Team Team - - of of - - Four Four Powerful Mechanism for Deployment Powerful Mechanism for Deployment Copyright © 2004 Raytheon Company. All rights reserved. November 2004

Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

TeamTeam--ofof--FourFourPowerful Mechanism for DeploymentPowerful Mechanism for Deployment

Copyright © 2004 Raytheon Company. All rights reserved.

November 2004

Page 2: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

2Copyright © 2004 Raytheon Company. All rights reserved.

Author contact infoAuthor contact info

Laurie Haack

Senior Principal Software Engineer

Engineering Process Group

Network Centric Systems

Raytheon Company

Fullerton, CA

[email protected]

714-446-4286

Page 3: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

3Copyright © 2004 Raytheon Company. All rights reserved.

SW CMMI Level 5 andSE CMMI Level 3 + inDecember 2003

Second SW-CMM Level 5 inSeptember 2002

SW-CMM Level 5in October 1998

First SW-CMM Level 3 inworld in 1990

Network Centric Systems, Fullerton, CA

Organization and AccomplishmentsOrganization and Accomplishments

Page 4: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

4Copyright © 2004 Raytheon Company. All rights reserved.

Many pieces to puzzle for organization andMany pieces to puzzle for organization andproject successproject success

OrganizationProcesses

LessonsLearnedBest Practices

QuantitativeMethods

ProgramRequirements

Page 5: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

5Copyright © 2004 Raytheon Company. All rights reserved.

Process Improvement Requires SynergyProcess Improvement Requires Synergybetween Organization and Programsbetween Organization and Programs

• To achieve high levels ofprocess maturity, theorganization and programsmust work closely together

• New process at theorganization level need to bedeployed to programs

• Best practices and lessonslearned from the program levelsmust be flowed to theorganization and shared acrossprograms

• Quantitative managementactivities need infrastructure tofacilitate metrics collection andanalysis

Page 6: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

6Copyright © 2004 Raytheon Company. All rights reserved.

Team of Four (Team of Four (ToFToF) Concept) Concept

• Team of Four Conceptsuccessful at otherRaytheon sites

• Adopted the concept inFullerton in 2001

• Consistent withintegrated productteam approach

• Very effectivemechanism for processimprovement

Team of Four promotessynergy betweenorganization and programs

Page 7: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

7Copyright © 2004 Raytheon Company. All rights reserved.

What is a TeamWhat is a Team--ofof--Four (Four (ToFToF)?)?

• A teamed approach to projectleadership and support

• Team goal is to help ensureproject success while helping theorganization improve over time

• The team members bring a broadperspective, can better facilitatesharing across projects and helpthe organization improve as awhole

• Also the primary mechanism forprocess deployment activities onprojects

• Supports the organization’sprocess improvement efforts

Page 8: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

8Copyright © 2004 Raytheon Company. All rights reserved.

Who is on a SW TeamWho is on a SW Team--ofof--Four (Four (ToFToF)??)??

SoftwareProgramManager

EngineeringProcessGroup Rep

QualityAssuranceRep

EngineeringManagementRep

Page 9: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

9Copyright © 2004 Raytheon Company. All rights reserved.

Morphing of SWMorphing of SW ToFToF toto ToXToX

SW ToF

SE ToF ToF with multipleengineeringdisciplines

Page 10: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

10Copyright © 2004 Raytheon Company. All rights reserved.

Expanded Team of XExpanded Team of X

SoftwareEngineeringManager

SystemsEngineeringManager

Team of Four concept expanded beyond software toinclude other engineering disciplines

HardwareEngineeringManager

Quality Rep

EngineeringProcessGroup Rep

ProgramEngineer

Functional Managers

Page 11: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

11Copyright © 2004 Raytheon Company. All rights reserved.

ToFToF adds Valueadds Value

� Improved ProgramPerformance

� Improved Process/ProductQuality

Stronger Tie between Programs and Functional OrganizationsMore Successful IPTs

More Predictable Programs

Stronger Tie between Programs and Functional OrganizationsMore Successful IPTs

More Predictable Programs

• Better visibility of key drivers(e.g., Productivity and othermeasures)

• Collaborative risk mitigation• Timely resolution of issues

(more proactive, less reactive)• Eliminates wasted activities

(no “reinventing the wheel”)

• Institutionalized processes• In-Phase containment of

defects• Shared Lessons Learned and

Best Practices

Page 12: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

12Copyright © 2004 Raytheon Company. All rights reserved.

ToFToF Effective at all Maturity LevelsEffective at all Maturity Levels

• Team of Four supports Level 1through Level 5 programs

• Less mature programs focus onimproving measurements,configuration management, etc

• More mature programs focus onquantitative management,process improvement

Page 13: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

13Copyright © 2004 Raytheon Company. All rights reserved.

ToFToF Supports Program through Life CycleSupports Program through Life Cycle

Team of Four supportsprograms during

-Start up

-Development

-Wrap up

-Maintenance

Page 14: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

14Copyright © 2004 Raytheon Company. All rights reserved.

The TeamThe Team--ofof--Four ProcessFour Process -- Project StartProject Start--upup

• Team sets up plans, process and metrics• Uses engineering startup checklist to plan

for startup events• Develops plans for programs plans and

procedures• Tailors program process to organization

processes• Reviews plans including Software

Development Plan/ Systems EngineeringManagement Plan, Metrics Plan, etc.

• Develops and reviews the ProcessImprovement Plan (PIP)

Page 15: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

15Copyright © 2004 Raytheon Company. All rights reserved.

Update Project Plans

Develop Project Plans

Process Deployment at Start upProcess Deployment at Start up

TailorOrganizationEngineeringDirectives

ObtainApproval of

Tailoring fromPolicy Board

Establish“Team of Four”

ConductProject Startup

Review

UpdateTailoring as

needed

• IMP/IMS• SEMP/SDP• Metrics Collection Plan

Update,Baseline &

Release ProjectPlans

• Risk Mgt Plan• Facilities Plan• Process Improvement Plan

SOW

Req

mts

Eng.

Goals &

Objectives

CSW

PSe

ctio

n 5

RFODirectives

SEP

HW

EPSPEP

Page 16: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

16Copyright © 2004 Raytheon Company. All rights reserved.

The TeamThe Team--ofof--Four ProcessFour Process--Development PhasesDevelopment Phases

• During program developmentToF focus is on:

• Quantitative Management• Process Improvement

Page 17: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

17Copyright © 2004 Raytheon Company. All rights reserved.

ToFToF Quantitative ManagementQuantitative Management

• Determine what metrics to collect• Determine best method for collection• Establish goals and thresholds for key

metrics• Analyze metrics• Look for trends, compare to

organization norms• Identify areas of concern• Do causal analysis• Prepare for reviews with senior

management

Page 18: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

18Copyright © 2004 Raytheon Company. All rights reserved.

Sample Requirements VolatilitySample Requirements VolatilityReportReport

Totals Sep-00 Oct-00 Nov-00 Dec-00 Jan-01 Feb-01 Mar-01 Apr-01 May-01 Jun-01 Jul-01 Aug-01 Sep-01Total # of Requirements 1100 1101 1004 1004 997 999 1006 1006 1006 1002 1011 1007 1007# of Reqts Added 7 5 0 0 3 2 7 0 0 0 14 0 0# of Reqts Modified 1 8 0 15 0 1 10 5 0 0 0 3 0# of Reqts Deleted 8 4 97 0 10 0 0 0 0 4 5 4 0Total # Reqts changed 16 17 97 15 13 3 17 5 0 4 19 7 0% Requirement Volatility 1.45% 1.55% 8.81% 1.49% 1.29% 0.30% 1.70% 0.50% 0.00% 0.40% 1.90% 0.69% 0.00%Org Volatility Baseline 8.14% 5.76% 5.76% 5.76% 5.76% 5.76% 5.76% 0.65% 0.65% 0.65% 0.65% 0.65% 0.65%Upper Tolerance (+10%) 8.95% 6.34% 6.34% 6.34% 6.34% 6.34% 6.34% 0.72% 0.72% 0.72% 0.72% 0.72% 0.72%Lower Tolerance (-10%) 7.33% 5.18% 5.18% 5.18% 5.18% 5.18% 5.18% 0.59% 0.59% 0.59% 0.59% 0.59% 0.59%

Program Lifecycle Phase CDR SystemIntegration

Requirements Volatility % Change (example)

0.00%1.00%2.00%3.00%4.00%5.00%6.00%7.00%8.00%9.00%

10.00%

Sep-00 Oct-00 Nov-00 Dec-00 Jan-01 Feb-01 Mar-01 Apr-01 May-01 Jun-01 Jul-01 Aug-01 Sep-01

Perc

ent r

equi

rem

ent V

olat

ility

% Requirement Volatility Org Volatility Baseline Upper Tolerance (+10%) Lower Tolerance (-10%)

Customer requested deletionof these requirements. ECP-029 cost/schedule innegotiation

New functionality added.ECP-030 being generated,schedule relief of 2 weeksneeded

Page 19: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

19Copyright © 2004 Raytheon Company. All rights reserved.

Project Monitoring and ControlProject Monitoring and Control

ProductAssuranceProduct

Assurance

EngineeringManagementEngineeringManagement

EPGEPG

EngineeringMetrics

Coordinator

EngineeringMetrics

CoordinatorProject

Team of FourProject

Team of Four

• Engineering Goals& Norms

• SW Metrics• History Data

Meets at least monthly to:• Analyze metrics and identify

corrective and preventive actions• Sponsor and monitor project process

improvement activities• Ensure program records are

maintained• Review org-level process

improvements for incorporation intoproject processes

RaytheonManagement

Chain

RaytheonManagement

Chain

• Engineering Director- Sets engineering goals- Reviews project status bi-monthly

• Engineering Manager regularly monitorsproject activities as member of ToF

• Supports Engineering Director inestablishing engineering goals

• Collects and analyzes metricsacross the organization

• Maintains and reports status ofprogress against engineeringgoals

• Monitors project-level metricscollection

• Provides metrics training andconsultation

• Provides process support toproject a member of ToF

• Flows organization level processimprovements to project via ToF

• Shares project best practices withorganization via EPG

• Member of ToF• Monitors process compliance

and product quality

• Process & qualitygoals & objectives

• Review status towardsgoals and objectives

Page 20: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

20Copyright © 2004 Raytheon Company. All rights reserved.

ToFToF Process ImprovementProcess Improvement

• Address activities identified in theprogram’s process improvement plan

• Seek process improvements for areasidentified in quantitative management

• Sponsor Six Sigma activities on theprogram

• Identify lessons learned and bestpractices to share with rest oforganization

• Review other programs lessonslearned and best practices anddetermine if they should be applied tothis program

• Prepare for appraisals and audits

Page 21: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

21Copyright © 2004 Raytheon Company. All rights reserved.

Process Improvement CycleProcess Improvement Cycle

Improve & pilot projectprocess improvements

within projects

Incorporateprocess

improvements

Collect & analyzepjt data, requests,recommendations

Improve & pilot org.process improvements

Projectdata

Identify &prioritize

improvements

Pilotimprovements,as necessary

Evaluateeffectiveness ofimprovements

Planimprovements,

piloting,deployment

Candidate improvementopportunities

Processupdates

Significant improvementsProcess innovations

Updated engineering directives, training,tools & enablers

Perform ProcessCollect Data

Evaluateeffectiveness ofimprovements

Analyze dataIdentify

improvements

Plan & deployprocess

improvements

Process Improvement Requests& Recommendations toOrg-level Processes

Process Improvement Requests& Recommendations to

Org-level Processes

Identify org &business unit goals

and needs

Project LevelProcess

ImprovementActivities

Org / Eng LevelProcess

ImprovementActivities

Eng / Business UnitLevel Activities

Page 22: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

22Copyright © 2004 Raytheon Company. All rights reserved.

The TeamThe Team--ofof--Four ProcessFour Process -- WrapWrap--up Activitiesup Activities

• At end of development:• Collect and review lessons learned for the entire project• Complete the end-of-project report and submit to the

organization metrics team• Present a project shutdown/summary report at the

Engineering Project Reviews• Determine if project is transitioning to maintenance and

categorize the type of maintenance activity

Page 23: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

23Copyright © 2004 Raytheon Company. All rights reserved.

The TeamThe Team--ofof--Four ProcessFour Process -- Transition toTransition toMaintenance:Maintenance:

• Develop a Maintenance Plan• Review and revise the

Software Development Planand Systems EngineeringDevelopment Plan.

• Update tailoring report asneeded

• Review and revise otherplans and processdocuments as applicable

Page 24: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

24Copyright © 2004 Raytheon Company. All rights reserved.

ToFToF Members RolesMembers Roles

SoftwareEngineeringManager

SystemsEngineeringManager

HardwareEngineeringManager

Quality Rep

EngineeringProcessGroup Rep

ProgramEngineer

Functional Managers

Page 25: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

25Copyright © 2004 Raytheon Company. All rights reserved.

Program Engineer’s RoleProgram Engineer’s Role

• Program Engineerresponsible for allengineering activities on theprogram

• Chair of ToF• Responsible for program

reviews with seniormanagement

• Looking out for overallproject success

• Communicates to programmembers and to PMO

Page 26: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

26Copyright © 2004 Raytheon Company. All rights reserved.

Functional Manager’s RoleFunctional Manager’s Role

• Functional Managerincludes SW, SE and/or HWprogram level manager

• Responsible for theirdiscipline’s activities

• Processes• Monitoring progress• Training of their team

members

• Provide inputs for tailoring,planning, risk identification,causal analysis, etc.

Page 27: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

27Copyright © 2004 Raytheon Company. All rights reserved.

Quality Engineer’s RoleQuality Engineer’s Role

• Audit ToF Activities• Participate

• Identify processproblems

• Monitor deploymentof new processes

• Participate insolving problems

Page 28: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

28Copyright © 2004 Raytheon Company. All rights reserved.

Engineering Process Group (EPG) Member’sEngineering Process Group (EPG) Member’sRoleRole

• Flow information betweenprogram and organization

• Engineering goals• Lesson’s learned• Best practices• Measurement data

• Facilitate• Set up meetings• Take minutes/track actions

Page 29: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

29Copyright © 2004 Raytheon Company. All rights reserved.

Deploying Team of Four ConceptsDeploying Team of Four Concepts

• Team of Four procedure• Identifies responsibilities, roles,

typical activities

• Team of Four Training conductedduring meetings

• Hour ToF training course• Training on metrics analysis, new

processes, etc.

• EPG Liaison support team• To provide training for new EPG

members• To ensure consistency in

approach across teams

Page 30: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

30Copyright © 2004 Raytheon Company. All rights reserved.

Benefits of Effective TeamsBenefits of Effective Teams--ofof--FourFour

• Improved engineering processes• Improved communication/collaboration• More consistency across projects• Shared lessons learned for use on other

programs• Better product quality• Improved competitiveness• Promotes higher maturity processes

“Working as a Team Fosters Program Success”

Page 31: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

31Copyright © 2004 Raytheon Company. All rights reserved.

Q & A

Page 32: Team-of-Four · Senior Principal Software Engineer Engineering Process Group Network Centric Systems Raytheon Company ... Metrics Coordinator Project Team of Four ... • Determine

Team of FourNovember 2004

32Copyright © 2004 Raytheon Company. All rights reserved.

AcronymsAcronyms

CMMI Capability Maturity Model IntegrationEPG Engineering Process GroupHW HardwareIMP Integrated Master PlanIMS Integrated Master ScheduleIPT Integrated Product TeamMgmt ManagementPIP Process Improvement PlanPMO Program Management OfficeRep RepresentativeRFO Raytheon Fullerton OperationsSDP Software Development PlanSE Systems EngineeringSEMP Systems Engineering ManagementPlanSW Software EngineeringToF Team of FourToX Team of Many