TECEdrainboard – 6 850 02 1 6 800 30 6 800 90 6 801 00 6 801 20 6 801 29 6 801 50 DN 50 60 110 195 O / 50 O / 110 100 106 310 10-16

TECEdrainboard – 6 850 02 - Startseite | TECE · General building supervision test certificate AbP: P-MPA-E-04-010 (if the particular installation situation affords compliance with

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: TECEdrainboard – 6 850 02 - Startseite | TECE · General building supervision test certificate AbP: P-MPA-E-04-010 (if the particular installation situation affords compliance with

TECEdrainboard – 6 850 02

1

6 800 306 800 906 801 006 801 206 801 296 801 50

DN 50

60 110

195

O/ 50O/ 110

100

106

310

10-1

6

Page 2: TECEdrainboard – 6 850 02 - Startseite | TECE · General building supervision test certificate AbP: P-MPA-E-04-010 (if the particular installation situation affords compliance with

TECEdrainboard – 6 850 02

2 mm

3 mm

4 mm

2

a

b

Silik

ona

b

min. 10 mm

max. 16 mm

a

b

Page 3: TECEdrainboard – 6 850 02 - Startseite | TECE · General building supervision test certificate AbP: P-MPA-E-04-010 (if the particular installation situation affords compliance with

TECEdrainboard – 60 850 02

3

Einbauanforderungen Installation requirements

Übereinstimmungsnachweis

Der Bodenablauf TECEdrainboard-FireStop der Feuerwiderstands-klasse R 90 wurde gemäß DIN 4102 Teil 11 zum Einbau in Massivdecken von einem autorisierten Prüfinstitut geprüft.

Die folgenden Einbauanforderungen sowie die Einbauanforder-ungen der jeweiligen Zulassung sind dabei unbedingt zu beachten.

Allgemein bauaufsichtliches Prüfzeugnis AbP: P-MPA-E-04-010 (wenn die brandschutztechnische Eignung durch die besondere Einbaulage erreicht wird)

Anforderung oder Abruf von Prüfzeugnis und Zulassung unter www.tece.de.

Proof of compliance

The TECEdrainboard-FireStop floor outlet with fire ratings of R 90 has been testet by an authorised testing institution for installation in solid floors in accordance with DIN 4102 part 11.

It is essential that the following installation requirements and the installation requirements for the approval in question are observed.

General building supervision test certificate AbP: P-MPA-E-04-010 (if the particular installation situation affords compliance with the appropriate fire protection)

Test certificate and approval can be requested or downloaded from www.tece.de.

Grundkörperhöhe (ohne Ablaufstutzen): 110 mmMassivdeckenstärke: 150 mmErforderliche Mindestbetonunterdeckung (B): ³ 40 mm

Main outlet body-height (without outlet connector): 110 mmSolid floor thickness: 150 mmMinimum necessary underlying concrete surface (B): ³ 40 mm

Abflussrohrleitungz. B. Baustoffklasse A1, B1, B2gemäß DIN 4102-1

Drainpipee. g. construction material class A1, B1, B2, pursuant to DIN 4102-1

Massivdeckenstärke

Concrete floor thickness

Mindestbeton-unterdeckung (B)

Minimum underlying concrete surface (B)

Feuerwiderstandsklasse R 90

Fire rating R 90 Ablaufstutzen senkrecht

Vertikal outlet connector

AbP: P-MPA-E-04-010

B