8/3/2019 Technical Basics for Grid Connection
1/73
David Roberts
Dulas Ltd, UK
DULAS
Grid Connection ofEmbedded Generators
8/3/2019 Technical Basics for Grid Connection
2/73
This presentation will:
Outline the issues concerned with the gridconnection of embedded generators
Outline the work undertaken in Sri Lanka in theyear 2000 on the grid connection of embeddedgenerators
DULAS
Grid Connection of Embedded Generators
8/3/2019 Technical Basics for Grid Connection
3/73
What is Embedded Generation?
Embedded generation describes any generationsystem that is connected to the distributionnetwork. It derives from the generation beingembedded into the distribution network.
There is no formal definition of what is a distributionsystem and what is therefore an embeddedgenerator.
Commonly systems up to 33 kV are described as
distribution systems, where either consumer loadsor lines leading to consumer loads are present.
DULAS
8/3/2019 Technical Basics for Grid Connection
4/73
Why is this a subject requiring attention?
Distribution networks are primarily designedto distribute power from a centraltransmission system down to consumerloads connected to the distribution system,
the power flow is one wayWith embedded generation the power flow is
more complex and may be both ways
There are plans for the implementation ofincreasing amounts of smaller gridconnected generation systems.
DULAS
8/3/2019 Technical Basics for Grid Connection
5/73
What are the key factors to be considered?
Grid stability and security Fault Level
Interconnection Protection
Islanded Operation Voltage levels Earthing Load flow
Connection application process Testing and maintenance of protection
DULAS
8/3/2019 Technical Basics for Grid Connection
6/73
Maintenance of grid stability and security are primerequirements for the specification of interconnectionequipment and regulations.
The grid supply system may be subject to: increasing load demand
low availability of spinning reserve
load shedding to maintain system security
an increasing use of embedded generation
DULAS
Grid stability and security
8/3/2019 Technical Basics for Grid Connection
7/73
Connection and disconnection of embeddedgeneration may cause grid disturbances whichmay affect grid stability and reliability.
This is particularly the case if there is the lossof a large amount of embedded generation atone time and embedded generation may be asignificant contribution towards overall
generation capacity. There is usually no central control over
embedded generation operationDULAS
Grid Stability
8/3/2019 Technical Basics for Grid Connection
8/73
There will be increasing amounts of embeddedgeneration in Indonesia
This is likely to lead to an increasingproportion of the grid load being supplied by
embedded generation.
The security of supply of the embeddedgeneration will become more significant for the
security of the grid as a whole.
DULAS
Grid Security
8/3/2019 Technical Basics for Grid Connection
9/73
The connection of embedded generation willcontribute to the fault levels in the system
This may require changes to the protectionequipment on the distribution system
This is usually only a factor when there arelarge sizes or large numbers of embeddedgenerators in one area.
DULAS
Fault levels
8/3/2019 Technical Basics for Grid Connection
10/73
There is a requirement for some electricalprotection at the point of connection to ensurethat:
Operation of the generator will not compromise the
safety of the grid system Deviations in the grid system will not damage the
generator equipment
Safety on the distribution system and at the
generation station is maintained Islanded operation of sections of the distribution
system is prevented
DULAS
Interconnection Protection
8/3/2019 Technical Basics for Grid Connection
11/73
Islanded operation is where: a section of the distribution network is separated from
the rest of the network (islanded) and
the supply to the separated section is maintained by
embedded generationThis is potentially dangerous in that there is little
control on voltage or frequency and theprotection systems of the distribution network
may not operate due to the limited capacity ofthe embedded generation
DULAS
Islanded operation
8/3/2019 Technical Basics for Grid Connection
12/73
Embedded generation will cause changes to thevoltage levels in the distribution systemgenerally it will raise the voltage at points alongthe distribution network.
This voltage rise must be limited to ensure thatthe supplies to consumers remain withinstatutory and safe working limits
DULAS
Voltage Levels
8/3/2019 Technical Basics for Grid Connection
13/73
Embedded generators ususally genrate at lowvoltage (400V 3 phase) and require suitableearthing for their safe operation
The connection points will usually include switch
gear and transformers which require suitablehigh voltage earthing
These earthing systems must be separated to
ensure the safety of the plant in fault conditions
DULAS
Earthing
8/3/2019 Technical Basics for Grid Connection
14/73
Embedded generators will change the load flow inin the distribution system.
In some cases power will be fed from thedistribution system into the transmission system
These changes in load flow may causetransmission and distribution system voltagecontrol and protection devices to operate
incorrectly.
DULAS
Load Flow and Grid System operation
8/3/2019 Technical Basics for Grid Connection
15/73
A standard process is required for an embeddedgenerator to:
Apply for a connection
Agree the connection requirements,specifications and costs
Implement and test the connection protection
Operate and maintain the connection
protection
DULAS
Connection process
8/3/2019 Technical Basics for Grid Connection
16/73
The connection protection and earthing needs tobe maintained and tested.
The distribution system will rely on the operationof the embedded generation protection for safe
and reliable operation
Maintenance and testing requirements need to bedefined and implemented
DULAS
Testing and Maintenance
8/3/2019 Technical Basics for Grid Connection
17/73
DULAS
Typical connection arrangement
8/3/2019 Technical Basics for Grid Connection
18/73
DULAS
The Sri Lanka Guide to Interconnection
Of Embedded Generators
2000The work undertaken in Sri Lanka included:Meetings and discussions with many departments of theCeylon Electricity Board, existing and prospective
embedded generation companies and consultantsworking in the field of embedded generation.The man outputs were:
The production of a Guide
Training courses for CEB and private generationcompany personnel
8/3/2019 Technical Basics for Grid Connection
19/73
DULAS
The Sri Lanka Guide to Interconnection
Of Embedded Generators
2000
The work was undertaken by a consortium of companiesand consultants from Sri Lanka and the UK. The lead
partners were:Resource Management Associates in Sri LankaDulas Ltd in UK
The work was funded by the World Bank through the Pre
Electrification Unit of the CEB
8/3/2019 Technical Basics for Grid Connection
20/73
The CEB will need to undertake studies to ascertainthe acceptability and requirements for the connectionof a new embedded generator.
These studies will require information from the
proposed generating company.
The generating company will also require someinformation from the CEB to design suitable protectionarrangements and maybe to modify proposed designs
to suit particular grid requirements.
DULAS
Grid Interconnection of Embedded Generators - SriLanka
Studies and Information Requirements
8/3/2019 Technical Basics for Grid Connection
21/73
DULAS
Grid Interconnection of Embedded GeneratorsSri Lanka
Studies to be undertaken by the CEB at the
time of a connection applicationThe following studies may be conducted by theCEB:
Stability
Fault Level Grid protection Voltage levels Earthing Load flow
8/3/2019 Technical Basics for Grid Connection
22/73
The affect on local stability of new embedded generationcapacity should be analysed when the capacity of thenew plant exceeds 5MW, or when the total capacity ona single distribution line exceeds 5MW.
For small generators, typically less than 1MW, therequirement for stability information from theGenerating Company may be waived.
The Generating Company shall provide a model of the
AVR of the proposed generators where the capacityexceeds 5MW.
DULAS
Stability
Grid Interconnection of Embedded GeneratorsSri Lanka
8/3/2019 Technical Basics for Grid Connection
23/73
The cumulative effect of of the embedded generator(s)on the design fault level for the distribution systemshall be assessed by the CEB.
A study should be undertaken when the cumulative fault
level reaches 90% of the rating of the associatedswitchgear, or the design fault level.
The CEB may require more detailed information from thegenerator than that specified in Annex 3.
DULAS
Fault Level
Grid Interconnection of Embedded GeneratorsSri Lanka
8/3/2019 Technical Basics for Grid Connection
24/73
The effect on the distribution system protection ratingsand settings shall be studied if any of the followingapply:
the proposed generating site maximum short circuitcurrent is greater than 20% of the distribution systemshort circuit current
the cumulative short circuit current from all embeddedgenerators on a distribution line will exceed 30% of thedistribution system short circuit current
there will be a net export of power from the distributionsystem to the 132 kV transmission system.
DULAS
Protection
Grid Interconnection of Embedded GeneratorsSri Lanka
8/3/2019 Technical Basics for Grid Connection
25/73
The nominal voltage at the Point of Supply (POS) shallbe stated by the CEB in the LOI.
The voltage rise at the POS must be within operationallimits.
A two stage approach shall be made to studies 1) Exclude load connections
2) Include load connections
The stage 2 study is required when the stage 1 study
indicates a potential problem.
DULAS
Voltage Levels
Grid Interconnection of Embedded GeneratorsSri Lanka
8/3/2019 Technical Basics for Grid Connection
26/73
The Guide provides information on acceptable earthingpractices and earthing requirements for a variety ofsituations. An Annex on earthing is included to providebackground information on earthing.
The Generating Company shall provide informationabout the proposed earthing arrangement to the CEB.
It is the responsibility of the Generating Company toprovide adequate earthing at a generating site.
The interconnection of generating site and CEB earthsystems should be considered for each site situationwith reference to the Guide.
DULAS
Earthing
Grid Interconnection of Embedded GeneratorsSri Lanka
8/3/2019 Technical Basics for Grid Connection
27/73
To assess the load flow at the distribution transformer themaximum cumulative generation capacity and theminimum captive load on the distribution line shall becalculated.
This will indicate if there are conditions under which therewill be an export of power from the distribution line tothe 132 kV transmission system.
If export is likely to occur the protection at the sub stationwill need to be studied.
DULAS
Load Flow
Grid Interconnection of Embedded GeneratorsSri Lanka
8/3/2019 Technical Basics for Grid Connection
28/73
The initial information to be provided by the CEB andthe generating company are given in a pro forma inAnnex 3.
This information exchange is to follow the issue of anLOI.
The Generating Company shall later provide thefollowing information, prior to acceptance testing:
the proposed interconnection protectionimplementation
protection test procedures
drawings showing the protection arrangements
DULAS
Information Requirements
Grid Interconnection of Embedded GeneratorsSri Lanka
8/3/2019 Technical Basics for Grid Connection
29/73
Synchronisation
Synchronisation means the minimisation of thedifference in magnitude, frequency and phase anglebetween the corresponding phases of the generatoroutput and the grid supply prior to the connection ofthe two supplies.
Synchronisation can be achieved either manually orautomatically, the latter is preferable.
It is very unlikely that new installations will include onlymanual synchronisation. If manual synchronisation issuggested its safe and reliable operation should beseriously considered and implemented carefully.
DULAS
Grid Interconnection of Embedded Generators - Synchronisation of Generators
8/3/2019 Technical Basics for Grid Connection
30/73
Synchronisation (2)
Voltage Fluctuation
During Synchronisation of a single generator, theinduced voltage fluctuation on the grid should notnormally exceed 3% at the Point of Common
Coupling,
The requirements of voltage step and flicker givenin Section 11 should also be met.
DULAS
Grid Interconnection of Embedded Generators - Synchronisation of Generators
8/3/2019 Technical Basics for Grid Connection
31/73
DULAS
Grid Interconnection of Embedded Generators - Synchronisation of Generators
Synchronisation of Synchronous
Generators Generator output frequency must be the same asthe grid frequency.
The phase angle between the generator outputand the grid supply must be less than specifiedlimits
The rate of change in phase angle between thegrid and the generator must be within specifiedlimits
Then the generator may be connected to the grid
DULAS
8/3/2019 Technical Basics for Grid Connection
32/73
DULAS
Grid Interconnection of Embedded Generators - Synchronisation of Generators
DULAS
Synchronisation Methods for Synchronous
Generators Control motive power to generator to achieve
synchronisation.
Usually indicated with Synchroscope lights or
indicator. Problems of controlling large rotatingmasses and motive power
Control of the load on the generator to achievesynchronisation. This is usually done with anElectronic Load Control (ELC) system
Requires a dump load, it provides very smooth anaccurate synchronisation.
8/3/2019 Technical Basics for Grid Connection
33/73
DULAS
Grid Interconnection of Embedded Generators - Synchronisation of Generators
DULAS
Synch Check relays
A synch check relay must be used to check thatthe synchronisation of the generator and the grid iswithin the specified limits
The relay must operate on at least two, andpreferably all three phases to ensure phaserotation is correct
8/3/2019 Technical Basics for Grid Connection
34/73
DULAS
Grid Interconnection of Embedded Generators- Synchronisation of Generators
DULAS
Synchronisation limits
The limits specified in the Guide for allowingsynchronisation are:
Phase angle +/- 20 degrees
Maximum voltage difference 7% Maximum slip frequency 0.44 %
8/3/2019 Technical Basics for Grid Connection
35/73
Synchronisation of Induction Generators
Two main methods of synchronisation:
Use of electronic soft start unit to motor the generatorup to synchronous speed
Mechanically drive the generator up to synchronous
speed.
Once at, or slightly above, synchronous speed thegenerator may be connected to the grid.
DULAS
Grid Interconnection of Embedded Generators - -Synchronisation of Generators
8/3/2019 Technical Basics for Grid Connection
36/73
Synchronisation of Induction Generators (2)
Inrush Current
There will be a large inrush current when the generatoris connected. This current is building up the field in the
generator.The inrush current may be reduced by adding seriesresistance for a short time after connection.
A large inrush current will cause problems to the local
grid, which must provide the current
DULAS
Grid Interconnection of Embedded Generators Synchronisation of Generators
8/3/2019 Technical Basics for Grid Connection
37/73
The addition of embedded generation may change therequirements for grid protection.
There will be a fault level contribution from theembedded generator, though this is usually small.
It is important that grid system protection will operatewhen required.
If a grid sub station becomes a net exporter of powerto the 132kV system the operation of voltage control
and distance protection systems will require study andmodification.
DULAS
Grid Interconnection of Embedded GeneratorsSri Lanka
Grid protection
8/3/2019 Technical Basics for Grid Connection
38/73
The hazards created during islanded operation are:
Unearthed operation of the distribution system
Lower fault levels
Out of synchronisation reclosure
Voltage levels outside statutory limits
Reduction in quality of supply
Risk to maintenance personnel
DULAS
Grid Interconnection of Embedded Generators - Sri Lanka
Hazards of Islanding
8/3/2019 Technical Basics for Grid Connection
39/73
Due to the hazards listed the operation of an islandedsituation is to be avoided.
There may be an advantage to consumers, andgenerating companies, to allow islanded operation in
the maintenance of supply when a line has beendisconnected. This advantage is small and thehazards outweigh the advantages.
DULAS
Grid Interconnection of Embedded Generators - Sri Lanka
Islanding
8/3/2019 Technical Basics for Grid Connection
40/73
The onset of an islanded situation will be accompaniedby a disturbance in the grid.
The detection of islanded operation relies of thedetection of this disturbance.
The disturbance may take the form of:
a change in voltage or frequency
a single shift in voltage vector
a change in reactive power flow
DULAS
Grid Interconnection of Embedded Generators - Sri Lanka
Detection of Islanded operation
8/3/2019 Technical Basics for Grid Connection
41/73
A prime consideration in the development of thedetection and protection requirements is to minimisethe potential for multiple tripping of embeddedgenerators due to grid disturbances or faults onadjacent lines which may not require a generator to be
disconnected.
This multiple tripping is known as Common Cause orCommon Mode tripping.
DULAS
Common Cause Tripping
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
42/73
The protection types and settings specified in the Guide
are designed to avoid Common Cause tripping.
For larger generating sites (>5MW) inter tripping fromthe grid sub station, and possibly distribution breakers,should be used to ensure a generator is disconnected
when an islanded condition occurs. For sites < 5MW Loss of Mains (LoM) protection may
be used to detect an islanded condition anddisconnect the generator. For these smaller generating
sites the remaining small possibility of common causetripping is considered acceptable.
DULAS
Avoiding Common Cause TrippingGrid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
43/73
All sites require under / over voltage and under / overfrequency protection
Other Loss of Mains protection may be provided by:
Rate of Change of Frequency (ROCOF)
Voltage Vector Shift
Reverse VAR
Other novel techniques
DULAS
Loss of Mains Protection
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
44/73
Voltage
The voltage of all three phases shall be monitored.
The limits for operation are:
for HV connection +/- 10%
for LV connection +/- 14%
The relay should have a time delay to avoidspurious trips due to remote faults.
The maximum total tripping time shall be 0.5seconds
DULAS
Islanding Detection and Protection (1)
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
45/73
Frequency
The frequency of the supply shall be monitored, thiscan be single phase.
The limits for operation are:
+4%, -6% (i.e. 52Hz to 47Hz)
There is no requirement for a time delay.
The maximum total tripping time shall be 0.5seconds
The low frequency limit may be reduced to 46Hz,this may require additional generator frequencyprotection.
DULAS
Islanding Detection and Protection (1)
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
46/73
Rate of Change of Frequency (ROCOF)
True ROCOF detects the islanded condition
rather than the onset of islanding.
Some ROCOF relays may also be sensitive to an
initial change in voltage vector.
The limits of operation are:
2.5 Hz/second. This high level is specified toensure minimum spurious tripping.
There is no requirement for a time delay.
The maximum total tripping time shall be 0.5seconds
DULAS
Loss of Mains Protection (1)
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
47/73
Voltage Vector Shift
Voltage vector shift detects the onset on anislanded condition.
It is susceptible to spurious tripping due to grid
distrurbances
The limits of operation are:
6 degrees in a half cycle.
This may be de-sensitised to up to 12 degrees.
There is no requirement for a time delay.
The maximum total tripping time shall be 0.5seconds
DULAS
Loss of Mains Protection (2)
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
48/73
Reverse VAR
Reverse VAR relays detect the flow of reactivepower from the generator to the grid. This willoccur when during an islanded condition of a
single generator. Generators must have stable power factor control
to use reverse VAR protection.
The limits of operation are to be agreed between
the generating company and the CEB. Typically 1-5% of the magnitude of maximum kW export.
A time delay of up to 5 seconds may be required.
DULAS
Loss of Mains Protection (3)
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
49/73
Intertripping
Intertripping is a direct means of islandingprotection. It can provide a reliable method oftripping isanded generators without any common
cause problems. A trip signal is sent from the circuit breaker or
recloer responsible for the islanding.
The reliability is dependant upon the security of the
trip signal communication method. Reliabilityshould be assessed for each particular site. A failsafe method of communication should be used.
DULAS
Loss of Mains Protection (4)
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
50/73
Fault Thrower
This is a special application of a fault thrower.
The fault thrower would be installed at the sourcesub station and would operate following the
opening of the source circuit breaker.
Operation would be delayed to allow generatorrelays to operate if sufficient load imbalance exists.
It is only effective for generators connected
between the source breaker and the first autorecloser.
DULAS
Loss of Mains Protection (5)
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
51/73
Other novel techniques
The Guide does not preclude the use of noveltechniques that may be developed to achieve adependable and reliable loss of mains function.
An example is the use of sensitive ROCOF blocked byvoltage vector shift to prevent operation during generalgrid instability.
DULAS
Loss of Mains Protection (6)
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
52/73
Detection of islanding will not be possible in allsituations, for example a perfect load / generatorbalance may exist.
Secondary protection may be used such as:
dead line or synch check on auto reclosingdevices
Neutral Voltage Displacement (NVD)
NVD is a dependable means of satisfying safety
requirements and mitigating the risks of islandedoperation.
Details on NVD protection are given in the Guide.
DULAS
Islanding Network Protection
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
53/73
The type and size of generator connection isclassified into five cases and the protectionrequirements defined for each case.
The factors that define which case applies are:
Generation site capacity
Generator type
Ratio of minimum captive load and maximumcapacity
Capacity and interconnection protection of othergenerators on the same distribution line and substation.
DULAS
Interconnection Protection Requirements
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
54/73
DULAS
Interconnection Protection Requirements Summary
Case 1 Case 2 Case 3 Case 4 Case 5
Generator type All All See case
3descripti
on
All See case 5
description
Self commutated
static inverters
Minimum captive
loadL L L L
Maximum
cumulative export
capacity
0.8 x L
Max site export
capacity
< 5
MW
< 5 MW < 5
MW
> 5 Mw
Under and over
voltage protection
Under and over
frequency protection *
Vector shift
protection *
ROCOF protection
*True ROCOF
protection*
NVD protection *(1)
Intertripping * * * *Other requirements * * * * *
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
55/73
All types of Generator The maximum cumulative export capacity is less
than half the minimum distribution line (orcaptive) load
the maximum export capacity is less than 5MW.Protection Required
Under and over voltage
Under and over frequency
Optional:
Three phase vector shift, subject to generatorpreference
DULAS
Interconnection Protection, Case 1
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
56/73
All types of generator
The maximum cumulative export capacity is lessthan 0.8 times the minimum captive load, and
the maximum export capacity is less than 5MW.
Protection Required:
Under and over voltage
Under and over frequency
3 phase vector shift
Optional: True RoCoF may be used as well as vector shift
DULAS
Interconnection Protection, Case 2
Grid Interconnection of Embedded Generators - Sri Lanka
id i f b dd d i k
8/3/2019 Technical Basics for Grid Connection
57/73
All types of generator except mains excited generatorsdefined in Case 5.
The maximum cumulative generation export capacityis greater than 0.8 times the minimum captive load,
such that load/generator balance is possible, and the maximum export capacity is less than 5 MW.
Protection Required:
Under and over voltage
Under and over frequency
3 phase vector shift, or true ROCOF
NVD
Dead line check
DULAS
Interconnection Protection, Case 3
Grid Interconnection of Embedded Generators - Sri Lanka
G id I i f E b dd d G S i L k
8/3/2019 Technical Basics for Grid Connection
58/73
Alternative ProtectionAs a replacement for the combination of Vector shift
and NVD any one of the following may be used:
Intertripping
Fault thrower
Reverse VAR, where applicable
NVD is not required when the maximum exportcapacity is less than 1MW if the cumulative exportcapacity on a line is less than 0.8 times theminimum captive load.
DULAS
Interconnection Protection, Case 3 (2)
Grid Interconnection of Embedded Generators - Sri Lanka
G id I t ti f E b dd d G t S i L k
8/3/2019 Technical Basics for Grid Connection
59/73
All types of generator The maximum export capacity of an Embedded
Generation site is greater than 5 MW.
It is preferred that the Embedded Generator is
connected directly to the primary bus rather thanteed into an HV distribution feeder.
Protection Required
Under and over voltage
Under and over frequency Intertripping from primary bus intake
Parallel earthing or NVD protection
DULAS
Interconnection Protection, Case 4
Grid Interconnection of Embedded Generators - Sri Lanka
G id I t ti f E b dd d G t S i L k
8/3/2019 Technical Basics for Grid Connection
60/73
If the Embedded Generator is teed into a distributionfeeder, the following is also required:
Intertripping from the feeder breaker or
Fault throwing or
Reverse VAR protection where applicable.Generators larger than 5 MW will be encouraged to
obtain more secure connections. For largegenerators remote from the primary bus, adequate
security may only be achieved by double circuitconnection to the primary bus.
DULAS
Interconnection Protection, Case 4 (2)
Grid Interconnection of Embedded Generators - Sri Lanka
Grid Interconnection of Embedded Generators Sri Lanka
8/3/2019 Technical Basics for Grid Connection
61/73
Mains excited asynchronous (induction) generator withlocal power factor correction less than the reactivepower demand, or a line commutated inverter.
The CEB network/circuit capacitance is not sufficient
to self excite the generator. The maximum cumulative connected generation
export capacity is greater than 0.8 times the minimumcaptive load. No synchronous generation or self-
excited generation are connected.
DULAS
Interconnection Protection, Case 5
Grid Interconnection of Embedded Generators - Sri Lanka
Grid Interconnection of Embedded Generators Sri Lanka
8/3/2019 Technical Basics for Grid Connection
62/73
Protection Required Under and over voltage
Under and over frequency
3-phase vector shift
The total generation connected to a primary substationusing the vector shift method for loss of mainsprotection shall not exceed 20MW.
DULAS
Interconnection Protection, Case 5 (2)
Grid Interconnection of Embedded Generators - Sri Lanka
Grid Interconnection of Embedded Generators Sri Lanka
8/3/2019 Technical Basics for Grid Connection
63/73
Some wind turbines and photovoltaic system invertersare examples of this type of generator.
The general requirements are covered with
synchronous machines in cases 1-4.
However inverters commonly include proprietaryprotection methods, including ROCOF.
It is the responsibility of the Generating Company to
demonstrate that the protection meets theacceptable levels of dependability and reliability.
DULAS
Interconnection Protection,Self Commutated Static Inverters
Grid Interconnection of Embedded Generators - Sri Lanka
Grid Interconnection of Embedded Generators Sri Lanka
8/3/2019 Technical Basics for Grid Connection
64/73
It is the responsibility of the Generating Company to
organise, agree procedures with the CEB andundertake protection equipment testing.
Prior to testing, the Generating Company will certifythat:
the earthing system conforms to the provisions inthis Guide and other relevant standards.
the design and implementation of the protectionsystem complies with the requirements of the
Guide, and any protection specified in the PPA. the generating system is safe to operate and
complies with all the relevant requirements forelectrical installations.
DULAS
Test and Acceptance ProceduresGrid Interconnection of Embedded Generators - Sri Lanka
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
65/73
It is the responsibility of the Generating Companyrepresentative to provide and complete the test forms.
Testing is to be witnessed by the CEB representative.The CEB representative is to certify by signature thatthe protection tests were witnessed as successful.
The CEB may provide staff and/or equipment to theGenerating Company to enable tests to be
undertaken.
A standard form to be completed during testing isincluded in Annex 5 of the Guide
DULAS
Test and Acceptance Procedures (2)Grid Interconnection of Embedded Generators - Sri Lanka
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
66/73
The required grid connection protection is to be testedprior to acceptance of new generation plant forconnection to the grid. Short term connection may beallowed to set up and test the protection equipment.
Retesting at intervals of no greater than three years or:
Following any significant change in generation orprotection equipment.
Following any maintenance or repair, whichinvolved the disconnection or rearrangement of any
protection equipment.
DULAS
Test and Acceptance Procedures (3)Grid Interconnection of Embedded Generators Sri Lanka
Grid Interconnection of Embedded Generators - Sri Lanka
8/3/2019 Technical Basics for Grid Connection
67/73
DULAS
Thank you for attention
Any Comments or Questions?
Grid Interconnection of Embedded Generators Sri Lanka
Grid Interconnection of Embedded Generators Sri Lanka
8/3/2019 Technical Basics for Grid Connection
68/73
DULAS
Information to be provided by the CEB
This information shall include the planned (or prospective) fault levels
expected by the CEB in 10 years from the time of connection
application.
Maximum fault levels (for equipment selection and earthing
design):
Network design symmetrical fault level (kA or MVA)Peak asymmetrical fault level at half cycle (kA)
3-phase symmetrical fault level at half cycle (MVA or kA)
X/R ratio for 3 phase symmetrical fault
1-phase to earth fault level (kA) (neglecting earth system
resistances)
X/R ratio for 1-phase to earth fault (neglecting earth system
resistances)
Grid Interconnection of Embedded Generators Sri Lanka
Grid Interconnection of Embedded Generators Sri Lanka
8/3/2019 Technical Basics for Grid Connection
69/73
DULAS
Information to be provided by the CEB (2)
Minimum fault levels (for protection design):3-phase steady state symmetrical fault level (MVA or kA)
X/R ratio for 3 phase symmetrical fault
1-phase to earth fault level (kA) (Neglecting earth system
resistances)
X/R ratio for 1-phase to earth fault (neglecting earth system
resistances)
Grid Interconnection of Embedded Generators Sri Lanka
Grid Interconnection of Embedded GeneratorsSri Lanka
8/3/2019 Technical Basics for Grid Connection
70/73
DULAS
Information from the Generating Company(1)Synchronous Generators with a capacity above 500 kW
Site Name
Location ...Site Reference Number ....
Generating Company Name.
Contact
Point of Supply (location) .
Maximum export capacity
Maximum import capacity ...
Power factor operating range ..
Generator (for each synchronous generator):
Terminal voltage (kV) ..
Machine rating (MVA) .
Stator resistance (pu) tolerance % .Sub-transient reactance (pu) . tolerance % .
Transient reactance (pu) . tolerance % .
Synchronous reactance (pu) . tolerance % .
Sub-transient time constant (ms) ... tolerance(ms) .
Transient time constant (ms) . tolerance (ms) .
Grid Interconnection of Embedded GeneratorsSri Lanka
8/3/2019 Technical Basics for Grid Connection
71/73
DULAS
Information from the Generating Company(2)
Synchronous Generators with a capacity above 500 kW
Generator (for each synchronous generator):Terminal voltage (kV) ..
Machine rating (MVA) .
Stator resistance (pu) tolerance % .
Sub-transient reactance (pu) . tolerance % .
Transient reactance (pu) .. tolerance % .
Synchronous reactance (pu) .. tolerance % .
Sub-transient time constant (ms). tolerance(ms) .
Transient time constant (ms) . tolerance(ms) .
Grid Interconnection of Embedded GeneratorsSri Lanka
8/3/2019 Technical Basics for Grid Connection
72/73
DULAS
Information from the Generating Company(3)
Transformer (for each generator transformer);
Rating (MVA) ..
Reactance (pu) .. tolerance % .
Resistance (pu) .. tolerance % .
Voltage Ratio .. vector group .
Cable or Line between the Generator and Point of
Common Coupling where this cabling distance
exceeds 50 metres
Voltage (V) ..
Reactance (Ohm) Resistance (Ohm)
Grid Interconnection of Embedded GeneratorsSri Lanka
8/3/2019 Technical Basics for Grid Connection
73/73
DULAS
Information from the Generating Company(4)
Where a total generating capacity is less than 500 kW
there is a reduced requirement for information from the
Generating Company.
This information requirement is listed on page A3:4
Where Induction, or Asynchronous, generators are
proposed the same information should be provided
where relevant to the induction type generator.