  • 8/7/2019 Tech Center Drive Fact Sheet

    1/6

    This project will connect the Hamilton Road and I-270 interchange withGahannas industrial and commerce area. With the followingbenefits:

    Relieve congestion of the 40,000 daily car count at the Morrison andHamilton Intersection by diverting traffic.

    This will be a positive impact to 295 Businesses and 5,053 Employees.

    Provide better and shorter access to I-270 and the airport.

    Provide access to prime locations for commercial and officedevelopment.

    - 120 Acres in Central Park of Gahanna and 78 Acres of vacant land

    within I-270 Loop Provide a link in the city-wide bike trail across I-270.

    Improved Drive Sequence.

    Developments will be visible 130,000 vehicles daily along I-270.

    This project will provide access to nearly 200f i l d f d l t

  • 8/7/2019 Tech Center Drive Fact Sheet

    2/6

    History of the Project

    May of 1998The City investigated alternatives for better connectivity to the industrial area.

    April of 2000The City held a public involvement meeting regarding congestion at Morrison and Hamiltonintersection.

    June of 2000Engineering began for Tech Center Drive.

    October 2000

    The City applied for a Grant for construction of Tech Center Drive which was not granted.

    September of 2001ODOT the City conducted an interchange modification study which identified that the I-270ramps would need to be upgraded for Tech Center Drive.

    April of 2004The City had an unsuccessful attempt at obtaining TRAC funding

    2006 and 2007Morrison road was improved to accept the future Tech Center Drive on the east side. This wasfunded entirely with local funds.

    2007Gahanna was awarded Federal funds for the I-270 ramp modifications.

    2010

    The I-270 ramp modifications were constructed.

    Project Funding

    The total project construction cost is $6,997,560

  • 8/7/2019 Tech Center Drive Fact Sheet

    3/6

    200 South Hamilton Road, Gahanna, Ohio 43230

    (614) 342-4005 www.gahanna.gov

    0

    Tech

    36 .034 Ac res (Pa rk land Dona t ion )

    Fu tu re 12 .138 Ac re Parcel

    19 .808 Ac r

    (C i t y o f Gahanna -

    Fu tu re 24 .680 Ac re Parcel Fu tu re 41 .365 Ac re Parcel

    I-270

    Ham

    iltonR

    d.

  • 8/7/2019 Tech Center Drive Fact Sheet

    4/6

    Bridge Over I-270 Location & Design

  • 8/7/2019 Tech Center Drive Fact Sheet

    5/6

    RoadwayImprovementsStatus

    BridgeoverI270R.O.W.AcquisitionCompleted

    FundingInPlace

    DesignInProgress

    Construction2011

    TechcenterPhase2R.O.W.Controlled

    PreliminaryDesignComplete

    FutureConstruction

    I270/HamiltonRoad

    Completion2011

    ec cen er aseR.O.W.AcquisitionCompleted

    FundingInPlace

    Design

    In

    ProgressConstruction2011

    TechcenterPhase4R.O.W.Controlled

    PreliminaryDesignComplete

    FutureConstruction

  • 8/7/2019 Tech Center Drive Fact Sheet

    6/6

    SiteAerial