Page 1: Team Perfect 10

Conceptual Design Review

Amanda Childress, Duane Goodfellow, Paul Judiscak, Tiana Miller-Jackson, Melissa Savage, Dan Wawrzyniak

September 20, 2007

Page 2: Team Perfect 10

Overview

Mission Statement:To stabilize the satellite from rotating in order to capture clear pictures of stars during daylight, to avoid damage to the satellite during flight and to positively influence further near space exploration.

Page 3: Team Perfect 10

Overview

Plan to photograph stars during daylight hours

Plan to take clear pictures with use of stabilization of satellite on Y axis

Plan to reduce damage to the satellite through stabilization

Page 4: Team Perfect 10

DesignParts:Structure: Foam CoreHOBO Datalogger with Internal and External

Temperature ProbesCCD CameraHP Digital CameraTiming Circuit to control camerasADAS2 Motors to control rotationHeater

Page 5: Team Perfect 10

Design

Page 6: Team Perfect 10

DesignHeater Power

Timer PowerSwitc

h

Heater

Timer

HP Camera Power

HP Camera

CCD Camer

a

CCD Camera Power

ADAS

ADAS Power

Motor 1

Motor 2

HOBO

Internal Temp

External Temp

Switch

Page 7: Team Perfect 10

Management

Project Manager

Mass/Money Budget

Electrical Structure Experiment TestingData

Assessment

Amanda

Dan

Duane

Melissa

Paul

Tiana

Page 8: Team Perfect 10

ManagementDate Event

20 September 2007 Proposal

25 September 2007 Initial design

2 October 2007 Complete design

11 October 2007 Order/acquire hardware

16 October 2007 Prototype

16-22 October 2007 Testing

25 October-6 November 2007 Finalization of testing and final modifications to satellite

7-9 November 2007 Preparation for launch

10 November 2007 Launch

After 10 November 2007 Post-mission data assessment and conclusions

4 December 2007 Final Presentation

Page 9: Team Perfect 10

BudgetItem Mass (g) Cost (US$)Foamcore TBD -Camera 130 -HOBO 29 -Timing Circuit TBD -CCD Imaging System TBD 30Heater TBD -Gyro Chip TBD 35Motor 45 (2) 14 (2)Video Recorder TBD TBDBatteries TBD -

Page 10: Team Perfect 10