler

Hwy

Reynolds Rd

Eastlink

Bur

ke R

d

Lower Plenty Rd

Spri

n gva

leR

d

Metropolitan Ring RdMetropolitan Ring Rd

Bla

ckbu

r nR

d

Elga

r R

d

Manningham

Rd

Eastern Fwy

Eastern Fwy

DoncasterRd

Won

gaR

d

Laughing Waters Rd

NorthcorpB

v d

Doncaster Rd

Dawson Rd

Nic

hola

sLa

ne

Metropolitan Ring Rd

Porter St

Par

kR

d

Alex

ande

r Rd

Mid

dleb

orou

gh R

d

Harri

sG

ully

Rd

Citylink

Ed wardes St

Elt h

am

-Yarra Glen Rd

Mount

Pleasant Rd

Ti nda lsR

d

Ringwo od- W

arrandyteR

d

Rey

nold

s R

d

Western Ring RdKangaroo

Ground

-W

arrandy

te Rd

Watery Gully Rd

M

enzie

s

Rd

Yallambie Rd

Eastern Fwy

G oldMem orial Rd

Ga lada

Tamboore

Pway

Clevela

ndAv

G:\31\35006\GIS\Maps\Working\Specialist Submission\EES\Land and Visual Impact\3135006_8_1_Viewshed_Noise_Walls_A3L_RevJ.mxd

© 2019. Whilst every care has been taken to prepare this map, GHD (and DATA CUSTODIAN) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.

LEGEND

Map Projection: Transverse MercatorHorizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 55

North East Link Project Job NumberRevision L

31-35006

25 Feb 2019

Zone of Theoretical VisibilityNoise Walls

o Date

Data source: CIP Imagery - DELWP - 2018 | roads, watercourses, parks, rail, localities - Vicmap - 2019 | project infrastructure, viewpoints, character areas, study areas - GHD, AECOM - 2019. Created by:trighetti

Paper Size A3Study Area

Ventilation Structures

Noise Walls and Viaduct Structures

Noise Walls

Proposed reference project

Elevated ramp

Surface road

Road in trench

Underground tunnel0 0.75 1.5 2.25 3

Kilometres

Areas of lesshorizontal visibility

Areas of greater horizontal visibility

Figure 8-1

Environment Effects Statement (EES)

Page 55: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

180 Lonsdale Street Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W www.ghd.com

YARRA RIVER

YARRA RIVER

STO

NY

CR

EE

K

P LENTYRIVER

JUM

PIN

GC

RE

EK

DONCASTER

BLACKBURNRICHMOND

DIAMONDCREEK

PLENTY

BRIARHILL

WATSONIA

KEW

TEMPLESTOWE

TEMPLESTOWELOWER

NORTHCOTE

KINGSBURY

YALLAMBIE

VIEWBANK

WARRANDYTE

ALPHINGTON

IVANHOE

CLIFTONHILL

PRESTON

IVANHOEEAST

KEWEAST

RESEARCH

MONTMORENCY

FITZROYNORTH

MACLEOD

BOX HILLNORTH

NORTHWARRANDYTE

BULLEEN

NUNAWADING

ELTHAM

RESERVOIR

HEIDELBERG

EAGLEMONT

DONCASTEREAST

BLACKBURNNORTH

BALWYN

GREENSBOROUGH

BALWYNNORTH

MITCHAM

MONTALBERTNORTH

DONVALE

BUNDOORA

Plen

ty R

d

Bulle

enR

d

Banksia St

Chandler

Hwy

Reynolds Rd

Eastlink

Lower Plenty Rd

Spri

n gva

leR

d

Metropolitan Ring RdMetropolitan Ring Rd

Bla

ckbu

rnR

d

Elga

r R

d

Bur

ke R

d

Manningham

Rd

Eastern Fwy

Eastern Fwy

Eastern Fwy

Doncaster Rd

G:\31\35006\GIS\Maps\Working\Specialist Submission\EES\Land and Visual Impact\3135006_8_2_Viewshed_Viaducts_A3L_RevJ.mxd

© 2019. Whilst every care has been taken to prepare this map, GHD (and DATA CUSTODIAN) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.

LEGEND

Map Projection: Transverse MercatorHorizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 55

North East Link ProjectEnvironment Effects Statement (EES)

Job NumberRevision L

31-35006

25 Feb 2019

Zone of Theoretical VisibilityViaducts

o Date

Data source: CIP Imagery - DELWP - 2018 | roads, watercourses, parks, rail, localities - Vicmap - 2019 | project infrastructure, viewpoints, character areas, study areas - GHD, AECOM - 2019. Created by:trighetti

Paper Size A3Study Area

Ventilation Structures

Noise Walls and Viaduct Structures

Viaducts

Proposed reference project

Elevated ramp

Surface road

Road in trench

Underground tunnel

0 0.75 1.5 2.25 3

Kilometres

Areas of lesshorizontal visibility

Areas of greater horizontal visibility

Figure 8-2

Page 56: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

180 Lonsdale Street Melbourne VIC 3000 Australia T 61 3 8687 8000 F 61 3 8687 8111 E [email protected] W www.ghd.com

!?

!?

YARRA RIVER

YARRA RIVER

STO

NY

CR

EE

K

P LENTYRIVER

JUM

PIN

GC

RE

EK

DONCASTER

BLACKBURNRICHMOND

DIAMONDCREEK

PLENTY

BRIARHILL

WATSONIA

KEW

TEMPLESTOWE

TEMPLESTOWELOWER

NORTHCOTE

KINGSBURY

YALLAMBIE

VIEWBANK

WARRANDYTE

ALPHINGTON

IVANHOE

CLIFTONHILL

PRESTON

IVANHOEEAST

KEWEAST

RESEARCH

MONTMORENCY

FITZROYNORTH

MACLEOD

BOX HILLNORTH

NORTHWARRANDYTE

BULLEEN

NUNAWADING

ELTHAM

RESERVOIR

HEIDELBERG

EAGLEMONT

DONCASTEREAST

BLACKBURNNORTH

BALWYN

GREENSBOROUGH

BALWYNNORTH

MITCHAM

MONTALBERTNORTH

DONVALE

BUNDOORA

Plen

ty R

d

Bulle

enR

d

Banksia St

Chandl er

Hwy

Reynolds Rd

Eastlink

Lower Plenty Rd

Spr i

ngv a

leR

d

M80 Ring Rd

M80 Ring Rd

Bla

ckbu

rnR

d

Elga

r R

d

Bur

ke R

d

Manningham

Rd

Eastern Fwy

Eastern Fwy

Eastern Fwy

Doncaster Rd

Northern Ventilation Outlet40m high

Southern Ventilation Outlet40m high

G:\31\35006\GIS\Maps\Working\Special ist Submission\EES\Land and Visual Impact\3135006_8_3_Viewshed_Ventilation_Outlet_A3L_RevM.mxd

© 2019. Whilst every care has been taken to prepare this map, GHD (and DATA CUSTODIAN) make no representations or warranties about its accuracy, reliability, completeness or suitability for any particular purpose and cannot accept liability and responsibility of any kind (whether in contract, tort or otherwise) for any expenses, losses, damages and/or costs (including indirect or consequential damage) which are or may be incurred by any party as a result of the map being inaccurate, incomplete or unsuitable in any way and for any reason.

LEGEND

0 0.75 1.5 2.25 3

KilometresMap Projection: Transverse Mercator

Horizontal Datum: GDA 1994Grid: GDA 1994 MGA Zone 55

North East Link ProjectEnvironment Effects Statement (EES)

Job NumberRevision M

31-35006

01 Mar 2019

Zone of Theoretical VisibilityVentilation outlets

o Date

Data source: CIP Imagery - DELWP - 2018 | roads, watercourses, parks, rai l, localities - Vicmap - 2019 | project infrastructure, viewpoints, character areas, study areas - GHD, AECOM - 2019. Created by:trighetti

Paper Size A3 Study Area

Ventilation Structures

Noise Walls and Viaduct Structures

!? Ventilation Outlet

1 ventilation outlet visible

2 ventilation outlets visible

Proposed reference project

Elevated ramp

Surface road

Road in trench

Underground tunnel

Figure 8-3

Page 57: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,
Page 58: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

April 2019E Lichkus

Page 59: Technical report H Appendices A-B - Landscape and visualnortheastlink.vic.gov.au/__data/assets/pdf_file/0009/364194/NELP-EE… · Melbourne Water 3 July 2018 Yarra Strategic Plan,

www.ghd.com