Page 1 of 5 Technical Committee on Standpipes (SPI-AAA) M E M O R A N D U M DATE: March 13, 2015 TO: Principal and Alternate Members of the Technical Committee on Standpipes (SPI-AAA) FROM: Chad Duffy, NFPA Staff Liaison Office: (617) 984-7262 Email: [email protected] SUBJECT: AGENDA – NFPA 14 Second Draft Meeting (Fall 2015) Enclosed is the agenda for the Second Draft meeting for NFPA 14, Standard for the Installation of Standpipe and Hose Systems, which will be held via adobe connect/conference call, 11:00am to 3:00pm ET on Tuesday April 7, 2015. Please submit requests for additional agenda items to the chair at least seven days prior to the meeting, and notify the chair and staff liaison as soon as possible if you plan to introduce any Second revisions at the meeting. All NFPA Technical Committee meetings are open to the public. Please contact me for information on attending a meeting as a guest. Read NFPA's Regulations Governing the Development of NFPA Standards (Section 3.3.3.3) for further information. Additional Meeting Information: See the Meeting Notice on the Document Information Page (www.nfpa.org/14next) for meeting location details. If you have any questions, please feel free to contact Elena Carroll, Project Administrator at 617-984-7952 or by email [email protected]. C. Standards Administration

Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Page 1 of 5

Technical Committee on Standpipes (SPI-AAA)

M E M O R A N D U M

DATE: March 13, 2015

TO: Principal and Alternate Members of the Technical Committee on Standpipes (SPI-AAA)

FROM: Chad Duffy, NFPA Staff Liaison Office: (617) 984-7262 Email: [email protected]

SUBJECT: AGENDA – NFPA 14 Second Draft Meeting (Fall 2015)

Enclosed is the agenda for the Second Draft meeting for NFPA 14, Standard for the Installation of Standpipe and Hose Systems, which will be held via adobe connect/conference call, 11:00am to 3:00pm ET on Tuesday April 7, 2015. Please submit requests for additional agenda items to the chair at least seven days prior to the meeting, and notify the chair and staff liaison as soon as possible if you plan to introduce any Second revisions at the meeting. All NFPA Technical Committee meetings are open to the public. Please contact me for information on attending a meeting as a guest. Read NFPA's Regulations Governing the Development of NFPA Standards (Section 3.3.3.3) for further information. Additional Meeting Information: See the Meeting Notice on the Document Information Page (www.nfpa.org/14next) for meeting location details. If you have any questions, please feel free to contact Elena Carroll, Project Administrator at 617-984-7952 or by email [email protected]. C. Standards Administration

Page 2: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Technical Committee on Standpipes (SPI-AAA) NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET

Adobe Connect/Conference Call

Page 2 of 5

AGENDA

Tuesday, April 7, 2015

1. Call to Order – 11:00 AM

2. Introductions and Attendance

3. Review Agenda

4. NFPA Staff Liaison Presentation and Review of Key Dates in Current Cycle

5. Chairman Comments

6. Approval of Previous Meeting Minutes

7. Act on Public Comments for NFPA 14 and Committee Second Revision Proposals

8. New Business

9. Adjourn – 3:00 PM

Please submit requests for additional agenda items to the chair at least seven days prior to the meeting. Please notify the chair and staff liaison as soon as possible if you plan to introduce any committee input at the meeting. Key Dates for the Fall 2015 Revision Cycle

Proposal Closing Date January 3, 2014 Final Date for First Draft Meeting June 13, 2014 Posting of First Draft and TC Ballot August 1, 2014 Ballots Returned By August 22, 2014 Post Final First Draft September 5, 2014

Comment Closing Date November 14, 2014

Final Date for Second Draft Meeting May 1, 2015

Posting of Second Draft and TC Ballot June 12, 2015

Ballots Returned By July 3, 2015

Posting Final Second Draft July 17, 2015 Closing Date for Notice of Intent to Make a Motion (NITMAM)

August 21, 2015

Page 3: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Technical Committee on Standpipes (SPI-AAA) NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET

Adobe Connect/Conference Call

Page 3 of 5

Issuance of Consent Document (No NITMAMs) November 10, 2015

NFPA Annual Meeting June 6-9, 2016 Issuance of Document with NITMAM August 4, 2016

Technical Committee deadlines are in bold.

Page 4: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Technical Committee on Standpipes (SPI-AAA) NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET

Adobe Connect/Conference Call

Page 4 of 5

Meeting Preparation Committee members are strongly encouraged to review the published comments prior to the meeting and to be prepared to act on each item. Handout materials should be submitted to the chair at least seven days prior to the meeting. Only one posting of the comments will be made; it will be arranged in section/order and will be pre-numbered. This will be posted to the NFPA Document information pages located at www.nfpa.org/14. If you have trouble accessing the website please contact Elena Carroll at [email protected].

Mandatory Materials:

Last edition of the standard Meeting agenda Public comments Committee Officers' Guide (Chairs) Roberts’ Rules of Order (Chairs; An abbreviated version may be found in the

Committee Officer’s Guide) Optional Materials:

NFPA Annual Directory NFPA Manual of Style Prepared committee input/comments (If applicable)

Regulations and Guiding Documents All committee members are expected to behave in accordance with the Guide for the Conduct of Participants in the NFPA Codes and Standards Development Process. All actions during and following the committee meetings will be governed in accordance with the Regulations Governing the Development of NFPA Standards. Failure to comply with these regulations could result in challenges to the standards-making process. A successful challenge on procedural grounds could prevent or delay publication of the document. The style of the document must comply with the Manual of Style for NFPA Technical Committee Documents.

Page 5: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Technical Committee on Standpipes (SPI-AAA) NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET

Adobe Connect/Conference Call

Page 5 of 5

General Procedures for Meetings

Use of tape recorders or other means capable of producing verbatim transcriptions of any NFPA Committee Meeting is not permitted.

Attendance at all NFPA Committee Meetings is open. All guests must sign in and identify their affiliation.

Participation in NFPA Committee Meetings is generally limited to committee members and NFPA staff. Participation by guests is limited to individuals, who have received prior approval from the chair to address the committee on a particular item, or who wish to speak regarding public input or comments that they submitted.

The chairman reserves the right to limit the amount of time available for any presentation.

No interviews will be allowed in the meeting room at any time, including breaks.

All attendees are reminded that formal votes of committee members will be secured by letter ballot. Voting at this meeting is used to establish a sense of agreement, but only the results of the formal letter ballot will determine the official action of the committee.

Note to Special Experts: Particular attention is called to Section 3.3(e) of the NFPA Guide for the Conduct of Participants in the NFPA Codes and Standards Development Process in the NFPA Directory. This section requires committee members to declare any interest they may represent, other than their official designation as shown on the committee roster. This typically occurs when a special expert is retained by and represents another interest category on a particular subject. If such a situation exists on a specific issue or issues, the committee member shall declare those interests to the committee and refrain from voting on any action relating to those issues.

Page 6: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Attachment #1:

Previous Meeting Minutes

Page 7: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

MINUTES of the NFPA 14 Public Input meeting

Tempe, AZ – March 4 thru 5, 2014

Tuesday; March 4

1. In Chairman Tom Brown’s absence, temporary Chairman Maurice Pilette called the meeting to

order at 8:05 AM and welcomed the committee.

2. All attendees made self-Introductions; See attached attendance.

3. Staff Liaison Chad Duffy reviewed the meeting agenda.

4. Staff Liaison Chad Duffy reviewed the new terms and motions of the new Standard

Development Process.

5. Staff Liaison Chad Duffy provided the First Draft presentation including key dates in the current

cycle.

6. Chairman Pilette provided standard meeting instructions

7. Chairman Pilette called for a motion to accept minutes of April 2012 ROC meeting of the

TECHNICAL COMMITTEE in Scottsdale, AZ. Motion passed unanimously.

8. Technical Committee began the review and action process on 142 public input proposals.

9. Session recessed at 5:15PM

Wednesday; March 5

10. Technical Committee reconvened at 7:30 AM on 03/5/14 and continued the review and action

process on the Public Input proposals.

11. Chairman Pilette assigned a task group to review the horizontal exit requirements and develop

an annex diagram for section 7.3.2.5. The task group consists of the following members:

a. Peter Schwab – Chairman b. Cecil Bilbo c. Steve Leyton d. James Peterkin e. Jeannene Meisman

Page 8: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

12. Chairman Pilette assigned a task group to review section 6.1.2 “Protection of Aboveground

Pipe” requirements to bring forward comments at the second draft meeting:

a. Dave Hague– Chairman b. Cecil Bilbo c. Terry Victor d. Bob Morgan e. Don Casey f. Michael McDaniel g. John Norman III h. James Dockrill

13. Chairman Pilette asked if there was any unfinished business. No unfinished business was

brought forward.

14. Chairman Pilette announced that the next meeting will likely be scheduled in March or April

2015. Exact date and location to be announced in the future.

15. Chairman Pilette called for a motion to adjourn at 12:50 PM. Motion passed unanimously.

Respectfully submitted,

Chad Duffy, NFPA

Page 9: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Attendees

Principals:

Cecil Bilbo Marinus Both Brian Conway James Dockrill David Hague Edwin Kotak Richard Kozel Stephen Leyton Scott Martorano Jeannene Meisman David Mettauer Bob Morgan Rita Neiderheiser John Norman James Peterkin Maurice Pilette Edward Prendergast Rich Richardson Daniel Sanchez Peter Schwab Kyle Smith Ronald Webb Eric Lee, Voting Alternate Alternates:

Don Casey Terence Manning Michael McDaniel Laura Poag Jeff Saunders Terry Victor Daniel Weaver Thomas Wellen Guests:

Bob Upson

Chad Duffy, NFPA Staff Liaison

Page 10: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Attachment #2: Public Comment

Page 11: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 22-NFPA 14-2014 [ New Section after 1.4 ]

A.1.4

A.1.4 It is the intent of the Commi ee to recognize that future edi ons of this standard are a further refinement of this edi on and earlier edi ons. Thechanges in future edi ons will reflect the con nuing input of the fire protec on community in its a empt to meet the purpose stated in this standard.Compliance with a future edi on could be considered as providing an equivalent level of system integrity and performance of the system. 

Statement of Problem and Substantiation for Public Comment

This language is similar to language in NFPA 101 annex and was added to NFPA 25 during the first draft meeting.

Related Item

Public Input No. 139-NFPA 14-2013 [New Section after 1.4.2]

Submitter Information Verification

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Street Address:

City:

State:

Zip:

Submittal Date: Wed Nov 12 17:32:02 EST 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

1 of 25 1/15/2015 8:34 AM

Page 12: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 4-NFPA 14-2014 [ Section No. 4.1.4 ]

4.1.4

The materials or devices listing instructions shall identify and specify the existing system components, including the fluids conveyed, with whichthe newly listed materials, devices, or components are compatible.

Statement of Problem and Substantiation for Public Comment

Delete this section. Compatibility is a complex subject that cannot be codified in a single section. The majority of the issues that the industry has encountered in regards to compatibility relate to CPVC. NFPA 13 has added language and the labs are working towards some compatibility protocols. NFPA 14 should wait to add compatibility language once the 13 Committee and the labs have landed in a more defined place.

Related Item

Public Input No. 151-NFPA 14-2014 [New Section after 4.1.3]

Submitter Information Verification

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 23 10:02:02 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

2 of 25 1/15/2015 8:34 AM

Page 13: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 5-NFPA 14-2014 [ Section No. 6.3.3 ]

6.3.3

Listed indicating-type valves shall be provided at the standpipe for controlling branch lines where the distance to the remote hose stationexceeds 20 40 ft (6 12 m) measured along the pipe.

Statement of Problem and Substantiation for Public Comment

On horizontal standpipe systems in a mall, the 20'-0" limitation would be too restrictive and this change would require control valves for every hose valve. Granted the 40' number is arbitrary but I believe more realistic.

Related Item

Public Input No. 80-NFPA 14-2013 [Section No. 6.3.3]

Submitter Information Verification

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 23 10:42:37 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

3 of 25 1/15/2015 8:34 AM

Page 14: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 7-NFPA 14-2014 [ New Section after 6.3.6.1.3 ]

6.3.6.1.3.1

The location of the T-wrench shall be acceptable to the AHJ.

Renumber 6.3.6.1.3.1 to 6.3.6.1.3.2

Statement of Problem and Substantiation for Public Comment

Moved requirement to separate section

Related Public Comments for This Document

Related Comment Relationship

Public Comment No. 6-NFPA 14-2014 [Section No. 6.3.6.1.3 [Excluding any Sub-Sections]]

Related Item

Public Input No. 83-NFPA 14-2013 [Section No. 6.3.6.1.3]

Submitter Information Verification

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 23 10:52:54 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

4 of 25 1/15/2015 8:34 AM

Page 15: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 6-NFPA 14-2014 [ Section No. 6.3.6.1.3 [Excluding any Sub-Sections] ]

Where a post-indicator valve cannot be used, an underground valvewith valve with an approved roadway box, complete with T-wrench andwhere acceptable to the AHJ, shall wrench shall be permitted.

Statement of Problem and Substantiation for Public Comment

Added a space (editorial) and removed language in regards to the AHJ approval of the wrench location. Another comment will add that language as a subsection

Related Public Comments for This Document

Related Comment Relationship

Public Comment No. 7-NFPA 14-2014 [New Section after 6.3.6.1.3]

Related Item

Public Input No. 83-NFPA 14-2013 [Section No. 6.3.6.1.3]

Submitter Information Verification

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 23 10:48:56 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

5 of 25 1/15/2015 8:34 AM

Page 16: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 26-NFPA 14-2014 [ Section No. 6.4.2 ]

6.4.2

A listed check valve shall be in the fire department connection piping

6.4.2.1 In areas subject to freezing temperatures, the check valve shall be installed as near as practicable to the point where the firedepartment connection piping connects to the system main piping.

6.4.2.

1

2 In areas not subject to freezing temperatures, the check valve shall be installed at any location in the fire department connection piping.

6.4.2.3

The requirements of 6.4.2 shall apply to manual dry systems.

Statement of Problem and Substantiation for Public Comment

In areas not subject to freezing temperatures, it is very common for the FDC check valve to be installed above ground at the FDC inlet assembly. This avoids costly underground vaults and greatly facilitates Inspection, testing, and maintenance.

Related Item

First Revision No. 29-NFPA 14-2014 [Section No. 6.4.2]

Submitter Information Verification

Submitter Full Name: JAMES M FELD

Organization: University of California – Fire Prevention Division

Affilliation: University of California

Street Address:

City:

State:

Zip:

Submittal Date: Thu Nov 13 17:13:00 EST 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

6 of 25 1/15/2015 8:34 AM

Page 17: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 27-NFPA 14-2014 [ Section No. 6.4.5.2.2.1 ]

Delete Proposed Section 6.4.5.2.2.1

The sign in 6.4.5.2.2 shall not be required when the system demand pressure is less than 150 psi (10.3 bar).

Statement of Problem and Substantiation for Public Comment

Since signs have a significant probability of getting lost or stolen, it is important for the firefighters to have the sign indicating the pressure required at the FDC for the standpipe system. A FDC without a sign should be indicative of only 2 conditions (1) it is an older system installed prior to the time when NFPA 14 started to require the sign, or (2) the sign is missing. An inspector upon seeing a FDC for a standpipe system without a sign can investigate as to whether or not the sign is required. For those who attempt to draw a similarity with sprinkler systems, please consider that firefighters must operate the standpipe system inside the building on floors well above ground level. The pump operator should NOT be in a position to guess what pressure to use at the FDC and wait for the firefighters to call for more pressure thereby making firefighting a trial and error operation.

Related Item

First Revision No. 32-NFPA 14-2014 [Section No. 6.4.5.2.2]

Submitter Information Verification

Submitter Full Name: JAMES M FELD

Organization: University of California – Fire Prevention Division

Affilliation: University of California

Street Address:

City:

State:

Zip:

Submittal Date: Thu Nov 13 17:29:40 EST 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

7 of 25 1/15/2015 8:34 AM

Page 18: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 2-NFPA 14-2014 [ Section No. 7.2.1 ]

7.2.1

The maximum pressure at any point in the system at any time shall not exceed 350 400 psi (24 27.6 bar).

Statement of Problem and Substantiation for Public Comment

Most PRV's for standpipe use are UL/FM listed to 400psi.

Related Item

Public Input No. 2-NFPA 14-2013 [Chapter 7]

Submitter Information Verification

Submitter Full Name: BRIAN CALLAHAN

Organization: XL FIRE PROTECTION

Street Address:

City:

State:

Zip:

Submittal Date: Wed Aug 06 10:07:25 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

8 of 25 1/15/2015 8:34 AM

Page 19: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 1-NFPA 14-2014 [ Section No. 7.2.2.1 ]

7.2.2.1

Where express mains supply higher standpipe zones, there shall be no hose outlets on any portion of the system where the pressure exceeds350 400 psi (24 27.6 bar).

Statement of Problem and Substantiation for Public Comment

I make this suggestion based on the fact that most PRV valves for fire protection standpipe use are UL/FM listed to 400psi., i.e. Zurn, Elkhart, Potter Roemer, etc.

Related Item

Public Input No. 1-NFPA 14-2013 [New Section after 6.1.1]

Submitter Information Verification

Submitter Full Name: BRIAN CALLAHAN

Organization: XL FIRE PROTECTION

Street Address:

City:

State:

Zip:

Submittal Date: Wed Aug 06 09:52:09 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

9 of 25 1/15/2015 8:34 AM

Page 20: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 23-NFPA 14-2014 [ Section No. 7.3.2.2.1 [Excluding any Sub-Sections] ]

Hose connections on one side of a horizontal exit shall not be required where another outlet on that side of the horizontal exit can reach theportions of the building on the other side of the horizontal exit within the distances required by 7.3.2.2.1.1or 7.3.2.2.1.2 that would have beenprotected by the outlet that was omitted.

Additional Proposed Changes

File Name Description Approved

7.3.2.2.1.docx Revised 7.3.2.2.1

A.7.3.2.2.1_2016_Horizontal_Exit.pdf Annex figure for A.7.3.2.2.1

Statement of Problem and Substantiation for Public Comment

The attached language is proposed to correlate NFPA 14 with the IBC. As currently written, NFPA 14 is opposite of the building code. A revised annex diagram is part of this change as well.

Related Item

Public Input No. 104-NFPA 14-2013 [Section No. 7.3.2]

Submitter Information Verification

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Street Address:

City:

State:

Zip:

Submittal Date: Thu Nov 13 10:31:45 EST 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

10 of 25 1/15/2015 8:34 AM

Page 21: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Terra View would not let me enter this without screwing it up.

7.3.2.2.1*

Where all floor areas are reachable from an exit stairway hose connection on the same side of a horizontal exit within the distances required by 7.3.2.2.1.1or 7.3.2.2.1.2 as applicable, the hose connection on the other side of the horizontal exit shall be permitted to be omitted.

Page 22: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

FIGURE A.7.3.2.2.1 Horizontal Exits

Page 23: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 24-NFPA 14-2014 [ Section No. 7.3.2.4 ]

7.3.2.4

Nonrequired unenclosed stairs connecting only two adjacent floors shall occupied by the same tenant shall not require hose connections.

A.7.3.2.4 This typically occurs in buildings where a tenant occupies 2 floors aand adds a convenience stair that is not a part of the requiredmeans of egress. This also occurs in hotel lobbies where the second floor is accessed from the first floor lobby by an unenclosed stair.

Statement of Problem and Substantiation for Public Comment

The proposed change is poorly worded. A non required stair that serves 4 stories also serves 2 stories by default. The intent of the PI was to cover convenience stairs between 2 floors. This typically occurs when the 2 floors are occupied by the same tenant and where these stairs are unenclosed. An enclosed non required stair serving only 2 stories in a 5 story building needs to have a standpipe. The responding fire department does not know whether or not the stair is required. When they enter a stair they expect to find a standpipe. This will result in an excessive delay in establishing firefighting operations. Such delay increases the size of the fire resulting in greater risk to the occupants and to the firefighters as well as an increase in property damage.

Related Item

First Revision No. 118-NFPA 14-2014 [Global Input]

Submitter Information Verification

Submitter Full Name: JAMES M FELD

Organization: University of California – Fire Prevention Division

Affilliation: University of California

Street Address:

City:

State:

Zip:

Submittal Date: Thu Nov 13 11:15:11 EST 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

11 of 25 1/15/2015 8:34 AM

Page 24: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 25-NFPA 14-2014 [ Section No. 7.3.2.5 ]

Delete Proposed Section 7.3.2.5

A single hose connection shall be permitted to be installed in the corridor or breezeway between open stairs that are not greater than 75 ft (23m) apart.

Statement of Problem and Substantiation for Public Comment

An enclosed corridor can be connected to 2 open stairs. The proposed change does not specify where in the corridor the hose connection is to be located. If it located 10 feet from one stair and the firefighters access the floor using the other stair they will have to travel 65 feet to the hose connection while in all probability passing the apartment that is involved in the fire. The responding firefighters may not even know that there is a hose connection in the corridor/breezeway because they expect the standpipe hose connections to be in the stairways.

Related Item

First Revision No. 119-NFPA 14-2014 [Global Input]

Submitter Information Verification

Submitter Full Name: JAMES M FELD

Organization: University of California – Fire Prevention Division

Affilliation: University of California

Street Address:

City:

State:

Zip:

Submittal Date: Thu Nov 13 11:27:50 EST 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

12 of 25 1/15/2015 8:34 AM

Page 25: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 8-NFPA 14-2014 [ New Section after 7.5.1 ]

7.5.1.1

Standpipes shall be permitted to not be interconnected where acceptable to the AHJ.

Statement of Problem and Substantiation for Public Comment

The Committee statement said that section 7.5.1 gave the AHJ the ability to specify how standpipes are interconnected. The statement is in contrast to the point raised by the Public Input. Many AHJ's are under a Min/Max system so since 7.5.1 states they shall be interconnected, they have no choice. By adding this section, the AHJ can now have the legal ability to allow standpipes to not be interconnected based on their fire fighting SOP's.

Related Item

Public Input No. 95-NFPA 14-2013 [New Section after 7.5.1]

Submitter Information Verification

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 23 12:53:51 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

13 of 25 1/15/2015 8:34 AM

Page 26: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 9-NFPA 14-2014 [ Section No. 7.6.2 [Excluding any Sub-Sections] ]

Standpipes that are part of a combined system in a building that is partially sprinklered shall be at least 6 in. (150 mm) in size.

Statement of Problem and Substantiation for Public Comment

This modification is based on the Committee Rejection Statement for PI #96.

Related Item

Public Input No. 96-NFPA 14-2013 [Section No. 7.6.2]

Submitter Information Verification

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 23 13:00:31 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

14 of 25 1/15/2015 8:34 AM

Page 27: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 28-NFPA 14-2014 [ Section No. 10.1 [Excluding any Sub-Sections] ]

The volume water flow rate and pressure of a public water supply shall be determined from waterflow test data or other approved method.[24:5.1.2]

Statement of Problem and Substantiation for Public Comment

Volume uses units of gallons. The correct reference is water flow rate - gpm

Related Item

First Revision No. 99-NFPA 14-2014 [Section No. 10.1]

Submitter Information Verification

Submitter Full Name: JAMES M FELD

Organization: University of California – Fire Prevention Division

Affilliation: University of California

Street Address:

City:

State:

Zip:

Submittal Date: Thu Nov 13 18:17:31 EST 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

15 of 25 1/15/2015 8:34 AM

Page 28: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 10-NFPA 14-2014 [ Section No. 10.1.1 ]

10.1.1

Daily and seasonal flow and pressure fluctuation data shall be provided by the water purveyor, and the fire protection design must account forboth high and low variations.

10.1.1.1

Where these data are not available, design shall be based on the available water flow data.

Statement of Problem and Substantiation for Public Comment

NFPA 13R and NFPA 24 made modifications to the rules for waterflow tests. NFPA 13 did not make this change. This will be a Correlating Committee Decision. The NFPA 14 committee should try and harmonize with the final outcome from the sprinkler project.

Related Item

Public Input No. 5-NFPA 14-2013 [Section No. 10.1]

Submitter Information Verification

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 23 13:12:46 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

16 of 25 1/15/2015 8:34 AM

Page 29: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 19-NFPA 14-2014 [ Section No. 11.4.1 ]

11.4.1 * General.

All new systems, including yard piping and fire department connection piping, shall be tested hydrostatically at not less than 200 psi (13.8 bar) or50 psi (3.5 bar) in excess of the system working pressure, whichever is greater, and shall maintain that pressure at ±5 psi (±0 .35 bar) for 2hours.

Statement of Problem and Substantiation for Public Comment

The +/- 5 psi should apply only to the hydrostatic test of the underground fire main. This is covered in 11.4.3. It is not difficult to maintain the hydrostatic test pressure without leakage for the aboveground piping portion of the standpipe system. If temperature changes result in pressure fluctuations, the test should be conducted during a time when the change in ambient temperature is minimal (i.e., avoid sunrise and sunset). Contractors who have a difficult time maintaining the hydrostatic test pressure need to improve their workmanship practices. NFPA 14 should not be a mechanism to compensate for poor workmanship practices.

Related Item

First Revision No. 66-NFPA 14-2014 [Section No. 11.4.1]

Submitter Information Verification

Submitter Full Name: JAMES M FELD

Organization: University of California Fire Prevention Division

Street Address:

City:

State:

Zip:

Submittal Date: Mon Nov 10 14:31:32 EST 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

17 of 25 1/15/2015 8:34 AM

Page 30: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 11-NFPA 14-2014 [ New Section after 11.5.1 ]

11.5.1.1

The test required by 11.5.1 shall be permitted to be waived when acceptable to the AHJ.

Statement of Problem and Substantiation for Public Comment

The practice of flowing the entire system demand at the remote hose locations has been in the standard a long time. While it can prove that water is getting to the roof, is it necessary? The pump(s) are required to be tested. Usually these are in locations that make disposal of the thousands of gallons of water practical. By requiring the test on the roof, that water has to go somewhere. There have been multiple occurrences of a standpipe test discharge causing a roof leader drain to fail and flooding a building out at CO. All standpipes are required to be hydraulically calculated. If plans and calculations are performed and the system is installed to those plans, why are we not trusting the math? Do we require a bucket test for the remote area of a sprinkler system? If the committee cannot bear to lose this test, they should require a permanent drain adjacent to the remote standpipe capable of handling the flow for the acceptance.

Related Item

Public Input No. 50-NFPA 14-2013 [New Section after 11.5.1.1]

Submitter Information Verification

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 23 13:36:08 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

18 of 25 1/15/2015 8:34 AM

Page 31: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 20-NFPA 14-2014 [ Section No. 11.5.2 [Excluding any Sub-Sections] ]

For a manual standpipe, a fire department pumper or , portable pump of a capacity to provide required the required flow and pressure shall ,or other approved means shall be used to verify the system design by pumping into the fire department connection.

Add Annex A.11.5.2

A.11.5.2. It is not always necessary to use a pump to test a standpipe system. See Figure A.11.5.2(a), Figure A.11.5.2(b), and FigureA.11.5.2(c) for examples of possible test methods. When using the method shown in Figure A.11.5.2(c) it is necessary to flow the systemdemand while observing the pressures at the FDC inlet and the hydraulically remote standpipe hose valve. While the standpipe test mayindicate that a grerater pressure is required at the FDC inlet than what was indicated in the hydraulic calculations, this is not necessarily a causefor failing the test. This greater pressure, if acceptable to the AHJ based on the ability of the fire apparatus to provide the additional pressure,needs to be incorporated into the standpipe sign required at the FDC by Section 6.4.5.2.2.

Additional Proposed Changes

File Name Description Approved

Standpipe_Flow_Test_Methods.pdf Annex Section A.11.5.2

Statement of Problem and Substantiation for Public Comment

It is not always necessary to use a pump to test a standpipe system. The proposed Annex material shows 3 test methods, the last of which does not use a pump. Consider where one provides 750 gpm at 75 psi at the FDC inlet resulting in 25 psi available at the hydraulically most remote standpipe outlet. If the standpipe required 100 psi at the hose valve, then adding 75 psi to both the FDC inlet pressure (75 psi) and the remote hose valve pressure (25 psi) means that if the FDC were supplied at 150 psi (75 psi + 75 psi), then 100 psi (25 psi + 75 psi) would be available at the hose valve outlet.

Relying on the hydraulic calculations to demonstrate that the standpipe system will perform as calculated is dangerous. In testing numerous standpipe systems, I have experienced from 5 psi to 20 psi additional pressure over what the hydraulic calculations indicated.

Testing of the standpipe is necessary in order to provide firefighters with the proper flows to fight a fire. The standpipe system represents the last chance at effecting extinguishment of the fire. A standpipe system that fails in a fire can result in firefighter injury or death. NFPA 14 should ensure that the system performs adequately when the system is new. Consider that standpipe training conducted by many fire departments includes how to use the standpipe assuming the supply from the FDC is inoperative. Many fire departments do not trust standpipe systems because they have had many problems.

Related Item

First Revision No. 71-NFPA 14-2014 [New Section after 11.5.2]

Submitter Information Verification

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

19 of 25 1/15/2015 8:34 AM

Page 32: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Submitter Full Name: JAMES M FELD

Organization: University of California - Fire Prevention Division

Affilliation: University of California

Street Address:

City:

State:

Zip:

Submittal Date: Mon Nov 10 18:36:03 EST 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

20 of 25 1/15/2015 8:34 AM

Page 33: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Standpipe Flow Test Methods

Test with pump through FDC

250 gpm

250 gpm

100 psi

250 gpm

150 psi

Figure A.11.5.2(a)

Page 34: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Standpipe Flow Test Methods

Test by Re-Circulating Water

250 gpm 150 psi

100 psi

250 gpm

250 gpm No Hydrant

No Water Discharge

In-Line Flow Meter

Figure A.11.5.2(b)

Page 35: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Standpipe Flow Test Methods

Test through FDC Without Pump

250 gpm 250 gpm

25 psi

250 gpm

75 psi

FDC Valve

Test 75 25

ADD 75 75

Total 150 100

Flow 750 gpm

750 gpm

Figure A.11.5.2(c)

Page 36: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 21-NFPA 14-2014 [ Section No. 11.5.2.1 ]

Delete Section 11.5.2.1

Where allowed by the authority having jurisdiction, the test required by 11.5.2 shall be permitted to be waived.

Statement of Problem and Substantiation for Public Comment

The substantiation for this section indicated that many fire departments will not conduct the acceptance test due to the liability should something go wrong. Where the fire department will not provide a pump to test the system, the contractor should provided it. The conduct of the test is the contractor's responsibility, not the fire department's. Where a fire department will provide equipment to test the system, there typically is a charge for the service. So it is of no consequence whether the contractor pays the fire department or another company to provide the pump. See my Comment on Section11.5.2 indicating how the test can be conducted without a pump.

Related Item

First Revision No. 71-NFPA 14-2014 [New Section after 11.5.2]

Submitter Information Verification

Submitter Full Name: JAMES M FELD

Organization: University of California - Fire Prevention Division

Affilliation: University of California

Street Address:

City:

State:

Zip:

Submittal Date: Mon Nov 10 19:39:51 EST 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

21 of 25 1/15/2015 8:34 AM

Page 37: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 29-NFPA 14-2014 [ Section No. 11.8.4 ]

11.8.4

One set of instruction manuals for all major components of the standpipe system shall be provided to the building owner. The manual shallcontain the following:

(1) An explanation of the operation of the component

(2) Instructions Manufacturer's instructions for routine maintenance

(3) Instructions Manufacturer's i nstructions concerning repairs

(4) Parts Manufacturer's p arts list and identification for serviceable components

(5) A copy of the current edition of NFPA 25

Statement of Problem and Substantiation for Public Comment

Section 11.9 indicates that the manufacturer's instructions are to be provided. 11.8.3 would allow the contractor to provide handwritten instructions.

Related Item

First Revision No. 74-NFPA 14-2014 [Section No. 11.9]

Submitter Information Verification

Submitter Full Name: JAMES M FELD

Organization: University of California – Fire Prevention Division

Affilliation: University of California

Street Address:

City:

State:

Zip:

Submittal Date: Thu Nov 13 18:27:41 EST 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

22 of 25 1/15/2015 8:34 AM

Page 38: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 17-NFPA 14-2014 [ New Section after A.7.3.2.2 ]

A.7.3.2.5

A.7.3.2.5 The standard in section 7.3.2.1 requires that a standpipe be provided in each required exit stairwell. One arrangement that may befound in certain residential buildings is to have (2) remotely located exit stairs providing the occupants two distinct means of egress. This sectionallows a single hose connection to be located anywhere between the exit stairs provided the exit stairs are open and are located within 75 ft (23m) of each other. (See figure A.7.3.2.5).

Additional Proposed Changes

File Name Description Approved

NFPA_14_Single_Hose_Valve_in_Open_Breezeway.pdf Figure A.7.3.2.5

Statement of Problem and Substantiation for Public Comment

This section and figure is being submitted on behalf of the Horizontal Exit task group. The task group was assigned the task to create an annex figure for section A.7.3.2.5.

Related Item

First Revision No. 119-NFPA 14-2014 [Global Input]

Submitter Information Verification

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Affilliation: Horizontal Exit Task Group

Street Address:

City:

State:

Zip:

Submittal Date: Fri Oct 31 08:48:28 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

23 of 25 1/15/2015 8:34 AM

Page 39: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA
Page 40: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Public Comment No. 12-NFPA 14-2014 [ Section No. A.7.10.1.2 ]

A.7.10.1.2

See Section 14.4 of NFPA 13.

When performing a hydraulic design, the hydraulic characteristics of each water supply need to be known. The procedure for determining thehydraulic characteristics of permanent water supplies, such as pumps, is fairly straightforward and is described in NFPA 20. The procedure fordetermining the hydraulic characteristics of fire apparatus supplying a standpipe system are similar. Lacking better information about local fireapparatus, a conservative design would accommodate a 1000 gpm (3785 L/min) fire department pumper performing at the level of designspecifications set forth in NFPA 1901. NFPA 1901 specifies that fire department pumpers must be able to achieve three pressure/flowcombinations. These are 100 percent of rated capacity at 150 psi (1034 kPa) net pump pressure, 70 percent of rated capacity at 200 psi (1379kPa) net pump pressure, and 50 percent of rated capacity at 250 psi (1724 kPa) net pump pressure. Therefore, a 1000 gpm (3785 L/min)pumper can be expected to deliver no less than 1000 gpm (3785 L/min) at 150 psi (1034 kPa), 700 gpm (2650 L/min) at 200 psi (1379 kPa), and500 gpm (1893 L/min) at 250 psi (1724 kPa). Residual supply pressure on the suction side of a pump from a municipal or other pressurizedwater supply can also be added. The 150 psi (1034 kPa) suggested pressure is also found in NFPA 13E. It also states that this is the pressureto be provided unless the sign at the fire department connection states otherwise. It is not the intent of this standard to limit the maximumpumper pressure at the fire department connection inlet for manual or automatic standpipes to 150 psi (1034 kPa).

To perform a hydraulic design, one should determine the minimum required pressure and flow at the hydraulically most remote hose connectionand calculate this demand back through system piping to each water supply, accumulating losses for friction and elevation changes and addingflows for additional standpipes and sprinklers at each point where such standpipes or sprinklers connect to the hydraulic design path. Whenconsidering fire apparatus as a water supply, flows are calculated from system piping through the fire department connection and back throughconnecting hoses to the pump. If the pressure available at each supply source exceeds a standpipe system's pressure demand at thedesignated flow, the design is acceptable. Otherwise, the piping design or the water supply needs to be adjusted.

The intent of the standard is to require that each vertical standpipe serving two or more hose connections be capable of individually flowing 500gpm (1893 L/min) and 250 gpm (946 L/min) at each of the two hydraulically most demanding connections at the required residual pressure.Given the requirement in 7.10.1.1.3 for the hydraulically most remote standpipe to supply this pressure and flow rate and given the minimumstandpipe sizes in Section 7.6, the ability of standpipes that are not hydraulically most remote to satisfy this requirement is implicit and shouldnot require additional hydraulic calculations.

Statement of Problem and Substantiation for Public Comment

During the first draft, the committee made it clear that even with automatic standpipes, a calculation to the fire department connection is required. Many AHJ's refer to NFPA 13E which is a recommended practice and cite section 4.3.4 and limit the maximum pressure at the FDC inlet to 150 PSI for calculation purposes. This language makes it clear that the 150 psi is not a maximum.

Related Item

Public Input No. 97-NFPA 14-2013 [Section No. 7.7.1]

Submitter Information Verification

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

24 of 25 1/15/2015 8:34 AM

Page 41: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Submitter Full Name: Peter Schwab

Organization: Wayne Automatic Fire Sprinkler

Street Address:

City:

State:

Zip:

Submittal Date: Tue Sep 23 13:55:40 EDT 2014

National Fire Protection Association Report http://submittals.nfpa.org/TerraViewWeb/ContentFetcher?commentParams=(CommentType="...

25 of 25 1/15/2015 8:34 AM

Page 42: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Attachment #3: Committee Roster

Page 43: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Address List No PhoneStandpipes SPI-AAA

Chad Duffy03/13/2015

SPI-AAA

David R. Hague

ChairLiberty Mutual Insurance20 Riverside RoadWeston, MA 02493-2231

I 3/4/2009SPI-AAA

Cecil Bilbo, Jr.

PrincipalAcademy of Fire Sprinkler Technology, Inc.301 North Neil Street, Suite 426Champaign, IL 61820-3170Alternate: Michael Wade McDaniel

SE 3/1/2011

SPI-AAA

Marinus Both

PrincipalWestern States Fire Protection Companyd.b.a. Statewide Fire Protection3130 Westwood DriveLas Vegas, NV 89109Alternate: John L. Hulett

IM 7/28/2006SPI-AAA

Randal G. Brown

PrincipalRandal Brown & Associates Engineering Ltd.6 Lansing Square, Suite 105Toronto, ON M2J 1T5 CanadaAlternate: Don Casey

SE 4/14/2005

SPI-AAA

Brian G. Conway

PrincipalGreat Lakes Plumbing & Heating Company4521 West Diversey AvenueChicago, IL 60639Illinois Fire Prevention AssociationAlternate: Jerry Graupman

IM 4/14/2005SPI-AAA

James Dockrill

PrincipalJ&S Fire Sprinkler Design & Consulting55 Woodrow StreetSt. Catharines, ON L2P 2A4 CanadaCanadian Automatic Sprinkler AssociationAlternate: Jason W. Ryckman

IM 8/2/2010

SPI-AAA

Jeff Hebenstreit

PrincipalUL LLC484 Tamarach DriveEdwardsville, IL 62025-5246Alternate: Daniel R. Weaver

RT 08/11/2014SPI-AAA

Thomas H. Jutras

PrincipalEngineering Planning & Management, Inc.959 Concord StreetFramingham, MA 01701New England Association of Fire Protection SystemDesigners

IM 7/19/2002

SPI-AAA

Edwin A. Kotak, Jr.

PrincipalRobert W. Sullivan, Inc.529 Main Street, Suite 203Boston, MA 02129

SE 1/17/1997SPI-AAA

Richard W. Kozel

PrincipalLivingston Fire Protection, Inc.5150 Lawrence PlaceHyattsville, MD 20781

IM 10/3/2002

SPI-AAA

Eric Lee

PrincipalEnvironmental Systems Design, Inc.175 West Jackson Blvd., Suite 1400Chicago, IL 60604

SE 1/10/2002SPI-AAA

Stephen M. Leyton

PrincipalProtection Design and Consulting2851 Camino Del Rio South, Suite 400San Diego, CA 92108American Fire Sprinkler AssociationAlternate: Thomas G. Wellen

IM 7/12/2001

1

Page 44: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Address List No PhoneStandpipes SPI-AAA

Chad Duffy03/13/2015

SPI-AAA

Terence A. Manning

PrincipalJENSEN HUGHES668 North 44th Street, Suite 240WPhoenix, AZ 85008Alternate: Joseph A. Castellano

SE 1/1/1989SPI-AAA

Scott T. Martorano

PrincipalThe Viking Corporation210 North Industrial Park RoadHastings, MI 49058

M 8/5/2009

SPI-AAA

Kevin D. Maughan

PrincipalTyco Fire Protection Products1467 Elmwood AvenueCranston, RI 02910Alternate: Terry L. Victor

M 4/14/2005SPI-AAA

David R. Mettauer

PrincipalEast Texas Fire Protection, Ltd.PO Box 4033Palestine, TX 75802National Association of Fire Equipment Distributors

IM 3/4/2009

SPI-AAA

Bob D. Morgan

PrincipalFort Worth Fire Department1000 Throckmorton StreetFort Worth, TX 76102

E 8/2/2010SPI-AAA

Rita L. Neiderheiser

PrincipalRoad Sprinkler Fitters UA LU 669PO Box 40393Denver, CO 80204United Assn. of Journeymen & Apprentices of thePlumbing & Pipe Fitting IndustryAlternate: Charles W. Ketner

L 8/2/2010

SPI-AAA

John W. Norman III

Principal264 Hewlett AvenueMerrick, NY 11566

SE 3/1/2011SPI-AAA

James S. Peterkin

PrincipalHeery International1717 Arch Street, Suite 3730Philadelphia, PA 19103-2840

SE 8/2/2010

SPI-AAA

Maurice M. Pilette

PrincipalMechanical Designs Ltd.19 Erie DrivePO Box 2188Natick, MA 01760

SE 1/1/1990SPI-AAA

Edward J. Prendergast

PrincipalWolf Technical Services10344 South LeavittChicago, IL 60643

SE 8/5/2009

SPI-AAA

Rich Richardson

PrincipalSeattle Fire Department220 Third Avenue South, 2nd FloorSeattle, WA 98104Alternate: Gary L. English

E 1/14/2005SPI-AAA

Daniel Sanchez

PrincipalCity of Los AngelesBuilding & Safety201 North Figueroa Street, Suite 400Los Angeles, CA 90012

E 10/18/2011

SPI-AAA

Peter T. Schwab

PrincipalWayne Automatic Fire Sprinklers, Inc.222 Capitol CourtOcoee, FL 34761-3033

IM 7/29/2005SPI-AAA

Kyle J. Smith

PrincipalCobb County Fire & Emergency Services4844 Dartford DrivePowder Springs, GA 30127Alternate: Christopher Sobieski

E 10/20/2010

2

Page 45: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Address List No PhoneStandpipes SPI-AAA

Chad Duffy03/13/2015

SPI-AAA

Mark Summers

PrincipalLos Alamos National Laboratory1300 Iris Street, Suite 208Los Alamos, NM 87544

U 03/07/2013SPI-AAA

Ronald N. Webb

PrincipalS.A. Comunale Company, Inc.2900 Newpark DriveBarberton, OH 44203National Fire Sprinkler AssociationAlternate: John B. Corso

M 10/23/2003

SPI-AAA

Jim Widmer

PrincipalPotter Roemer FIRE PROPO Box 3237Montgomery, AL 36109-1405Fire Equipment Manufacturers' AssociationAlternate: Jeff Saunders

M 10/23/2003SPI-AAA

Don Casey

AlternateRandal Brown & Associates Engineering Ltd.Suite 105 - 6 Lansing SquareToronto, ON M2J 1T5 CanadaPrincipal: Randal G. Brown

SE 10/18/2011

SPI-AAA

Joseph A. Castellano

AlternateJENSEN HUGHES3384 Peachtree Road, Suite 550Atlanta, GA 30326-2826Principal: Terence A. Manning

SE 08/11/2014SPI-AAA

John B. Corso

AlternateNational Fire Sprinkler Association, Inc.2400 Tyler LaneLouisville, KY 40205Principal: Ronald N. Webb

M 1/10/2008

SPI-AAA

Gary L. English

AlternateSeattle Fire Department220 Third Avenue SouthSeattle, WA 98104Principal: Rich Richardson

E 1/14/2005SPI-AAA

Jerry Graupman

AlternateGreat Lakes Plumbing & Heating Company4521 West Diversey AvenueChicago, IL 60639Illinois Fire Prevention AssociationPrincipal: Brian G. Conway

IM 8/9/2011

SPI-AAA

John L. Hulett

AlternateWestern States Fire Protection Company7020 South Tucson WayCentennial, CO 80112-6791Principal: Marinus Both

IM 1/10/2008SPI-AAA

Charles W. Ketner

AlternateNational Automatic Sprinkler Fitters LU 669Joint Apprenticeship & Training Committee7050 Oakland Mills RoadColumbia, MD 20732United Assn. of Journeymen & Apprentices of thePlumbing & Pipe Fitting IndustryPrincipal: Rita L. Neiderheiser

L 8/2/2010

SPI-AAA

Michael Wade McDaniel

AlternateF TechVolcan Momotombo2714, Col. El Colli UrbanoZapopan, Jalisco, 45070 MexicoPrincipal: Cecil Bilbo, Jr.

SE 03/07/2013SPI-AAA

Jason W. Ryckman

AlternateCanadian Automatic Sprinkler Association335 Renfrew Drive, Suite 302Markham, ON L3R 9S9 CanadaPrincipal: James Dockrill

IM 10/28/2014

3

Page 46: Technical Committee on Standpipes (SPI-AAA) · NFPA 14 Second Draft Meeting (Fall 2015) Tuesday, April 7, 2015, 11:00am – 3:00pm ET Adobe Connect/Conference Call Page 2 of 5 AGENDA

Address List No PhoneStandpipes SPI-AAA

Chad Duffy03/13/2015

SPI-AAA

Jeff Saunders

AlternateWilson & Cousins Interior Fire Protection4390 Paletta Court, Unit MBurlington, ON L7L 5R2 CanadaFire Equipment Manufacturers' AssociationPrincipal: Jim Widmer

M 07/29/2013SPI-AAA

Christopher Sobieski

AlternateCobb County Fire & Emergency Services1500 Powers Ferry RoadMarietta, GA 30067-5414Principal: Kyle J. Smith

E 10/29/2012

SPI-AAA

Terry L. Victor

AlternateTyco/SimplexGrinnell705 Digital Drive, Suite NLinthicum, MD 21090-2267Principal: Kevin D. Maughan

M 03/07/2013SPI-AAA

Daniel R. Weaver

AlternateUL LLC333 Pfingsten RoadNorthbrook, IL 60062-2096Principal: Jeff Hebenstreit

RT 10/20/2010

SPI-AAA

Thomas G. Wellen

AlternateAmerican Fire Sprinkler Association, Inc.12750 Merit Drive, Suite 350Dallas, TX 75251American Fire Sprinkler AssociationPrincipal: Stephen M. Leyton

IM 03/05/2012SPI-AAA

James W. Nolan

Member EmeritusJames W. Nolan Company633 Florence DrivePark Ridge, IL 60068

SE 1/1/1965

SPI-AAA

Chad Duffy

Staff LiaisonNational Fire Protection Association1 Batterymarch ParkQuincy, MA 02169-7471

4/18/2011