Agenda
PART 1
• Meeting Objectives
• Background and Context
• Walkability Audit
• Technical Agency Committee
– Roles, Responsibilities & Schedule
PART 2
• Global Café
3
Meeting Objectives
• Provide scope of the Transportation Master Plan
(TMP)
• Describe role and responsibilities of the TAC
• Allow participants to seek clarity and to offer input to
the process
• Discuss the issues and opportunities
• Discuss next steps
4
What is a
Transportation Master Plan?
6
Vision
• “To develop a sustainable and
integrated transportation system that
provides safe and efficient options
for multi-modal travel and increased
accessibility, while contributing to
creating a vibrant community and
preserving the natural environment,
in a cost-effective manner.”
7
“Road Map”
WE ARE
HERE
8
Guiding Documents
• Metrolinx:
– Regional Transportation Plan “The Big Move”
• Halton Region:
– Transportation Master Plan
– Active Transportation Master Plan
• City of Burlington:
– Official Plan Review
– Capital Expenditure Plan
– Strategic Plan
9
What is Included in a TMP?
1. Active Transportation
2. Public Transit
3. Travel Demand Management
4. Road Network
10
Walkability Audit Overview of Preliminary Observations
• Vehicles have the right of way
• Discontinuous sidewalks
• High volume of pedestrians and
cyclists
• High volume of truck traffic
• Retail front doors open to parking lot
• Reconstructed intersection – Maple
Avenue / Fairview Street
• Land use – Appleby Line /
Harvester Road
11
Technical Agency Committee
Meetings
• Meeting #2 – September 2013
• Meeting #3 – November 2013
Online Discussions – MindMixer
• First Survey - July
• Topic specific discussions
Review Key Documents
• Transportation Demand Management Paper
• Draft Alternatives to Transportation Network
12
Timelines
Key Milestones Date
Agency/Stakeholder engagement June 2013 – February 2014
Alternative solutions to network July 2013 – September 2013
Public engagement July 2013 – February 2014
Preferred solutions for network October 2013
Report to Council – DRAFT December 2013
Report to Council – FINAL March 2014
NETWORKING
BREAK
14
Global Café Conversation
Table 1Table 1 Governing Fundamentals
Table 2Table 2 Specific Issues to be Addressed
Table 3Table 3 Specific Areas of Opportunity
Table 4Table 4 Challenges and Obstacles
Table 5Table 5 What can you do?
What can the TMP do for you?
Thank you for participating!
Please contact the project team if you have additional comments or questions:
Jenny Setterfield, C.E.T.
City Project Manager
Transportation Services Department
City of Burlington
426 Brant Street
P.O. Box 5013
Burlington, ON L7R 3Z6
905.335.7671
Suzette Shiu, P.Eng.
Consultant Project Manager
Cole Engineering Group Ltd.
70 Valleywood Drive
Markham, ON L3R 4T5