6
§ ¨ ¦ 5 § ¨ ¦ 80 § ¨ ¦ 5 | ÿ 99 | ÿ 99 § ¨ ¦ 580 | ÿ 152 SR-99 through Sacramento I-5 thourgh Sacramento I-80 to the Bay Area SR-99 at SR-120 SR-99 at SR-132 in Modesto SR-99 through Fresno and North to county line SR-99 through Stockton SR-65 from Bakersfield to Porterville I-5 through Stockton SR-120 at Valley Home Road SR-99 at Gateway Dr in Madera County SR-152 at SR-165 in Merced County Fresno Bakersfield Merced Sacramento Stockton Visalia Modesto Hanford Sacramento to Bakersfield Traffic, Transit, Circulation & Parking Technical Evaluation Figure 8 Goods Movement Bottlenecks April 2003 ¯ U.S. Department of Transportation Federal Railroad Administration California High-Speed Train Program EIR/EIS Legend Proposed High-Speed Train Stations Proposed High-Speed Train Alignments

Technical Evaluation §¨¦ 80 - California High-Speed Rail · Figure 13 Airport Area Level Of Service: No Build 2020 vs. with High-Speed Train. April 2003 ¯ Legend. Æm. Study Airports

  • Upload
    buibao

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

§̈¦5

§̈¦80

§̈¦5

|ÿ99

|ÿ99

§̈¦580

|ÿ152

SR-99 through Sacramento

I-5 thourgh Sacramento

I-80 to the Bay Area

SR-99 at SR-120

SR-99 at SR-132 in Modesto

SR-99 through Fresno and North to county line

SR-99 through Stockton

SR-65 from Bakersfield to Porterville

I-5 through Stockton

SR-120 at Valley Home Road

SR-99 at Gateway Dr in Madera County

SR-152 at SR-165 in Merced County

Fresno

Bakersfield

Merced

Sacramento

Stockton

Visalia

Modesto

Hanford

Sacramento to BakersfieldTraffic, Transit, Circulation & Parking

Technical Evaluation

Figure 8 Goods Movement BottlenecksApril 2003

¯U.S. Departmentof TransportationFederal RailroadAdministration

California High-Speed Train Program EIR/EIS

Legend

Proposed High-Speed Train Stations

Proposed High-Speed Train Alignments

§̈¦5

§̈¦80

§̈¦5

|ÿ99

|ÿ99

§̈¦580

|ÿ152

Downtown

Power Inn

Briggsmore

Airport

Castle AFB

TruxtunGolden State

Downtown

Downtown

Airport

Fresno

Bakersfield

Merced

Sacramento

Stockton

Visalia

Modesto

Hanford

Sacramento to BakersfieldTraffic, Transit, Circulation & Parking

Technical Evaluation

Figure 9 Station Area Level of Service: Existing 2002 vs. No Build 2020April 2003

¯

Station Location V/C LOS V/C LOSSacramento-Downtown 0.61 B 0.86 DSacramento-Power Inn 0.79 C 0.79 CStockton-Downtown 0.46 A 0.61 BModesto-Briggsmore 0.50 A 0.64 BModesto-Downtown 0.48 A 0.65 BMerced-Castle AFB 0.40 A 0.53 AMerced-Airport 0.21 A 0.37 AMerced-Downtown 0.85 D 0.97 EFresno-Downtown 0.35 A 0.54 AHanford-Downtown 0.41 A 0.63 BVisalia 0.38 A 0.64 BBakersfield-Golden State 0.56 A 0.92 EBakersfield-Truxtun 0.40 A 0.67 BBakersfield-Airport 0.58 A 0.84 D

Existing 2002 Baseline 2020

U.S. Departmentof TransportationFederal RailroadAdministration

California High-Speed Train Program EIR/EIS

Legend

Proposed High-Speed Train Stations

Proposed High-Speed Train Alignments

spaethling
Text Box
Station Area Level of Service: Existing 2002 vs. No-Project 2020

Æm

Æm

Æm

Æm

Æm

Æm

§̈¦5

§̈¦80

§̈¦5

|ÿ99

|ÿ99

§̈¦580

|ÿ152

Fresno

Bakersfield

Merced

Sacramento

Stockton

Visalia

Modesto

Hanford

Sacramento to BakersfieldTraffic, Transit, Circulation & Parking

Technical Evaluation

Figure 10 Airport Area Level Of Service: Existing 2002 vs. No Build 2020April 2003

¯Legend

Æm Study Airports

Proposed High-Speed Train Stations

Proposed High-Speed Train Alignments

2020 BaselineAirport Location V/C LOS V/C LOSSacramento (SMF) 0.66 B 0.88 DModesto (MOD) 0.76 C 0.91 EMerced (MCE) 0.11 A 0.31 AFresno (FYI) 0.17 A 0.37 AVisalia (VIS) 0.36 A 0.62 BBakersfield (BLF) 0.33 A 1.09 F

Existing 2002

U.S. Departmentof TransportationFederal RailroadAdministration

California High-Speed Train Program EIR/EIS

spaethling
Text Box
Airport Area Level of Service: Existing 2002 vs. No-Project 2020

Æm

Æm

Æm

Æm

Æm

Æm

§̈¦5

§̈¦80

§̈¦5

|ÿ99

|ÿ99

§̈¦580

|ÿ152

Fresno

Bakersfield

Merced

Sacramento

Stockton

Visalia

Modesto

Hanford

Sacramento to BakersfieldTraffic, Transit, Circulation & Parking

Technical Evaluation

Figure 11 Airport Area Level Of Service: No Build 2020 vs. Modal AlternativeApril 2003

¯Legend

Æm Study Airports

Proposed High-Speed Train Stations

Proposed High-Speed Train Alignments

2020 Baseline Modal AltAirport Location V/C LOS V/C LOSSacramento (SMF) 0.88 D 0.90 DModesto (MOD) 0.91 E 0.91 EMerced (MCE) 0.31 A 0.31 AFresno (FYI) 0.37 A 0.38 AVisalia (VIS) 0.62 B 0.62 BBakersfield (BLF) 1.09 F 1.09 F

U.S. Departmentof TransportationFederal RailroadAdministration

California High-Speed Train Program EIR/EIS

spaethling
Text Box
Airport Area Level of Service: No-Project 2020 vs. Modal Alternative

§̈¦5

§̈¦80

§̈¦5

|ÿ99

|ÿ99

§̈¦580

|ÿ152

Downtown

Power Inn

Briggsmore

Airport

Castle AFB

TruxtunGolden State

Downtown

Downtown

Airport

Fresno

Bakersfield

Merced

Sacramento

Stockton

Visalia

Modesto

Hanford

Sacramento to BakersfieldTraffic, Transit, Circulation & Parking

Technical Evaluation

Figure 12 Station Area Level of Service: No Build 2020 vs. with High-Speed TrainApril 2003

¯

Station Location V/C LOS V/C LOSSacramento-Downtown 0.86 D 0.88 DSacramento-Power Inn 0.79 C 0.85 DStockton-Downtown 0.61 B 0.62 BModesto-Briggsmore 0.64 B 0.65 BModesto-Downtown 0.65 B 0.66 BMerced-Castle AFB 0.53 A 0.53 AMerced-Airport 0.37 A 0.38 AMerced-Downtown 0.97 E 0.97 EFresno-Downtown 0.54 A 0.55 AHanford-Downtown 0.63 B 0.63 BVisalia 0.64 B 0.64 BBakersfield-Golden State 0.92 E 0.93 EBakersfield-Truxtun 0.67 B 0.68 BBakersfield-Airport 0.84 D 0.85 D

Baseline 2020 High Speed Train

California High-Speed Train Program EIR/EIS

U.S. Departmentof TransportationFederal RailroadAdministration

Legend

Proposed High-Speed Train Stations

Proposed High-Speed Train Alignments

spaethling
Text Box
Station Area Level of Service: No Project 2020 vs. with High Speed Train

Æm

Æm

Æm

Æm

Æm

Æm

§̈¦5

§̈¦80

§̈¦5

|ÿ99

|ÿ99

§̈¦580

|ÿ152

Fresno

Bakersfield

Merced

Sacramento

Stockton

Visalia

Modesto

Hanford

Sacramento to BakersfieldTraffic, Transit, Circulation & Parking

Technical Evaluation

Figure 13 Airport Area Level Of Service: No Build 2020 vs. with High-Speed TrainApril 2003

¯Legend

Æm Study Airports

Proposed High-Speed Train Stations

Proposed High-Speed Train Alignments

2020 Baseline HSTAirport Location V/C LOS V/C LOSSacramento (SMF) 0.88 D 0.63 BModesto (MOD) 0.91 E 0.90 DMerced (MCE) 0.31 A 0.29 AFresno (FYI) 0.37 A 0.33 AVisalia (VIS) 0.62 B 0.62 BBakersfield (BLF) 1.09 F 1.05 F

California High-Speed Train Program EIR/EIS

U.S. Departmentof TransportationFederal RailroadAdministration

spaethling
Text Box
Airport Area Level of Service: No Project 2020 vs. with High-Speed Train