Tec
Surge
Childr111 Mi
Constru
chnicaDue: Dece
ery Exp
ren’s Natichigan Avenue
And
uction Manage
al Reember 3, 2
pansio
tional Mede, NW • Washing
rea Kle
ement • Advise
port 2007
n Phas
dical Centgton, DC 200
ein
ed By Dr. Mess
3
se 1
ter 010
ner
Execut
A. Crit
B. Crit
C. Prob
D. Tech
E. Weig
tive Summ
tical Indus
tical Issue
blem Ident
hnical Ana
ght Matr
Te
mary………
stry Issue
es Resear
tification
alysis Me
ix…………
S
Andre
echnica
Table o
………………
es….………
rch Metho
n……………
ethods……
……………
Surger
Child111
ea Klein • Cons
al Rep
of Conte
……………
………………
od...………
………………
………………
…………….…
ry Expa
dren’s Na Michigan Aven
struction Mana
port 3
ents
……………
……………
……………
………………
……………
……………
ansion
tional Menue, NW • Was
agement • Adv
3
………………
……………
………….……
……………
……………
……………
Phase
edical Cenhington, DC 20
vised By Dr. Me
………2
…….....3
……...7
………..9
…….…10
……….11
e 1
nter 0010
essner
1
Executi
Testchtose ThthcoinsochpCo Thopcomenpa
ive Summa
echnical Assigtudy of the seshosen researchopics chosen toemester.
he topics discuhe current laboonference part
n the constructolutions and chhosen it for myrefabrication iontrol Risk Ass
he selected anperating roomost savings thr
methods and pngineering foratient recover
ary
nment #3 is a ssions held at th topic, the proo be studied fo
ussed at the Roor workforce. ticipants resultion industry thanges for they research topn hospital rensessment (ICRA
nalysis topics wms. Evaluating rough reusing ossible redesigr schedule redy will not be d
S
Andre
preliminary stthe PACE Rounoblems with mor an in depth
oundtable weEach topic wating in a large he attendees w
e future. I partic. Narrowingovations with A) regulations
were a reevaluathe mechanicmaterials will
gn of certain euction and cos
disturbed by co
Surger
Child111
ea Klein • Cons
tage to writingndtable held omy thesis build
analysis, and
re prefabricatis presented bybrainstorming
were able to gticularly enjoye the focus of pa primary inte.
ation of the mcal system for p
require researelements. The st savings in fuonstruction or
ry Expa
dren’s Na Michigan Aven
struction Mana
g my thesis proon October 25t
ding that coulda weight matr
on, building iny a panel and wg session. By e
grasp new conced the discuss
prefabrication,erest in how it
echanical systpossible prefabrch into currenacoustical ana
uture projects repair work in
ansion
tional Menue, NW • Was
agement • Adv
oposal. It incluth, 2007, a discud provide brearix for the plan
nformation mowith questionexamining thecepts and comion on prefabr I would like tocan be tied to
tem and acousbrication, sche
nt design and calysis will be uwhen delicate
n neighboring
Phase
edical Cenhington, DC 20
vised By Dr. Me
udes a summarussion of my
adth topics, thenned report ne
odeling (BIM), s from the
e current situatme up with iderication and hao examine
o the Infection
stical design ofedule reductioconstruction sed as value
e procedures aareas.
e 1
nter 0010
essner
ry and
e ext
and
tions as for ave
f the on and
and
2
A. Criti
A brief su
P
Prinfa InImadargede Thpberewistobew Belareto Oinmac B
BIthbty
cal Indust
mmary of thr
refabrication
refabrication isnstalled. The actors include
ndustry leadersmplementationdapts to changre also differineneral consenesigning a pro
he applicationrefabrication ae in charge is d
equiring the mwould take a gr
sue is how to mogether in alteeing moved o
will be put toge
enefits of prefaabor, and the ineduce VOC emo minimize trav
Overall, many ondustry and its
many, but with ccepted and u
Building Inform
IM is a currenthe use of intelluilding. It use
ype of thinking
ry Issues
ree panel disc
n
s defined, primmain types areresidential con
s have many cn is the largestge. Many feel g opinions of sus of the PAC
oject with the i
n of prefabricatalready, when difficult to ans
most prefabricareat deal of timmeet current c
ernative locationce they are a
ether once on
abrication inclnherent benef
missions, dust cvelling distanc
obstacles lie in s current think
standardized sed.
mation Modeli
hot topic in inigent multidims new technol
g. The main go
S
Andre
cussions held
marily, as the ae prefabricationstruction as o
oncerns with pt hurdle to conprefabricationwhen in the d
CE Roundtableintention of us
tion in construan entire proj
swer. Should tated materials?me and care, ancode and inspeons. Transportssembled off ssite.
lude higher qufits which makcontaminationce.
the way of preing, prefabricaprocedures an
ing (BIM)
ndustry worldwmensional modlogies, which roal of BIM wou
Surger
Child111
ea Klein • Cons
at the 2007
act of construcon, pre-assembopposed to co
prefabricationnquer, due in pn will limit the esign process
e that the earliesing prefabrica
uction is also a ect is using prhe general co? Coordinatingnd labor preseection requiretation to the sisite and dama
uality of assemke it ideal for g
, and will force
efabrication. Wation has a futund general pra
wide. Not havdels to integrarequire new skuld be an integ
ry Expa
dren’s Na Michigan Aven
struction Mana
7 PACE Round
ting pieces of bly, and on vermmercial cons
n in its implempart to how slocreativity of arto begin cons
er prefabricatiated materials,
large issue. Wefabricated mntractor have g the efforts o
ents an importaements when pite is also a conge caused by t
mblies, with smreen construce assembly to
While it may reure in construc
actices, prefabr
ving a completate the design kill sets and tragrated design
ansion
tional Menue, NW • Was
agement • Adv
dtable in Stat
an assembly brsus off site costruction, and
entation and aowly the constrchitects and e
sidering prefabon is consider, time and mo
While many traaterials, the qucontrol, or thef the teams boant issue. Anopieces of a buincern with largthe transporta
maller tolerancetion. Assemblbe conducted
equire an overction. It will tarication will be
tely formalizedand construct
aining, and it aand delivery, w
Phase
edical Cenhington, DC 20
vised By Dr. Me
te College, PA
before they areonstruction. Ot
lean construc
application. truction industengineers. Thebrication. It is ed the better. ney can be sav
ades use uestion of whoe trade contracoth on and off other applicatilding are put ge, heavy loadation, and how
es, less cost foling off site wi
d within a local
rhaul of the enake the effort oecome more w
d definition, BItion analysis olso takes a diffwithout reduc
e 1
nter 0010
essner
A.
e ther
ction.
try ere the By
ved.
o will ctor site on
ds w they
r ll l zone
tire of
widely
M is f a ferent tion
3
inusge Ounmhede Thhambeshhetrdehaonin Peavthbedew Buthpofwth W
Cpprefe
n quality. Whilsers are havingetting started,
Owners presentnfamiliar with
made early in a elpful, but theesign more, an
he next major as control of th
model, how deteginning of a phould all the delp enhance if
rades have adoetermine if coave as much ton board, and t
nvolved.
erhaps the largvailable howevhere are groupenefits of all thesign team to
want to follow o
uilding Informhere is much toroblems, if a tef BIM, the indu
was nice to see he industry me
Workforce Dev
urrently the corojects are beiroblem is espe
etiring, the pooewer people w
e the industryg trouble unde, and getting t
t one of the mthe technologproject to pro
e users must unnd they need t
problem withhe model, authtailed the modproject. Clearesigners be ab
f not replace stopted BIM easinflicts with otho gain from ushe biggest cha
gest problem fver each come
ps working on he attempts. Fmake decision
or create.
mation Modelino be solved abeam is ready austry is becom
the group at tembers presen
velopment
onstruction wong bid, with fe
ecially acute. Sor reputation o
who make a car
S
Andre
y players are merstanding thehe project tea
ajor blockadesgy and how it covide the full enderstand it firto be prepared
BIM is how tohors versus usdel should be, ly the architecble to alter thetandard drawiily, i.e. the MEPher trades are sing BIM. To ballenge to ind
for BIM in indues with its owncreating a stan
For the time bens about what
ng is going to bbout how best nd willing to wing more accethis Roundtabnt at last year’s
orkforce is dwewer laborers tSeveral factorsof the construcreer out of con
Surger
Child111
ea Klein • Cons
making progrese need and usem to buy-into
s for BIM in thechanges the b
extent of its adrst. Owners usd to make big d
o get everyoneers, how manyand what soft
ctural design tee model, or shongs, does everP trades, who npresent. Lowee completely sustry right now
ustry is the lacn format and isndard, there iseing, resolvingt software will
be a vital part to use it on pr
work through tepting and tryile seemed mo
s PACE Semina
indling and it to staff them. s attributing toction industry
nstruction.
ry Expa
dren’s Na Michigan Aven
struction Mana
ss in this type oe of BIMs. The the concept a
e constructionbuilding proces
vantages. As asing it need todecisions earli
e on the team iy trades need ware will be ueam needs to ould only one ryone need acneed extremeer trades, i.e. csuccessful, thew is how to sp
k of standardss not compatibs more than ong this issue fallbe used for a p
of constructiorojects. The bethe issues. As ng to solve th
ore open to BIMar.
is a bigger issuIn the Washin
o the lack of la, changes in w
ansion
tional Menue, NW • Was
agement • Adv
of thinking, mae biggest challeand use it.
n industry. Moss. BIM needs a tool, BIM can
o be trained to ier than typica
involved. Queto be involvedsed, create isshave access toperson be in c
ccess to them aly detailed dra
concrete and fie entire projecread the word
s. Multiple softble with all othne group, whics largely on thproject, and w
on in the futureenefits of BIM more people e issues at han
M as a whole in
ue than many ngton DC area bor are the ba
workforce dem
Phase
edical Cenhington, DC 20
vised By Dr. Me
any owners anenge of BIM is
ost owners are to be a decisio
n be extremelythink about th
al.
estions such asd in making thues from the
o the model, bcontrol? If BIMas a user? Certawings to inishes, might t team needs t
d, and get ever
tware packageher formats. Wch reduces thehe owner and what standards
e, but right nowoutweigh the become cham
nd. As an asiden comparison w
realize. Largein particular, tby boomers ographics, and
e 1
nter 0010
essner
nd
on y he
s who e
ut M is to
tain
not to be ryone
es are While e
s they
w
mpions e, it with
r the
d
4
Coinofongrbeimpthcoansc Thwtrinanpw A poeflaanwimco Aorre K
ThmininSem
onstruction nenterested in thf construction ne primary issruff, abrupt anetter, looking
mage does notublic exposure
here aren’t maounseling on and soft skills anchool.
his poor reputwould not recoraining managn the workers cnd better worklaces would be
would be a high
final major coopulation seesffective and sk
anguage develnd in many ins
with this newermmigrant workompanies, and
s a whole, the rder to accom
enovation of m
ey Contacts
his Roundtablemany people wndustry needs nterested to seeminar in the s
mark and impro
eeds people, ais industry. Beworkers and m
ue is the attitund has a bad dlike they are ot impress manye to the new fany new faces t
alternate careend to adapt to
ation is not onmmend it as aement staff to
conditions. Woking conditione safer, laboreher retention r
omponent to ts this as a repu
killed as othersopment progr
stances implemr workforce, bukers are trained workers with
construction iplish this goal
management te
e session provwere of the issu
is to be able toee if any of thespring. One ofove the system
S
Andre
and a large parefore people wmanagement sude of the worisposition. Ow
out to make as y people, and aces of construto find. Ideas ter paths withino the new work
nly a perceptioa career to theio manage peoporkers who are
ns. If managemrs would be wrate.
his issue is theutation ruinings, if managed prams on both tmented with eut also trainingd in useful fiel
hout any exper
industry could, and obtain thechniques and
ved to be very ues, and how oo adapt to andse topics take f the reasons I
m from within.
Surger
Child111
ea Klein • Cons
rt of this discuswill seriously costaff needs to
rkers already inwners and cons
much money is a limiting fa
uction with its to improve then the industry,kforce, and the
on of outsidersir own childrenple more effece trained and i
ment was moreworking under
e increase of img factor, when properly. To rethe laborer an
excellent resultg and job cultuds and are qua
rience need to
d use a facelift,he people need job culture.
resourceful anopen they wered adopt techno
root in the indam so interes
ry Expa
dren’s Na Michigan Aven
struction Mana
ssion was focuonsider the coimprove. The
n place. A sterstruction manaas possible no
actor in generaincreased con
e image includ retraining cure possibility of
s. Many peopln. Options to cctively, and to in the industrye willing to admore reasona
mmigrant workthe truth is th
elieve some ofnd managements. Language bure. Just like aalified to take
o be trained to
, and present aded, the indus
nd enlightenine to new ideasologies and idedustry over theted in this ind
ansion
tional Menue, NW • Was
agement • Adv
used on how tonstruction tradproblem has meotypical consagement staff o matter the coating interest. ncerns for safede televised prrrent employef recruiting at y
e who work wchange this atget owner’s to
y are leaving tovocate better ble time const
kers. A large pese immigran
f the problemsnt side have bbarriers are non labor force, aon different johandle respon
a better picturstry needs to u
ng. I was surprs. Part of the ceals for a bettee next few moustry is to see
Phase
edical Cenhington, DC 20
vised By Dr. Me
o get more pedes, the reputamany levels, bstruction workdo not fair mu
onsequences. There is little ty and quality
rograms, es in behavioryounger levels
within the induttitude includeo take more into seek better wconditions, wo
traints, and the
percentage of tt workers can
s suggestions feen considere
ot the only proa portion of th
obs within thensibilities on s
e to society. Inundergo a
ised by how awcultural changeer society. I amnths until the how I can mak
e 1
nter 0010
essner
ople ation
but ker is uch This
, but
ral s of
stry e terest
wages ork ere
the be as for
ed, oblem he ir ite.
n
ware e the m PACE ke my
5
I m
Si
met several pe¬ Stan Ca
¬ James
ince the sessio¬ Corinn
¬ Ben Mo¬ Leaha
eople who willarlat: Hensel P
Stan’s compboth relate t
Faust: Turner Turner is a nindustry I ho
on, I have made Ambler: Bart
Corinne proconstruction
organ: Barton Martynuska: B
S
Andre
be good contPhelps pany is known to my project.Construction
national compaope will prove
e several otheton Malow
ovided two conn. Malow
Barton Malow
Surger
Child111
ea Klein • Cons
tacts for my th
for experience
any with manyto be invaluab
er contacts thro
ntacts within h
ry Expa
dren’s Na Michigan Aven
struction Mana
esis research.
e in prefabrica
y resources, anble
ough interview
her company w
ansion
tional Menue, NW • Was
agement • Adv
ation and for c
nd Jim’s exper
ws and corresp
who have expe
Phase
edical Cenhington, DC 20
vised By Dr. Me
lean rooms wh
ience in the
pondence.
erience in hosp
e 1
nter 0010
essner
hich
pital
6
B. Criti Problem S
HUcospanRibesp
It anco
Research
ThimpcocoreA
Research
1. To m
2. Resm
3. MaICar
4. Senarpexex
5. Comdi
cal Issues
Statement:
ospital renovanited States. Uonducted whilpaces is nothinn occupied hoisk Assessmene done to imppecifically pref
is my goal to rnd labor savinonstruction.
h Goal:
he intent of mmplement on hractices alreadompare to my ontractors andeducing onsitemerican Instit
Steps:
obtain a true umake contract wsearch statistic
my target audieke contact wit
CRA regulationreas of researcnd out preliminre already beinrefabrication, txample of thisxpertise and ampile data froirection on wh
Research
ations and expUnfortunately,le the rest of thng new to the ospital is causent(s), ICRAs, in h
rove the qualifabrication.
research the egs, but also fo
y research ovehospital constrdy in place by c
plans. Hopefud facility manae labor and labute of Architec
understandingwith contractocs on hospital rence. th owners andns and which isch to best benenary surveys tong used for hetarget trades f would be condvice they havm these conta
hich trades to f
S
Andre
Method
pansions are an, to meet to thhe hospital coconstruction i
e for even morehospital constty of construc
effect of prefabr its benefits to
er this coming ruction projeccertain contracully, the guidegers to aid in u
bor costs, and icts (AIA).
g of the currenors to ask quesrenovation an
owner’s repressues prefabricefit the end uso general and althcare proje
for prefabricatntacting mechave. acts to determfocus on.
Surger
Child111
ea Klein • Cons
n integral part he continual nentinues to opendustry howee concern. Whruction has alltion and infec
brication on hoo the health an
semester is tots where infeccting trades w
e I create throuusing prefabricin better meet
nt ICRA regulatstions and affird expansion p
esentatives to cation may heser. trade contract
ects. These surtion and any suanical contrac
ine how best t
ry Expa
dren’s Na Michigan Aven
struction Mana
of maintainineeds of the puerate normally
ever the risk of hile the implemeviated manytion control in
ospital renovatnd safety of pa
o create a guidction control is
which will provugh my researccation as a meting the ICRA g
tions. Read therm my conclusprojects to crea
establish whalp address. Th
tors to discernrveys would inuggestions forctors known fo
to format a gu
ansion
tional Menue, NW • Was
agement • Adv
g the health cblic, these pro
y. Working in pcontaminatio
mentation of Iny of the problemn the healthcar
tion projects, natients in hosp
de with prefabrs a major conceide examples ach can be usedeans of reducinguidelines set f
e guideline estsions. ate a firm basis
t concerns thehis will hopefu
n what methodclude the amo
r what else it mor prefabricatio
ide, and to pro
Phase
edical Cenhington, DC 20
vised By Dr. Me
are systems inojects must be partially occupn and infectionfection Contrms, I feel morere market;
not only for itspitals undergo
rication ideas tern. There areand experiencd by owners, ng schedule timforth by the
tablished, and
s of need and v
ey have about lly provide tar
ds of prefabricount and meth
may be of use ton to see what
ovide further
e 1
nter 0010
essner
n the
pied n in rol e can
s cost ing
to e ce to
me,
d
verify
the rget
ation hod of to. An t
7
6. Creanp
7. Estainho
8. Takgu
Sample S
Preliminar¬ A¬ H¬ D
w¬ W¬ D
gu Post Guide
¬ W¬ D¬ D¬ D¬ D
th¬ A¬ W
eate the guide nd contractorsroject for the mablish credibil
nexperienced, ow easy the gu
king the resultsuide myself an
urvey Questi
ry Survey to Ore you familiarave you used id you have di
were they, and Was prefabricat
o you think fauidelines?
eline Survey Was the guide e
id the guide po you feel the o you feel thiso you have an
he guide? Examre there any su
Would you use
for prefabricas. The hope fomaximum benity of the guidto review the uide is to undes from the surv
nd make adjus
ons:
Owners r with the 2006ICRA guidelineifficulties in mhow did you ation used to anbricating mate
easy to undersprovide sufficie
topics outlines guide would ny suggestionsmples: newer uggestions yothis guide in f
S
Andre
tion in healthcor this guide is nefit. de by asking m
guide and comerstand and imveys and commtments as req
6 ICRA guidelies for past or paintaining any
attempt to solvny extent durinerials and syste
stand and folloent informatioed covered issube useful to fu
s for ways to betechnologies, u wish to mak
future projects
Surger
Child111
ea Klein • Cons
care projects uto create som
members of themplete a survemplement, andments from inuired.
nes establishepresent projecy of the procedve them? ng your projecems off site is
ow? n on prefabricues prevalent uture project oetter the guideworkforce issu
ke for material s either alone o
ry Expa
dren’s Na Michigan Aven
struction Mana
using languagemething which
e target audieney. This surveyd if they woulddustry membe
ed by the AIA?cts in your facildures outlined
ct? a viable optio
cation practicein healthcare c
owners and coe or the ideas ues, etc… the guide is m
or in conjuncti
ansion
tional Menue, NW • Was
agement • Adv
e friendly to owcan be implem
nces, both expy would includd use it in practers, I would th
ity? d in you progra
n to help main
es and implemconstruction?
onstruction teafor prefabricat
missing? ion with the IC
Phase
edical Cenhington, DC 20
vised By Dr. Me
wners, designemented early in
perienced and e questions abtical applicatioen reevaluate
am? If so, wha
ntain the ICRA
entation?
ams? tion outlined w
CRA regulation
e 1
nter 0010
essner
ers, n a
bout ons.
the
t
within
ns?
8
C. Prob
The foconstrreduc
M
InthanamdetoAm
A
Gthhathmop
E
ThOlifsusyen Fi
Thhawsh
blem Identif
ollowing itemsructed by an ae the project c
Mechanical Sy
n this renovatihe offices it orind replaced. Amount of the sesigned to be
o reduce the colso, the use of
means of sched
Acoustical Ana
iven the sensithe Critical Inteave been take
he plans for momaterials being
ption of study
lectrical Syst
he electrical syOperating room
fe support systupply and emeystem controlsnsure it meets
ire Protectio
he project is cuave spray firep
with a new desihow possible s
fication
s are elements lternative met
cost, the projec
ystem:
on project a spginally held. T
As the largest vschedule, and LEED® certifie
ost and schedprefabrication
dule reduction
alysis:
tivity of the arnsive Care Unin to isolate coore renovation
g put into placey.
tem:
ystem for this rms are the maintems working.ergency powes. It is an optio the requireme
n:
urrently havinproofing on thign and is delaschedule reduc
S
Andre
of the Surgerythod. The goact schedule, o
pace is being dThese changesvalued packagwould probabd but the use ule. Recyclingn is a distinct p.
eas surroundinit (CICU), noise
onstruction non in the future e, or the use of
renovation is cn focus, and in. Large complr. Examining t
on for value enents.
g a major issuee ceiling whic
aying further cctions and rev
Surger
Child111
ea Klein • Cons
y Expansion pral of this projecr both. They w
designed to has required all oe on this proje
bly be examineof more efficie
g and/or reuse possibility for t
ng which house during constise through altthis is an impo
f more materia
critical providen most cases coex equipmentthe design wo
ngineering and
e with fireprooh is unacceptaonstruction in
veal constructa
ry Expa
dren’s Na Michigan Aven
struction Mana
roject which cct is to analyzewill be evaluate
andle a differeof the existing ect, the mechaed as a breadtent methods atechnology w
the mechanica
ses the Neonaruction is a maternative methortant issue toals being place
ed the nature oonsume large t gets hooked
ould provide ind cost savings
ofing the operable. The design the ORs. A cloability issues.
ansion
tional Menue, NW • Was
agement • Adv
ould be redesie and evaluateed in a later re
ent and more smechanical w
anical work takh topic. The bnd equipmen
would be examal systems if de
tal Intensive Cajor concern. hods and meao consider. Aned in the inter
of the work doamounts of enup to both the
nformation on to “right-size”
rating rooms. gn team has noser look with
Phase
edical Cenhington, DC 20
vised By Dr. Me
igned or e these items toeport.
specialized usework to be remkes a considerabuilding is not
t may be analymined for feasib
esigned correc
Care Unit (NICUSeveral measuns, however, g analysis of finstitial floors is
one in the buildnergy to keep e main power energy use anthe equipmen
It was designeot yet come uthe system ma
e 1
nter 0010
essner
o
e than oved able
yzed bility. ctly as
U) and ures given nish
an
ding. the
nd nt and
ed to p ay
9
D. Tech
The foreduct
M
Loscredepdefareim
A
Reinthmrethcrcopto
hnical Analy
ollowing topicstion, and cons
Mechanical Sy
ooking specificchedule reducegulations andetermine wharefabrication. etermine if reu
abrication timeeuse, the costsmpacted at all.
Acoustical Ana
ecognizing thento the acoustihe hospital is c
methods of conelevant to this he acoustical preate a minimuoncentration, wlanned for this
o eliminate fut
ysis Metho
s were selectestructability.
ystem Analys
cally at the HVtion. I want to
d reduce the get prefabricatinThe effort put
using ductwore. An in depths associated wi
alysis:
e concerns of tical design of t
creating disturnstruction nee
project, but toproperties of thum noise penewhich if disturs hospital in thture problems.
S
Andre
ods
d for a more in
is:
VAC system I po try to minimieneral conges
ng can be donet into analyzinrk already in pl
h analysis woulith relocating a
the Children’s the operating bances in the d to be used fr
o future projeche materials usetration. The wrbed could be he future, the v.
Surger
Child111
ea Klein • Cons
n depth analys
lan to examineize the work dostion of the sitee, and if any elg prefabricatiolace on the prold require calcand sterilizing
National Medrooms. As of nsurrounding arom what wascts who can avsed in the opework being dofatal for the pa
value of this re
ry Expa
dren’s Na Michigan Aven
struction Mana
sis to provide p
e prefabricatioone on site to e. The system ements can beon would assisoject could proulating how m materials, and
dical Center, I wnow, much of areas and causs planned. Thevoid these proberating room done in these roatients. Know
edesign lies in
ansion
tional Menue, NW • Was
agement • Adv
possible cost s
on as a means aid in meetingwould be exae redesigned tst in my researove to save mo
much material d if the schedu
would like to tathe constructi
sing delays whe schedule savblems. My ho
designs, and moms requires e
wing more renocreating the b
Phase
edical Cenhington, DC 20
vised By Dr. Me
savings, sched
of cost savingg the ICRA mined to to allow for rch. I also planoney and is available for
ule would be
ake a closer looion being donen alternativeings would nope is to reeval
modify them toextreme focusovations are bebest space poss
e 1
nter 0010
essner
1
ule
s and
n to
r
ok e in
e ot be uate
s and eing sible
10
E. Weig
De
HVAC SysteAcoustics oPrefabricat
ght Matrix
scription
emof the ORtion
Total
Research
10519
34
S
Andre
Value Engi
5107
22
Surger
Child111
ea Klein • Cons
neering Constr
ry Expa
dren’s Na Michigan Aven
struction Mana
ructability Revie
10107
27
ansion
tional Menue, NW • Was
agement • Adv
ew Schedule Re
10
7
17
Phase
edical Cenhington, DC 20
vised By Dr. Me
eduction Tota
352540
100
e 1
nter 0010
essner
1
al
0