95
EN CITY CLIENT: 05/12/2017 FINAL CD SET LOT NUMBER: 11/15/2016 CONSULTANTS: TODD BEYREUTHER, P.E. [STREET] SPOKANE, WA [ZIP CODE] 04/24/2017 08/10/2017 CONTACT: ADDRESS: TEAM NAME: 5/2/2017 9:00 C B A D LOT #107 U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2017 WWW.SOLARDECATHLON.GOV [email protected] SOLARDEC.WSU.EDU DRAWN BY: SHEET TITLE: MARK DATE DESCRIPTION 80% DD SET 1 2 3 4 5 6 7 8 CHECKED BY: 02/17/2017 FINAL CHECKSET 100% CD SET WSU ENVIRONMENTAL HEALTH & SAFETY KATERRA INC. 06/23/2017 100% CD SET CHANGES 1 100% CD SET CHANGES 2 G-001 COVER SHEET TG MT

TEAM NAME: EN CITY ADDRESS: SPOKANE, WA [ZIP CODE] … · 2017. 9. 15. · 6 2 todd beyreuther, p.e. 100% cd set changes 1 mark 8/17/2017 3:25 en city 7 d 100% cd set changes 2 02/17/2017

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • EN CITY

    CLIENT:

    05/12/2017

    FINAL CD SET

    LOT NUMBER:

    11/15/2016

    CONSULTANTS:

    TODD BEYREUTHER, P.E.

    [STREET]SPOKANE, WA [ZIP CODE]

    04/24/2017

    08/10/2017

    CONTACT:

    ADDRESS:

    TEAM NAME:

    5/2/

    2017

    9:0

    0

    C

    B

    A

    D

    LOT #107

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    [email protected]

    DRAWN BY:

    SHEET TITLE:

    MARK DATE DESCRIPTION80% DD SET

    12345678

    CHECKED BY:

    02/17/2017 FINAL CHECKSET100% CD SET

    WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.

    06/23/2017100% CD SET CHANGES 1100% CD SET CHANGES 2

    G-001

    COVER SHEET

    TG MT

  • 26

    TODD BEYREUTHER, P.E.

    100% CD SET CHANGES 1

    MARK

    8/17

    /201

    7 3:

    25

    EN CITY

    7

    D

    100% CD SET CHANGES 2

    02/17/2017

    WSU ENVIRONMENTAL HEALTH & SAFETY

    DESCRIPTION

    CONTACT:

    3

    CLIENT:

    11/15/2016

    4

    04/24/2017

    SHEET TITLE:

    TEAM NAME:

    LOT #107

    FINAL CD SET

    80% DD SET

    05/12/2017

    8

    DATE

    100% CD SET

    CHECKED BY:

    CONSULTANTS:

    C

    LOT NUMBER:

    08/10/2017

    A

    1

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    B

    KATERRA INC.

    06/23/2017

    ADDRESS:

    5

    FINAL CHECKSET

    DRAWN BY:

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    WINDOW

    MISCELLANEOUS

    E.F.

    DWG.

    GYP.

    DRAIN

    DRAWING

    NEW

    ELECTRICAL

    MATL.

    DOWN

    GALV.

    MILLWORK

    DIA.

    DOWNSPOUT

    DETAILDC

    DHW

    DS.

    CONT.

    AND

    CONTINUOUS OR CONTINUED

    H.EX.

    CEILING

    HARDWARE

    CTR.

    DRN.

    MANUFACTURER

    MEMBRANE

    TEMPERATURETMPY.

    GROUND

    INSULATION

    T&G

    TEMPORARY

    INTERIOR

    EQ.

    ELASTOMERIC

    INSTRUMENT

    TRTD.TOUNGUE AND GROOVE

    T.C. THERMOCOUPLE

    TTEMP.

    FLOOR

    V.

    TEMPERATURE

    HEAT EXCHANGER

    HOT&

    CONC.

    CLG.COLD WATER

    DOUBLEDIRECT CURRENT

    DTL.

    GND.

    DOMESTIC HOT WATERDIAMETER

    DN.

    OPNG.

    GYPSUM

    DW DISHWASHER

    H.R.

    ELEVATION

    ELEC.EMBED.

    KIT.

    MEMB.

    GAUGE

    MECHANICAL

    FOOTING

    MATERIAL

    METALMAIN DISTRIBUTION PANEL

    GALVANIZED

    FT.

    GFCI

    TEMPERED

    MOUNTED

    W/O

    NO.

    MISC.

    WEATHER RESISTENT OUTLETS W/ COVER

    WIN.W.H.

    V.O.C.

    VAPOR BARRIER

    VERIFY IN FIELD

    WATTSW/

    WATERPROOF BARRIER

    FLR.

    WATER CLOSETWITH

    FIXT.

    FINISH

    W.P. WATER PUMP

    VERTICALVEHICLE

    W.R.

    MINIMUM

    MLWK.MDP.

    WITHOUT

    WATER HEATER

    W

    FURNITURE

    MECH.

    GALLON

    WEIGHT

    NUMBER

    ALTERNATE

    LVR.

    FAN COIL UNIT

    ABV.

    EQUIP.EQUAL

    WOOD

    kW

    EMBEDDED

    INT.

    ELAST.

    INSUL.

    EXHAUST FAN

    INSTR.INSTALL OR INSTALLATIONINST.INFORMATIONINFO.

    HOT WATERH.W.

    H.S.S. HARDWAREH.P. HEAT PUMPHT. HEIGHTHVAC HEATING, VENTILATION, & AIR CONDITIONING

    VALVE

    UNLESS NOTED OTHERWISEU.N.O.

    UTIL. UTILITYTEMP.

    GRADE

    HWDR.H

    GA.

    CROSS LAMINATED TIMBERCLTCONCRETE

    CEILINGCENTER

    CW

    DBL.

    TREATEDT.S. TEMPERATURE SENSORTYP. TYPICAL

    PTN. PARTITION

    O/ OVEROVHD. OVERHEADO.C. ON CENTER

    (E)OPENING

    OPP. OPPOSITEOPR. OPERABLE

    NOT TO SCALEN.T.S.

    ABRV.

    AFF

    MAX.

    ELEV.

    KILLOWATT

    ENERGY RECOVERY VENTILATOR

    WD.

    EXT.

    LAVATORY

    ALUM.

    F.C.U.FLOOR DRAIN

    AUTO.

    LAV.

    F.E.

    BLOCKING

    BOARD

    CLG.

    GAL

    C

    FURN.

    V.B.

    MTD.MTL.

    ERV

    GROUND FAULT CIRCUIT INTERRUPT

    F.R.FIXTURE

    BOTTOMBOT.

    BUILDINGBLDG.BD.

    AVERAGEAVG.AUTOMATIC

    FACE OF FINISH

    ALT.

    KITCHEN

    ALUMINUM

    E.J.

    LT.

    F.O.F.

    EXISTING

    ALTERNATE CURRENT

    EXPANSION JOINT

    AC

    EXTERIOR

    FIN.

    ABBREVIATION

    LIGHT

    F.D.FIRE EXTINGUISHER

    ABOVE

    LOUVER

    EQUIPMENT

    FOLDING

    ABOVE FINISH FLOOR

    (N)

    W.C.

    BLKG.

    MAXIMUM

    FIRE RATED

    MFD.MFR.

    COLD

    HOME RUN

    WP.B.

    MANUFACTURED

    FLDG.

    GRD.

    VOLATILE ORGANIC COMPOUND

    FTG.

    V.I.F.

    WT.

    VERT.VEH.

    MIN.

    FOOT OR FEET

    N

    ARCH SYMBOLS

    NORTH ARROW

    A101A1 A1

    FLOOR PLENUM LAYOUT

    A1

    WINDOW TAG1T

    A

    101 FURNITURE, FIXTURE, EQUIPEMENT TAG

    TINY HOUSE INTERIOR ELEVATION

    WATER TRUCK AND FILL LOCATIONS

    2'0'GRAPHIC SCALE

    A

    EMERGENCY GATHERING AREA

    EGRESS PATH

    I-503

    101 FINISH TYPE TAGFIRE EXTINGUISHER

    S.D.

    F.E.

    MATERIAL HATCHES

    CASEWORK DETAILS

    SITE LOGISTICS PLAN AND NOTES

    O-601

    PLYWOOD

    HIGH DENSITY FOAM

    BATT INSULATION

    I-901

    RIGID INSULATION

    SOIL

    STEEL

    FIRST AID KIT

    PLUMBING

    OPERATIONS

    O-907

    P-001

    L-106

    O-103

    P-101

    O-602

    L-102

    O-104

    P-102

    O-801

    8'

    INTERIOR DETAILS

    PLUMBING SUPPLY PLAN

    CLUBHOUSE INTERIOR ELEVATIONSI-202

    P-901

    SHEET NAME

    I-201

    SHEET NUMBER

    ADA TOUR ROUTEG-103

    INTERIOR DESIGN PLAN

    P-902

    THREE-LINE DIAGRAM ROOF PV

    G-101

    G-002

    PLUMBING SUPPLY ISOMETRIC CLUBHOUSE

    G-001GENERAL

    SHEET LIST

    CODE ANALYSIS

    MECH PLAN, SCHEDULE, NOTES

    L-113

    O-904

    EMERGENCY EGRESS PLAN

    FIRE SUPRESSION COVERAGE PLAN

    MODULE LOCATION DIAGRAM

    DESCRIPTION

    SOLAR ENVELOPE COMPLIANCE ELEVATIONS - NORTH/SOUTHSOLAR ENVELOPE COMPLIANCE ELEVATIONS - EAST/WEST

    FIRE DETECTION AND ALARM

    LIQUID LOCATION & SPILL CONTAINMENT

    SITE LANDSCAPE AND MATERIALS PLAN

    F-101

    ABRV.

    WATER TRUCK AND EMPTYING LOCATIONS

    SITE LAYOUT PLAN

    PLANTER MODULE PLACEMENT PLAN

    E-603

    F-102

    SQUARE FOOTAGE COMPLIANCE PLAN

    SITE IRRIGATION PLAN

    SITE PLANT LIST

    FIRE PROTECTION

    MODULE SETTING PLAN - WET AREAS/UTILITY

    ENLARGED GROUND CONTACT PLAN

    COVER SHEET

    ENLARGED GROUND CONTACT PLAN

    G-003

    TINY HOUSE INTERIOR

    G-102

    ENLARGED GROUND CONTACT PLANENLARGED GROUND CONTACT PLAN

    PLUMBING NOTES, SYMBOLS, ABRV, & SCHEDULE

    SHEET NUMBER

    ELECTRICAL

    SHEET NAME

    ASSEMBLY SEQUENCE SITE

    ENLARGED GROUND CONTACT PLAN

    I-102

    SOLAR PANEL MOUNTING DETAILSA-504A-503

    MODULAR DECK DETAILS

    PLUMBING DRAINAGE, WASTE, AND VENT PLAN

    S-505S-506

    GREEN WALL DETAILSA-401A-501A-502

    PLANTER DIAGRAM

    A-305A-304

    A-203

    A-201

    ARCHITECTURALA-101

    FLOWABLE FILL INSTALLATION AND REMOVAL

    PLUMBING SUPPLY ISOMETRIC TINY HOUSE

    M-101

    A-103LOFT PLANROOF PLAN

    A-204

    A-302A-301

    TINYHOME MODULES FRAMING PLAN

    S-504S-503 SKYLIGHT MODULE DETAILSS-502

    TINYHOME BATHROOM MODULE STRUCTURAL DETAILS

    O-102

    S-101

    TINYHOME CLOSET MODULE STRUCTURAL DETAILS

    M-201

    O-101

    TINYHOME STRUCTURAL SECTION

    MECHANICAL

    L-501

    S-302S-301

    S-501

    S-110

    S-202

    CONCRETE

    S-201

    SITE ELEVATIONS SOUTH/NORTH

    ROOF STRUCTURE PLAN

    CLT HATCH

    S-104STRUCTURAL FLOOR PLAN

    S-102 GEOFOAM FOUNDATION PLAN

    SITE ELEVATIONS EAST/WEST

    P-904

    EGRESS AND ADA SYMBOLS

    STRUCTURAL DETAILS

    CLUBHOUSE BUILDING SECTIONS

    STRUCTURAL

    SMOKE DETECTOR

    E-001

    CLUBHOUSE STRUCTURAL ELEVATIONS

    L-701

    101'

    L-301

    TINY HOUSE BUILDING SECTIONS

    PLANTER SECTIONS

    4'

    L-302 PLANTER SECTIONS

    L-114

    WALL TYPE

    P-903

    L-112L-111

    A1

    CLUBHOUSE STRUCTURAL SECTION

    TINY HOUSE ELEVATIONS

    L-107

    INTERIOR ELEVATION TAG

    L-105L-104L-103

    01

    L-101LANDSCAPE

    TINYHOME STRUCTURAL ELEVATIONS

    E-101

    SHEET LIST, ABBREVIATIONS, SYMBOLS, & HATCHES

    PLUMBING WASTE ISOMETRIC CLUBHOUSE

    G-202

    TINY HOUSE WALL SECTIONS

    CLUBHOUSE ELEVATIONS

    E-102

    G-201

    LIFT WEIGHT CALCULATIONS

    L-108SITE PLANTING PLAN

    L-110

    H-101

    O-906

    S-103

    HAZARD

    FLOOR FINISH PLAN

    INTERIOR DETAILSI-501

    CLUBHOUSE WALL SECTIONS

    SKYLIGHT MODULE DETAILS

    A-303

    AC POWER PLAN

    CIVIL

    TINY HOUSE STAIR SECTIONS

    FLOOR PLAN

    C-101

    A-102

    LOCATION PLAN

    ENVELOPE DETAILS

    A-202

    SITE SECTIONSA-306

    FALL PROCTECTION PLAN/FALL ARREST SYSTEMS

    ENVELOPE DETAILS

    SINGLE-LINE DIAGRAM AND ELECTRICAL PANEL SCHEDULE

    I-103

    ELECTRICAL NOTES, SYMBOLS, ABRV, & SCHEDULE

    DISASSEMBLY SEQUENCE SITE

    ABRV.

    PLUMBING WASTE ISOMETRIC TINY HOUSE

    DESCRIPTION

    A-601

    CLUBHOUSE MECHANICAL COMPARTMENT ELEVATIONS

    INTERIORSI-101

    ABBREVIATIONS

    A-505

    SIM

    A101

    AREA TAG

    E-601

    FLOWABLE FILL DETAILS

    CALLOUT TAG

    SECTION TAG

    CENTER LINE

    I-501

    A101

    GREENWALL DETAILS

    A1

    A1

    100ROOM NAME

    REFLETED CEILING PLAN W/ WIRING

    GROUND CONTACT PLANDECK FRAMING AND PATTERN

    GRID TAG1

    TINY HOUSE WALL SECTIONS

    ABRV.

    REVISION TAG

    EXTERIOR ELEVATION TAG

    DESCRIPTION

    A1A101

    1

    DOOR TAG

    WINDOW & DOOR SCHEDULE

    TRUCK ROUTE

    G-002

    SHEET LIST, ABREVIATIONS,

    SYMBOLS, & HATCHESTG TG

  • MAT'L FIN MAT'LMAT'L FIN FIN MAT'LFLOOR N. WALL

    NOTE: SEE EXTERIOR ELEVATIONS FOR EXTERIOR FINISHES.

    BASE CEILING REMARKSLOCATION

    *SEE INT. ELEVS.

    *SEE INT. ELEVS.

    *SEE INT. ELEVS.

    CC

    FINST-1

    S. WALLMAT'L

    ST-1ST-1

    W. WALL

    ST-1

    ST-1

    CLTCLT

    E. WALL

    CBL

    CLT

    T-2CLTCLTCLTCLT

    CCST-1N/AST-1ST-1*ST-1ST-1ST-1ST-1

    PLYCLTN/A

    T-2

    FINISH SCHEDULE

    MAT'L

    CC

    SLAT

    ST-1

    CLTCLT

    ST-1CCST-1ST-1*ST-1N/AST-1N/A

    PLYCLTCLTCLTCLT*

    CLTCLT

    FIN

    CLT

    CCST-1N/AST-1ST-1*ST-1N/AST-1ST-1

    PLYCLTN/ACLTCLT*CLTCBLCLTCLT

    CC*CC*ST-1*ST-1ST-1ST-1ST-1

    PLYCLTCLT*CLT*CLT

    ST-1

    BLDG

    SEALSEAL

    SLAT

    SEAL-

    *SEALSEALCCSEALSEAL

    CLTT-2T-1T-1T-1T-2T-1CLTT-1T-1

    -

    N/A*N/AN/AN/AT-2N/AN/A

    CC

    N/A

    MECHBATHDININGKITCHENLIVINGBATHHALLLOFTKITCHENLIVING

    CLUB.

    T. H.

    CLT

    CC

    CLTCLT

    MAT'L

    CLT

    CLTCLT

    CLT

    ST-1

    ROOM FIN FIN

    CODE ANALYSISSCALE: 1/4"=1'-0"

    A8

    MARK

    SHEET TITLE:

    [STREET]SPOKANE, WA [ZIP CODE]

    LOT NUMBER:

    CLIENT:

    TODD BEYREUTHER, P.E.

    FINAL CD SET

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    LOT #107

    CONSULTANTS:

    100% CD SET CHANGES 2100% CD SET CHANGES 1

    D

    06/23/2017

    KATERRA INC.

    A

    11/15/2016

    WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SET

    B

    FINAL CHECKSET02/17/2017

    C

    DRAWN BY: CHECKED BY:

    8

    5/9/

    2017

    5:4

    5

    7 6

    TEAM NAME:

    04/24/2017

    5 4

    ADDRESS:

    3 2

    CONTACT:

    05/12/2017

    1

    80% DD SET

    EN CITY

    DESCRIPTIONDATE

    [email protected]

    08/10/2017

    G-003

    CODE ANALYSIS

    TG MT

  • COMMUNITY BUILDING:

    COMMUNITY BUILDING UNCONDITIONED SF:

    TINY HOUSE:

    TOTAL GROSS SF:

    TOTAL NET SF:

    OUTDOOR BUILT AREA:

    TOTAL BUILT AREA(TOTAL GROSS+OUTDOOR):

    682 SF

    16 SF

    330 SF

    1012 SF

    996 SF

    1491 SF

    2503 SF

    SQURE FOOT CALCULATIONS

    05/11/2017 REV. 1

    SCALE: 1/4"=1'-0"SQUARE FOOTAGE COMPLIANCE PLAN

    A8

    N

    LOT NUMBER:

    CLIENT:

    CONSULTANTS:

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    LOT #107

    11/15/2016

    DRAWN BY:

    D

    100% CD SET CHANGES 2100% CD SET CHANGES 1

    A

    06/23/2017

    KATERRA INC.

    B

    WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SET

    C

    04/24/2017FINAL CHECKSET02/17/2017

    7/11

    /201

    7 4:

    07

    CHECKED BY:

    8

    TEAM NAME:

    05/12/2017

    7 6

    ADDRESS:

    5 4

    CONTACT:

    08/10/2017

    3

    EN CITY

    [email protected]

    80% DD SET

    DESCRIPTION

    2 1

    DATE

    [STREET]SPOKANE, WA [ZIP CODE]

    MARK

    SHEET TITLE:

    TODD BEYREUTHER, P.E.

    FINAL CD SET

    CLUBHOUSE

    TINY HOUSE

    UNCONDITIONED

    ELECTRIC VEHICLE

    A

    B

    C

    7/11

    /201

    7 4:

    07

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    D

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    11/15/2016

    DRAWN BY:

    04/24/201705/12/2017

    08/10/2017 FINAL CD SET100% CD SET CHANGES 2100% CD SET CHANGES 1

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SETFINAL CHECKSET02/17/2017

    CHECKED BY:

    8 7 6 5 4 3 2

    06/23/2017

    1

    80% DD SET

    DESCRIPTIONDATEMARK

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:U.S. DEPARTMENT OF ENERGY

    SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV

    LOT #107

    G-101

    SQUARE FOOTAGECOMPLIANCE

    PLANBK TG

  • TGMT1

    REV. 105/11/2017

    0' 2' 4' 8' N

    A8EMERGENCY EGRESS PLAN

    FINAL CD SET

    100% CD SET CHANGES 106/23/2017

    KATERRA INC.

    100% CD SETFINAL CHECKSET02/17/2017

    CHECKED BY:

    8 7 6 4 3 2 1

    80% DD SET

    DESCRIPTIONDATEMARK

    5

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:U.S. DEPARTMENT OF ENERGY

    SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV

    LOT #107

    D

    A

    WSU ENVIRONMENTAL HEALTH & SAFETY

    B

    C

    7/11

    /201

    7 5:

    03

    100% CD SET CHANGES 2

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    11/15/2016

    DRAWN BY:

    04/24/201705/12/2017

    08/10/2017

    84'

    145'

    168'

    C

    A

    B

    EMERGENCY GATHERING AREA

    EMERGENCY GATHERING AREA

    G-102

    EMERGENCY EGRESS PLAN

  • TOUR ENTRANCE

    3'-0"

    3'-0

    "

    3'-0"

    3'-0

    "

    3'-0"

    3'-0

    "

    3'-0

    "

    3'-0

    "3'

    -0"

    3'-0"

    TABLE AND CHAIRS TO BE MOVED OUT OF 3'-0" CLEAR PATH PRIOR TO TOUR OPENING AND REMAIN UNTIL END OF TOUR.

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    DRAWN BY:

    CLIENT:

    CONSULTANTS:

    04/24/2017

    11/15/2016

    LOT NUMBER:

    DATE

    SHEET TITLE:

    08/10/2017

    EN CITY

    CONTACT:

    ADDRESS:

    TEAM NAME:

    7/13

    /201

    7 11

    :50

    C

    B

    A

    D

    FINAL CD SET

    MARK

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    [email protected]

    DESCRIPTION80% DD SET

    12345678

    CHECKED BY:

    02/17/2017 FINAL CHECKSET100% CD SET

    WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.

    06/23/2017100% CD SET CHANGES 1100% CD SET CHANGES 2

    LOT #107

    05/12/2017

    ADA TOUR ROUTEA7

    N0' 2' 4' 8'

    SCALE: 1/4"=1'-0" G-103

    ADA TOUR ROUTE

    TGMT

  • 78'-0"

    78'-0"

    0'

    0'

    4' 8'2'

    4'2' 8'

    SCALE: 1/4"=1'-0"

    GRADE

    5' - 6"

    2' - 0"T.O. FINISHED FLOOR

    16' - 6 3/8"

    SOLAR COMPLIANCE SOUTH ELEVATIONSCALE: 1/4"=1'-0"

    A8

    SOLAR ENVELOPE

    18' - 0"

    0' - 0"

    5' - 6"

    T.O. ROOF

    T.O. CLT WALL

    SOLAR COMPLIANCE NORTH ELEVATION

    TYP. SILL HEIGHT

    T.O. ROOF16' - 6 3/8"

    GRADE

    T.O. FINISHED FLOOR

    C8

    T.O. CLT WALL

    0' - 0"

    2' - 0"

    11' 0-5/8"

    18' - 0"

    TYP. SILL HEIGHT

    11' 0-5/8"

    SOLAR ENVELOPE

    LOT #107

    D

    A

    C

    8/3/

    2017

    12:

    27

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    B

    11/15/2016

    DRAWN BY:

    04/24/2017

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    05/12/2017

    08/10/2017 FINAL CD SET06/23/2017

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SETFINAL CHECKSET02/17/2017

    8 7 6 5 4 3

    CHECKED BY:

    2 1

    80% DD SET

    DESCRIPTIONDATEMARK

    100% CD SET CHANGES 1100% CD SET CHANGES 2

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:

    G-201

    SOLAR COMPLIANCEELEVATIONS

    SOUTH/NORTHSA TG

  • 11' 0-5/8"

    SOLAR COMPLIANCE WEST ELEVATION

    TYP. SILL HEIGHT

    18' - 0"

    T.O. FINISHED FLOOR

    8'

    GRADE

    SOLAR ENVELOPE

    0'

    0' - 0"

    2'0' 4'

    2' - 0"

    TYP. SILL HEIGHT

    5' - 6"

    SCALE: 1/8"=1'-0"

    SOLAR ENVELOPE

    SCALE: 1/8"=1'-0" 4'

    T.O. FINISHED FLOOR

    2'

    T.O. ROOF

    T.O. ROOF

    T.O. CLT WALL

    A7

    18' - 0"

    16' - 6 3/8"

    11' 0-5/8"

    5' - 6"

    B7

    16' - 6 3/8"

    0' - 0"

    T.O. CLT WALL

    GRADE

    8'SOLAR COMPLIANCE EAST ELEVATION

    2' - 0"

    LOT #107

    D

    A

    C

    8/3/

    2017

    12:

    27

    TEAM NAME:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    ADDRESS:

    CONSULTANTS:

    11/15/2016

    DRAWN BY:

    B

    04/24/201705/12/2017

    08/10/2017

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    FINAL CD SET06/23/2017

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SETFINAL CHECKSET02/17/2017

    8 7 6 5 4 3 2 1

    CHECKED BY:

    80% DD SET

    DESCRIPTIONDATEMARK

    SHEET TITLE:

    LOT NUMBER:

    100% CD SET CHANGES 1100% CD SET CHANGES 2

    CLIENT:

    60'-0"

    60'-0"

    G-202

    SOLAR COMPLIANCEELEVATIONSEAST/WEST

    SA TG

  • GREYWATER TREATMENT

    SYSTEM

    WASTE TANK SUPPLY TANK

    A7SCALE: 1/4"=1'-0"LIQUID LOCATION AND SPILL CONTAINMENT PLAN

    05/12/2017

    08/10/2017 FINAL CD SET

    100% CD SET CHANGES 106/23/2017

    KATERRA INC.

    100% CD SETFINAL CHECKSET02/17/2017

    8 7 6 5 4 3 2

    80% DD SET

    DESCRIPTIONDATE

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:U.S. DEPARTMENT OF ENERGY

    SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV

    LOT #107

    D

    A

    B

    C

    7/13

    /201

    7 3:

    11

    MARK

    TEAM NAME:

    ADDRESS:

    CONTACT:

    1

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    CHECKED BY:

    11/15/2016

    WSU ENVIRONMENTAL HEALTH & SAFETY

    DRAWN BY:

    100% CD SET CHANGES 2

    04/24/2017

    H-101

    LIQUID LOCATION& SPILL

    CONTAINMENTTGAA

  • EN CITY

    [STREET]SPOKANE, WA [ZIP CODE]

    CLIENT:

    CONTACT:

    ADDRESS:

    [email protected]

    6

    80% DD SET

    DATE

    LOT NUMBER:

    B

    A

    TEAM NAME:

    2/23

    /201

    7 9:

    17

    02/17/2017

    7 3 1

    100% CD SET CHANGES 2

    DESCRIPTION

    SHEET TITLE:

    MARK

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    100% CD SET

    LOT #107

    D

    C

    WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.

    06/23/2017100% CD SET CHANGES 1

    FINAL CHECKSET

    CHECKED BY:

    8 5 4 2

    FINAL CD SET08/10/2017

    05/12/201704/24/2017

    DRAWN BY:

    11/15/2016

    CONSULTANTS:

    TODD BEYREUTHER, P.E.

    114

    60TH AVE (78' R.O.W.)

    107WSU105103

    RICH

    FIEL

    D ST

    REET

    101

    102

    UNLOADING LANE

    104 106 108

    109

    SALI

    DA S

    TREE

    T

    111

    PROGRAM SPACE

    RAIL STOP

    113

    ONE WAY TRAVEL LANE

    PARK

    SOLAR COVERED PARKING LOT

    110

    PANASONIC APARTMENT COMPLEX

    112

    DIA LAND

    UNLOADING LANE

    LOCATION PLANSCALE: 1/64"=1'-0"

    A8

    N0' 64' 128'32'

    C-101

    LOCATION PLAN

    TGDJ

  • BASELINE B

    BASE

    LINE

    A

    PRESSURE TANK

    HEAT EXCHANGE UNIT

    PLANTER

    PLANTER

    HEAT EXCHANGE UNIT

    IMBER GREY WATERTREATMENT SYSTEM

    COLLECTION BASIN

    ENTRYWAY PLANTER

    ENTRY RAMP (1:12 SLOPE)

    ENTRY RAMP (1:20 SLOPE)

    DOMESTIC WATERSUPPLY TANK PLANTER

    GREY WATERSTORAGE TANK PLANTER

    EXIT RAMP (1:12 SLOPE)

    EXIT RAMP (1:20 SLOPE)

    3. ALL ANGLES ARE 90 OR 45 DEGREES UNLESSOTHERWISE NOTED.

    2. All DIMENSIONS ARE TO AND FROM FACE OF WALL,CENTERLINE, OR BASELINE OR ARCHITECTURALGRIDLINE UNLESS OTHERWISE NOTED.

    1. THIS SHEET SHOWS LAYOUT OF ALL DESIGNEDELEMENTS. FOR ELEVATION INFORMATION REFER TOSHEET L-104 (SITE GRADING AND DRAINAGE PLAN)

    REFERENCE KEY NOTES:

    SHEET KEY NOTES:

    GENERAL SHEET NOTES:

    LEGEND:

    DRAWN BY:

    CLIENT:

    DESCRIPTION

    FINAL CD SET

    SHEET TITLE:

    DATE

    08/10/2017

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    05/12/2017

    CONSULTANTS:

    A

    D

    LOT #107

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    C

    04/24/2017

    EN CITY

    MARK

    CONTACT:

    8/15

    /201

    7 3:

    32

    80% DD SET

    1

    ADDRESS:

    5 48 67

    B

    CHECKED BY:

    02/17/2017 FINAL CHECKSET100% CD SET

    WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.

    06/23/2017100% CD SET CHANGES 1100% CD SET CHANGES 2

    3

    TEAM NAME:

    LOT NUMBER:

    [email protected]

    2

    11/15/2016

    L-301A3

    A3

    L-501

    L-501

    A8

    C5

    L-501

    SITE MATERIALS PLANSCALE: 1/4"=1'-0"

    A8

    A3L-302

    A6L-302

    L-301A6

    L-101

    ELECTRIC CARPARKING

    PRIVATE DECK

    PATIO OUTDOORDINING

    SITE LANDSCAPE AND MATERIALS PLAN

    MSNM

  • P.O.B

    BASE

    LINE

    A

    BASELINE B

    1' 1-1/4"24

    '-9 1

    /2"

    33'-6

    "

    18'-5 3/4"

    4'-1

    1 1/

    2"

    8'-1

    0 1/

    2"

    39'-6 1/2"10

    '-6"

    15'-1

    1 1/

    2"

    x

    FINAL CHECKSET

    5

    WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SET

    CHECKED BY:

    6

    06/23/2017

    KATERRA INC.

    05/12/2017

    CLIENT:

    B

    02/17/2017

    LOT #107

    7

    C

    100% CD SET CHANGES 1

    08/10/2017

    DRAWN BY:

    11/15/2016

    CONSULTANTS:

    TODD BEYREUTHER, P.E.

    [STREET]SPOKANE, WA [ZIP CODE]

    [email protected]

    EN CITY

    CONTACT:

    ADDRESS:

    TEAM NAME:

    8/15

    /201

    7 3:

    43

    D

    8

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    A

    FINAL CD SET100% CD SET CHANGES 2

    04/24/2017

    LOT NUMBER:

    SHEET TITLE:

    MARK DATE DESCRIPTION80% DD SET

    1234

    P.O.B

    GENERAL SHEET NOTES:

    PROPERTY LINE

    REFERENCE KEY NOTES:

    1. THIS SHEET SHOWS LAYOUT OF ALL DESIGNED ELEMENTS. FOR ELEVATION INFORMATION REFER TO SHEET.

    LEGEND:

    2. ALL DIMENSIONS ARE TO AND FROM FACE OF WALL, CENTERLINE, OR BASELINE OR ARCHITECTURAL GRIDLINE UNLESS OTHERWISE NOTED.

    SHEET KEY NOTES:

    3. ALL ANGLES ARE 90 OR 45 DEGREES UNLESS OTHERWISE NOTED.

    DESCRIPTION:

    LEGEND:

    BASELINE

    ALIGN FACES

    BUILDING SETBACK

    POINT OF BEGINNINGAT THE SOUTHEAST CORNER OF THE COMMUNITY BUILDING

    8'

    A74'2'0' N

    SCALE: 1/4"=1'-0"SITE LAYOUT PLAN L-102

    SITE LAYOUT PLAN

    TGSA

  • BASE

    LINE

    A

    BASELINE B

    A6A110

    SIM

    A6SIM

    A112

    SIM

    SIM

    A114A6

    A113

    A111A6

    SIMA5

    30'-11 1/4"

    10'-0

    "

    3'-2

    5/8

    "

    33'-2

    1/2

    "

    19'-7 3/8"

    10'-0

    "

    17'-9 3/4"

    38'-5 1/4"

    20'-7 1/2"

    22'-5

    15/

    16"

    10'-0

    "7'

    -6"

    14'-1

    1 15

    /16"

    7'-6

    1/2

    "

    DESCRIPTION:

    -ALL PIERS WILL UTILIZE A SADDLE TOPFOR SUPPORT OF DECK MODULES (PART # 238)-ALL PIERS TO BE PLACED ON 1/2" PLYWOOD

    P5

    8

    CENTRAL PIERS INC - 14" PERIMETER DECK PIERPART #7

    CENTRAL PIERS INC - SADDLE TOP PIER TOPPART #238

    CENTRAL PIERS INC - 4" PERIMETER DECK PIERPART #38

    17

    S2

    2

    3 CENTRAL PIERS INC - 6" STANDARD DECK PIERPART #39

    CENTRAL PIERS INC - 8" STANDARD DECK PIERPART #41

    X

    QUANTITY

    CENTRAL PIERS INC - 6" PERIMETER DECK PIERPART #40

    CENTRAL PIERS INC - 10" PERIMETER DECK PIERPART #3

    P6

    NOTES:

    P4

    CENTRAL PIERS INC - 14" STANDARD DECK PIERPART #6

    CENTRAL PIERS INC - 12" PERIMETER DECK PIERPART #5

    CENTRAL PIERS INC - 10" STANDARD DECK PIERPART #1

    S1

    88

    #

    CENTRAL PIERS INC - 8" PERIMETER DECK PIERPART #42

    5

    1

    S3

    8

    SYMBOL

    S4

    P1

    P2

    4

    1

    39

    P3

    P

    P

    4

    6

    5

    P

    P

    5

    S

    P

    1

    P

    5

    1

    5

    4

    6

    P

    6

    555

    5

    5P

    P

    P

    P

    4

    3

    5

    S 1 S S

    P

    5

    S S

    P

    1 S

    P

    P

    P

    S

    S

    P

    P

    P

    P

    S

    P

    P

    5

    1

    4

    2

    55

    555555

    5

    2

    5

    P

    5

    P

    6

    2

    6

    P

    3

    S

    5

    S

    5

    1

    5

    15

    P

    5

    P

    5

    P

    P

    P

    1

    P

    PP

    1

    PPP

    1 1 1

    P 2

    1

    P

    1 1 1

    P

    2

    1

    2

    P

    3

    P

    4

    P

    5

    P PP

    5

    P

    5

    P

    5

    S

    1

    P

    5

    S

    5

    S

    5

    1

    5

    P

    5

    P

    2

    PPP

    P

    P

    5

    PPP

    P

    1

    P

    P

    S S S

    P 11P

    1P

    4' N2' 8'0'

    SHEET TITLE:

    LOT NUMBER:

    TODD BEYREUTHER, P.E.

    CLIENT:U.S. DEPARTMENT OF ENERGY

    SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV

    CONSULTANTS:

    LOT #107

    D

    100% CD SET CHANGES 2

    DRAWN BY:

    100% CD SET CHANGES 106/23/2017

    A

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    B

    08/10/2017

    100% CD SET

    C

    FINAL CHECKSET04/24/201702/17/2017

    CHECKED BY:

    8/15

    /201

    7 4:

    31

    8 7

    TEAM NAME:

    6 5

    ADDRESS:

    11/15/2016

    4 3

    CONTACT:

    2 1

    EN CITY

    80% DD SET

    DESCRIPTION

    [email protected]

    DATE

    [STREET]SPOKANE, WA [ZIP CODE]

    05/12/2017

    MARK

    FINAL CD SET

    A8SCALE: 1/4"=1'-0"Ground Contact Plan

    5328'

    L-103

    GROUND CONTACT PLAN

    TGSA

  • BASE

    LINE

    A

    BASELINE B

    15

    18

    4

    1

    1

    1

    16

    1

    17 1718 18

    7

    10

    11

    12

    11111 1 1 1

    1111

    2

    2

    2

    1

    2

    8

    2 1 1 1 2 1 1 2

    2

    3 3

    5

    9

    1313

    16

    14

    6' 1-1/8" X 3' 7-7/8" RAMP

    #

    6' 1-1/8" X 3' 7-7/8" MODULE

    MODULE TYPES LEGEND:

    1. THIS SHEET SHOWS LAYOUT OF ALL DESIGNED ELEMENTS. FOR ELEVATION INFORMATION REFER TO SHEET

    5' 0" X 5' 1-7/8" RAMP

    3' 0" X 5' 1-7/8" MODULE

    SHEET KEY NOTES:

    4' 0" X 5' 1-7/8" MODULE

    3' 7-3/4" X 1' 2-13/16" MODULE

    GENERAL SHEET NOTES:

    3. ALL ANGLES ARE 90 OR 45 DEGREES UNLESSOTHERWISE NOTED.

    1. DECK PATTERN CONTINGENT ON GRID ORIENTED FROM TOP LEFT TO BOTTOM RIGHT. EXAMPLE: (DOWN 12, OVER 10)

    2' 5-3/4" X 5' 1-7/8" HALF MODULE

    5' 0" X 5' 1-7/8" STANDARD MODULE

    5' 0" X 5' 1-7/8" RAMP

    2. ALL DIMENSIONS ARE TO AND FROM FACE OFWALL, CENTERLINE, OR BASELINE OR ARCHITECTURAL GRIDLINE UNLESS OTHERWISE NOTED.

    TINY HOME ENTRY MODULE

    3' 9" X 7' 6" MODULE

    3' 9" X 3' 2-1/2" MODULE

    5' 0" X 3' 9" MODULE

    2' 6-1/2" X 5' 1-7/8" MODULE

    QT

    CLUBHOUSE ENTRY MODULE

    1' 4-7/8" X 5' 0" MODULE

    3' 7-3/4" X 1' 2-5/8" MODULE

    2' 5-3/4" X 3' 9" HALF MODULE

    REFERENCE KEY NOTES:

    DESCRIPTION:

    KATERRA INC.

    8/15

    /201

    7 3:

    51

    11/15/2016

    CHECKED BY:

    EN CITY

    8

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    WSU ENVIRONMENTAL HEALTH & SAFETY

    CONTACT:

    DATE

    100% CD SET CHANGES 1100% CD SET CHANGES 2

    DESCRIPTION

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    4

    LOT NUMBER:

    MARK

    [email protected]

    7

    DRAWN BY:

    CLIENT:

    D

    TEAM NAME:

    B

    SHEET TITLE:

    80% DD SET

    100% CD SET

    06/23/2017

    02/17/2017

    56

    [STREET]SPOKANE, WA [ZIP CODE]

    3 2

    C

    1

    ADDRESS:

    04/24/2017

    A

    05/12/2017

    FINAL CHECKSET

    08/10/2017

    LOT #107

    FINAL CD SET

    7

    01

    777

    8

    7

    8

    6

    3 109

    4

    02

    8654

    3

    66

    08

    66

    5

    01

    62 6

    23

    2

    76

    7

    01

    8

    6

    10

    01

    5

    01

    5

    01

    7

    11

    7

    12

    7

    5

    01

    1

    10

    10

    01

    9

    10

    1312

    1111

    9

    01

    11

    15

    18

    12

    02

    01

    1212

    17

    12

    12

    8

    7

    01

    7 6

    6

    5 4

    5

    3

    10

    7

    4

    7

    5

    1

    4

    12

    3

    1

    4

    11

    10

    1

    10

    10

    1

    7

    8

    11

    02

    1

    9 10

    2

    88

    9

    1

    87

    1

    109

    3

    6

    87

    1

    6

    16

    5

    2

    43

    1

    01

    2

    14

    9 8

    7

    02

    4'2'A8

    0'GRAPHIC SCALE

    NDECK PATTERN AND FRAMING PLANSCALE: 1/4"=1'-0" 8' L-104

    DECK PATTERN AND FRAMING PLAN

    TGSA

  • BASELINE B

    BASE

    LINE

    A

    1

    2 3

    4

    5

    6

    7

    8

    9

    9

    10 101010

    12

    11 11

    13

    13

    13

    14

    14

    14

    14

    14

    East Mechincal

    West Mechnical

    14

    14

    14

    14

    14

    1

    L-705

    MODULE TYPES LEGEND:

    L-709

    GENERAL SHEET NOTES:

    L-701

    1

    L-706

    1

    1. DECK PATTERN CONTINGENT ON GRID ORIENTED FROM TOP LEFT TO BOTTOM RIGHT. EXAMPLE: (DOWN 12, OVER 10)

    L-751

    L-708

    1

    3. ALL ANGLES ARE 90 OR 45 DEGREES UNLESSOTHERWISE NOTED.

    L-702

    L-703

    2. ALL DIMENSIONS ARE TO AND FROM FACE OFWALL, CENTERLINE, OR BASELINE OR ARCHITECTURAL GRIDLINE UNLESS OTHERWISE NOTED.

    L-714

    1

    REFERENCE KEY NOTES:

    2

    L-704

    4

    QTY.

    10

    MODULE NUMBER

    1. THIS SHEET SHOWS LAYOUT OF ALL DESIGNED ELEMENTS. FOR ELEVATION INFORMATION REFER TO SHEET

    L-710

    1

    L-712

    1

    2

    1

    3

    1

    L-707

    L-711

    SHEET KEY NOTES:

    1

    L-750

    CUTSHEET

    1

    L-713

    04/24/2017

    FINAL CD SET

    05/12/2017

    DRAWN BY:

    08/10/2017

    CHECKED BY:

    [STREET]SPOKANE, WA [ZIP CODE]

    100% CD SET CHANGES 106/23/2017

    KATERRA INC.

    100% CD SETFINAL CHECKSET02/17/2017

    WSU ENVIRONMENTAL HEALTH & SAFETY

    8 7 6 4 3 2

    80% DD SET

    DESCRIPTIONDATEMARK

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:

    ADDRESS:

    8/15

    /201

    7 4:

    07

    B

    C

    CONTACT:

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    A

    TEAM NAME:

    LOT #107

    EN CITY

    [email protected]

    1

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    11/15/2016

    5

    D

    100% CD SET CHANGES 2

    10

    11

    9

    12

    13

    14

    WEST MECH.

    EAST MECH.

    2

    3

    4

    1

    5

    6

    7

    10

    8

    12

    A8PLANTER MODULE PLACEMENT PLAN

    8'4'2'0'GRAPHIC SCALE

    NSCALE: 1/4"=1'-0" L-105

    PLANTER MODULE PLACEMENT PLAN

    MT SA

  • DCVA

    Q

    G

    VM

    V

    FS

    M

    R

    BRASS PIPE FROM GATE VALVE TODOUBLE CHECK VALVE ASSEMBLY

    BRONZE GATE VALVE

    PROPERTY LINETYPE K COPPER PIPE FROMMETER TO GATE VALVE

    BRASS PIPE FROM PRV TO MASTER VALVE

    MAIN WATER METER BOX

    DOUBLE CHECK ASSEMBLY+ PRESSURE REDUCING VALVE

    QUICK COUPLING VALVE 10" DIAMETER ROUND BOX

    SCHEDULE 4 ABS MAINLINE TO AUTOMATIC CONTROL VALVE

    WATER SERVICE LINE

    FLOW SENSOR (FS 100B)

    3' MINIMUM CLEARANCETO FIRST JOINT/FITTING

    SUPERIOR MODEL MASTER VALVEIN BOX - LINE SIZE

    FOGTITE MODEL 25-TA

    FUTU

    RE E

    QUIP

    MEN

    TPR

    OPOS

    ED E

    QUIP

    MEN

    T

    1850-QT DC 1" FEBCO SERIES 850 DOUBLE CHECK VALVE ASSEMBLY

    7.38

    VALVE SIZE

    G

    SCH 40 ABS SLEEVE, SIZE INDICATEDON PLAN

    MANUFACTURER/MODEL/DESCRIPTION

    V

    1

    IRRIGATION SYSTEM TO BE INSTALLED AFTER COMPETITION. VEGETATION TO BE HAND WATER DURING THE COMPETITION.

    M

    6

    3. THE IRRIGATION CONTRACTOR SHALL BE RESPONSIBLEFOR THE INSTALLATION OF SLEEVES AND CHASESUNDER DECKING, THROUGH WALLS, AND FOR ALLCONTROL WIRE. THIS INCLUDES EXIST. PIPING ASNOTED ON THE PLANS

    SYMBOL

    #

    7.38

    V

    2. IRRIGATION DRAWINGS ARE DIAGRAMMATIC. ALLPIPING, VALVES, ETC., SHOWN WITHIN PAVED AREASARE FOR DESIGN CLARIFICATION ONLY AND SHALL BEINSTALLED IN PLANTING AREAS. AVOID ANY CONFLICTSBETWEEN THE IRRIGATION SYSTEM, PLANTING, SITELIGHTING, UTILITIES AND ARCHITECTURAL FEATURES

    GREEN WALL

    P.O.C. IN BELOW DECK STORAGE- SEE A3 FOR LAYOUT

    7.38

    GENERAL IRRIGATION NOTES:

    1"

    HC-1200i 12-STATION 120 VAC INDOOR PLASTIC CONTROLLER

    RAINBIRD FS-1000-B1" FLOW SENSOR

    VALVE FLOW

    XCZ-100-PRF 1" DRIP VALVE WITH 1" PR FILTER

    1" WGV-X WATTSGATE VALVE

    BUCKNER SUPERIOR 3200 1"

    VALVE CALLOUT

    C

    FS

    7. ALL SLEEVES UNDER VEHICULAR DRIVES OR PATHSSHALL BE DUCTILE IRON.

    4. ANY DAMAGED PAVING OR OTHER SURFACES ORIMPROVEMENTS NOT BE DESIGNATED FORDEMOLITION SHALL BE REPLACED TO MATCHEXISTING.

    8. ALL SLEEVING SHALL BE INSPECTED BY SPRPLUMBING SHOP.

    5. THE CONTRACTOR SHALL ADJUST EACH PRESSURECOMPENSATING REMOTE CONTROL VALVE ANDPRESSURE REGULATOR FOR OPTIMUMPERFORMANCE AND TO COMPENSATE FORPRESSURE AND FRICTION LOSS. THE CONTRACTORSHALL FLUSH AND ADJUST ALL DRIPS FOROPTIMUM PERFORMANCE.

    SCHEDULE 40 ABSMAINLINE

    4

    Q

    RAINBIRD XFCV ON-SURFACE DRIP LINE

    C

    DCVA

    VALVE NUMBER

    DECAGON DEVICES MICROCLIMATE MONITORING SYSTEM WITH EMSOG SOLAR

    1. THE IRRIGATION SYSTEM IS BASED ON THE MINIMUMOPERATING PRESSURE & THE MAXIMUM FLOW DEMANDSHOWN ON THE IRRIGATION DRAWINGS. THEIRRIGATION CONTRACTOR SHALL TEST STATIC WATERPRESSURE AT THE NEW IRRIGATION POINT OFCONNECTION PRIOR TO CONSTRUCTION.

    6. FILL, FINE GRADE, RESOD &/OR RESEED ALL AREASDISTURBED BY REMOVAL OF EXISTING IRRIGATIONEQUIPMENT. REFERENCE PLANTING PLAN FORCORRECT SEED MIXTURE.

    1"

    #

    SCH 40 ABS SUPPLY LATERAL LINES

    R

    1"

    #

    BUCKNER-SUPERIOR QB44-LRC1" TWO PIECE, SINGLE SLOT BRASS QUICK COUPLING VALVE W/ LOCKING YELLOW TUFF

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    11/15/2016

    DRAWN BY:

    04/24/201705/12/2017

    08/10/2017 FINAL CD SET

    [email protected]

    EN CITY

    100% CD SET CHANGES 2100% CD SET CHANGES 1

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SET02/17/2017

    CHECKED BY:

    8 4

    B

    3 1

    A

    LOT NUMBER:

    6

    CLIENT:

    SHEET TITLE:

    DATE DESCRIPTIONMARK

    FINAL CHECKSET

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    LOT #107

    80% DD SET

    06/23/2017

    D

    25

    C

    8/15

    /201

    7 4:

    10

    TEAM NAME:

    7

    ADDRESS:

    CONTACT:

    N0' 2' 4' 8'SITE IRRIGATION PLANA8

    SCALE: 1/4"=1'-0"

    SCALE: N/AA3

    POINT OF CONNECTION (IRRIGATION SYSTEM)

    L-106

    SITE IRRIGATION PLAN

    V.S. MS

    1"

    5

    7.38

    1"

    2

    7.38

  • OCCIMUM x CITRIODORUM (10)

    SESLERIA AUTUMNALIS (16)BERBERIS THUMBERGI GORUZAM (6)

    SESLERIA AUTUMNALIS (16)

    SESLERIA AUTUMNALIS (8)

    BERBERIS THUNBERGI GORUZAM (4)

    SESLERIA AUTUMNALIS (20)

    BERBERIS THUNBERGI GORUZAM (6)

    MUHLENBERGIA CAPILLARIS (5)

    SESLERIA AUTUMNALIS (5)

    ACER SACCHARUM (4)

    SESLERIA AUTUMNALIS (16)

    SESLERIA AUTUMNALIS (17)

    MUHLENBERGIA CAPILLARIS (6)

    SESLERIA AUTUMNALIS (9)

    SESLERIA AUTUMNALIS (29)

    PLANT PALETTE REPRESENTED ON PLAN COORELATES TO SITE PLANT LIST ON SHEETL-107.

    THE REPRESENTATION SHAPES IN THIS PLAN REFER TO THE PLANTS POT SIZE NOT PLANTS VEGETATION SPREAD.

    KEYNOTES:

    GENERAL NOTES:

    SHEET TITLE:

    [STREET]SPOKANE, WA [ZIP CODE]

    8

    80% DD SET

    100% CD SET

    8/15

    /201

    7 4:

    13

    5

    CONTACT:

    DESCRIPTIONMARK

    100% CD SET CHANGES 1

    08/10/2017

    11/15/2016

    D

    06/23/2017

    B

    C

    CHECKED BY:

    7

    CONSULTANTS:

    4

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    1

    04/24/2017

    [email protected]

    DATE

    FINAL CD SET

    TODD BEYREUTHER, P.E.

    CLIENT:

    23

    100% CD SET CHANGES 2

    LOT #107

    A

    WSU ENVIRONMENTAL HEALTH & SAFETY

    FINAL CHECKSET02/17/2017

    KATERRA INC.

    05/12/2017

    TEAM NAME:

    6

    DRAWN BY:

    ADDRESS:

    EN CITY

    LOT NUMBER:

    SITE PLANTING PLAN 4'2' N0' 8'SCALE: 1/4"=1'-0"

    A7 L-107

    SITE PLANTING PLAN

    SA MS

  • 1 GAL

    Group:

    Pink Muhlygrass

    3 GAL

    Scientific Name: Common Name:

    Muhlenbergia Capillaris

    Container Size:

    Barberry Gold

    Notes:

    10

    Quantity:

    10 GAL

    Ocimum × citriodorum 'Pesto Perpetuo'

    136Tree Acer Saccharum

    Basil

    Sugar MapleGrasses

    1 QUART

    3 GAL

    4

    11

    16

    Sesleria autumnalis

    Herbs

    Sweet Grass

    6' CANOPY DIAMETER

    Berberis Thunbergi Goruzam

    KEYNOTES:

    GENERAL NOTES:

    PLANTS USED AT COMPETITION SITE MY VARYDEPENDING ON VENDOR AVAILABILITY

    EACH POT SIZE LABELED IN THIS SHEET ARE USED TO GRAPHICALLY REPRESENT PLANT PLACMENT ON SITE.

    THIS LIST COORELATES TO THE SITE PLANTING PLAN L-106.

    34

    A

    DATE

    CONSULTANTS:

    C

    ADDRESS:

    7/26

    /201

    7 1:

    11

    CLIENT:

    LOT #107

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    LOT NUMBER:

    MARK

    6 5

    80% DD SET

    D

    FINAL CHECKSET

    KATERRA INC.

    2

    TEAM NAME: EN CITY

    1

    CONTACT:

    100% CD SET CHANGES 1

    CHECKED BY:

    [STREET]SPOKANE, WA [ZIP CODE]

    05/12/2017100% CD SET

    8

    DRAWN BY:

    SHEET TITLE:

    7

    11/15/2016

    WSU ENVIRONMENTAL HEALTH & SAFETY

    02/17/2017

    06/23/2017

    DESCRIPTION

    TODD BEYREUTHER, P.E.

    100% CD SET CHANGES 2

    04/24/2017

    B

    [email protected]

    L-108

    SITE PLANT LIST

    CS MS

  • INSTALL 2x6 POST DECK MODULE CONSTRUCTIONFOR OPTIMAL PIER PLACEMENT

    2'-11"

    2'-9

    11/

    16"

    4'-3

    "3'

    -2 1

    /2"

    5'-0

    "5'

    -0"

    5'-0

    "

    2'-1 1/2"4'-8 7/8"

    N4'2'0' 8'

    80% DD SET

    1

    05/12/2017

    KATERRA INC.

    5

    DRAWN BY:

    100% CD SETFINAL CHECKSET02/17/2017

    06/23/2017

    67

    100% CD SET CHANGES 1

    ADDRESS:

    4 3 2

    04/24/2017

    WSU ENVIRONMENTAL HEALTH & SAFETY

    DESCRIPTIONDATEMARK

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:

    A

    D

    8

    LOT #107

    B

    C

    7/26

    /201

    7 10

    :56

    TEAM NAME:

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    11/15/2016

    CHECKED BY:

    100% CD SET CHANGES 2

    Enlarged Ground Contact PlanA6

    SCALE: 1/2"=1'-0" L-110

    ENLARGED GROUND CONTACT PLAN

    SA TG

  • INSTALL 2x6 POST DECK MODULE CONSTRUCTIONFOR OPTIMAL PIER PLACEMENT

    PIER PLACED AGAINST PERPENDICULAR DECK JOIST

    1'-9 7/8" 3'-4"2'-11" 5'-1 7/8" 5'-1 7/8" 5'-1 7/8" 5'-1 7/8" 1'-9 7/8"

    5'-1 7/8" 5'-1 7/8" 5'-1 7/8" 5'-1 7/8" 5'-1 7/8"

    2'-6

    5/1

    6"4'-6

    5/1

    6"

    5'-0

    "2'

    -10

    1/8"

    1'-8

    3/1

    6"

    1'-10 9/16"

    2'N

    4'0' 8'

    DRAWN BY:

    04/24/2017

    11/15/2016

    100% CD SET CHANGES 2

    8

    100% CD SET CHANGES 105/12/2017

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    06/23/2017

    CHECKED BY:

    LOT #107

    02/17/2017

    C

    7 6 5 4 3 2 1

    80% DD SET

    DESCRIPTIONDATEMARK

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    CLIENT:

    FINAL CHECKSET

    LOT NUMBER:

    SHEET TITLE:

    D

    A

    B

    100% CD SET

    7/26

    /201

    7 10

    :56

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    SCALE: 1/2"=1'-0"A6

    Enlarged Ground Contact Plan

    L-111

    ENLARGED GROUND CONTACT PLAN

    TGSA

  • 2'-9

    11/

    16"

    7'-6"

    3'-4"

    5'-1 7/8" 5'-1 7/8" 3'-9"

    3'-3 5/16"5'-1 7/8"5'-1 7/8"

    2'-7 1/16" 2'-6 13/16" 2'-7 5/16" 2'-6 9/16"

    5'-0

    "3'

    -2 1

    5/16

    "1'

    -3 3

    /8"

    2'-6

    "6" 2'-10 5/16" 5'-1 7/8" 5'-1 7/8" 3'-9"

    2'N

    4'0' 8'

    2

    05/12/2017

    CONSULTANTS:

    04/24/2017

    B

    100% CD SET CHANGES 2

    3

    06/23/2017

    KATERRA INC.

    CHECKED BY:

    02/17/2017

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    FINAL CHECKSET

    C

    8 7 6 5 4

    DRAWN BY:

    100% CD SET CHANGES 1

    1

    80% DD SET

    DESCRIPTIONDATE

    CLIENT:

    LOT NUMBER:

    100% CD SET

    SHEET TITLE:

    MARK

    LOT #107

    D

    A

    WSU ENVIRONMENTAL HEALTH & SAFETY

    11/15/2016

    7/26

    /201

    7 10

    :56

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    Enlarged Ground Contact PlanSCALE: 1/2"=1'-0"

    A5

    L-112

    ENLARGED GROUND CONTACT PLAN

    SA TG

  • 2'-6

    "5'

    -0"

    4'-0

    "

    4'-2 1/2"8"

    4'-7

    "

    4'-4 7/8"

    4'-2 1/2"

    N0' 2' 4' 8'

    80% DD SET

    1

    05/12/2017

    KATERRA INC.

    5

    DRAWN BY:

    DESCRIPTION

    FINAL CHECKSET02/17/2017

    06/23/2017

    67

    100% CD SET CHANGES 1

    ADDRESS:

    4 3 2

    04/24/2017

    WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SET

    DATEMARK

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:

    A

    D

    8

    LOT #107

    B

    C

    7/26

    /201

    7 10

    :56

    TEAM NAME:

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    11/15/2016

    CHECKED BY:

    100% CD SET CHANGES 2

    SCALE: 1/2"=1'-0"Enlarged Ground Contact Plan

    A5

    L-113

    ENLARGED GROUND CONTACT PLAN

    TGSA

  • 1'-6 3/84'-6 1/4"5'-1 7/8"4'-3 3/16" 5'-1 7/8"

    3'-6 5/8" 5'-1 7/8" 5'-1 7/8" 5'-1 7/8"

    4'-7

    "2'

    -1 1

    /2"

    2'N

    4'0' 8'

    2

    05/12/2017

    CONSULTANTS:

    04/24/2017

    B

    100% CD SET CHANGES 2

    3

    06/23/2017

    KATERRA INC.

    CHECKED BY:

    02/17/2017

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    FINAL CHECKSET

    C

    8 7 6 5 4

    DRAWN BY:

    100% CD SET CHANGES 1

    1

    80% DD SET

    DESCRIPTIONDATE

    CLIENT:

    LOT NUMBER:

    100% CD SET

    SHEET TITLE:

    MARK

    LOT #107

    D

    A

    WSU ENVIRONMENTAL HEALTH & SAFETY

    11/15/2016

    7/26

    /201

    7 10

    :56

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    Enlarged Ground Contact PlanA6

    SCALE: 1/2"=1'-0" L-114

    ENLARGED GROUND CONTACT PLAN

    SA TG

  • CEDAR 1x3

    3/4" PLYWOOD W/LIQUID APPLIED MEMBRANE

    SIMPSON STRONG TIE FB24Z CONNECTOR

    DOUGLAS FIR 2x4 BLOCK

    DOUGLAS FIR 2x4

    ADJUSTABLE BOLT FOOT

    SIMPSON STRONG TIE TENSION BRIDGE

    1"

    1'-7

    3/4

    "

    1'-0

    9/1

    6"

    3'-7

    3/4

    "

    2'-1 1/2"

    1'-8 1/2"

    6 1/

    2"

    5 1/

    2"

    2'-0

    "

    SIMPSON STRONG TIE TENSION BRIDGE

    CEDAR 1x3

    SIMPSON STRONG TIEFB24Z CONNECTOR

    ADJUSTABLE BOLT FOOT

    CEDAR 1x5-1/4" TONGUE AND GROOVE SIDING

    DOUGLAS FIR 2x4

    MONARCH SS Z CLIP

    3/4" PLYWOOD W/LIQUID APPLIED MEMBRANE

    1"

    2'-0

    "

    5 1/

    2"

    6 1/

    2"

    1'-1"

    8"

    2'-6

    1/2

    "

    4'-6

    1/2

    "

    8 9/

    16"

    06/23/2017

    KATERRA INC.

    100% CD SET CHANGES 2100% CD SET CHANGES 1

    LOT #107

    08/10/2017

    05/12/201704/24/2017

    DRAWN BY:

    11/15/2016

    FINAL CD SET

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    [STREET]SPOKANE, WA [ZIP CODE]

    [email protected]

    EN CITY

    CONTACT:

    ADDRESS:

    TEAM NAME:

    8/15

    /201

    7 4:

    16

    C

    B

    A

    D

    CONSULTANTS:

    TODD BEYREUTHER, P.E.

    CLIENT:

    LOT NUMBER:

    SHEET TITLE:

    MARK DATE DESCRIPTION80% DD SET

    12345678

    CHECKED BY:

    02/17/2017 FINAL CHECKSET100% CD SET

    WSU ENVIRONMENTAL HEALTH & SAFETY

    PLANTER MODULE 10 SECTION ASCALE: 1-1/2"=1'-0"

    A3SCALE: 1-1/2"=1'-0"

    A6PLANTER MODULE 09 SECTION A L-301

    PLANTER SECTIONS

    SA xx

  • FLASHING

    SIMPSON STRONG TIEFB24Z CONNECTOR

    CEDAR 1x3

    1'-0

    9/1

    6"

    2'-5 3/4"

    5'-0"

    2'-5 3/4"

    2'-6

    3/1

    6"

    3'-6

    3/4

    "

    3'-7

    3/4

    "

    DOUGLAS FIR 2x4

    SIMPSON STRONG TIE TENSION BRIDGE

    ADJUSTABLE BOLT FOOT

    3/4" PLYWOOD +LIQUID APPLIED MEMBRANE

    FLASHING

    3/4" PLYWOOD + LIQUID APPLIED MEMBRANE

    4'-6

    1/2

    "CEDAR 1x5-1/4" TONGUE + GROOVE

    SIDING

    SIMPSON STRONG TIE FB24Z CONNECTOR

    DOUGLAS FIR 2x4

    CEDAR 1x3

    SIMPSON STRONG TIE TENSION BRIDGE

    ADJUSTABLE BOLT FOOT

    5'-0"

    2'-5 3/4"2'-5 3/4"

    4'-5

    1/2

    "

    2'-7

    1/2

    "

    8 9/

    16"

    LOT NUMBER:

    100% CD SET CHANGES 208/10/2017

    05/12/2017

    CLIENT:

    DRAWN BY:

    11/15/2016

    CONSULTANTS:

    TODD BEYREUTHER, P.E.

    [STREET]SPOKANE, WA [ZIP CODE]

    [email protected]

    FINAL CD SET

    CONTACT:

    ADDRESS:

    TEAM NAME:

    8/15

    /201

    7 4:

    16

    C

    B

    A

    D

    LOT #107

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    SHEET TITLE:

    04/24/2017

    EN CITY

    MARK DATE DESCRIPTION80% DD SET

    12345678

    CHECKED BY:

    02/17/2017 FINAL CHECKSET100% CD SET

    WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.

    06/23/2017100% CD SET CHANGES 1

    A3SCALE: 1-1/2"=1'-0"PLANTER MODULE 09 SECTION B

    SCALE: 1-1/2"=1'-0"A6

    PLANTER MODULE 10 SECTION B L-302

    PLANTER SECTIONS

    xxSA

  • CENTRAL PIERS INC. SADDLE TOP PLATE (#238)

    CENTRAL PIER, INC.SADDLE TOP (#238)

    CENTRAL PEIR, INC.STANDARD 16" PIER (#8)

    4" RFB DECK MODULE CONNECTOR BOLT

    CENTRAL PIERS INC.16" STANDARD PIER (S1)

    CENTRAL PIERS INC. SADDLE TOP (#238)

    3/4" PLYWOOD SPACER

    CEDAR 2x6 DECK JOIST

    1x6 COMPOSITE DECK BOARD

    3/4" PLYWOOD BASE

    SIMPSON STRONG TIE 6" RFB DECK MODULE CONNECTION BOLT

    1x6 COMPOSITE DECK BOARD

    1x6 DECK JOIST

    4" RFB DECK CONNECTOR BOLT

    CENTRAL PIERS INC. PIER SADDLE TOP (238)

    CENTRAL PIERS INC.16" STANDARD PERIMETER PIER (#P5)

    1x8 BUILDING PERIMETER DECK SUPPORT

    WATERLINE

    1-1/2" SQ. DECK BOARD SUPPORT

    1x6 COMPOSITE DECK BOARD

    SIMPSON STRONG TIE 4" RFB DECK MODULE CONNECTION BOLT

    2x6 CEDAR DECK JOIST

    3/4" PLYWOOD SPACER

    POOL CONTAINMENT STRUCTURE

    CENTRAL PIER, INC.16" PERIMETER PIER (P5)

    CEDAR 2x6 DECK JOIST

    SIMPSON STRONG TIE SDS SCREW - 8 PER BOARD

    1x6 COMPOSITE DECK BOARD

    FINAL CD SET08/10/2017

    05/12/201704/24/2017

    DRAWN BY:

    11/15/2016

    CONSULTANTS:

    TODD BEYREUTHER, P.E.

    [STREET]SPOKANE, WA [ZIP CODE]

    [email protected]

    EN CITY

    CONTACT:

    ADDRESS:

    TEAM NAME:

    8/16

    /201

    7 9:

    07

    C

    B

    A

    D

    LOT #107

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    CLIENT:

    LOT NUMBER:

    SHEET TITLE:

    MARK DATE DESCRIPTION80% DD SET

    12345678

    CHECKED BY:

    02/17/2017 FINAL CHECKSET100% CD SET

    WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.

    06/23/2017100% CD SET CHANGES 1100% CD SET CHANGES 2

    TYP. DECK TO THRESHOLDA8

    SCALE: 1-1/2"=1'-0"A5

    DECK, BENCH AND POOLSCALE: 3"=1'-0"

    TYP. DECK TO DECKA3

    TYP. DECK MODULE PLANA3 C5SCALE: 1"=1'-0" TYP. DECK MODULE NORTHSCALE: 1-1/2"=1'-0"

    SCALE: 3"=1'-0" L-501

    MODULAR DECKDETAILS

    MTSA

  • DRAWN BY:

    CONSULTANTS:

    DESCRIPTION

    04/24/2017

    11/15/2016

    100% CD SET CHANGES 2100% CD SET CHANGES 1

    06/23/2017

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    05/12/2017

    FINAL CHECKSET02/17/2017

    CHECKED BY:

    8 7 6 5 4 3 2 1

    80% DD SET

    100% CD SET

    DATEMARK

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:U.S. DEPARTMENT OF ENERGY

    SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV

    LOT #107

    D

    A

    B

    C

    7/25

    /201

    7 11

    :25

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    A6PLANTER MODULE 14 EXPLODED ISOMETRICSCALE: N/A L-701

    PLANTER DIAGRAM

    SA TG

  • x

    1' 7-1/8" x7-1/4"

    x

    7-1/4"x

    7-1/4"x

    TOOLED CONTROL JOINT

    TOOLED CONTROL JOINT

    3'-0

    "

    3'-0

    "

    3'-0

    "

    21'-2 1/2"15

    '-2 1

    /2"

    2'-0

    3/4

    "

    121°

    2'-0

    3/4

    "

    2'-1 3/8"5'-1 5/8"12'-8 3/4"

    2'-6"

    3'-0

    "

    121°

    13'-2 1/2" 10'-9 1/2" 3'-2 1/2" 8'-11 5/8" 3'-2 7/8"

    2'-4

    1/4

    "

    17'-2

    1/4

    "

    41'-2 1/2"

    2'-6" TYP.

    2'-6

    " TYP

    .2'-6" TYP.

    2'-6

    " TYP

    .7-1/4"

    SHEET NOTES

    1.FLOWABLE FILL TO BE REMOVED AFTER COMPETITION AND TO BE USED AS PAVERS AT FINAL SITE

    SCALE: 1/4"=1'-0"

    A2

    FLOWABLE FILL INSTALLATION AND REMOVALA8

    B2S-506

    S-506A2

    B2

    S-506

    S-506

    SHEET TITLE:

    MARK

    100% CD SET

    DATE DESCRIPTION

    WSU ENVIRONMENTAL HEALTH & SAFETY

    80% DD SET

    05/12/2017

    1

    KATERRA INC.

    04/24/2017

    DRAWN BY:

    2

    11/15/2016

    CONSULTANTS:

    3

    06/23/2017

    TODD BEYREUTHER, P.E.

    [STREET]SPOKANE, WA [ZIP CODE]

    4

    [email protected]

    EN CITY

    5

    100% CD SET CHANGES 1

    CONTACT:

    ADDRESS:

    6

    TEAM NAME:

    8/7/

    2017

    2:5

    6

    7

    100% CD SET CHANGES 2

    C

    B

    8

    A

    D

    CHECKED BY:

    LOT #107

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    02/17/2017

    CLIENT:

    LOT NUMBER:

    FINAL CHECKSET

    S-101

    FLOWABLE FILL INSTALLATION AND REMOVAL

    DGBK

  • GF-00 GF-00

    GF-00

    GF-00

    GF-00

    GF-23

    GF-00

    GF-00 GF-00

    GF-21

    C

    B

    GF-22

    13

    5

    D

    EGF-19

    F

    L

    GF-20

    6

    K

    J

    GF-20

    I

    H

    GF-19

    5

    4

    F

    G

    GF-27

    GF-19

    4

    GF-06

    GF-02

    1

    GF-10

    3

    GF-11

    3

    GF-01GF-01

    I

    L

    2

    GF-03

    2

    GF-03GF-03

    GF-13

    12

    GF-14 GF-15

    GF-16

    GF-17

    GF-00

    GF-18

    GF-03

    11

    GF-03

    13

    GF-00

    C

    6541

    GF-00

    32

    101211

    GF-01

    109

    K

    87

    GF-00

    H

    1 6 954

    GF-01

    B

    G

    32

    GF-26

    GF-12GF-11

    GF-10

    GF-00

    GF-10

    GF-09

    GF-02

    GF-08

    GF-07

    GF-01

    GF-01

    8

    GF-06GF-05

    GF-01

    GF-04

    GF-00

    GF-26

    GF-00

    GF-00

    GF-00

    GF-01

    GF-00GF-01

    GF-25

    GF-00

    7

    D

    GF-00GF-00

    GF-25

    GF-01 GF-00

    GF-24

    GF-01

    GF-02

    GF-03

    GF-24

    GF-02

    GF-00

    GF-14

    GF-00

    1

    GF-00

    GF-01

    GF-00

    GF-00

    GF-00

    GF-00

    GF-01GF-00GF-00

    GF-00

    GF-00

    GF-00

    GF-00

    GF-00

    6

    E

    J

    4'-0

    "

    4'-0

    "4'

    -0"

    4'-0

    "

    4'-0

    "4'

    -0"

    4'-0

    "

    x

    1' 6-1/8"

    4'-0

    "

    1' 6-1/8"

    1' 6-1/8" x

    x

    x

    1' 6-1/8"

    3'-6

    1/8

    "4'

    -0"

    1' 6-1/8"

    4'-0

    "4'

    -0"

    1' 6-1/8"

    4'-0"4'-0" x4'-0"4'-0"

    x

    4'-0"

    4'-0"

    3'-6

    1/8

    "

    4'-0"4'-0"

    4'-0

    "

    4'-0"4'-0"

    4'-0

    "

    4'-0"4'-0"

    4'-0

    "

    4'-0"4'-0"

    4'-0"

    4'-0"

    4'-0"4'-0"4'-0" 4'-0"

    4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"

    GEOFOAM FOUNDATION 01A4

    SCALE: 1/8"=1'-0"SCALE: 1/8"=1'-0"A8

    KATERRA INC.

    06/23/2017

    80% DD SET

    WSU ENVIRONMENTAL HEALTH & SAFETYTODD BEYREUTHER, P.E.

    4

    100% CD SET CHANGES 1100% CD SET CHANGES 2

    7

    8/7/

    2017

    11:

    25

    6 5

    CONSULTANTS:

    3 2 1

    DESCRIPTIONDATEMARK

    C

    8

    CHECKED BY:

    D

    LOT #107

    02/17/2017

    A

    B

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    CLIENT:

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    FINAL CHECKSET

    LOT NUMBER:

    11/15/2016

    SHEET TITLE:

    DRAWN BY:

    04/24/201705/12/2017

    100% CD SET

    GEOFOAM FOUNDATION 02

    S-102

    GEOFOAM FOUNDATION PLAN

    SA DG

  • 10 1/2"11'-8 3/4"

    12'-7 1/4"

    5'-7

    3/4

    "4'

    -1"

    12'-2 1/2" 6'-8 5/8"

    8'-6

    3/4

    "8'

    -6 3

    /4"

    5'-10 5/8"

    7-1/2"

    1'-2

    7/1

    6"x

    1'-8

    5/1

    6"

    2'-0"

    14'-2 1/2"

    3'-6

    1/4

    "

    12'-2 1/2"

    2'-0

    "3'

    -7 3

    /4"

    FLR.EDGE

    ET 7

    ET 6

    ET 3

    WT

    7W

    T 6

    WT

    5W

    T 1

    NT 4NT 1

    WT

    2

    NT 5 NT 6NT 2

    BATHROOM MODULE NLT FLOOR PANEL

    CLOSET MODULE NLT FLOOR PANEL

    TINYHOME NLT FLOOR PANEL

    ET 5

    FLR.EDGE

    NT 3

    FLR.EDGE

    ET 4

    WT3

    ET 2

    FLR.

    EDGE

    ST 7ST 6

    WT

    4

    ST 5

    FLR.

    EDGE

    ST 4ST 3ST 2

    FLR.

    EDGE

    ST 1

    FLR.EDGE

    FLR.

    EDGE

    ET 1

    POST OUTLINES, TYP.

    0504

    03

    0102

    C

    A

    8/17

    /201

    7 2:

    16

    80% DD SET

    CONTACT: [email protected]

    06/23/2017

    EN CITY

    8 1

    LOT #107

    ADDRESS:

    TODD BEYREUTHER, P.E.

    04/24/2017

    DRAWN BY:

    FINAL CD SET

    DESCRIPTION

    100% CD SET

    CHECKED BY:

    5 2

    SHEET TITLE:

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    B

    TEAM NAME:

    [STREET]SPOKANE, WA [ZIP CODE]

    CONSULTANTS:

    11/15/2016

    05/12/2017

    08/10/2017100% CD SET CHANGES 2100% CD SET CHANGES 1

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    FINAL CHECKSET02/17/2017

    7 6 4 3

    DATEMARK

    LOT NUMBER:

    CLIENT:

    D

    C8FLOOR PANEL 02 (BM)

    B6

    A6

    D8FLOOR PANEL 01 (CM)

    D6FLOOR PANEL 04 (TH)

    SCALE: 1/4"=1'-0"MODULE FLOOR PLAN

    A3

    SCALE: 1/2=1'-0" SCALE: 1/2=1'-0"

    SCALE: 1/2=1'-0"FLOOR PANEL 03 (TH)

    SCALE: 1/2=1'-0"

    FLOOR PANEL 05 (TH)SCALE: 1/2=1'-0"

    S-103

    STRUCTURALFLOOR PLAN

    DGSA

  • ST 1

    NT 1

    ST 1

    WT

    5W

    T 1

    NT 1

    1-3/4" x 9-1/4" x 14' 9-15/16"LVL RAFTER (TYP.)

    1-3/4" x 9-1/4" x 6' 5-9/16"LVL

    1-3/4" x 3-1/2" x 5' 6-3/4"LVL TOP PLATE

    1-3/4" x 9-1/4" x 2' 11-1/2"LVL RAFTER

    ST 1

    1-3/4" x 9-1/4" x 5' 10-3/8"LVL

    NT 1 NT 5 NT 6

    ET

    2

    WT

    6

    1-3/4" x 9-1/4" x 10' 2-1/16"LVL RAFTER

    NT 1

    1-3/4" x 9-1/4" x 7' 10-15/16"LVL RAFTER

    1-3/4" x 3-1/2" x 5' 10"LVL TOP PLATE

    1-3/4" x 9-1/4" x 14' 9-15/16"LVL RAFTER (TYP.)

    1-3/4" x 9-1/4" x 4' 0-1/8"LVL

    NT 1

    ST 1

    NT 1 NT 1

    ST 1

    WT

    1

    NT 1

    ST 1

    NT 1

    ST 1 ST 5ST 1 ST 3ST 1

    NT 3

    ET 1

    ET 6

    WT

    7W

    T 4

    ET 3

    NT 1

    ST 6

    1-3/4" x 3-1/2" x 19' 10-3/4"LVL TOP PLATE

    1-3/4" x 9-1/4" x 9' 11-1/4"LVL RAFTER

    1-3/4" x 9-1/4" x 5' 11-3/16"LVL RAFTER

    1-3/4" x 9-1/4" x 1' 5"LVL RAFTER

    1-3/4" x 9-1/4" x 5' 4-1/16"LVL RAFTER

    1-3/4" x 9-1/4" x 6' 5-13/16"LVL

    1-3/4" x 9-1/4" x 14' 9-15/16"LVL RAFTER (TYP.)

    1-3/4" x 9-1/4" x 6' 5-9/16"LVL

    WT

    1W

    T 1

    WT

    1

    NT 1

    WT

    1W

    T 1

    NT 1

    WT

    1W

    T 1

    ET 3

    ET

    3E

    T 3

    ET 3

    ET 3

    WT

    2

    ET

    3ET

    2ET

    3ET

    3

    NT 1NT 1

    ST 1

    NT 1

    ST 1

    NT 1

    ST 4

    NT 1

    ST 2ST 1

    NT 4

    ST 1

    NT 2

    ET 3

    ET 4

    ET 5

    ET 7

    ST 1

    WT3

    FLR.EDGENT 1

    ST 1 ST 1 ST 1 ST 7

    1-3/4" x 3-1/2" x 14' 2-1/4"LVL TOP PLATE

    1-3/4" x 11-1/4" x 17' 0-5/16"LVL RIDGE BEAM

    ST 1

    1-3/4" x 9-1/4" x 10' 3-1/8" LVL RAFTER (TYP.)

    x6-3/8"4-3/8"x2'

    -8 1

    /2"

    2'-8

    1/2

    "2'

    -8 1

    /2"

    5' 7-13/16" x 1-3/4" x 9-1/4" LVL RAFTER2'

    -8 1

    /2"

    2'-8

    1/2

    "1'

    -2 1

    /8"

    3'-0 1/8"2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-8 1/2"

    6' 5-1/8" x 1-3/4" x 9-1/4"LVL RAFTER

    8' 8-7/16" x 1-3/4" x 9-1/4"LVL RAFTER

    2'-4 1/8"1'-9 1/2"2'-8 1/2"2'-8 1/2"2'-8 1/2"1'-8 3/4"1'-4 1/4"2'-6"

    2'-8 1/2"

    6' 1-9/16" x 1-3/4" x 9-1/4" LVL RAFTER

    2'-8 1/2"

    2'-8

    1/2

    "

    2'-8 1/2" 2'-8 1/2"

    2'-8

    1/2

    "2'-8

    1/2

    "2'

    -8 1

    /2"

    2'-8

    1/2

    "2'

    -8 1

    /2"

    2'-8

    1/2

    "

    6' 1-5/8" x 1-3/4" x 9-1/4"LVL RAFTER

    5' 7-1/16" x 1-3/4" x 9-1/4"LVL RAFTER

    6' 7-13/16" x 1-3/4" x 9-1/4"LVL RAFTER

    1'-2

    1/8

    "

    2'-8

    1/2

    "

    2'-8 1/2"2'-8 1/4" 2'-8 1/2"2'-8 1/2" 3'-9 1/2" 2'-0 1/4" 2'-8 1/2" 2'-8 1/2"

    6' 3-5/16" x 1-3/4" x 9-1/4" LVL RAFTER

    2'-8 1/2" 2'-1" 1'-7 1/2" 1'-2" 2'-9 9/16" 2'-9 9/16" 2'-9 9/16" 2'-4 9/16"

    2'-8

    1/2

    "

    2'-8 1/2"2'-8 1/2"1'-5 5/8"

    6' 5-1/8" x 1-3/4" x 9-1/4"LVL RAFTER

    2'-8

    1/2

    "2'

    -8 1

    /2"

    2'-8

    1/2

    "

    2'-3 15/16"

    6' 1-7/16" x 1-3/4" x 9-1/4" LVL RAFTER

    4'-1 1/8"2'-8 1/2"

    5' 7-13/16" x 1-3/4" x 9-1/4"LVL RAFTER

    6' 3-5/16" x 1-3/4" x 9-1/4" LVL RAFTER

    3' 8-1/8" x 1-3/4" x 9-1/4"LVL RAFTER

    5' 6-1/16" x 1-3/4" x 9-1/4"LVL RAFTER

    11' 0-13/16" x 1-3/4" x 9-1/4"LVL RAFTER (TYP.)

    2'-8

    1/2

    "2'

    -8 1

    /2"

    8' 4-1/16" x 1-3/4" x 9-1/4" LVL RAFTER (TYP.)

    2'-8

    1/2

    "

    3'-8 7/8"2'-10 3/4"

    4' 3-7/8" x 1-3/4" x 9-1/4"LVL RAFTER

    3'-2" 4'-1" 3'-9 1/2"

    3' 8-1/8" x 1-3/4" x 9-1/4"LVL RAFTER

    12' 10-9/16" x 1-3/4" x 11-1/4" LVL RIDGE BEAM

    11' 5-3/16" x 1-3/4" x 9-1/4" LVL RAFTER

    7' 1-13/16" x 1-3/4" x 9-1/4" LVL RAFTER

    11' 5-3/16" x 1-3/4" x 9-1/4"LVL RAFTER10' 2-7/16" x 1-3/4" x 9-1/4"LVL RAFTER6' 11-13/16" x 1-3/4" x 9-1/4"LVL RAFTER3' 9-3/16" x 1-3/4" x 9-1/4"LVL RAFTER

    13' 7-15/16" x 1-3/4" x 9-1/4" LVL RAFTER (TYP.)

    11/15/2016

    [STREET]SPOKANE, WA [ZIP CODE]

    05/12/2017

    80% DD SET

    CONSULTANTS:

    TODD BEYREUTHER, P.E.WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SET CHANGES 2100% CD SET CHANGES 1

    06/23/2017

    KATERRA INC.

    DRAWN BY:

    100% CD SETFINAL CHECKSET02/17/2017

    CHECKED BY:

    8 7 6 5 4 3 2 1

    04/24/2017

    DESCRIPTIONDATEMARK

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:U.S. DEPARTMENT OF ENERGY

    SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV

    LOT #107

    D

    A

    B

    C

    8/7/

    2017

    8:1

    5

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    A4A8CLUBHOUSE ROOF STRUCTURE PLAN TINY HOME ROOF STRUCTURE PLAN

    SCALE: 1/4"=1'-0"SCALE: 1/4"=1'-0" S-104

    ROOF STRUCTURE PLAN

    SA DG

  • 3/4" PLYWOOD (TYP)DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)

    NT 5NT 4NT 3

    6'-8 5/8"

    8'-2

    5/8

    "

    DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)

    1/2" PLYWOOD

    3/4" PLYWOOD (TYP)

    FLR.

    EDGE

    WT

    1W

    T 2

    WT3

    WT

    4W

    T 5

    NT 3NT 2NT 1FLR.EDGE

    8'-3

    1/4

    "

    5'-7 1/8"

    ADDRESS:

    EN CITY

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    [STREET]SPOKANE, WA [ZIP CODE]

    TEAM NAME:

    6 3

    DESCRIPTION

    DRAWN BY:

    CONTACT:

    4

    A

    WSU ENVIRONMENTAL HEALTH & SAFETY

    MARK

    1

    04/24/2017

    11/15/2016

    06/23/2017

    TODD BEYREUTHER, P.E.

    [email protected]

    2

    8/4/

    2017

    10:

    49

    100% CD SET CHANGES 1

    C

    5

    B

    D

    100% CD SET

    CLIENT:

    LOT #107

    7

    FINAL CHECKSET

    LOT NUMBER:

    KATERRA INC.

    SHEET TITLE:

    02/17/2017

    DATE

    CHECKED BY:

    CONSULTANTS:

    80% DD SET

    8

    100% CD SET CHANGES 205/12/2017

    A5SCALE: 1/2"=1'-0"

    A3BATHROOM MODULE FRAMING PLAN

    SCALE: 1/2"=1'-0"CLOSET MODULE FRAMING PLAN S-110

    TINYHOME MODULESFRAMING PLAN

    SA DG

  • ST 17WT 5

    NT 3

    WT 1

    NT 2ET 1 NT 17NT 16

    FLREDGE

    ET 2

    WT 2 ST 15

    1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST (TYP.)

    NT 9 FLREDGE

    FLREDGE

    ET 4

    ST 12ST 11ST 10ST 9ST 8ST 7

    NT 15FLR

    EDGE

    WT 3 ST 13

    FLREDGE

    NLT FLOOR PANEL

    ET 3 NT 10

    1-3/4" x 5-1/4" x 12' 2-3/8"LVL POST

    1-3/4" x 5-1/4" x 9' 1-3/8"LVL POST

    1-3/4" x 5-1/4" x 10' 7-7/8"LVL POST

    NT 7FLREDGE NT 8

    1-3/4" x 3-1/2" x 6' 4-7/8"LVL TOP PLATE

    NT 6ET 6

    WT 7 ST 16ST 1

    1-3/4" x 3-1/2" x 12' 2-1/2"LVL TOP PLATE

    1-3/4" x 3-1/2" x 11' 9-1/2"LVL TOP PLATE

    1-3/4" x 3-1/2" x 16' 2-1/4"LVL TOP PLATE

    1-3/4" x 5-1/4" x 8' 5-7/16"LVL POST (TYP.)

    NLT FLOOR PANEL

    NLT FLOOR PANEL

    1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST (TYP.)

    1-3/4" x 5-1/4" x 13' 8-13/16"LVL POST

    1-3/4" x 5-1/4" x 12' 2-3/8"LVL POST

    1-3/4" x 5-1/4" x 9' 1-3/8"LVL POST

    1-3/4" x 5-1/4" x 10' 7-7/8"LVL POST

    1-3/4" x 3-1/2" x 6' 5-1/16"LVL TOP PLATE

    ST 6ST 5WT 4 ST 4

    NT 14

    ST 3

    NT 13

    FLREDGE

    ET 7 NT 12

    ST 14 FLREDGE

    NT 11

    1-3/4" x 5-1/4" x 13' 8-13/16"LVL POST

    WT 6 ST 2

    1-3/4" x 3-1/2" x 5' 8-5/16"LVL TOP PLATE

    1-3/4" x 3-1/2" x 6' 4-13/16"LVL TOP PLATE

    1-3/4" x 5-1/4" x 11' 11-1/8"LVL POST

    1-3/4" x 5-1/4" x 9' 6-3/8"LVL POST

    1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST (TYP.)

    1-3/4" x 5-1/4" x 10' 2-5/16"LVL POST (TYP.)

    1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST

    1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST

    1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST

    1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST (TYP.)

    1-3/4" x 3-1/2" x 11' 9-1/2"LVL TOP PLATE

    NLT FLOOR PANEL

    NT 1 NT 5NT 4ET 5

    2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-8 1/2"1'-4 1/4"1'-8 3/4"2'-8 1/2"2'-8 1/2"2'-8 1/2"

    4 3/8"

    1'-9 1/2"2'-4 1/8"

    1'-1 1/2"

    2'-8 1/2"2'-8 1/2"2'-8 1/2"3'-0 1/8" 2'-8 1/2"2'-8 1/2"2'-8 1/2" 2'-8 1/2" 2'-8 1/2" 2'-8 1/2" 1'-2 1/8"

    2'-3 15/16"2'-4 9/16"2'-9 9/16"2'-9 9/16"2'-9 9/16"1'-2"1'-7 1/2"2'-1"

    1'-1 1/2"

    2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-0 1/4"3'-9 1/2"2'-8 1/2"2'-8 1/4" 2'-8 1/2"2'-8 1/2"2'-8 1/2"1'-2 1/8" 2'-8 1/2" 2'-8 1/2" 2'-8 1/2"

    4 3/8"

    06/23/2017

    TEAM NAME:

    SHEET TITLE:

    100% CD SET CHANGES 1

    TODD BEYREUTHER, P.E.

    100% CD SET CHANGES 2

    DESCRIPTION

    C

    KATERRA INC.

    MARK

    6

    DRAWN BY:

    4

    80% DD SET

    DATE

    8

    ADDRESS:

    FINAL CHECKSET

    WSU ENVIRONMENTAL HEALTH & SAFETY

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    LOT NUMBER:

    CHECKED BY:

    1

    11/15/2016

    3

    04/24/201705/12/2017

    5 2

    CONSULTANTS:

    [email protected]

    B

    7

    [STREET]SPOKANE, WA [ZIP CODE]

    EN CITY

    CONTACT:

    02/17/2017

    8/7/

    2017

    10:

    31

    100% CD SET

    D

    LOT #107

    A

    CLIENT:

    CLUBHOUSE WEST STRUCTURAL ELEVATIONSCALE: 1/4"=1'-0"

    A7CLUBHOUSE SOUTH STRUCTURAL ELEVATION

    SCALE: 1/4"=1'-0"

    A4

    SCALE: 1/4"=1'-0"CLUBHOUSE NORTH STRUCTURAL ELEVATION

    C4CLUBHOUSE EAST STRUCTURAL ELEVATION

    SCALE: 1/4"=1'-0"

    C7

    S-201

    CLUBHOUSESTRUCTURALELEVATIONSSA DG

  • FLR.EDGE

    1-3/4" x 5-1/4" x 9' 8-3/8"LVL STUD

    1-3/4" x 5-1/4" x 11' 4-1/4"LVL STUD 1-3/4" x 5-1/4" x ?

    LVL STUD

    NLT FLOOR PANEL

    1-3/4" x 5-1/4" x 13' 6-1/4"LVL STUD (TYP.)

    FLR.EDGE NT 1

    1-3/4" x 5-1/4" x 12' 10-1/2"LVL STUD

    ET 7

    1-3/4" x 5-1/4" x ?LVL STUD

    1-3/4" x 5-1/4" x 13' 11-1/4"LVL STUD (TYP.)

    1-3/4" x 3-1/2" x 5' 10" LVL TOP PLATE

    NLT FLOOR PANEL

    FLR.EDGENT 2NT 3NT 4NT 5NT 6

    FLR.EDGEET 6ET 5ET 4ET 3ET 2ET 1

    1-3/4" x 3-1/2" x 5' 6-3/4" LVL TOP PLATE

    2'-7 3/4"2'-8 1/2"2'-8 1/2"2'-8 1/2"3'-2"2'-6"2'-10 3/4"3'-8 7/8"4'-1" 2'-8 1/2"3'-8 3/4"

    FLR.EDGE

    1-3/4" x 5-1/4" x 8' 5-7/16"LVL STUD (TYP.)

    FLR.EDGEET 5ST 5ST 3 ST 4

    1-3/4" x 5-1/4" x 8' 5-7/16"LVL STUD (TYP.)

    ET 4 ET 3 ET 1ST 7

    NLT FLOOR PANEL

    ET 6ST 6FLR.EDGE

    1-3/4" x 3-1/2" x 14' 2-1/4" LVL TOP PLATE

    FLR.EDGE ST 1 ST 2

    1-3/4" x 3-1/2" x 19' 10-3/4" LVL TOP PLATE

    ET 2ET 7

    2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-7 3/4"

    4'-1"2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-8 1/2"1'-5 5/8" 3'-8 3/4"

    NLT FLOOR PANEL

    ADDRESS:

    C

    CONSULTANTS:

    11/15/2016

    [email protected]

    8/6/

    2017

    2:5

    5

    05/12/2017

    4

    04/24/2017

    DRAWN BY:

    TODD BEYREUTHER, P.E.

    [STREET]SPOKANE, WA [ZIP CODE]

    CONTACT:

    TEAM NAME:

    100% CD SET CHANGES 2100% CD SET CHANGES 1

    06/23/2017

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SETFINAL CHECKSET02/17/2017

    CHECKED BY:

    8 7 6 5

    EN CITY

    3 2 1

    80% DD SET

    DESCRIPTIONDATEMARK

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:U.S. DEPARTMENT OF ENERGY

    SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV

    LOT #107

    D

    A

    B

    SCALE: 1/4"=1'-0"

    TINYHOME SOUTH WALL FRAME ELEVATIONA8

    SCALE: 1/4"=1'-0"C3

    SCALE: 1/4"=1'-0" SCALE: 1/4"=1'-0"

    TINYHOME SOUTH WALL FRAME ELEVATION

    TINYHOME SOUTH WALL FRAME ELEVATION

    TINYHOME SOUTH WALL FRAME ELEVATION

    A3

    C8

    S-202

    TINYHOME STRUCTURAL ELEVATIONS

    SA XX

  • NT7 NT10 NT11 NT15 NT17NT14NT13NT9NT6NT5NT3 FLR.EDGENT16NT12NT8NT4NT1 NT2FLR.EDGE

    S503A6

    SIM

    B6S501

    SIM

    SIM

    S501C2

    SIM

    S501A4

    B4SIM

    S501

    ET 2 ET 6ET 3 ET 4 FLREDGEET 7ET 1FLR

    EDGE ET 5

    B4SIM

    S501

    B4SIM

    S501

    1

    MARK80% DD SET

    CONTACT:

    D

    SHEET TITLE:

    DESCRIPTION

    TODD BEYREUTHER, P.E.

    EN CITY

    8/9/

    2017

    12:

    04

    A

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    LOT NUMBER:

    DATE11/15/2016

    CONSULTANTS:

    [STREET]SPOKANE, WA [ZIP CODE]

    [email protected]

    TEAM NAME:

    C

    B

    LOT #107

    DRAWN BY:

    CLIENT:

    05/12/201704/24/2017

    ADDRESS:

    100% CD SET CHANGES 2100% CD SET CHANGES 1

    06/23/2017

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SETFINAL CHECKSET02/17/2017

    CHECKED BY:

    8 7 6 5 4 3 2

    SOLAR ENVELOPE

    T.O. HIGH WALL LVL TOP PLATE

    TYP. SILL HEIGHT

    T.O. FINISHED FLOOR

    9' 10-13/16"

    0' - 0"

    2' - 0"

    15' 3-1/2"

    5' - 6"

    GRADE

    18' - 0"

    GRADE

    18' - 0"SOLAR ENVELOPE

    0' - 0"

    T.O. HIGH WALL LVL TOP PLATE

    T.O. TYP. LVL TOP PLATE

    2' - 0"T.O. FINISHED FLOOR

    15' 3-1/2"

    9' 10-13/16"

    5' - 6"

    T.O. TYP. LVL TOP PLATE

    TYP. SILL HEIGHT

    A3STRUCTURAL SECTION B

    STRUCTURAL SECTION A

    SCALE: 1/4"=1'-0"

    A3SCALE: 1/4"=1'-0"

    S-301

    COMMUNITY BUILDINGSTRUCTURAL SECTION

    DGSA

  • ET 3 ET 6ET 2 ET 7 FLR.EDGEFLR.EDGE ET 4 ET 5ET 1

    A2SIM

    S501

    A6S502

    SIM

    B4SIM

    S501

    ST 6 ST 7ST 1FLR.EDGE ST 4 ST 5ST 3

    FLR.EDGEST 2

    C2

    A4

    S503

    SIM

    S501

    SIM

    A6

    SIM

    S501

    SIM

    S501B6

    80% DD SET

    1

    DESCRIPTION

    8/6/

    2017

    5:5

    5

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    MARK DATE

    CONSULTANTS:

    EN CITYTEAM NAME:

    B

    LOT #107

    CLIENT:

    SHEET TITLE:

    TODD BEYREUTHER, P.E.

    C

    [STREET]SPOKANE, WA [ZIP CODE]

    [email protected]

    CONTACT:

    ADDRESS:

    05/12/2017

    A

    D

    04/24/2017

    DRAWN BY:

    LOT NUMBER:

    11/15/2016

    100% CD SET CHANGES 2100% CD SET CHANGES 1

    06/23/2017

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SETFINAL CHECKSET02/17/2017

    CHECKED BY:

    8 7 6 5 4 3 2

    2' - 0"2' - 0"

    5' - 6"

    15' 3-1/2"

    GRADE

    9' 10-13/16"

    18' - 0"

    TYP. SILL HEIGHT

    0' - 0"

    T.O. FINISHED FLOOR

    GRADE

    SOLAR ENVELOPESOLAR ENVELOPE

    T.O. HIGH WALL LVL TOP PLATE T.O. HIGH WALL LVL TOP PLATE

    18' - 0"

    T.O. TYP. LVL TOP PLATE

    TYP. SILL HEIGHT

    T.O. TYP. LVL TOP PLATE

    T.O. FINISHED FLOOR

    0' - 0"

    5' - 6"

    15' 3-1/2"

    9' 10-13/16"

    SCALE: 1/4"=1'-0"A3

    STRUCTURAL SECTION BSTRUCTURAL SECTION AA3

    SCALE: 1/4"=1'-0"

    S-302

    TINYHOMESTRUCTURAL SECTION

    DGSA

  • 1-3/4" X 3-1/2" LVL TOP PLATE

    3/4" PLYWOOD

    1-1/2" X 3-1/2" PANEL TOP PLATE

    1-3/4" X 9-1/4" LVL (SKYLIGHT MODULE)3/4" PLYWOOD (SKYLIGHT MODULE)

    5-1/2" X 1-3/4" LVL POST

    3-7/8" NLT FLOOR PANEL

    5-1/2" X 1-3/4" LVL POST

    SIMPSON SDS25600 6" SDS SCREW

    1-3/4" X 3-1/2" LVL TOP PLATE

    11-1/4" X 1-3/4" LVL RAFTER (BEYOND)

    WALL PANEL3/4" PLYWOOD

    1-3/4" X 5-1/2" LVL POST (BEYOND)

    ROOF PANEL3/4" PLYWOOD

    SIMPSON SDS25600 6" SDS SCREW

    3-7/8" NLTFLOOR PANEL

    5-1/2" X 1-3/4" LVL POST (BEYOND)

    WALL PANEL3/4" PLYWOOD

    VARI

    ES

    DOUGLAS FIR1-1/2" X 3-1/2"

    1-3/4" X 9-1/4" LVL (SKYLIGHT MODULE)1-3/4" X 9-1/4" LVL RAFTER

    ROOF PANEL3/4" PLYWOOD

    SIMPSON SDS25600 2-1/2" SDS SCREW

    9-1/4" x 1-3/4" LVL RAFTER

    SIMPSON SDS25600 6" SDS SCREW

    5-1/2" X 1-3/4" LVL POST

    SIMPSON SDS25600 6" SDS SCR

    3/4" PLYWOOD

    5-1/2" x 1-3/4" STUD

    SDSW 3" SCREW1-3/4" x 5-1/2" LVL POST1-1/2" x 3-1/2" TYP.

    3/4" PLYWOOD

    1-3/4" x 9-1/4" LVL RAFTER

    1-3/4" X 3-1/2" LVL TOP PLATE

    SIMPSON SDS25600 6" SDS SCREW

    1-3/4" X 5-1/2" LVL POST

    VARI

    ES

    1-3/4" X 9-1/4" LVL RAFTER

    1-3/4" X 9-1/4" LVL (SKYLIGHT MODULE)

    SIMPSON SDS25600 6" SDS SCREW

    DOUGLAS FIR1-1/2" X 3-1/2"

    WALL PANEL3/4" PLYWOOD

    ROOF PANEL3/4" PLYWOOD

    5-1/2" X 1-3/4" LVL POST (BEYOND)

    9-1/4" x 1-3/4" RAFTER

    05/12/201704/24/2017

    100% CD SET CHANGES 2100% CD SET CHANGES 1

    06/23/2017

    CHECKED BY:

    8 7 6 5 4 3 2 1

    80% DD SET

    DESCRIPTIONDATEMARK

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:U.S. DEPARTMENT OF ENERGY

    SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV

    LOT #107

    D

    A

    B

    C

    8/8/

    2017

    5:0

    5

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    11/15/2016

    DRAWN BY:

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SETFINAL CHECKSET02/17/2017

    STUD TO FLOOR

    D8

    C4

    SCALE: 3"=1'-0"

    RAFTER TO POST

    C2

    A4

    D6

    SCALE: 3"=1'-0"

    SCALE: 3"=1'-0"PLAN: TALL WALL CORNER

    WALL / ROOF PANEL @ RAKE

    STUD TO RAFTER @ GUTTER

    SCALE: 3"=1'-0"

    TYP. WALL ASSEMBLY

    TYP. RAFTER TO SYLIGHT

    B8ROOF PANEL TO FRAME @ SKYLIGHT

    A6

    B4

    SCALE: 3"=1'-0"

    WALL TO FLOORA2

    SCALE: 3"=1'-0"

    STUD TO RIDGE BEAM

    B6

    SCALE: 3"=1'-0"

    SCALE: 3"=1'-0"

    SCALE: 3"=1'-0"

    SCALE: 3"=1'-0"

    SCALE: 3"=1'-0"

    SCALE: 3"=1'-0"

    WALL PANEL TO SKYLIGHT MODULEB2

    A8ROOF PANEL TO LVL JOIST S-501

    DETAILS

    DGMT

  • 1-3/4" x 9-1/4" LVL RAFTER

    3/4" PLYWOOD (TYP)

    1-3/4" x 9-1/4" LVL RAFTER

    1-1/2" x 5-1/2" WINDOW BUCK

    2'-1

    15/

    16"1'

    -9 1

    1/16

    "

    LOT NUMBER:

    7

    KATERRA INC.

    CLIENT:

    WSU ENVIRONMENTAL HEALTH & SAFETY

    FINAL CHECKSET02/17/2017

    CHECKED BY:

    8 5

    06/23/2017

    6 4 3 2 1

    80% DD SET

    DESCRIPTIONDATEMARK

    100% CD SET CHANGES 1100% CD SET CHANGES 2

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    100% CD SET

    LOT #107

    D

    A

    B

    C

    8/8/

    2017

    5:0

    5

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    11/15/2016

    DRAWN BY:

    04/24/201705/12/2017

    SHEET TITLE:

    LOOKING WEST @ SKYLIGHT MODULEA6

    SCALE: 3"=1'-0"

    SCALE: N/AAXON: SKYLIGHT MODULE

    C8

    S-502

    SKYLIGHT MODULE

    DGSA

  • 3/4" PLYWOOD (TYP)

    1-1/2" x 5-1/2" WINDOW BUCK

    1'-7

    15/

    16"

    2'-2

    1/8

    "

    DRAWN BY:

    11/15/2016

    05/12/201704/24/2017

    DESCRIPTION

    100% CD SET CHANGES 106/23/2017

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SET

    DATE

    FINAL CHECKSET

    CHECKED BY:

    8 7 6 5 4 3 2 1

    80% DD SET02/17/2017

    100% CD SET CHANGES 2

    MARK

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:U.S. DEPARTMENT OF ENERGY

    SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV

    LOT #107

    D

    A

    B

    C

    8/8/

    2017

    5:0

    5

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    TODD BEYREUTHER, P.E.

    CONSULTANTS:

    SCALE: N/A

    LOOKING NORTH @ SKYLIGHT MODULEC6

    SCALE: 3"=1'-0"

    AXON: SKYLIGHT MODULEC8

    S-503

    SKYLIGHT MODULE

    SA DG

  • WALL ASSEMBLY 05WALL ASSEMBLY 01

    WALL ASSEMBLY 04WALL ASSEMBLY 02

    FLOOR PANEL 01WALL ASSEMBLY 03

    1-1/2" x 3-1/2" DOUGLAS FIR LUMBER 1-1/2" x 3-1/2" DOUGLAS FIR LUMBER1-1/2" x 3-1/2" DOUGLAS FIR LUMBER

    1/2" PLYWOOD

    3/4" PLYWOOD

    1-1/2" x 3-1/2" DOUGLAS FIR LUMBER

    3/4" PLYWOOD

    3/4" PLYWOOD

    3/4" PLYWOOD

    1-1/2" x 3-1/2" DOUGLAS FIR LUMBER

    6'-9

    1/2

    "

    1'-2 7/16"

    2'-1"

    6'-9

    1/2

    "

    2'-1 1/2"

    5'-6 7/8"

    8'-1 3/4"

    7'-0

    1/2

    "

    4 1/4"

    2'-7 1/4"

    5'-10"

    2'-4 1/8"

    6'-5

    1/2

    "

    5'-7 5/8"

    2'-0 3/4"

    3'-3 7/8"

    2'-5"

    5'-1 3/8"

    4'-9 5/8"

    5 9/16"

    5'-2 1/8"

    1'-0 7/8"

    8'-3

    1/4

    "

    1'-10 3/4"

    7'-0

    1/2

    "

    2'-1 3/8"

    5'-0 5/8"

    3'-10"

    4'-11 7/8"

    7'-11"

    3'-0 3/8"

    7'-0

    1/2

    "

    5'-0 5/8"

    8'-3 1/4"

    1'-5 1/16"

    6'-5

    1/2

    "

    6'-9

    1/2

    "

    2'-9 1/16"

    4'-1 1/16"

    7'-0

    1/2

    "

    4'-11 1/8"

    7'-0

    1/2

    "

    10 5/8"

    1'-3 1/4"

    ADDRESS: [STREET]SPOKANE, WA [ZIP CODE]

    CONTACT:

    TODD BEYREUTHER, P.E.

    EN CITY

    05/12/2017

    DRAWN BY:

    11/15/2016

    CONSULTANTS:

    DESCRIPTION

    [email protected]

    2

    100% CD SET CHANGES 2100% CD SET CHANGES 1

    06/23/2017

    KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY

    100% CD SETFINAL CHECKSET02/17/2017

    CHECKED BY:

    8 7 6 5 4 3

    04/24/2017

    1

    80% DD SET

    DATEMARK

    SHEET TITLE:

    LOT NUMBER:

    CLIENT:U.S. DEPARTMENT OF ENERGY

    SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV

    LOT #107

    D

    A

    B

    C

    8/4/

    2017

    9:0

    6

    TEAM NAME:

    A5

    A5

    WALL ASSEMBLY 02

    SCALE: 1/2"=1'-0" SCALE: 1/2"=1'-0"

    A2

    SCALE: 1/2"=1'-0"A4

    A4SCALE: 1/2"=1'-0"

    TINYHOME BATHROOM MODULEB1

    WALL ASSEMBLY 01SCALE: 1/2"=1'-0"

    WALL ASSEMBLY 03

    SCALE: 1/2"=1'-0"

    WALL ASSEMBLY 04

    FLOOR ASSEMBLY 01

    SCALE: N/A

    A2WALL ASSEMBLY 05

    S-504

    TINYHOME BATHROOM MODULE

    STRUCTURAL DETAILSDGSA

  • WALL ASSEMBLY 06WALL ASSEMBLY 05WALL ASSEMBLY 09

    WALL ASSEMBLY TYPE 01WALL ASSEMBLY TYPE 08

    DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)3/4" PLYWOOD (2 SHEETS)

    3/4" PLYWOOD

    3/4" PLYWOOD

    DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)

    3/4" PLYWOOD3/4" PLYWOOD (2 SHEETS)

    DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)3/4" PLYWOOD

    3/4" PLYWOOD

    DOUGLAS FIR 1-1/2" x 3-1/2" (TYP) DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)3/4" PLYWOOD

    DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)

    3/4" PLYWOOD

    DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)

    DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)

    6'-1 1/8"

    1'-5 11/16"

    2'-11 5/16"

    4'-5"

    5'-8 7/8"

    7'-0

    1/2

    "

    6'-9

    1/2

    "

    7'-0

    1/2

    "

    6'-5

    1/2

    "

    2'-1 15/16"

    2'-5 7/16"

    3'-0 1/8"

    10 3/16"

    3'-3 5/8"

    3'-9 13/16"

    7'-0

    1/2

    "

    2'-5"

    7'-0

    1/2

    "

    6'-5

    1/2

    "

    1'-0 7/8"

    2'-1 1/2"

    2'-5"

    7'-0

    1/2

    "

    6'-5

    1/2

    "

    1'-0 5/8"

    2'-1 1/2"2'-1 1/2"

    1'-0 5/8"

    3'-1 5/16"

    2'-5"

    7'-0

    1/2

    "

    6'-5

    1/2

    "

    6'-0 3/8"

    1'-4 1/2"

    1'-8"

    7'-0

    1/2

    "

    7'-0

    1/2

    "

    1'-4 1/2"

    1'-8"

    6'-9

    1/2

    "

    1'-3"

    2'-9 15/16"

    2'-1

    1 3/

    4"

    10'-2

    1/2

    "

    7'-0

    1/2

    "2

    1/4"

    2'-2 3/16"

    2'-6 15/16"

    2'-11 7/16"

    7'-0

    1/2

    "

    6'-5

    1/2

    "

    7'-0

    1/2

    "

    1'-4 1/2"

    1'-8 3/4"

    6'-9

    1/2

    "

    1'-3"

    WALL ASSEMBLY TYPE 03

    WALL ASSEMBLY TYPE 01WALL ASSEMBLY TYPE 02

    WALL ASSEMBLY TYPE 09WALL ASSEMBLY TYPE 05

    WALL ASSEMBLY TYPE 04

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    CLIENT:

    TEAM NAME:

    LOT #107

    6

    D

    1

    [email protected]

    06/23/2017

    8

    8/7/

    2017

    2:0

    6

    WSU ENVIRONMENTAL HEALTH & SAFETY

    B

    5

    KATERRA INC.

    TODD BEYREUTHER, P.E.

    DESCRIPTION

    ADDRESS:

    MARK

    SHEET TITLE:

    LOT NUMBER:

    7 3

    100% CD SET CHANGES 1100% CD SET

    4

    C

    A

    FINAL CHECKSET

    100% CD SET CHANGES 2

    DATE

    02/17/2017

    CONSULTANTS:

    80% DD SET

    [STREET]SPOKANE, WA [ZIP CODE]

    CHECKED BY:

    EN CITY

    2

    CONTACT:

    11/15/2016

    DRAWN BY:

    04/24/201705/12/2017

    WALL ASSEMBLY 05WALL ASSEMBLY 01SCALE: 1/2" = 1'

    A6

    WALL ASSEMBLY 08SCALE: 1/2" = 1'

    C8

    SCALE: N/A

    SCALE: 1/2" = 1'

    A8

    SCALE: N/A

    CLOSET MODULE AXON NW

    CLOSET MODULE AXON SE

    A4 A3 A2

    C2

    C5A6SCALE: 1/2" = 1' SCALE: 1/2" = 1'

    WALL ASSEMBLY 07WALL ASSEMBLY 06

    WALL ASSEMBLY 09C4

    SCALE: 1/2" = 1'

    SCALE: 1/2" = 1'WALL ASSEMBLY 04WALL ASSEMBLY 03

    SCALE: 1/2" = 1'WALL ASSEMBLY 02

    A5SCALE: 1/2" = 1'

    S-505

    TINYHOME CLOSET MODULE

    STRUCTURAL DETAILSDGSA

  • NOTE:· AFTER CURED, REMOVE 2X4 EDGE &INSTALL HARDI PANELEDGE FINISH?(OR WE CAN JUST USE A PLYWOOD +HARDI PANEL PERIMETER?).

    SHIM AS REQUIREDTO ACHIEVE LEVEL SURFACE

    3-1/2" FLOWABLE FILL W/ 100 PSIBEARING STRENGTH AFTER

    3HR CURE TIME

    1-1/2" x 3-1/2"SPIKE & NAIL

    VAPOR BARRIERSTAPLED TO FORM

    10 MIL VAPOR BARRIER

    30" PTYP.

    3-1/2" FLOWABLE FILL10 MIL VAPOR BARRIERTOOLED CONTROL JOINT

    C2S-506

    SIM

    TOOLED CONTROL JOINT

    10 MIL VAPOR BARRIERWRAP TO FORMWORK

    3-1/2" FLOWABLE FILL1-1/2" x 3-1/2" FORMWORK

    PENCIL ROD ANCHOR- TO BE DRIVEN THROUGH

    AFTER FLOWABLE FILL HAS CURED

    SCALE: 1"=1'-0"

    SCALE: 1"=1'-0"

    C2FLOWABLE FORMWORK CONNECTION

    FLOWABLE FILL

    FLOWABLE FILL @ EDGE

    B2SCALE: 1"=1'-0"

    A2

    WSU ENVIRONMENTAL HEALTH & SAFETY

    80% DD SET

    KATERRA INC.

    06/23/2017

    TODD BEYREUTHER, P.E.

    4

    100% CD SET CHANGES 1

    56

    CONSULTANTS:

    3 2 1

    100% CD SET CHANGES 2

    DESCRIPTIONDATEMARK

    7

    8/7/

    2017

    2:4

    2

    C

    8

    B

    A

    CHECKED BY:

    D

    LOT #107

    02/17/2017

    TEAM NAME:

    ADDRESS:

    CONTACT:

    EN CITY

    [email protected]

    [STREET]SPOKANE, WA [ZIP CODE]

    U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017

    WWW.SOLARDECATHLON.GOV

    CLIENT:

    11/15/2016

    DRAWN BY:

    04/24/201705/12/2017

    FINAL CHECKSET

    LOT NUMBER:

    SHEET TITLE:

    100% CD SET

    S-506

    FLOWABLE FILL DETAILS

    BK XX

  • 12'-4 1/2"11'-9 3/4"

    15'-1

    1 1/

    2"

    6'-11 3/4"11 3/4"

    3'-1

    1 7/

    8"

    9'-11 1/4"

    11 3/4"12'-9 1/2"

    3'-1

    1 7/

    8"

    41'-11 1/2