What is measured?
PROCEDURE Amount of interaction between
clients and officers.
TIME Processing time by an officer
COSTS Processing fee (% of GNI per capita)
• Focusing towards reducing Procedures, Time and Costs of
Construction Permit
2
IMPLEMENTATION OF OSC 3.0
Cost of Unsafe Act
Starting Business
Dealing with Construction Permits
Getting Electricity
Registering Property
Getting Credit
Trading Across Borders
Paying Taxes
Protecting Minority Investors
Enforcing Contracts
Resolving Insolvency
P2 P3
Notice of Commencement of
Work
Consideration of Proposed
Development Plans
Process 2 Process 3
Pre Consultation
P5
Final Inspection Stage I & Stage II
Finish
P1
Process 1
Start
CCC deposit and G Forms
P4
Interim Inspection
STAGES OF CONSTRUCTION
Process 4 Process 5 Process 6
P6
• Covers from the Start to Finish of construction
• Focus on 6 main processes
6
Process 1 = PRE-CONSULTATION
JBPM is not directly involved in Process 3 (Notice of Commencement of Work). Not Compulsory Pre-consultation process will be carried out at the counter upon request.
8
PLAN REVIEW
Plan Submission
-New application, received by OSC.
-Amendment application, received by OSC (yet to acquire CCC but
making amendments).
-Available amendment application, received from applicant (CCC
has been issued and amendments have been made).
-Simultaneous application is allowed
(M&E plan approval will only be issued once all of the Passive Fire
Protection [building plans] have been complied with.)
MODEL SEMASA PUSAT SETEMPAT (OSC)
NEGERI MODEL PROJECT SIZE
Kuala Lumpur
OSC 1 Submission Small Scale
KLISBEST Medium & Large Scale
Selain Kuala Lumpur,
OSC 3.0 Small & Large Scale
Sabah & Sarawak Tiada Tiada
PERTIMBANGAN KEPADA PELAN-PELAN CADANGAN PEMAJUAN PROSES 2 :
OSC 2.8
Tidak
Ya
Lengkap?
Semak kelengkapan dokumen
Permintaan Tambahan Dokumen / Maklumat
Kemukakan Lengkap
PEMOHON KEMUKA PERMOHONAN SECARA SATU PERSATU ATAU SECARA SERENTAK
2.2
AGENSI
MEMPERAKU Pentadbir Tanah
Negeri
•124A •204D •Lain-lain
2.3 AGENSI
MEMPERAKU Jabatan Perancang
PBT
• Pelan KM • Pelan Nama
Jalan • Pelan Nama
Taman • Pelan Lanskap
2.4 AGENSI
MEMPERAKU Jabatan Bangunan
PBT
• Pelan Bangunan • Permit Papan
Adang • Permit Roro bin
2.5 AGENSI
MEMPERAKU Jabatan Kejuruteraan
PBT
• Pelan Struktur • Pelan Kerja Tanah • Pelan Jalan Parit
dan Lampu Jalan • Permit Korek Jalan • Pelan Laluan Utiliti
2.6
• JPS • JBPM • TNB • IWK • JPBD
• SKMM • PTN/PTG • JMG • PBAN • JKR • JAS
PEMOHON 2.1
OSC 2.2
Sambung
Pengeluaran kelulusan selepas pindaan dipatuhi
AGENSI YANG
MENGULAS
2.7
MESY JK OSC
14 hari
5 hari
PERTIMBANGAN KEPADA PELAN-PELAN CADANGAN PEMAJUAN PROSES 2 :
• Sediakan Pemakluman keatas permohonan yang lulus kepada Mesyuarat
Majlis Penuh
PEMOHON
OSC Kumpulkan surat-surat
Kelulusan Permit dan Pelan-pelan yang telah diendos dan
serah kepada Pemohon
Sambung dari belakang
MESY JK OSC
• Sediakan surat pemakluman
keputusan kepada Pemohon
OSC
• Pemakluman Kelulusan KM
Bersyarat Untuk Selesaikan Hal-Hal Tanah kepada PTN
Pemohon pinda pelan dan kemukakan kepada OSC bagi pertimbangan
Jawatankuasa OSC
ATAU
Pemohon pinda pelan dan kemuka kepada OSC bagi pengendosan pelan-
pelan
• Sediakan surat pengendosan pelan-pelan kepada Agensi
Memperaku
Lengkap ?
Perlu pindaan
AGENSI MEMPERAKU
MAJLIS PENUH
PTN
12
Process 3 = NOTICE OF COMMENCEMENT OF WORK
JBPM is not directly involved in Process 3 (Notice of Commencement of Work).
5.2
NOTIFIKASI PEMERIKSAAN INTERIM
PROSES 4 :
OSC menerima notifikasi pemeriksaan interim yang menyatakan pemajuan telah memenuhi kehendak agensi peringkat interim dan bersedia untuk pemeriksaan oleh agensi
OSC edar notis kepada TNB, BOMBA, PBAN, IWK, DOSH dan JKR/PBT.
PEMOHON • Notifikasi Pemeriksaan
Interim
5.4 5.5
OSC
PBT / JKR
Pemeriksaan Interim
DOSH
Pemeriksaan Interim
APP (IWK/ MAJAARI)
Pemeriksaan Interim
PBAN
a. Pemeriksaan Interim
b. Sambungan Paip Utama
TNB
Pemeriksaan Interim
4.1
4.2
4.3 4.4 4.5 4.6 4.7 BOMBA
Pemeriksaan
Interim
4.8
*Bagi sebarang ketidakpatuhan, agensi akan keluarkan notis ketidakpatuhan kepada pemohon
PEMOHON • Kemuka Permohonan
Permohonan pemeriksaan akhir I bagi skop PBAN, TNB & PBT/JKR .
Permohonan Sambungan komunikasi. Permohonan pemeriksaan akhir II bagi skop JPBM,
DOSH, APP (IWK/MAJAARI)
NFP •Penyambungan
komunikasi
PSP Terima surat pengesahan CCC
5.1
5.3 5.4 5.5
OSC
5.2
PEMERIKSAAN AKHIR DAN PENGELUARAN SURAT PENGESAHAN CCC
PROSES 5 :
PEMERIKSAAN AKHIR PERINGKAT I
JBPM a. Pemeriksaan
akhir b.Pengeluaran
surat pengesahan CCC (G8,G9)
DOSH a. Pemeriksaan
akhir b.Pengeluaran
surat pengesahan CCC (G11)
APP (IWK/ MAJAARI)
a. Pemeriksaan akhir b.Pengeluaran surat
pengesahan CCC (G14,G15)
PBT / JKR a. Pemeriksaan
akhir b.Pengeluaran
surat pengesahan CCC (G17)
5.7 5.8 5.9
5.6
PEMERIKSAAN AKHIR PERINGKAT II
PBAN a.Pengemukaan
Laporan Pengujian dan Pentauliahan
b.Pemeriksaan Akhir
c.Sambungan meter d. Pengeluaran
Surat Pengesahan CCC (G13)
TNB a. Pemeriksaan
akhir b.Sambungan
elektrik c.Pengeluaran
surat pengesahan CCC (G16)
5.4 5.5
Nota : • Pencawang diserahkan kepada TNB
setelah siap pembinaan pencawang sebelum tarikh Pemeriksaan Akhir.
• Permohonan disertakan dengan Laporan Pengujian dan Pentauliahan bagi skop bekalan air, tenaga, jalan dan parit, kebombaan, jentera dan pembentungan
Maklum keperluan pemeriksaan akhir I kepada PBAN,TNB, PBT/JKR
Maklum kepada NFP buat sambungan Maklum keperluan pemeriksaan akhir II kepada
JBPM, DOSH, APP (IWK/MAJAARI)
OSC
5.10
5.11
*Agensi salinkan surat pengesahan CCC kepada unit OSC
17
PERMOHONAN PEMERIKSAAN AKHIR II
PERMOHONAN PEMERIKSAAN AKHIR II BAGI *SISTEM PENCEGAH KEBAKARAN AKTIF - SISTEMPENCEGAH KEBAKARAN PASIF -
PEMASANGAN LIF/ESKALATOR - SISTEM RETIKULASI PEMBENTUNGAN – LOJI RAWATAN PEMBENTUNGAN
Kepada Tuan / Puan,
Saya mengesahkan kerja-kerja pembinaan dan / atau * Sistem Pencegah Kebakaran Aktif –
Sistem Pencegah Kebakaran Pasif - Pemasangan Lif/Eskalator - Sistem Retikulasi Pembentungan
– Loji Rawatan Pembentungan bagi projek ………………………………………… di atas lot ……………………
mukim …………………….. telah siap dilaksanakan dan bersedia untuk pemeriksaan akhir. Bersama –
sama ini disertakan laporan pengujian dan pentauliahan yang telah disahkan oleh perunding
yang dilantik bagi skop kerja yang berkaitan.
Tandatangan perunding
…..…....………………………………….
(Orang Utama Yang Mengemukakan)
Nama Perunding : ……………………... No. Pendaftaran:………………………..
Tarikh :……………………………….….
Tajuk permohonan cadangan pemajuan
nama lot
nama mukim
*1. Masukkan alamat penuh JBPM berkaitan
*2. Masukkan alamat penuh APP(IWK/Majaari) berkaitan
*3. Masukkan alamat penuh DOSH berkaitan
Samb. UNTUK KEGUNAAN UNIT OSC …………………………………………... Kepada : Tuan / Puan,
Tarikh pengeluaran pengesahan CCC bagi skop *Sistem Pencegahan Kebakaran (Aktif dan
Pasif) – Pemasangan Lif / Eskalator – Sistem Retikulasi Pembentungan / Logi Rawatan
Pembentungan dikeluarkan selewat-lewatnya 60 hari dari tarikh berikut :
Tarikh : ………………………………………………………………………………………...
…………………………..
(Unit OSC PBT)
Masuk nama PBT yang berkaitan
*3. Masukkan alamat penuh APP(IWK/Majaari) berkaitan
*2. Masukkan alamat penuh JBPM berkaitan
*4. Masukkan alamat penuh DOSH berkaitan
Masukan tarikh pemakluman permohonan Pemeriksaan Akhir I
*1. Masukkan nama pemohon
Nota :
Agensi teknikal hendaklah mengemukakan sesalinan surat pengesahan CCC kepada Urusetia OSC
Tarikh
PSP ke Agensi Melalui OSC
OSC ke Agensi
CURRENT ISSUES (OSC 3.0)
SOME ARCHITECTS/M&E ARE YET TO SUBMIT PLAN TO JBPM
(NOT YET RECEIVE CCC)
SOME ARCHITECTS/M&E ARE STILL SUBMITTING THEIR INSPECTION
REQUEST DIRECTLY TO JBPM
SOME ARCHITECTS/M&E HAVE NOT INCLUDED THE REPORTS OF STAGE I
FINAL INSPECTION TO JBPM (TNB & LEMBAGA AIR NEGERI) BEFORE
JBPM CONDUCT INSPECTION
THESE WILL CAUSE IN ADDITIONAL PROCEDURES IN WHICH IT WILL
AFFECT MALAYSIA’S RANKING
SOME ARCHITECTS/M&E ARE STILL SUBMITTING 2 SETS OF PLAN INSTEAD
OF 3
CURRENT ISSUES (OSC 3.0)
ANY KIND OF BUILDING INSPECTION REQUEST INCLUDING PAYMENT,
C1, C2, C3 AND MATERIAL CERTIFICATE WILL BE PROCESSED THROUGH
OSC AND THEN OSC WILL TRANSFER TO JBPM
PAYMENT MUST BE MADE BY CHEQUE (BECAUSE IT IS PROCESSED AT
OSC COUNTER)