KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGY GENERAL DIRECTORATE OF FACILITIES AND PROJECTS Construction of Solar Panel Storage Building at KACST Al-Uyaynah Research Station TECHNICAL REPORT Contractor Name: Saad Bin Abdullah Bin Naji Contracting Est. Date: 09.11.1436 (25.08.2015) ___________________________________________________________________________ _ a. Electrical Electrical Manhole not yet finished and no cables installed.

Technical Report Electrical Rev

Embed Size (px)

DESCRIPTION

electrical

Citation preview

Page 1: Technical Report Electrical Rev

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

a. Electrical

Electrical Manhole not yet finished and no cables installed.

Page 2: Technical Report Electrical Rev

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

Electrical Room , No panelboard and main cable installed

.

Grounding Rod with Bare Copper outside the Building

Page 3: Technical Report Electrical Rev

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

Disconnecting Switches for ACCU

Electrical Recessed Indoor Luminaire on Mezzanine

Page 4: Technical Report Electrical Rev

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

Electrical Pendant Highbay Industrial Luminaire Installed on Main Storage Area

Surface Mounted Luminaires in Electrical and Communication Room

Page 5: Technical Report Electrical Rev

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

Outdoor Luminaire

WC Downlight Luminaire

Page 6: Technical Report Electrical Rev

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

Pendant Mounted Indoor Luminaire Installed on Loading/Unloading Area

Exit Lights Installed on all Exit Doors

Page 7: Technical Report Electrical Rev

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

Floor Mounted Socket Installed at Mezzanine

Switches and Sockets

Page 8: Technical Report Electrical Rev

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

On/Off Pushbutton Switch for Highbay Lightings

Dip Switch

Page 9: Technical Report Electrical Rev

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

Duplex Socket Outlet at Main Storage Area

380 Volts Industrial Outlet Sample on Site

Page 10: Technical Report Electrical Rev

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________

Wall Mounted Duplex Socket in Rooms

Disconnecting Switch and Push Button for Roll up Shutter

Page 11: Technical Report Electrical Rev

KING ABDULAZIZ CITY FOR SCIENCE AND TECHNOLOGYGENERAL DIRECTORATE OF FACILITIES AND PROJECTS

Construction of Solar Panel Storage Buildingat KACST Al-Uyaynah Research Station

TECHNICAL REPORTContractor Name: Saad Bin Abdullah Bin Naji Contracting Est.

Date: 09.11.1436 (25.08.2015)____________________________________________________________________________