Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
EN CITY
CLIENT:
05/12/2017
FINAL CD SET
LOT NUMBER:
11/15/2016
CONSULTANTS:
TODD BEYREUTHER, P.E.
[STREET]SPOKANE, WA [ZIP CODE]
04/24/2017
08/10/2017
CONTACT:
ADDRESS:
TEAM NAME:
5/2/
2017
9:0
0
C
B
A
D
LOT #107
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
DRAWN BY:
SHEET TITLE:
MARK DATE DESCRIPTION80% DD SET
12345678
CHECKED BY:
02/17/2017 FINAL CHECKSET100% CD SET
WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.
06/23/2017100% CD SET CHANGES 1100% CD SET CHANGES 2
G-001
COVER SHEET
TG MT
26
TODD BEYREUTHER, P.E.
100% CD SET CHANGES 1
MARK
8/17
/201
7 3:
25
EN CITY
7
D
100% CD SET CHANGES 2
02/17/2017
WSU ENVIRONMENTAL HEALTH & SAFETY
DESCRIPTION
CONTACT:
3
CLIENT:
11/15/2016
4
04/24/2017
SHEET TITLE:
TEAM NAME:
LOT #107
FINAL CD SET
80% DD SET
05/12/2017
8
DATE
100% CD SET
CHECKED BY:
CONSULTANTS:
C
LOT NUMBER:
08/10/2017
A
1
[STREET]SPOKANE, WA [ZIP CODE]
B
KATERRA INC.
06/23/2017
ADDRESS:
5
FINAL CHECKSET
DRAWN BY:
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
WINDOW
MISCELLANEOUS
E.F.
DWG.
GYP.
DRAIN
DRAWING
NEW
ELECTRICAL
MATL.
DOWN
GALV.
MILLWORK
DIA.
DOWNSPOUT
DETAILDC
DHW
DS.
CONT.
AND
CONTINUOUS OR CONTINUED
H.EX.
CEILING
HARDWARE
CTR.
DRN.
MANUFACTURER
MEMBRANE
TEMPERATURETMPY.
GROUND
INSULATION
T&G
TEMPORARY
INTERIOR
EQ.
ELASTOMERIC
INSTRUMENT
TRTD.TOUNGUE AND GROOVE
T.C. THERMOCOUPLE
TTEMP.
FLOOR
V.
TEMPERATURE
HEAT EXCHANGER
HOT&
CONC.
CLG.COLD WATER
DOUBLEDIRECT CURRENT
DTL.
GND.
DOMESTIC HOT WATERDIAMETER
DN.
OPNG.
GYPSUM
DW DISHWASHER
H.R.
ELEVATION
ELEC.EMBED.
KIT.
MEMB.
GAUGE
MECHANICAL
FOOTING
MATERIAL
METALMAIN DISTRIBUTION PANEL
GALVANIZED
FT.
GFCI
TEMPERED
MOUNTED
W/O
NO.
MISC.
WEATHER RESISTENT OUTLETS W/ COVER
WIN.W.H.
V.O.C.
VAPOR BARRIER
VERIFY IN FIELD
WATTSW/
WATERPROOF BARRIER
FLR.
WATER CLOSETWITH
FIXT.
FINISH
W.P. WATER PUMP
VERTICALVEHICLE
W.R.
MINIMUM
MLWK.MDP.
WITHOUT
WATER HEATER
W
FURNITURE
MECH.
GALLON
WEIGHT
NUMBER
ALTERNATE
LVR.
FAN COIL UNIT
ABV.
EQUIP.EQUAL
WOOD
kW
EMBEDDED
INT.
ELAST.
INSUL.
EXHAUST FAN
INSTR.INSTALL OR INSTALLATIONINST.INFORMATIONINFO.
HOT WATERH.W.
H.S.S. HARDWAREH.P. HEAT PUMPHT. HEIGHTHVAC HEATING, VENTILATION, & AIR CONDITIONING
VALVE
UNLESS NOTED OTHERWISEU.N.O.
UTIL. UTILITYTEMP.
GRADE
HWDR.H
GA.
CROSS LAMINATED TIMBERCLTCONCRETE
CEILINGCENTER
CW
DBL.
TREATEDT.S. TEMPERATURE SENSORTYP. TYPICAL
PTN. PARTITION
O/ OVEROVHD. OVERHEADO.C. ON CENTER
(E)OPENING
OPP. OPPOSITEOPR. OPERABLE
NOT TO SCALEN.T.S.
ABRV.
AFF
MAX.
ELEV.
KILLOWATT
ENERGY RECOVERY VENTILATOR
WD.
EXT.
LAVATORY
ALUM.
F.C.U.FLOOR DRAIN
AUTO.
LAV.
F.E.
BLOCKING
BOARD
CLG.
GAL
C
FURN.
V.B.
MTD.MTL.
ERV
GROUND FAULT CIRCUIT INTERRUPT
F.R.FIXTURE
BOTTOMBOT.
BUILDINGBLDG.BD.
AVERAGEAVG.AUTOMATIC
FACE OF FINISH
ALT.
KITCHEN
ALUMINUM
E.J.
LT.
F.O.F.
EXISTING
ALTERNATE CURRENT
EXPANSION JOINT
AC
EXTERIOR
FIN.
ABBREVIATION
LIGHT
F.D.FIRE EXTINGUISHER
ABOVE
LOUVER
EQUIPMENT
FOLDING
ABOVE FINISH FLOOR
(N)
W.C.
BLKG.
MAXIMUM
FIRE RATED
MFD.MFR.
COLD
HOME RUN
WP.B.
MANUFACTURED
FLDG.
GRD.
VOLATILE ORGANIC COMPOUND
FTG.
V.I.F.
WT.
VERT.VEH.
MIN.
FOOT OR FEET
N
ARCH SYMBOLS
NORTH ARROW
A101A1 A1
FLOOR PLENUM LAYOUT
A1
WINDOW TAG1T
A
101 FURNITURE, FIXTURE, EQUIPEMENT TAG
TINY HOUSE INTERIOR ELEVATION
WATER TRUCK AND FILL LOCATIONS
2'0'GRAPHIC SCALE
A
EMERGENCY GATHERING AREA
EGRESS PATH
I-503
101 FINISH TYPE TAGFIRE EXTINGUISHER
S.D.
F.E.
MATERIAL HATCHES
CASEWORK DETAILS
SITE LOGISTICS PLAN AND NOTES
O-601
PLYWOOD
HIGH DENSITY FOAM
BATT INSULATION
I-901
RIGID INSULATION
SOIL
STEEL
FIRST AID KIT
PLUMBING
OPERATIONS
O-907
P-001
L-106
O-103
P-101
O-602
L-102
O-104
P-102
O-801
8'
INTERIOR DETAILS
PLUMBING SUPPLY PLAN
CLUBHOUSE INTERIOR ELEVATIONSI-202
P-901
SHEET NAME
I-201
SHEET NUMBER
ADA TOUR ROUTEG-103
INTERIOR DESIGN PLAN
P-902
THREE-LINE DIAGRAM ROOF PV
G-101
G-002
PLUMBING SUPPLY ISOMETRIC CLUBHOUSE
G-001GENERAL
SHEET LIST
CODE ANALYSIS
MECH PLAN, SCHEDULE, NOTES
L-113
O-904
EMERGENCY EGRESS PLAN
FIRE SUPRESSION COVERAGE PLAN
MODULE LOCATION DIAGRAM
DESCRIPTION
SOLAR ENVELOPE COMPLIANCE ELEVATIONS - NORTH/SOUTHSOLAR ENVELOPE COMPLIANCE ELEVATIONS - EAST/WEST
FIRE DETECTION AND ALARM
LIQUID LOCATION & SPILL CONTAINMENT
SITE LANDSCAPE AND MATERIALS PLAN
F-101
ABRV.
WATER TRUCK AND EMPTYING LOCATIONS
SITE LAYOUT PLAN
PLANTER MODULE PLACEMENT PLAN
E-603
F-102
SQUARE FOOTAGE COMPLIANCE PLAN
SITE IRRIGATION PLAN
SITE PLANT LIST
FIRE PROTECTION
MODULE SETTING PLAN - WET AREAS/UTILITY
ENLARGED GROUND CONTACT PLAN
COVER SHEET
ENLARGED GROUND CONTACT PLAN
G-003
TINY HOUSE INTERIOR
G-102
ENLARGED GROUND CONTACT PLANENLARGED GROUND CONTACT PLAN
PLUMBING NOTES, SYMBOLS, ABRV, & SCHEDULE
SHEET NUMBER
ELECTRICAL
SHEET NAME
ASSEMBLY SEQUENCE SITE
ENLARGED GROUND CONTACT PLAN
I-102
SOLAR PANEL MOUNTING DETAILSA-504A-503
MODULAR DECK DETAILS
PLUMBING DRAINAGE, WASTE, AND VENT PLAN
S-505S-506
GREEN WALL DETAILSA-401A-501A-502
PLANTER DIAGRAM
A-305A-304
A-203
A-201
ARCHITECTURALA-101
FLOWABLE FILL INSTALLATION AND REMOVAL
PLUMBING SUPPLY ISOMETRIC TINY HOUSE
M-101
A-103LOFT PLANROOF PLAN
A-204
A-302A-301
TINYHOME MODULES FRAMING PLAN
S-504S-503 SKYLIGHT MODULE DETAILSS-502
TINYHOME BATHROOM MODULE STRUCTURAL DETAILS
O-102
S-101
TINYHOME CLOSET MODULE STRUCTURAL DETAILS
M-201
O-101
TINYHOME STRUCTURAL SECTION
MECHANICAL
L-501
S-302S-301
S-501
S-110
S-202
CONCRETE
S-201
SITE ELEVATIONS SOUTH/NORTH
ROOF STRUCTURE PLAN
CLT HATCH
S-104STRUCTURAL FLOOR PLAN
S-102 GEOFOAM FOUNDATION PLAN
SITE ELEVATIONS EAST/WEST
P-904
EGRESS AND ADA SYMBOLS
STRUCTURAL DETAILS
CLUBHOUSE BUILDING SECTIONS
STRUCTURAL
SMOKE DETECTOR
E-001
CLUBHOUSE STRUCTURAL ELEVATIONS
L-701
101'
L-301
TINY HOUSE BUILDING SECTIONS
PLANTER SECTIONS
4'
L-302 PLANTER SECTIONS
L-114
WALL TYPE
P-903
L-112L-111
A1
CLUBHOUSE STRUCTURAL SECTION
TINY HOUSE ELEVATIONS
L-107
INTERIOR ELEVATION TAG
L-105L-104L-103
01
L-101LANDSCAPE
TINYHOME STRUCTURAL ELEVATIONS
E-101
SHEET LIST, ABBREVIATIONS, SYMBOLS, & HATCHES
PLUMBING WASTE ISOMETRIC CLUBHOUSE
G-202
TINY HOUSE WALL SECTIONS
CLUBHOUSE ELEVATIONS
E-102
G-201
LIFT WEIGHT CALCULATIONS
L-108SITE PLANTING PLAN
L-110
H-101
O-906
S-103
HAZARD
FLOOR FINISH PLAN
INTERIOR DETAILSI-501
CLUBHOUSE WALL SECTIONS
SKYLIGHT MODULE DETAILS
A-303
AC POWER PLAN
CIVIL
TINY HOUSE STAIR SECTIONS
FLOOR PLAN
C-101
A-102
LOCATION PLAN
ENVELOPE DETAILS
A-202
SITE SECTIONSA-306
FALL PROCTECTION PLAN/FALL ARREST SYSTEMS
ENVELOPE DETAILS
SINGLE-LINE DIAGRAM AND ELECTRICAL PANEL SCHEDULE
I-103
ELECTRICAL NOTES, SYMBOLS, ABRV, & SCHEDULE
DISASSEMBLY SEQUENCE SITE
ABRV.
PLUMBING WASTE ISOMETRIC TINY HOUSE
DESCRIPTION
A-601
CLUBHOUSE MECHANICAL COMPARTMENT ELEVATIONS
INTERIORSI-101
ABBREVIATIONS
A-505
SIM
A101
AREA TAG
E-601
FLOWABLE FILL DETAILS
CALLOUT TAG
SECTION TAG
CENTER LINE
I-501
A101
GREENWALL DETAILS
A1
A1
100ROOM NAME
REFLETED CEILING PLAN W/ WIRING
GROUND CONTACT PLANDECK FRAMING AND PATTERN
GRID TAG1
TINY HOUSE WALL SECTIONS
ABRV.
REVISION TAG
EXTERIOR ELEVATION TAG
DESCRIPTION
A1A101
1
DOOR TAG
WINDOW & DOOR SCHEDULE
TRUCK ROUTE
G-002
SHEET LIST, ABREVIATIONS,
SYMBOLS, & HATCHESTG TG
MAT'L FIN MAT'LMAT'L FIN FIN MAT'LFLOOR N. WALL
NOTE: SEE EXTERIOR ELEVATIONS FOR EXTERIOR FINISHES.
BASE CEILING REMARKSLOCATION
*SEE INT. ELEVS.
*SEE INT. ELEVS.
*SEE INT. ELEVS.
CC
FINST-1
S. WALLMAT'L
ST-1ST-1
W. WALL
ST-1
ST-1
CLTCLT
E. WALL
CBL
CLT
T-2CLTCLTCLTCLT
CCST-1N/AST-1ST-1*ST-1ST-1ST-1ST-1
PLYCLTN/A
T-2
FINISH SCHEDULE
MAT'L
CC
SLAT
ST-1
CLTCLT
ST-1CCST-1ST-1*ST-1N/AST-1N/A
PLYCLTCLTCLTCLT*
CLTCLT
FIN
CLT
CCST-1N/AST-1ST-1*ST-1N/AST-1ST-1
PLYCLTN/ACLTCLT*CLTCBLCLTCLT
CC*CC*ST-1*ST-1ST-1ST-1ST-1
PLYCLTCLT*CLT*CLT
ST-1
BLDG
SEALSEAL
SLAT
SEAL-
*SEALSEALCCSEALSEAL
CLTT-2T-1T-1T-1T-2T-1CLTT-1T-1
-
N/A*N/AN/AN/AT-2N/AN/A
CC
N/A
MECHBATHDININGKITCHENLIVINGBATHHALLLOFTKITCHENLIVING
CLUB.
T. H.
CLT
CC
CLTCLT
MAT'L
CLT
CLTCLT
CLT
ST-1
ROOM FIN FIN
CODE ANALYSISSCALE: 1/4"=1'-0"
A8
MARK
SHEET TITLE:
[STREET]SPOKANE, WA [ZIP CODE]
LOT NUMBER:
CLIENT:
TODD BEYREUTHER, P.E.
FINAL CD SET
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
LOT #107
CONSULTANTS:
100% CD SET CHANGES 2100% CD SET CHANGES 1
D
06/23/2017
KATERRA INC.
A
11/15/2016
WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SET
B
FINAL CHECKSET02/17/2017
C
DRAWN BY: CHECKED BY:
8
5/9/
2017
5:4
5
7 6
TEAM NAME:
04/24/2017
5 4
ADDRESS:
3 2
CONTACT:
05/12/2017
1
80% DD SET
EN CITY
DESCRIPTIONDATE
08/10/2017
G-003
CODE ANALYSIS
TG MT
COMMUNITY BUILDING:
COMMUNITY BUILDING UNCONDITIONED SF:
TINY HOUSE:
TOTAL GROSS SF:
TOTAL NET SF:
OUTDOOR BUILT AREA:
TOTAL BUILT AREA(TOTAL GROSS+OUTDOOR):
682 SF
16 SF
330 SF
1012 SF
996 SF
1491 SF
2503 SF
SQURE FOOT CALCULATIONS
05/11/2017 REV. 1
SCALE: 1/4"=1'-0"SQUARE FOOTAGE COMPLIANCE PLAN
A8
N
LOT NUMBER:
CLIENT:
CONSULTANTS:
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
LOT #107
11/15/2016
DRAWN BY:
D
100% CD SET CHANGES 2100% CD SET CHANGES 1
A
06/23/2017
KATERRA INC.
B
WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SET
C
04/24/2017FINAL CHECKSET02/17/2017
7/11
/201
7 4:
07
CHECKED BY:
8
TEAM NAME:
05/12/2017
7 6
ADDRESS:
5 4
CONTACT:
08/10/2017
3
EN CITY
80% DD SET
DESCRIPTION
2 1
DATE
[STREET]SPOKANE, WA [ZIP CODE]
MARK
SHEET TITLE:
TODD BEYREUTHER, P.E.
FINAL CD SET
CLUBHOUSE
TINY HOUSE
UNCONDITIONED
ELECTRIC VEHICLE
A
B
C
7/11
/201
7 4:
07
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
D
TODD BEYREUTHER, P.E.
CONSULTANTS:
11/15/2016
DRAWN BY:
04/24/201705/12/2017
08/10/2017 FINAL CD SET100% CD SET CHANGES 2100% CD SET CHANGES 1
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SETFINAL CHECKSET02/17/2017
CHECKED BY:
8 7 6 5 4 3 2
06/23/2017
1
80% DD SET
DESCRIPTIONDATEMARK
SHEET TITLE:
LOT NUMBER:
CLIENT:U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV
LOT #107
G-101
SQUARE FOOTAGECOMPLIANCE
PLANBK TG
TGMT1
REV. 105/11/2017
0' 2' 4' 8' N
A8EMERGENCY EGRESS PLAN
FINAL CD SET
100% CD SET CHANGES 106/23/2017
KATERRA INC.
100% CD SETFINAL CHECKSET02/17/2017
CHECKED BY:
8 7 6 4 3 2 1
80% DD SET
DESCRIPTIONDATEMARK
5
SHEET TITLE:
LOT NUMBER:
CLIENT:U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV
LOT #107
D
A
WSU ENVIRONMENTAL HEALTH & SAFETY
B
C
7/11
/201
7 5:
03
100% CD SET CHANGES 2
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
CONSULTANTS:
11/15/2016
DRAWN BY:
04/24/201705/12/2017
08/10/2017
84'
145'
168'
C
A
B
EMERGENCY GATHERING AREA
EMERGENCY GATHERING AREA
G-102
EMERGENCY EGRESS PLAN
TOUR ENTRANCE
3'-0"
3'-0
"
3'-0"
3'-0
"
3'-0"
3'-0
"
3'-0
"
3'-0
"3'
-0"
3'-0"
TABLE AND CHAIRS TO BE MOVED OUT OF 3'-0" CLEAR PATH PRIOR TO TOUR OPENING AND REMAIN UNTIL END OF TOUR.
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
DRAWN BY:
CLIENT:
CONSULTANTS:
04/24/2017
11/15/2016
LOT NUMBER:
DATE
SHEET TITLE:
08/10/2017
EN CITY
CONTACT:
ADDRESS:
TEAM NAME:
7/13
/201
7 11
:50
C
B
A
D
FINAL CD SET
MARK
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
DESCRIPTION80% DD SET
12345678
CHECKED BY:
02/17/2017 FINAL CHECKSET100% CD SET
WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.
06/23/2017100% CD SET CHANGES 1100% CD SET CHANGES 2
LOT #107
05/12/2017
ADA TOUR ROUTEA7
N0' 2' 4' 8'
SCALE: 1/4"=1'-0" G-103
ADA TOUR ROUTE
TGMT
78'-0"
78'-0"
0'
0'
4' 8'2'
4'2' 8'
SCALE: 1/4"=1'-0"
GRADE
5' - 6"
2' - 0"T.O. FINISHED FLOOR
16' - 6 3/8"
SOLAR COMPLIANCE SOUTH ELEVATIONSCALE: 1/4"=1'-0"
A8
SOLAR ENVELOPE
18' - 0"
0' - 0"
5' - 6"
T.O. ROOF
T.O. CLT WALL
SOLAR COMPLIANCE NORTH ELEVATION
TYP. SILL HEIGHT
T.O. ROOF16' - 6 3/8"
GRADE
T.O. FINISHED FLOOR
C8
T.O. CLT WALL
0' - 0"
2' - 0"
11' 0-5/8"
18' - 0"
TYP. SILL HEIGHT
11' 0-5/8"
SOLAR ENVELOPE
LOT #107
D
A
C
8/3/
2017
12:
27
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
CONSULTANTS:
B
11/15/2016
DRAWN BY:
04/24/2017
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
05/12/2017
08/10/2017 FINAL CD SET06/23/2017
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SETFINAL CHECKSET02/17/2017
8 7 6 5 4 3
CHECKED BY:
2 1
80% DD SET
DESCRIPTIONDATEMARK
100% CD SET CHANGES 1100% CD SET CHANGES 2
SHEET TITLE:
LOT NUMBER:
CLIENT:
G-201
SOLAR COMPLIANCEELEVATIONS
SOUTH/NORTHSA TG
11' 0-5/8"
SOLAR COMPLIANCE WEST ELEVATION
TYP. SILL HEIGHT
18' - 0"
T.O. FINISHED FLOOR
8'
GRADE
SOLAR ENVELOPE
0'
0' - 0"
2'0' 4'
2' - 0"
TYP. SILL HEIGHT
5' - 6"
SCALE: 1/8"=1'-0"
SOLAR ENVELOPE
SCALE: 1/8"=1'-0" 4'
T.O. FINISHED FLOOR
2'
T.O. ROOF
T.O. ROOF
T.O. CLT WALL
A7
18' - 0"
16' - 6 3/8"
11' 0-5/8"
5' - 6"
B7
16' - 6 3/8"
0' - 0"
T.O. CLT WALL
GRADE
8'SOLAR COMPLIANCE EAST ELEVATION
2' - 0"
LOT #107
D
A
C
8/3/
2017
12:
27
TEAM NAME:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
ADDRESS:
CONSULTANTS:
11/15/2016
DRAWN BY:
B
04/24/201705/12/2017
08/10/2017
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
FINAL CD SET06/23/2017
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SETFINAL CHECKSET02/17/2017
8 7 6 5 4 3 2 1
CHECKED BY:
80% DD SET
DESCRIPTIONDATEMARK
SHEET TITLE:
LOT NUMBER:
100% CD SET CHANGES 1100% CD SET CHANGES 2
CLIENT:
60'-0"
60'-0"
G-202
SOLAR COMPLIANCEELEVATIONSEAST/WEST
SA TG
GREYWATER TREATMENT
SYSTEM
WASTE TANK SUPPLY TANK
A7SCALE: 1/4"=1'-0"LIQUID LOCATION AND SPILL CONTAINMENT PLAN
05/12/2017
08/10/2017 FINAL CD SET
100% CD SET CHANGES 106/23/2017
KATERRA INC.
100% CD SETFINAL CHECKSET02/17/2017
8 7 6 5 4 3 2
80% DD SET
DESCRIPTIONDATE
SHEET TITLE:
LOT NUMBER:
CLIENT:U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV
LOT #107
D
A
B
C
7/13
/201
7 3:
11
MARK
TEAM NAME:
ADDRESS:
CONTACT:
1
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
CONSULTANTS:
CHECKED BY:
11/15/2016
WSU ENVIRONMENTAL HEALTH & SAFETY
DRAWN BY:
100% CD SET CHANGES 2
04/24/2017
H-101
LIQUID LOCATION& SPILL
CONTAINMENTTGAA
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
CLIENT:
CONTACT:
ADDRESS:
6
80% DD SET
DATE
LOT NUMBER:
B
A
TEAM NAME:
2/23
/201
7 9:
17
02/17/2017
7 3 1
100% CD SET CHANGES 2
DESCRIPTION
SHEET TITLE:
MARK
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
100% CD SET
LOT #107
D
C
WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.
06/23/2017100% CD SET CHANGES 1
FINAL CHECKSET
CHECKED BY:
8 5 4 2
FINAL CD SET08/10/2017
05/12/201704/24/2017
DRAWN BY:
11/15/2016
CONSULTANTS:
TODD BEYREUTHER, P.E.
114
60TH AVE (78' R.O.W.)
107WSU105103
RICH
FIEL
D ST
REET
101
102
UNLOADING LANE
104 106 108
109
SALI
DA S
TREE
T
111
PROGRAM SPACE
RAIL STOP
113
ONE WAY TRAVEL LANE
PARK
SOLAR COVERED PARKING LOT
110
PANASONIC APARTMENT COMPLEX
112
DIA LAND
UNLOADING LANE
LOCATION PLANSCALE: 1/64"=1'-0"
A8
N0' 64' 128'32'
C-101
LOCATION PLAN
TGDJ
BASELINE B
BASE
LINE
A
PRESSURE TANK
HEAT EXCHANGE UNIT
PLANTER
PLANTER
HEAT EXCHANGE UNIT
IMBER GREY WATERTREATMENT SYSTEM
COLLECTION BASIN
ENTRYWAY PLANTER
ENTRY RAMP (1:12 SLOPE)
ENTRY RAMP (1:20 SLOPE)
DOMESTIC WATERSUPPLY TANK PLANTER
GREY WATERSTORAGE TANK PLANTER
EXIT RAMP (1:12 SLOPE)
EXIT RAMP (1:20 SLOPE)
3. ALL ANGLES ARE 90 OR 45 DEGREES UNLESSOTHERWISE NOTED.
2. All DIMENSIONS ARE TO AND FROM FACE OF WALL,CENTERLINE, OR BASELINE OR ARCHITECTURALGRIDLINE UNLESS OTHERWISE NOTED.
1. THIS SHEET SHOWS LAYOUT OF ALL DESIGNEDELEMENTS. FOR ELEVATION INFORMATION REFER TOSHEET L-104 (SITE GRADING AND DRAINAGE PLAN)
REFERENCE KEY NOTES:
SHEET KEY NOTES:
GENERAL SHEET NOTES:
LEGEND:
DRAWN BY:
CLIENT:
DESCRIPTION
FINAL CD SET
SHEET TITLE:
DATE
08/10/2017
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
05/12/2017
CONSULTANTS:
A
D
LOT #107
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
C
04/24/2017
EN CITY
MARK
CONTACT:
8/15
/201
7 3:
32
80% DD SET
1
ADDRESS:
5 48 67
B
CHECKED BY:
02/17/2017 FINAL CHECKSET100% CD SET
WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.
06/23/2017100% CD SET CHANGES 1100% CD SET CHANGES 2
3
TEAM NAME:
LOT NUMBER:
2
11/15/2016
L-301A3
A3
L-501
L-501
A8
C5
L-501
SITE MATERIALS PLANSCALE: 1/4"=1'-0"
A8
A3L-302
A6L-302
L-301A6
L-101
ELECTRIC CARPARKING
PRIVATE DECK
PATIO OUTDOORDINING
SITE LANDSCAPE AND MATERIALS PLAN
MSNM
P.O.B
BASE
LINE
A
BASELINE B
1' 1-1/4"24
'-9 1
/2"
33'-6
"
18'-5 3/4"
4'-1
1 1/
2"
8'-1
0 1/
2"
39'-6 1/2"10
'-6"
15'-1
1 1/
2"
x
FINAL CHECKSET
5
WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SET
CHECKED BY:
6
06/23/2017
KATERRA INC.
05/12/2017
CLIENT:
B
02/17/2017
LOT #107
7
C
100% CD SET CHANGES 1
08/10/2017
DRAWN BY:
11/15/2016
CONSULTANTS:
TODD BEYREUTHER, P.E.
[STREET]SPOKANE, WA [ZIP CODE]
EN CITY
CONTACT:
ADDRESS:
TEAM NAME:
8/15
/201
7 3:
43
D
8
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
A
FINAL CD SET100% CD SET CHANGES 2
04/24/2017
LOT NUMBER:
SHEET TITLE:
MARK DATE DESCRIPTION80% DD SET
1234
P.O.B
GENERAL SHEET NOTES:
PROPERTY LINE
REFERENCE KEY NOTES:
1. THIS SHEET SHOWS LAYOUT OF ALL DESIGNED ELEMENTS. FOR ELEVATION INFORMATION REFER TO SHEET.
LEGEND:
2. ALL DIMENSIONS ARE TO AND FROM FACE OF WALL, CENTERLINE, OR BASELINE OR ARCHITECTURAL GRIDLINE UNLESS OTHERWISE NOTED.
SHEET KEY NOTES:
3. ALL ANGLES ARE 90 OR 45 DEGREES UNLESS OTHERWISE NOTED.
DESCRIPTION:
LEGEND:
BASELINE
ALIGN FACES
BUILDING SETBACK
POINT OF BEGINNINGAT THE SOUTHEAST CORNER OF THE COMMUNITY BUILDING
8'
A74'2'0' N
SCALE: 1/4"=1'-0"SITE LAYOUT PLAN L-102
SITE LAYOUT PLAN
TGSA
BASE
LINE
A
BASELINE B
A6A110
SIM
A6SIM
A112
SIM
SIM
A114A6
A113
A111A6
SIMA5
30'-11 1/4"
10'-0
"
3'-2
5/8
"
33'-2
1/2
"
19'-7 3/8"
10'-0
"
17'-9 3/4"
38'-5 1/4"
20'-7 1/2"
22'-5
15/
16"
10'-0
"7'
-6"
14'-1
1 15
/16"
7'-6
1/2
"
DESCRIPTION:
-ALL PIERS WILL UTILIZE A SADDLE TOPFOR SUPPORT OF DECK MODULES (PART # 238)-ALL PIERS TO BE PLACED ON 1/2" PLYWOOD
P5
8
CENTRAL PIERS INC - 14" PERIMETER DECK PIERPART #7
CENTRAL PIERS INC - SADDLE TOP PIER TOPPART #238
CENTRAL PIERS INC - 4" PERIMETER DECK PIERPART #38
17
S2
2
3 CENTRAL PIERS INC - 6" STANDARD DECK PIERPART #39
CENTRAL PIERS INC - 8" STANDARD DECK PIERPART #41
X
QUANTITY
CENTRAL PIERS INC - 6" PERIMETER DECK PIERPART #40
CENTRAL PIERS INC - 10" PERIMETER DECK PIERPART #3
P6
NOTES:
P4
CENTRAL PIERS INC - 14" STANDARD DECK PIERPART #6
CENTRAL PIERS INC - 12" PERIMETER DECK PIERPART #5
CENTRAL PIERS INC - 10" STANDARD DECK PIERPART #1
S1
88
#
CENTRAL PIERS INC - 8" PERIMETER DECK PIERPART #42
5
1
S3
8
SYMBOL
S4
P1
P2
4
1
39
P3
P
P
4
6
5
P
P
5
S
P
1
P
5
1
5
4
6
P
6
555
5
5P
P
P
P
4
3
5
S 1 S S
P
5
S S
P
1 S
P
P
P
S
S
P
P
P
P
S
P
P
5
1
4
2
55
555555
5
2
5
P
5
P
6
2
6
P
3
S
5
S
5
1
5
15
P
5
P
5
P
P
P
1
P
PP
1
PPP
1 1 1
P 2
1
P
1 1 1
P
2
1
2
P
3
P
4
P
5
P PP
5
P
5
P
5
S
1
P
5
S
5
S
5
1
5
P
5
P
2
PPP
P
P
5
PPP
P
1
P
P
S S S
P 11P
1P
4' N2' 8'0'
SHEET TITLE:
LOT NUMBER:
TODD BEYREUTHER, P.E.
CLIENT:U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV
CONSULTANTS:
LOT #107
D
100% CD SET CHANGES 2
DRAWN BY:
100% CD SET CHANGES 106/23/2017
A
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
B
08/10/2017
100% CD SET
C
FINAL CHECKSET04/24/201702/17/2017
CHECKED BY:
8/15
/201
7 4:
31
8 7
TEAM NAME:
6 5
ADDRESS:
11/15/2016
4 3
CONTACT:
2 1
EN CITY
80% DD SET
DESCRIPTION
DATE
[STREET]SPOKANE, WA [ZIP CODE]
05/12/2017
MARK
FINAL CD SET
A8SCALE: 1/4"=1'-0"Ground Contact Plan
5328'
L-103
GROUND CONTACT PLAN
TGSA
BASE
LINE
A
BASELINE B
15
18
4
1
1
1
16
1
17 1718 18
7
10
11
12
11111 1 1 1
1111
2
2
2
1
2
8
2 1 1 1 2 1 1 2
2
3 3
5
9
1313
16
14
6' 1-1/8" X 3' 7-7/8" RAMP
#
6' 1-1/8" X 3' 7-7/8" MODULE
MODULE TYPES LEGEND:
1. THIS SHEET SHOWS LAYOUT OF ALL DESIGNED ELEMENTS. FOR ELEVATION INFORMATION REFER TO SHEET
5' 0" X 5' 1-7/8" RAMP
3' 0" X 5' 1-7/8" MODULE
SHEET KEY NOTES:
4' 0" X 5' 1-7/8" MODULE
3' 7-3/4" X 1' 2-13/16" MODULE
GENERAL SHEET NOTES:
3. ALL ANGLES ARE 90 OR 45 DEGREES UNLESSOTHERWISE NOTED.
1. DECK PATTERN CONTINGENT ON GRID ORIENTED FROM TOP LEFT TO BOTTOM RIGHT. EXAMPLE: (DOWN 12, OVER 10)
2' 5-3/4" X 5' 1-7/8" HALF MODULE
5' 0" X 5' 1-7/8" STANDARD MODULE
5' 0" X 5' 1-7/8" RAMP
2. ALL DIMENSIONS ARE TO AND FROM FACE OFWALL, CENTERLINE, OR BASELINE OR ARCHITECTURAL GRIDLINE UNLESS OTHERWISE NOTED.
TINY HOME ENTRY MODULE
3' 9" X 7' 6" MODULE
3' 9" X 3' 2-1/2" MODULE
5' 0" X 3' 9" MODULE
2' 6-1/2" X 5' 1-7/8" MODULE
QT
CLUBHOUSE ENTRY MODULE
1' 4-7/8" X 5' 0" MODULE
3' 7-3/4" X 1' 2-5/8" MODULE
2' 5-3/4" X 3' 9" HALF MODULE
REFERENCE KEY NOTES:
DESCRIPTION:
KATERRA INC.
8/15
/201
7 3:
51
11/15/2016
CHECKED BY:
EN CITY
8
TODD BEYREUTHER, P.E.
CONSULTANTS:
WSU ENVIRONMENTAL HEALTH & SAFETY
CONTACT:
DATE
100% CD SET CHANGES 1100% CD SET CHANGES 2
DESCRIPTION
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
4
LOT NUMBER:
MARK
7
DRAWN BY:
CLIENT:
D
TEAM NAME:
B
SHEET TITLE:
80% DD SET
100% CD SET
06/23/2017
02/17/2017
56
[STREET]SPOKANE, WA [ZIP CODE]
3 2
C
1
ADDRESS:
04/24/2017
A
05/12/2017
FINAL CHECKSET
08/10/2017
LOT #107
FINAL CD SET
7
01
777
8
7
8
6
3 109
4
02
8654
3
66
08
66
5
01
62 6
23
2
76
7
01
8
6
10
01
5
01
5
01
7
11
7
12
7
5
01
1
10
10
01
9
10
1312
1111
9
01
11
15
18
12
02
01
1212
17
12
12
8
7
01
7 6
6
5 4
5
3
10
7
4
7
5
1
4
12
3
1
4
11
10
1
10
10
1
7
8
11
02
1
9 10
2
88
9
1
87
1
109
3
6
87
1
6
16
5
2
43
1
01
2
14
9 8
7
02
4'2'A8
0'GRAPHIC SCALE
NDECK PATTERN AND FRAMING PLANSCALE: 1/4"=1'-0" 8' L-104
DECK PATTERN AND FRAMING PLAN
TGSA
BASELINE B
BASE
LINE
A
1
2 3
4
5
6
7
8
9
9
10 101010
12
11 11
13
13
13
14
14
14
14
14
East Mechincal
West Mechnical
14
14
14
14
14
1
L-705
MODULE TYPES LEGEND:
L-709
GENERAL SHEET NOTES:
L-701
1
L-706
1
1. DECK PATTERN CONTINGENT ON GRID ORIENTED FROM TOP LEFT TO BOTTOM RIGHT. EXAMPLE: (DOWN 12, OVER 10)
L-751
L-708
1
3. ALL ANGLES ARE 90 OR 45 DEGREES UNLESSOTHERWISE NOTED.
L-702
L-703
2. ALL DIMENSIONS ARE TO AND FROM FACE OFWALL, CENTERLINE, OR BASELINE OR ARCHITECTURAL GRIDLINE UNLESS OTHERWISE NOTED.
L-714
1
REFERENCE KEY NOTES:
2
L-704
4
QTY.
10
MODULE NUMBER
1. THIS SHEET SHOWS LAYOUT OF ALL DESIGNED ELEMENTS. FOR ELEVATION INFORMATION REFER TO SHEET
L-710
1
L-712
1
2
1
3
1
L-707
L-711
SHEET KEY NOTES:
1
L-750
CUTSHEET
1
L-713
04/24/2017
FINAL CD SET
05/12/2017
DRAWN BY:
08/10/2017
CHECKED BY:
[STREET]SPOKANE, WA [ZIP CODE]
100% CD SET CHANGES 106/23/2017
KATERRA INC.
100% CD SETFINAL CHECKSET02/17/2017
WSU ENVIRONMENTAL HEALTH & SAFETY
8 7 6 4 3 2
80% DD SET
DESCRIPTIONDATEMARK
SHEET TITLE:
LOT NUMBER:
CLIENT:
ADDRESS:
8/15
/201
7 4:
07
B
C
CONTACT:
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
A
TEAM NAME:
LOT #107
EN CITY
1
TODD BEYREUTHER, P.E.
CONSULTANTS:
11/15/2016
5
D
100% CD SET CHANGES 2
10
11
9
12
13
14
WEST MECH.
EAST MECH.
2
3
4
1
5
6
7
10
8
12
A8PLANTER MODULE PLACEMENT PLAN
8'4'2'0'GRAPHIC SCALE
NSCALE: 1/4"=1'-0" L-105
PLANTER MODULE PLACEMENT PLAN
MT SA
DCVA
Q
G
VM
V
FS
M
R
BRASS PIPE FROM GATE VALVE TODOUBLE CHECK VALVE ASSEMBLY
BRONZE GATE VALVE
PROPERTY LINETYPE K COPPER PIPE FROMMETER TO GATE VALVE
BRASS PIPE FROM PRV TO MASTER VALVE
MAIN WATER METER BOX
DOUBLE CHECK ASSEMBLY+ PRESSURE REDUCING VALVE
QUICK COUPLING VALVE 10" DIAMETER ROUND BOX
SCHEDULE 4 ABS MAINLINE TO AUTOMATIC CONTROL VALVE
WATER SERVICE LINE
FLOW SENSOR (FS 100B)
3' MINIMUM CLEARANCETO FIRST JOINT/FITTING
SUPERIOR MODEL MASTER VALVEIN BOX - LINE SIZE
FOGTITE MODEL 25-TA
FUTU
RE E
QUIP
MEN
TPR
OPOS
ED E
QUIP
MEN
T
1850-QT DC 1" FEBCO SERIES 850 DOUBLE CHECK VALVE ASSEMBLY
7.38
VALVE SIZE
G
SCH 40 ABS SLEEVE, SIZE INDICATEDON PLAN
MANUFACTURER/MODEL/DESCRIPTION
V
1
IRRIGATION SYSTEM TO BE INSTALLED AFTER COMPETITION. VEGETATION TO BE HAND WATER DURING THE COMPETITION.
M
6
3. THE IRRIGATION CONTRACTOR SHALL BE RESPONSIBLEFOR THE INSTALLATION OF SLEEVES AND CHASESUNDER DECKING, THROUGH WALLS, AND FOR ALLCONTROL WIRE. THIS INCLUDES EXIST. PIPING ASNOTED ON THE PLANS
SYMBOL
#
7.38
V
2. IRRIGATION DRAWINGS ARE DIAGRAMMATIC. ALLPIPING, VALVES, ETC., SHOWN WITHIN PAVED AREASARE FOR DESIGN CLARIFICATION ONLY AND SHALL BEINSTALLED IN PLANTING AREAS. AVOID ANY CONFLICTSBETWEEN THE IRRIGATION SYSTEM, PLANTING, SITELIGHTING, UTILITIES AND ARCHITECTURAL FEATURES
GREEN WALL
P.O.C. IN BELOW DECK STORAGE- SEE A3 FOR LAYOUT
7.38
GENERAL IRRIGATION NOTES:
1"
HC-1200i 12-STATION 120 VAC INDOOR PLASTIC CONTROLLER
RAINBIRD FS-1000-B1" FLOW SENSOR
VALVE FLOW
XCZ-100-PRF 1" DRIP VALVE WITH 1" PR FILTER
1" WGV-X WATTSGATE VALVE
BUCKNER SUPERIOR 3200 1"
VALVE CALLOUT
C
FS
7. ALL SLEEVES UNDER VEHICULAR DRIVES OR PATHSSHALL BE DUCTILE IRON.
4. ANY DAMAGED PAVING OR OTHER SURFACES ORIMPROVEMENTS NOT BE DESIGNATED FORDEMOLITION SHALL BE REPLACED TO MATCHEXISTING.
8. ALL SLEEVING SHALL BE INSPECTED BY SPRPLUMBING SHOP.
5. THE CONTRACTOR SHALL ADJUST EACH PRESSURECOMPENSATING REMOTE CONTROL VALVE ANDPRESSURE REGULATOR FOR OPTIMUMPERFORMANCE AND TO COMPENSATE FORPRESSURE AND FRICTION LOSS. THE CONTRACTORSHALL FLUSH AND ADJUST ALL DRIPS FOROPTIMUM PERFORMANCE.
SCHEDULE 40 ABSMAINLINE
4
Q
RAINBIRD XFCV ON-SURFACE DRIP LINE
C
DCVA
VALVE NUMBER
DECAGON DEVICES MICROCLIMATE MONITORING SYSTEM WITH EMSOG SOLAR
1. THE IRRIGATION SYSTEM IS BASED ON THE MINIMUMOPERATING PRESSURE & THE MAXIMUM FLOW DEMANDSHOWN ON THE IRRIGATION DRAWINGS. THEIRRIGATION CONTRACTOR SHALL TEST STATIC WATERPRESSURE AT THE NEW IRRIGATION POINT OFCONNECTION PRIOR TO CONSTRUCTION.
6. FILL, FINE GRADE, RESOD &/OR RESEED ALL AREASDISTURBED BY REMOVAL OF EXISTING IRRIGATIONEQUIPMENT. REFERENCE PLANTING PLAN FORCORRECT SEED MIXTURE.
1"
#
SCH 40 ABS SUPPLY LATERAL LINES
R
1"
#
BUCKNER-SUPERIOR QB44-LRC1" TWO PIECE, SINGLE SLOT BRASS QUICK COUPLING VALVE W/ LOCKING YELLOW TUFF
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
CONSULTANTS:
11/15/2016
DRAWN BY:
04/24/201705/12/2017
08/10/2017 FINAL CD SET
EN CITY
100% CD SET CHANGES 2100% CD SET CHANGES 1
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SET02/17/2017
CHECKED BY:
8 4
B
3 1
A
LOT NUMBER:
6
CLIENT:
SHEET TITLE:
DATE DESCRIPTIONMARK
FINAL CHECKSET
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
LOT #107
80% DD SET
06/23/2017
D
25
C
8/15
/201
7 4:
10
TEAM NAME:
7
ADDRESS:
CONTACT:
N0' 2' 4' 8'SITE IRRIGATION PLANA8
SCALE: 1/4"=1'-0"
SCALE: N/AA3
POINT OF CONNECTION (IRRIGATION SYSTEM)
L-106
SITE IRRIGATION PLAN
V.S. MS
1"
5
7.38
1"
2
7.38
OCCIMUM x CITRIODORUM (10)
SESLERIA AUTUMNALIS (16)BERBERIS THUMBERGI GORUZAM (6)
SESLERIA AUTUMNALIS (16)
SESLERIA AUTUMNALIS (8)
BERBERIS THUNBERGI GORUZAM (4)
SESLERIA AUTUMNALIS (20)
BERBERIS THUNBERGI GORUZAM (6)
MUHLENBERGIA CAPILLARIS (5)
SESLERIA AUTUMNALIS (5)
ACER SACCHARUM (4)
SESLERIA AUTUMNALIS (16)
SESLERIA AUTUMNALIS (17)
MUHLENBERGIA CAPILLARIS (6)
SESLERIA AUTUMNALIS (9)
SESLERIA AUTUMNALIS (29)
PLANT PALETTE REPRESENTED ON PLAN COORELATES TO SITE PLANT LIST ON SHEETL-107.
THE REPRESENTATION SHAPES IN THIS PLAN REFER TO THE PLANTS POT SIZE NOT PLANTS VEGETATION SPREAD.
KEYNOTES:
GENERAL NOTES:
SHEET TITLE:
[STREET]SPOKANE, WA [ZIP CODE]
8
80% DD SET
100% CD SET
8/15
/201
7 4:
13
5
CONTACT:
DESCRIPTIONMARK
100% CD SET CHANGES 1
08/10/2017
11/15/2016
D
06/23/2017
B
C
CHECKED BY:
7
CONSULTANTS:
4
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
1
04/24/2017
DATE
FINAL CD SET
TODD BEYREUTHER, P.E.
CLIENT:
23
100% CD SET CHANGES 2
LOT #107
A
WSU ENVIRONMENTAL HEALTH & SAFETY
FINAL CHECKSET02/17/2017
KATERRA INC.
05/12/2017
TEAM NAME:
6
DRAWN BY:
ADDRESS:
EN CITY
LOT NUMBER:
SITE PLANTING PLAN 4'2' N0' 8'SCALE: 1/4"=1'-0"
A7 L-107
SITE PLANTING PLAN
SA MS
1 GAL
Group:
Pink Muhlygrass
3 GAL
Scientific Name: Common Name:
Muhlenbergia Capillaris
Container Size:
Barberry Gold
Notes:
10
Quantity:
10 GAL
Ocimum × citriodorum 'Pesto Perpetuo'
136Tree Acer Saccharum
Basil
Sugar MapleGrasses
1 QUART
3 GAL
4
11
16
Sesleria autumnalis
Herbs
Sweet Grass
6' CANOPY DIAMETER
Berberis Thunbergi Goruzam
KEYNOTES:
GENERAL NOTES:
PLANTS USED AT COMPETITION SITE MY VARYDEPENDING ON VENDOR AVAILABILITY
EACH POT SIZE LABELED IN THIS SHEET ARE USED TO GRAPHICALLY REPRESENT PLANT PLACMENT ON SITE.
THIS LIST COORELATES TO THE SITE PLANTING PLAN L-106.
34
A
DATE
CONSULTANTS:
C
ADDRESS:
7/26
/201
7 1:
11
CLIENT:
LOT #107
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
LOT NUMBER:
MARK
6 5
80% DD SET
D
FINAL CHECKSET
KATERRA INC.
2
TEAM NAME: EN CITY
1
CONTACT:
100% CD SET CHANGES 1
CHECKED BY:
[STREET]SPOKANE, WA [ZIP CODE]
05/12/2017100% CD SET
8
DRAWN BY:
SHEET TITLE:
7
11/15/2016
WSU ENVIRONMENTAL HEALTH & SAFETY
02/17/2017
06/23/2017
DESCRIPTION
TODD BEYREUTHER, P.E.
100% CD SET CHANGES 2
04/24/2017
B
L-108
SITE PLANT LIST
CS MS
INSTALL 2x6 POST DECK MODULE CONSTRUCTIONFOR OPTIMAL PIER PLACEMENT
2'-11"
2'-9
11/
16"
4'-3
"3'
-2 1
/2"
5'-0
"5'
-0"
5'-0
"
2'-1 1/2"4'-8 7/8"
N4'2'0' 8'
80% DD SET
1
05/12/2017
KATERRA INC.
5
DRAWN BY:
100% CD SETFINAL CHECKSET02/17/2017
06/23/2017
67
100% CD SET CHANGES 1
ADDRESS:
4 3 2
04/24/2017
WSU ENVIRONMENTAL HEALTH & SAFETY
DESCRIPTIONDATEMARK
SHEET TITLE:
LOT NUMBER:
CLIENT:
A
D
8
LOT #107
B
C
7/26
/201
7 10
:56
TEAM NAME:
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
CONSULTANTS:
11/15/2016
CHECKED BY:
100% CD SET CHANGES 2
Enlarged Ground Contact PlanA6
SCALE: 1/2"=1'-0" L-110
ENLARGED GROUND CONTACT PLAN
SA TG
INSTALL 2x6 POST DECK MODULE CONSTRUCTIONFOR OPTIMAL PIER PLACEMENT
PIER PLACED AGAINST PERPENDICULAR DECK JOIST
1'-9 7/8" 3'-4"2'-11" 5'-1 7/8" 5'-1 7/8" 5'-1 7/8" 5'-1 7/8" 1'-9 7/8"
5'-1 7/8" 5'-1 7/8" 5'-1 7/8" 5'-1 7/8" 5'-1 7/8"
2'-6
5/1
6"4'-6
5/1
6"
5'-0
"2'
-10
1/8"
1'-8
3/1
6"
1'-10 9/16"
2'N
4'0' 8'
DRAWN BY:
04/24/2017
11/15/2016
100% CD SET CHANGES 2
8
100% CD SET CHANGES 105/12/2017
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
06/23/2017
CHECKED BY:
LOT #107
02/17/2017
C
7 6 5 4 3 2 1
80% DD SET
DESCRIPTIONDATEMARK
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
CLIENT:
FINAL CHECKSET
LOT NUMBER:
SHEET TITLE:
D
A
B
100% CD SET
7/26
/201
7 10
:56
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
CONSULTANTS:
SCALE: 1/2"=1'-0"A6
Enlarged Ground Contact Plan
L-111
ENLARGED GROUND CONTACT PLAN
TGSA
2'-9
11/
16"
7'-6"
3'-4"
5'-1 7/8" 5'-1 7/8" 3'-9"
3'-3 5/16"5'-1 7/8"5'-1 7/8"
2'-7 1/16" 2'-6 13/16" 2'-7 5/16" 2'-6 9/16"
5'-0
"3'
-2 1
5/16
"1'
-3 3
/8"
2'-6
"6" 2'-10 5/16" 5'-1 7/8" 5'-1 7/8" 3'-9"
2'N
4'0' 8'
2
05/12/2017
CONSULTANTS:
04/24/2017
B
100% CD SET CHANGES 2
3
06/23/2017
KATERRA INC.
CHECKED BY:
02/17/2017
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
FINAL CHECKSET
C
8 7 6 5 4
DRAWN BY:
100% CD SET CHANGES 1
1
80% DD SET
DESCRIPTIONDATE
CLIENT:
LOT NUMBER:
100% CD SET
SHEET TITLE:
MARK
LOT #107
D
A
WSU ENVIRONMENTAL HEALTH & SAFETY
11/15/2016
7/26
/201
7 10
:56
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
Enlarged Ground Contact PlanSCALE: 1/2"=1'-0"
A5
L-112
ENLARGED GROUND CONTACT PLAN
SA TG
2'-6
"5'
-0"
4'-0
"
4'-2 1/2"8"
4'-7
"
4'-4 7/8"
4'-2 1/2"
N0' 2' 4' 8'
80% DD SET
1
05/12/2017
KATERRA INC.
5
DRAWN BY:
DESCRIPTION
FINAL CHECKSET02/17/2017
06/23/2017
67
100% CD SET CHANGES 1
ADDRESS:
4 3 2
04/24/2017
WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SET
DATEMARK
SHEET TITLE:
LOT NUMBER:
CLIENT:
A
D
8
LOT #107
B
C
7/26
/201
7 10
:56
TEAM NAME:
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
CONSULTANTS:
11/15/2016
CHECKED BY:
100% CD SET CHANGES 2
SCALE: 1/2"=1'-0"Enlarged Ground Contact Plan
A5
L-113
ENLARGED GROUND CONTACT PLAN
TGSA
1'-6 3/84'-6 1/4"5'-1 7/8"4'-3 3/16" 5'-1 7/8"
3'-6 5/8" 5'-1 7/8" 5'-1 7/8" 5'-1 7/8"
4'-7
"2'
-1 1
/2"
2'N
4'0' 8'
2
05/12/2017
CONSULTANTS:
04/24/2017
B
100% CD SET CHANGES 2
3
06/23/2017
KATERRA INC.
CHECKED BY:
02/17/2017
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
FINAL CHECKSET
C
8 7 6 5 4
DRAWN BY:
100% CD SET CHANGES 1
1
80% DD SET
DESCRIPTIONDATE
CLIENT:
LOT NUMBER:
100% CD SET
SHEET TITLE:
MARK
LOT #107
D
A
WSU ENVIRONMENTAL HEALTH & SAFETY
11/15/2016
7/26
/201
7 10
:56
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
Enlarged Ground Contact PlanA6
SCALE: 1/2"=1'-0" L-114
ENLARGED GROUND CONTACT PLAN
SA TG
CEDAR 1x3
3/4" PLYWOOD W/LIQUID APPLIED MEMBRANE
SIMPSON STRONG TIE FB24Z CONNECTOR
DOUGLAS FIR 2x4 BLOCK
DOUGLAS FIR 2x4
ADJUSTABLE BOLT FOOT
SIMPSON STRONG TIE TENSION BRIDGE
1"
1'-7
3/4
"
1'-0
9/1
6"
3'-7
3/4
"
2'-1 1/2"
1'-8 1/2"
6 1/
2"
5 1/
2"
2'-0
"
SIMPSON STRONG TIE TENSION BRIDGE
CEDAR 1x3
SIMPSON STRONG TIEFB24Z CONNECTOR
ADJUSTABLE BOLT FOOT
CEDAR 1x5-1/4" TONGUE AND GROOVE SIDING
DOUGLAS FIR 2x4
MONARCH SS Z CLIP
3/4" PLYWOOD W/LIQUID APPLIED MEMBRANE
1"
2'-0
"
5 1/
2"
6 1/
2"
1'-1"
8"
2'-6
1/2
"
4'-6
1/2
"
8 9/
16"
06/23/2017
KATERRA INC.
100% CD SET CHANGES 2100% CD SET CHANGES 1
LOT #107
08/10/2017
05/12/201704/24/2017
DRAWN BY:
11/15/2016
FINAL CD SET
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
[STREET]SPOKANE, WA [ZIP CODE]
EN CITY
CONTACT:
ADDRESS:
TEAM NAME:
8/15
/201
7 4:
16
C
B
A
D
CONSULTANTS:
TODD BEYREUTHER, P.E.
CLIENT:
LOT NUMBER:
SHEET TITLE:
MARK DATE DESCRIPTION80% DD SET
12345678
CHECKED BY:
02/17/2017 FINAL CHECKSET100% CD SET
WSU ENVIRONMENTAL HEALTH & SAFETY
PLANTER MODULE 10 SECTION ASCALE: 1-1/2"=1'-0"
A3SCALE: 1-1/2"=1'-0"
A6PLANTER MODULE 09 SECTION A L-301
PLANTER SECTIONS
SA xx
FLASHING
SIMPSON STRONG TIEFB24Z CONNECTOR
CEDAR 1x3
1'-0
9/1
6"
2'-5 3/4"
5'-0"
2'-5 3/4"
2'-6
3/1
6"
3'-6
3/4
"
3'-7
3/4
"
DOUGLAS FIR 2x4
SIMPSON STRONG TIE TENSION BRIDGE
ADJUSTABLE BOLT FOOT
3/4" PLYWOOD +LIQUID APPLIED MEMBRANE
FLASHING
3/4" PLYWOOD + LIQUID APPLIED MEMBRANE
4'-6
1/2
"CEDAR 1x5-1/4" TONGUE + GROOVE
SIDING
SIMPSON STRONG TIE FB24Z CONNECTOR
DOUGLAS FIR 2x4
CEDAR 1x3
SIMPSON STRONG TIE TENSION BRIDGE
ADJUSTABLE BOLT FOOT
5'-0"
2'-5 3/4"2'-5 3/4"
4'-5
1/2
"
2'-7
1/2
"
8 9/
16"
LOT NUMBER:
100% CD SET CHANGES 208/10/2017
05/12/2017
CLIENT:
DRAWN BY:
11/15/2016
CONSULTANTS:
TODD BEYREUTHER, P.E.
[STREET]SPOKANE, WA [ZIP CODE]
FINAL CD SET
CONTACT:
ADDRESS:
TEAM NAME:
8/15
/201
7 4:
16
C
B
A
D
LOT #107
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
SHEET TITLE:
04/24/2017
EN CITY
MARK DATE DESCRIPTION80% DD SET
12345678
CHECKED BY:
02/17/2017 FINAL CHECKSET100% CD SET
WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.
06/23/2017100% CD SET CHANGES 1
A3SCALE: 1-1/2"=1'-0"PLANTER MODULE 09 SECTION B
SCALE: 1-1/2"=1'-0"A6
PLANTER MODULE 10 SECTION B L-302
PLANTER SECTIONS
xxSA
CENTRAL PIERS INC. SADDLE TOP PLATE (#238)
CENTRAL PIER, INC.SADDLE TOP (#238)
CENTRAL PEIR, INC.STANDARD 16" PIER (#8)
4" RFB DECK MODULE CONNECTOR BOLT
CENTRAL PIERS INC.16" STANDARD PIER (S1)
CENTRAL PIERS INC. SADDLE TOP (#238)
3/4" PLYWOOD SPACER
CEDAR 2x6 DECK JOIST
1x6 COMPOSITE DECK BOARD
3/4" PLYWOOD BASE
SIMPSON STRONG TIE 6" RFB DECK MODULE CONNECTION BOLT
1x6 COMPOSITE DECK BOARD
1x6 DECK JOIST
4" RFB DECK CONNECTOR BOLT
CENTRAL PIERS INC. PIER SADDLE TOP (238)
CENTRAL PIERS INC.16" STANDARD PERIMETER PIER (#P5)
1x8 BUILDING PERIMETER DECK SUPPORT
WATERLINE
1-1/2" SQ. DECK BOARD SUPPORT
1x6 COMPOSITE DECK BOARD
SIMPSON STRONG TIE 4" RFB DECK MODULE CONNECTION BOLT
2x6 CEDAR DECK JOIST
3/4" PLYWOOD SPACER
POOL CONTAINMENT STRUCTURE
CENTRAL PIER, INC.16" PERIMETER PIER (P5)
CEDAR 2x6 DECK JOIST
SIMPSON STRONG TIE SDS SCREW - 8 PER BOARD
1x6 COMPOSITE DECK BOARD
FINAL CD SET08/10/2017
05/12/201704/24/2017
DRAWN BY:
11/15/2016
CONSULTANTS:
TODD BEYREUTHER, P.E.
[STREET]SPOKANE, WA [ZIP CODE]
EN CITY
CONTACT:
ADDRESS:
TEAM NAME:
8/16
/201
7 9:
07
C
B
A
D
LOT #107
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
CLIENT:
LOT NUMBER:
SHEET TITLE:
MARK DATE DESCRIPTION80% DD SET
12345678
CHECKED BY:
02/17/2017 FINAL CHECKSET100% CD SET
WSU ENVIRONMENTAL HEALTH & SAFETYKATERRA INC.
06/23/2017100% CD SET CHANGES 1100% CD SET CHANGES 2
TYP. DECK TO THRESHOLDA8
SCALE: 1-1/2"=1'-0"A5
DECK, BENCH AND POOLSCALE: 3"=1'-0"
TYP. DECK TO DECKA3
TYP. DECK MODULE PLANA3 C5SCALE: 1"=1'-0" TYP. DECK MODULE NORTHSCALE: 1-1/2"=1'-0"
SCALE: 3"=1'-0" L-501
MODULAR DECKDETAILS
MTSA
DRAWN BY:
CONSULTANTS:
DESCRIPTION
04/24/2017
11/15/2016
100% CD SET CHANGES 2100% CD SET CHANGES 1
06/23/2017
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
05/12/2017
FINAL CHECKSET02/17/2017
CHECKED BY:
8 7 6 5 4 3 2 1
80% DD SET
100% CD SET
DATEMARK
SHEET TITLE:
LOT NUMBER:
CLIENT:U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV
LOT #107
D
A
B
C
7/25
/201
7 11
:25
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
A6PLANTER MODULE 14 EXPLODED ISOMETRICSCALE: N/A L-701
PLANTER DIAGRAM
SA TG
x
1' 7-1/8" x7-1/4"
x
7-1/4"x
7-1/4"x
TOOLED CONTROL JOINT
TOOLED CONTROL JOINT
3'-0
"
3'-0
"
3'-0
"
21'-2 1/2"15
'-2 1
/2"
2'-0
3/4
"
121°
2'-0
3/4
"
2'-1 3/8"5'-1 5/8"12'-8 3/4"
2'-6"
3'-0
"
121°
13'-2 1/2" 10'-9 1/2" 3'-2 1/2" 8'-11 5/8" 3'-2 7/8"
2'-4
1/4
"
17'-2
1/4
"
41'-2 1/2"
2'-6" TYP.
2'-6
" TYP
.2'-6" TYP.
2'-6
" TYP
.7-1/4"
SHEET NOTES
1.FLOWABLE FILL TO BE REMOVED AFTER COMPETITION AND TO BE USED AS PAVERS AT FINAL SITE
SCALE: 1/4"=1'-0"
A2
FLOWABLE FILL INSTALLATION AND REMOVALA8
B2S-506
S-506A2
B2
S-506
S-506
SHEET TITLE:
MARK
100% CD SET
DATE DESCRIPTION
WSU ENVIRONMENTAL HEALTH & SAFETY
80% DD SET
05/12/2017
1
KATERRA INC.
04/24/2017
DRAWN BY:
2
11/15/2016
CONSULTANTS:
3
06/23/2017
TODD BEYREUTHER, P.E.
[STREET]SPOKANE, WA [ZIP CODE]
4
EN CITY
5
100% CD SET CHANGES 1
CONTACT:
ADDRESS:
6
TEAM NAME:
8/7/
2017
2:5
6
7
100% CD SET CHANGES 2
C
B
8
A
D
CHECKED BY:
LOT #107
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
02/17/2017
CLIENT:
LOT NUMBER:
FINAL CHECKSET
S-101
FLOWABLE FILL INSTALLATION AND REMOVAL
DGBK
GF-00 GF-00
GF-00
GF-00
GF-00
GF-23
GF-00
GF-00 GF-00
GF-21
C
B
GF-22
13
5
D
EGF-19
F
L
GF-20
6
K
J
GF-20
I
H
GF-19
5
4
F
G
GF-27
GF-19
4
GF-06
GF-02
1
GF-10
3
GF-11
3
GF-01GF-01
I
L
2
GF-03
2
GF-03GF-03
GF-13
12
GF-14 GF-15
GF-16
GF-17
GF-00
GF-18
GF-03
11
GF-03
13
GF-00
C
6541
GF-00
32
101211
GF-01
109
K
87
GF-00
H
1 6 954
GF-01
B
G
32
GF-26
GF-12GF-11
GF-10
GF-00
GF-10
GF-09
GF-02
GF-08
GF-07
GF-01
GF-01
8
GF-06GF-05
GF-01
GF-04
GF-00
GF-26
GF-00
GF-00
GF-00
GF-01
GF-00GF-01
GF-25
GF-00
7
D
GF-00GF-00
GF-25
GF-01 GF-00
GF-24
GF-01
GF-02
GF-03
GF-24
GF-02
GF-00
GF-14
GF-00
1
GF-00
GF-01
GF-00
GF-00
GF-00
GF-00
GF-01GF-00GF-00
GF-00
GF-00
GF-00
GF-00
GF-00
6
E
J
4'-0
"
4'-0
"4'
-0"
4'-0
"
4'-0
"4'
-0"
4'-0
"
x
1' 6-1/8"
4'-0
"
1' 6-1/8"
1' 6-1/8" x
x
x
1' 6-1/8"
3'-6
1/8
"4'
-0"
1' 6-1/8"
4'-0
"4'
-0"
1' 6-1/8"
4'-0"4'-0" x4'-0"4'-0"
x
4'-0"
4'-0"
3'-6
1/8
"
4'-0"4'-0"
4'-0
"
4'-0"4'-0"
4'-0
"
4'-0"4'-0"
4'-0
"
4'-0"4'-0"
4'-0"
4'-0"
4'-0"4'-0"4'-0" 4'-0"
4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"4'-0"
GEOFOAM FOUNDATION 01A4
SCALE: 1/8"=1'-0"SCALE: 1/8"=1'-0"A8
KATERRA INC.
06/23/2017
80% DD SET
WSU ENVIRONMENTAL HEALTH & SAFETYTODD BEYREUTHER, P.E.
4
100% CD SET CHANGES 1100% CD SET CHANGES 2
7
8/7/
2017
11:
25
6 5
CONSULTANTS:
3 2 1
DESCRIPTIONDATEMARK
C
8
CHECKED BY:
D
LOT #107
02/17/2017
A
B
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
CLIENT:
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
FINAL CHECKSET
LOT NUMBER:
11/15/2016
SHEET TITLE:
DRAWN BY:
04/24/201705/12/2017
100% CD SET
GEOFOAM FOUNDATION 02
S-102
GEOFOAM FOUNDATION PLAN
SA DG
10 1/2"11'-8 3/4"
12'-7 1/4"
5'-7
3/4
"4'
-1"
12'-2 1/2" 6'-8 5/8"
8'-6
3/4
"8'
-6 3
/4"
5'-10 5/8"
7-1/2"
1'-2
7/1
6"x
1'-8
5/1
6"
2'-0"
14'-2 1/2"
3'-6
1/4
"
12'-2 1/2"
2'-0
"3'
-7 3
/4"
FLR.EDGE
ET 7
ET 6
ET 3
WT
7W
T 6
WT
5W
T 1
NT 4NT 1
WT
2
NT 5 NT 6NT 2
BATHROOM MODULE NLT FLOOR PANEL
CLOSET MODULE NLT FLOOR PANEL
TINYHOME NLT FLOOR PANEL
ET 5
FLR.EDGE
NT 3
FLR.EDGE
ET 4
WT3
ET 2
FLR.
EDGE
ST 7ST 6
WT
4
ST 5
FLR.
EDGE
ST 4ST 3ST 2
FLR.
EDGE
ST 1
FLR.EDGE
FLR.
EDGE
ET 1
POST OUTLINES, TYP.
0504
03
0102
C
A
8/17
/201
7 2:
16
80% DD SET
CONTACT: [email protected]
06/23/2017
EN CITY
8 1
LOT #107
ADDRESS:
TODD BEYREUTHER, P.E.
04/24/2017
DRAWN BY:
FINAL CD SET
DESCRIPTION
100% CD SET
CHECKED BY:
5 2
SHEET TITLE:
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
B
TEAM NAME:
[STREET]SPOKANE, WA [ZIP CODE]
CONSULTANTS:
11/15/2016
05/12/2017
08/10/2017100% CD SET CHANGES 2100% CD SET CHANGES 1
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
FINAL CHECKSET02/17/2017
7 6 4 3
DATEMARK
LOT NUMBER:
CLIENT:
D
C8FLOOR PANEL 02 (BM)
B6
A6
D8FLOOR PANEL 01 (CM)
D6FLOOR PANEL 04 (TH)
SCALE: 1/4"=1'-0"MODULE FLOOR PLAN
A3
SCALE: 1/2=1'-0" SCALE: 1/2=1'-0"
SCALE: 1/2=1'-0"FLOOR PANEL 03 (TH)
SCALE: 1/2=1'-0"
FLOOR PANEL 05 (TH)SCALE: 1/2=1'-0"
S-103
STRUCTURALFLOOR PLAN
DGSA
ST 1
NT 1
ST 1
WT
5W
T 1
NT 1
1-3/4" x 9-1/4" x 14' 9-15/16"LVL RAFTER (TYP.)
1-3/4" x 9-1/4" x 6' 5-9/16"LVL
1-3/4" x 3-1/2" x 5' 6-3/4"LVL TOP PLATE
1-3/4" x 9-1/4" x 2' 11-1/2"LVL RAFTER
ST 1
1-3/4" x 9-1/4" x 5' 10-3/8"LVL
NT 1 NT 5 NT 6
ET
2
WT
6
1-3/4" x 9-1/4" x 10' 2-1/16"LVL RAFTER
NT 1
1-3/4" x 9-1/4" x 7' 10-15/16"LVL RAFTER
1-3/4" x 3-1/2" x 5' 10"LVL TOP PLATE
1-3/4" x 9-1/4" x 14' 9-15/16"LVL RAFTER (TYP.)
1-3/4" x 9-1/4" x 4' 0-1/8"LVL
NT 1
ST 1
NT 1 NT 1
ST 1
WT
1
NT 1
ST 1
NT 1
ST 1 ST 5ST 1 ST 3ST 1
NT 3
ET 1
ET 6
WT
7W
T 4
ET 3
NT 1
ST 6
1-3/4" x 3-1/2" x 19' 10-3/4"LVL TOP PLATE
1-3/4" x 9-1/4" x 9' 11-1/4"LVL RAFTER
1-3/4" x 9-1/4" x 5' 11-3/16"LVL RAFTER
1-3/4" x 9-1/4" x 1' 5"LVL RAFTER
1-3/4" x 9-1/4" x 5' 4-1/16"LVL RAFTER
1-3/4" x 9-1/4" x 6' 5-13/16"LVL
1-3/4" x 9-1/4" x 14' 9-15/16"LVL RAFTER (TYP.)
1-3/4" x 9-1/4" x 6' 5-9/16"LVL
WT
1W
T 1
WT
1
NT 1
WT
1W
T 1
NT 1
WT
1W
T 1
ET 3
ET
3E
T 3
ET 3
ET 3
WT
2
ET
3ET
2ET
3ET
3
NT 1NT 1
ST 1
NT 1
ST 1
NT 1
ST 4
NT 1
ST 2ST 1
NT 4
ST 1
NT 2
ET 3
ET 4
ET 5
ET 7
ST 1
WT3
FLR.EDGENT 1
ST 1 ST 1 ST 1 ST 7
1-3/4" x 3-1/2" x 14' 2-1/4"LVL TOP PLATE
1-3/4" x 11-1/4" x 17' 0-5/16"LVL RIDGE BEAM
ST 1
1-3/4" x 9-1/4" x 10' 3-1/8" LVL RAFTER (TYP.)
x6-3/8"4-3/8"x2'
-8 1
/2"
2'-8
1/2
"2'
-8 1
/2"
5' 7-13/16" x 1-3/4" x 9-1/4" LVL RAFTER2'
-8 1
/2"
2'-8
1/2
"1'
-2 1
/8"
3'-0 1/8"2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-8 1/2"
6' 5-1/8" x 1-3/4" x 9-1/4"LVL RAFTER
8' 8-7/16" x 1-3/4" x 9-1/4"LVL RAFTER
2'-4 1/8"1'-9 1/2"2'-8 1/2"2'-8 1/2"2'-8 1/2"1'-8 3/4"1'-4 1/4"2'-6"
2'-8 1/2"
6' 1-9/16" x 1-3/4" x 9-1/4" LVL RAFTER
2'-8 1/2"
2'-8
1/2
"
2'-8 1/2" 2'-8 1/2"
2'-8
1/2
"2'-8
1/2
"2'
-8 1
/2"
2'-8
1/2
"2'
-8 1
/2"
2'-8
1/2
"
6' 1-5/8" x 1-3/4" x 9-1/4"LVL RAFTER
5' 7-1/16" x 1-3/4" x 9-1/4"LVL RAFTER
6' 7-13/16" x 1-3/4" x 9-1/4"LVL RAFTER
1'-2
1/8
"
2'-8
1/2
"
2'-8 1/2"2'-8 1/4" 2'-8 1/2"2'-8 1/2" 3'-9 1/2" 2'-0 1/4" 2'-8 1/2" 2'-8 1/2"
6' 3-5/16" x 1-3/4" x 9-1/4" LVL RAFTER
2'-8 1/2" 2'-1" 1'-7 1/2" 1'-2" 2'-9 9/16" 2'-9 9/16" 2'-9 9/16" 2'-4 9/16"
2'-8
1/2
"
2'-8 1/2"2'-8 1/2"1'-5 5/8"
6' 5-1/8" x 1-3/4" x 9-1/4"LVL RAFTER
2'-8
1/2
"2'
-8 1
/2"
2'-8
1/2
"
2'-3 15/16"
6' 1-7/16" x 1-3/4" x 9-1/4" LVL RAFTER
4'-1 1/8"2'-8 1/2"
5' 7-13/16" x 1-3/4" x 9-1/4"LVL RAFTER
6' 3-5/16" x 1-3/4" x 9-1/4" LVL RAFTER
3' 8-1/8" x 1-3/4" x 9-1/4"LVL RAFTER
5' 6-1/16" x 1-3/4" x 9-1/4"LVL RAFTER
11' 0-13/16" x 1-3/4" x 9-1/4"LVL RAFTER (TYP.)
2'-8
1/2
"2'
-8 1
/2"
8' 4-1/16" x 1-3/4" x 9-1/4" LVL RAFTER (TYP.)
2'-8
1/2
"
3'-8 7/8"2'-10 3/4"
4' 3-7/8" x 1-3/4" x 9-1/4"LVL RAFTER
3'-2" 4'-1" 3'-9 1/2"
3' 8-1/8" x 1-3/4" x 9-1/4"LVL RAFTER
12' 10-9/16" x 1-3/4" x 11-1/4" LVL RIDGE BEAM
11' 5-3/16" x 1-3/4" x 9-1/4" LVL RAFTER
7' 1-13/16" x 1-3/4" x 9-1/4" LVL RAFTER
11' 5-3/16" x 1-3/4" x 9-1/4"LVL RAFTER10' 2-7/16" x 1-3/4" x 9-1/4"LVL RAFTER6' 11-13/16" x 1-3/4" x 9-1/4"LVL RAFTER3' 9-3/16" x 1-3/4" x 9-1/4"LVL RAFTER
13' 7-15/16" x 1-3/4" x 9-1/4" LVL RAFTER (TYP.)
11/15/2016
[STREET]SPOKANE, WA [ZIP CODE]
05/12/2017
80% DD SET
CONSULTANTS:
TODD BEYREUTHER, P.E.WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SET CHANGES 2100% CD SET CHANGES 1
06/23/2017
KATERRA INC.
DRAWN BY:
100% CD SETFINAL CHECKSET02/17/2017
CHECKED BY:
8 7 6 5 4 3 2 1
04/24/2017
DESCRIPTIONDATEMARK
SHEET TITLE:
LOT NUMBER:
CLIENT:U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV
LOT #107
D
A
B
C
8/7/
2017
8:1
5
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
A4A8CLUBHOUSE ROOF STRUCTURE PLAN TINY HOME ROOF STRUCTURE PLAN
SCALE: 1/4"=1'-0"SCALE: 1/4"=1'-0" S-104
ROOF STRUCTURE PLAN
SA DG
3/4" PLYWOOD (TYP)DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)
NT 5NT 4NT 3
6'-8 5/8"
8'-2
5/8
"
DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)
1/2" PLYWOOD
3/4" PLYWOOD (TYP)
FLR.
EDGE
WT
1W
T 2
WT3
WT
4W
T 5
NT 3NT 2NT 1FLR.EDGE
8'-3
1/4
"
5'-7 1/8"
ADDRESS:
EN CITY
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
[STREET]SPOKANE, WA [ZIP CODE]
TEAM NAME:
6 3
DESCRIPTION
DRAWN BY:
CONTACT:
4
A
WSU ENVIRONMENTAL HEALTH & SAFETY
MARK
1
04/24/2017
11/15/2016
06/23/2017
TODD BEYREUTHER, P.E.
2
8/4/
2017
10:
49
100% CD SET CHANGES 1
C
5
B
D
100% CD SET
CLIENT:
LOT #107
7
FINAL CHECKSET
LOT NUMBER:
KATERRA INC.
SHEET TITLE:
02/17/2017
DATE
CHECKED BY:
CONSULTANTS:
80% DD SET
8
100% CD SET CHANGES 205/12/2017
A5SCALE: 1/2"=1'-0"
A3BATHROOM MODULE FRAMING PLAN
SCALE: 1/2"=1'-0"CLOSET MODULE FRAMING PLAN S-110
TINYHOME MODULESFRAMING PLAN
SA DG
ST 17WT 5
NT 3
WT 1
NT 2ET 1 NT 17NT 16
FLREDGE
ET 2
WT 2 ST 15
1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST (TYP.)
NT 9 FLREDGE
FLREDGE
ET 4
ST 12ST 11ST 10ST 9ST 8ST 7
NT 15FLR
EDGE
WT 3 ST 13
FLREDGE
NLT FLOOR PANEL
ET 3 NT 10
1-3/4" x 5-1/4" x 12' 2-3/8"LVL POST
1-3/4" x 5-1/4" x 9' 1-3/8"LVL POST
1-3/4" x 5-1/4" x 10' 7-7/8"LVL POST
NT 7FLREDGE NT 8
1-3/4" x 3-1/2" x 6' 4-7/8"LVL TOP PLATE
NT 6ET 6
WT 7 ST 16ST 1
1-3/4" x 3-1/2" x 12' 2-1/2"LVL TOP PLATE
1-3/4" x 3-1/2" x 11' 9-1/2"LVL TOP PLATE
1-3/4" x 3-1/2" x 16' 2-1/4"LVL TOP PLATE
1-3/4" x 5-1/4" x 8' 5-7/16"LVL POST (TYP.)
NLT FLOOR PANEL
NLT FLOOR PANEL
1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST (TYP.)
1-3/4" x 5-1/4" x 13' 8-13/16"LVL POST
1-3/4" x 5-1/4" x 12' 2-3/8"LVL POST
1-3/4" x 5-1/4" x 9' 1-3/8"LVL POST
1-3/4" x 5-1/4" x 10' 7-7/8"LVL POST
1-3/4" x 3-1/2" x 6' 5-1/16"LVL TOP PLATE
ST 6ST 5WT 4 ST 4
NT 14
ST 3
NT 13
FLREDGE
ET 7 NT 12
ST 14 FLREDGE
NT 11
1-3/4" x 5-1/4" x 13' 8-13/16"LVL POST
WT 6 ST 2
1-3/4" x 3-1/2" x 5' 8-5/16"LVL TOP PLATE
1-3/4" x 3-1/2" x 6' 4-13/16"LVL TOP PLATE
1-3/4" x 5-1/4" x 11' 11-1/8"LVL POST
1-3/4" x 5-1/4" x 9' 6-3/8"LVL POST
1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST (TYP.)
1-3/4" x 5-1/4" x 10' 2-5/16"LVL POST (TYP.)
1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST
1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST
1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST
1-3/4" x 5-1/4" x 13' 10-1/8"LVL POST (TYP.)
1-3/4" x 3-1/2" x 11' 9-1/2"LVL TOP PLATE
NLT FLOOR PANEL
NT 1 NT 5NT 4ET 5
2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-8 1/2"1'-4 1/4"1'-8 3/4"2'-8 1/2"2'-8 1/2"2'-8 1/2"
4 3/8"
1'-9 1/2"2'-4 1/8"
1'-1 1/2"
2'-8 1/2"2'-8 1/2"2'-8 1/2"3'-0 1/8" 2'-8 1/2"2'-8 1/2"2'-8 1/2" 2'-8 1/2" 2'-8 1/2" 2'-8 1/2" 1'-2 1/8"
2'-3 15/16"2'-4 9/16"2'-9 9/16"2'-9 9/16"2'-9 9/16"1'-2"1'-7 1/2"2'-1"
1'-1 1/2"
2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-0 1/4"3'-9 1/2"2'-8 1/2"2'-8 1/4" 2'-8 1/2"2'-8 1/2"2'-8 1/2"1'-2 1/8" 2'-8 1/2" 2'-8 1/2" 2'-8 1/2"
4 3/8"
06/23/2017
TEAM NAME:
SHEET TITLE:
100% CD SET CHANGES 1
TODD BEYREUTHER, P.E.
100% CD SET CHANGES 2
DESCRIPTION
C
KATERRA INC.
MARK
6
DRAWN BY:
4
80% DD SET
DATE
8
ADDRESS:
FINAL CHECKSET
WSU ENVIRONMENTAL HEALTH & SAFETY
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
LOT NUMBER:
CHECKED BY:
1
11/15/2016
3
04/24/201705/12/2017
5 2
CONSULTANTS:
B
7
[STREET]SPOKANE, WA [ZIP CODE]
EN CITY
CONTACT:
02/17/2017
8/7/
2017
10:
31
100% CD SET
D
LOT #107
A
CLIENT:
CLUBHOUSE WEST STRUCTURAL ELEVATIONSCALE: 1/4"=1'-0"
A7CLUBHOUSE SOUTH STRUCTURAL ELEVATION
SCALE: 1/4"=1'-0"
A4
SCALE: 1/4"=1'-0"CLUBHOUSE NORTH STRUCTURAL ELEVATION
C4CLUBHOUSE EAST STRUCTURAL ELEVATION
SCALE: 1/4"=1'-0"
C7
S-201
CLUBHOUSESTRUCTURALELEVATIONSSA DG
FLR.EDGE
1-3/4" x 5-1/4" x 9' 8-3/8"LVL STUD
1-3/4" x 5-1/4" x 11' 4-1/4"LVL STUD 1-3/4" x 5-1/4" x ?
LVL STUD
NLT FLOOR PANEL
1-3/4" x 5-1/4" x 13' 6-1/4"LVL STUD (TYP.)
FLR.EDGE NT 1
1-3/4" x 5-1/4" x 12' 10-1/2"LVL STUD
ET 7
1-3/4" x 5-1/4" x ?LVL STUD
1-3/4" x 5-1/4" x 13' 11-1/4"LVL STUD (TYP.)
1-3/4" x 3-1/2" x 5' 10" LVL TOP PLATE
NLT FLOOR PANEL
FLR.EDGENT 2NT 3NT 4NT 5NT 6
FLR.EDGEET 6ET 5ET 4ET 3ET 2ET 1
1-3/4" x 3-1/2" x 5' 6-3/4" LVL TOP PLATE
2'-7 3/4"2'-8 1/2"2'-8 1/2"2'-8 1/2"3'-2"2'-6"2'-10 3/4"3'-8 7/8"4'-1" 2'-8 1/2"3'-8 3/4"
FLR.EDGE
1-3/4" x 5-1/4" x 8' 5-7/16"LVL STUD (TYP.)
FLR.EDGEET 5ST 5ST 3 ST 4
1-3/4" x 5-1/4" x 8' 5-7/16"LVL STUD (TYP.)
ET 4 ET 3 ET 1ST 7
NLT FLOOR PANEL
ET 6ST 6FLR.EDGE
1-3/4" x 3-1/2" x 14' 2-1/4" LVL TOP PLATE
FLR.EDGE ST 1 ST 2
1-3/4" x 3-1/2" x 19' 10-3/4" LVL TOP PLATE
ET 2ET 7
2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-7 3/4"
4'-1"2'-8 1/2"2'-8 1/2"2'-8 1/2"2'-8 1/2"1'-5 5/8" 3'-8 3/4"
NLT FLOOR PANEL
ADDRESS:
C
CONSULTANTS:
11/15/2016
8/6/
2017
2:5
5
05/12/2017
4
04/24/2017
DRAWN BY:
TODD BEYREUTHER, P.E.
[STREET]SPOKANE, WA [ZIP CODE]
CONTACT:
TEAM NAME:
100% CD SET CHANGES 2100% CD SET CHANGES 1
06/23/2017
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SETFINAL CHECKSET02/17/2017
CHECKED BY:
8 7 6 5
EN CITY
3 2 1
80% DD SET
DESCRIPTIONDATEMARK
SHEET TITLE:
LOT NUMBER:
CLIENT:U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV
LOT #107
D
A
B
SCALE: 1/4"=1'-0"
TINYHOME SOUTH WALL FRAME ELEVATIONA8
SCALE: 1/4"=1'-0"C3
SCALE: 1/4"=1'-0" SCALE: 1/4"=1'-0"
TINYHOME SOUTH WALL FRAME ELEVATION
TINYHOME SOUTH WALL FRAME ELEVATION
TINYHOME SOUTH WALL FRAME ELEVATION
A3
C8
S-202
TINYHOME STRUCTURAL ELEVATIONS
SA XX
NT7 NT10 NT11 NT15 NT17NT14NT13NT9NT6NT5NT3 FLR.EDGENT16NT12NT8NT4NT1 NT2FLR.EDGE
S503A6
SIM
B6S501
SIM
SIM
S501C2
SIM
S501A4
B4SIM
S501
ET 2 ET 6ET 3 ET 4 FLREDGEET 7ET 1FLR
EDGE ET 5
B4SIM
S501
B4SIM
S501
1
MARK80% DD SET
CONTACT:
D
SHEET TITLE:
DESCRIPTION
TODD BEYREUTHER, P.E.
EN CITY
8/9/
2017
12:
04
A
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
LOT NUMBER:
DATE11/15/2016
CONSULTANTS:
[STREET]SPOKANE, WA [ZIP CODE]
TEAM NAME:
C
B
LOT #107
DRAWN BY:
CLIENT:
05/12/201704/24/2017
ADDRESS:
100% CD SET CHANGES 2100% CD SET CHANGES 1
06/23/2017
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SETFINAL CHECKSET02/17/2017
CHECKED BY:
8 7 6 5 4 3 2
SOLAR ENVELOPE
T.O. HIGH WALL LVL TOP PLATE
TYP. SILL HEIGHT
T.O. FINISHED FLOOR
9' 10-13/16"
0' - 0"
2' - 0"
15' 3-1/2"
5' - 6"
GRADE
18' - 0"
GRADE
18' - 0"SOLAR ENVELOPE
0' - 0"
T.O. HIGH WALL LVL TOP PLATE
T.O. TYP. LVL TOP PLATE
2' - 0"T.O. FINISHED FLOOR
15' 3-1/2"
9' 10-13/16"
5' - 6"
T.O. TYP. LVL TOP PLATE
TYP. SILL HEIGHT
A3STRUCTURAL SECTION B
STRUCTURAL SECTION A
SCALE: 1/4"=1'-0"
A3SCALE: 1/4"=1'-0"
S-301
COMMUNITY BUILDINGSTRUCTURAL SECTION
DGSA
ET 3 ET 6ET 2 ET 7 FLR.EDGEFLR.EDGE ET 4 ET 5ET 1
A2SIM
S501
A6S502
SIM
B4SIM
S501
ST 6 ST 7ST 1FLR.EDGE ST 4 ST 5ST 3
FLR.EDGEST 2
C2
A4
S503
SIM
S501
SIM
A6
SIM
S501
SIM
S501B6
80% DD SET
1
DESCRIPTION
8/6/
2017
5:5
5
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
MARK DATE
CONSULTANTS:
EN CITYTEAM NAME:
B
LOT #107
CLIENT:
SHEET TITLE:
TODD BEYREUTHER, P.E.
C
[STREET]SPOKANE, WA [ZIP CODE]
CONTACT:
ADDRESS:
05/12/2017
A
D
04/24/2017
DRAWN BY:
LOT NUMBER:
11/15/2016
100% CD SET CHANGES 2100% CD SET CHANGES 1
06/23/2017
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SETFINAL CHECKSET02/17/2017
CHECKED BY:
8 7 6 5 4 3 2
2' - 0"2' - 0"
5' - 6"
15' 3-1/2"
GRADE
9' 10-13/16"
18' - 0"
TYP. SILL HEIGHT
0' - 0"
T.O. FINISHED FLOOR
GRADE
SOLAR ENVELOPESOLAR ENVELOPE
T.O. HIGH WALL LVL TOP PLATE T.O. HIGH WALL LVL TOP PLATE
18' - 0"
T.O. TYP. LVL TOP PLATE
TYP. SILL HEIGHT
T.O. TYP. LVL TOP PLATE
T.O. FINISHED FLOOR
0' - 0"
5' - 6"
15' 3-1/2"
9' 10-13/16"
SCALE: 1/4"=1'-0"A3
STRUCTURAL SECTION BSTRUCTURAL SECTION AA3
SCALE: 1/4"=1'-0"
S-302
TINYHOMESTRUCTURAL SECTION
DGSA
1-3/4" X 3-1/2" LVL TOP PLATE
3/4" PLYWOOD
1-1/2" X 3-1/2" PANEL TOP PLATE
1-3/4" X 9-1/4" LVL (SKYLIGHT MODULE)3/4" PLYWOOD (SKYLIGHT MODULE)
5-1/2" X 1-3/4" LVL POST
3-7/8" NLT FLOOR PANEL
5-1/2" X 1-3/4" LVL POST
SIMPSON SDS25600 6" SDS SCREW
1-3/4" X 3-1/2" LVL TOP PLATE
11-1/4" X 1-3/4" LVL RAFTER (BEYOND)
WALL PANEL3/4" PLYWOOD
1-3/4" X 5-1/2" LVL POST (BEYOND)
ROOF PANEL3/4" PLYWOOD
SIMPSON SDS25600 6" SDS SCREW
3-7/8" NLTFLOOR PANEL
5-1/2" X 1-3/4" LVL POST (BEYOND)
WALL PANEL3/4" PLYWOOD
VARI
ES
DOUGLAS FIR1-1/2" X 3-1/2"
1-3/4" X 9-1/4" LVL (SKYLIGHT MODULE)1-3/4" X 9-1/4" LVL RAFTER
ROOF PANEL3/4" PLYWOOD
SIMPSON SDS25600 2-1/2" SDS SCREW
9-1/4" x 1-3/4" LVL RAFTER
SIMPSON SDS25600 6" SDS SCREW
5-1/2" X 1-3/4" LVL POST
SIMPSON SDS25600 6" SDS SCR
3/4" PLYWOOD
5-1/2" x 1-3/4" STUD
SDSW 3" SCREW1-3/4" x 5-1/2" LVL POST1-1/2" x 3-1/2" TYP.
3/4" PLYWOOD
1-3/4" x 9-1/4" LVL RAFTER
1-3/4" X 3-1/2" LVL TOP PLATE
SIMPSON SDS25600 6" SDS SCREW
1-3/4" X 5-1/2" LVL POST
VARI
ES
1-3/4" X 9-1/4" LVL RAFTER
1-3/4" X 9-1/4" LVL (SKYLIGHT MODULE)
SIMPSON SDS25600 6" SDS SCREW
DOUGLAS FIR1-1/2" X 3-1/2"
WALL PANEL3/4" PLYWOOD
ROOF PANEL3/4" PLYWOOD
5-1/2" X 1-3/4" LVL POST (BEYOND)
9-1/4" x 1-3/4" RAFTER
05/12/201704/24/2017
100% CD SET CHANGES 2100% CD SET CHANGES 1
06/23/2017
CHECKED BY:
8 7 6 5 4 3 2 1
80% DD SET
DESCRIPTIONDATEMARK
SHEET TITLE:
LOT NUMBER:
CLIENT:U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV
LOT #107
D
A
B
C
8/8/
2017
5:0
5
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
CONSULTANTS:
11/15/2016
DRAWN BY:
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SETFINAL CHECKSET02/17/2017
STUD TO FLOOR
D8
C4
SCALE: 3"=1'-0"
RAFTER TO POST
C2
A4
D6
SCALE: 3"=1'-0"
SCALE: 3"=1'-0"PLAN: TALL WALL CORNER
WALL / ROOF PANEL @ RAKE
STUD TO RAFTER @ GUTTER
SCALE: 3"=1'-0"
TYP. WALL ASSEMBLY
TYP. RAFTER TO SYLIGHT
B8ROOF PANEL TO FRAME @ SKYLIGHT
A6
B4
SCALE: 3"=1'-0"
WALL TO FLOORA2
SCALE: 3"=1'-0"
STUD TO RIDGE BEAM
B6
SCALE: 3"=1'-0"
SCALE: 3"=1'-0"
SCALE: 3"=1'-0"
SCALE: 3"=1'-0"
SCALE: 3"=1'-0"
SCALE: 3"=1'-0"
WALL PANEL TO SKYLIGHT MODULEB2
A8ROOF PANEL TO LVL JOIST S-501
DETAILS
DGMT
1-3/4" x 9-1/4" LVL RAFTER
3/4" PLYWOOD (TYP)
1-3/4" x 9-1/4" LVL RAFTER
1-1/2" x 5-1/2" WINDOW BUCK
2'-1
15/
16"1'
-9 1
1/16
"
LOT NUMBER:
7
KATERRA INC.
CLIENT:
WSU ENVIRONMENTAL HEALTH & SAFETY
FINAL CHECKSET02/17/2017
CHECKED BY:
8 5
06/23/2017
6 4 3 2 1
80% DD SET
DESCRIPTIONDATEMARK
100% CD SET CHANGES 1100% CD SET CHANGES 2
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
100% CD SET
LOT #107
D
A
B
C
8/8/
2017
5:0
5
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
CONSULTANTS:
11/15/2016
DRAWN BY:
04/24/201705/12/2017
SHEET TITLE:
LOOKING WEST @ SKYLIGHT MODULEA6
SCALE: 3"=1'-0"
SCALE: N/AAXON: SKYLIGHT MODULE
C8
S-502
SKYLIGHT MODULE
DGSA
3/4" PLYWOOD (TYP)
1-1/2" x 5-1/2" WINDOW BUCK
1'-7
15/
16"
2'-2
1/8
"
DRAWN BY:
11/15/2016
05/12/201704/24/2017
DESCRIPTION
100% CD SET CHANGES 106/23/2017
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SET
DATE
FINAL CHECKSET
CHECKED BY:
8 7 6 5 4 3 2 1
80% DD SET02/17/2017
100% CD SET CHANGES 2
MARK
SHEET TITLE:
LOT NUMBER:
CLIENT:U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV
LOT #107
D
A
B
C
8/8/
2017
5:0
5
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
TODD BEYREUTHER, P.E.
CONSULTANTS:
SCALE: N/A
LOOKING NORTH @ SKYLIGHT MODULEC6
SCALE: 3"=1'-0"
AXON: SKYLIGHT MODULEC8
S-503
SKYLIGHT MODULE
SA DG
WALL ASSEMBLY 05WALL ASSEMBLY 01
WALL ASSEMBLY 04WALL ASSEMBLY 02
FLOOR PANEL 01WALL ASSEMBLY 03
1-1/2" x 3-1/2" DOUGLAS FIR LUMBER 1-1/2" x 3-1/2" DOUGLAS FIR LUMBER1-1/2" x 3-1/2" DOUGLAS FIR LUMBER
1/2" PLYWOOD
3/4" PLYWOOD
1-1/2" x 3-1/2" DOUGLAS FIR LUMBER
3/4" PLYWOOD
3/4" PLYWOOD
3/4" PLYWOOD
1-1/2" x 3-1/2" DOUGLAS FIR LUMBER
6'-9
1/2
"
1'-2 7/16"
2'-1"
6'-9
1/2
"
2'-1 1/2"
5'-6 7/8"
8'-1 3/4"
7'-0
1/2
"
4 1/4"
2'-7 1/4"
5'-10"
2'-4 1/8"
6'-5
1/2
"
5'-7 5/8"
2'-0 3/4"
3'-3 7/8"
2'-5"
5'-1 3/8"
4'-9 5/8"
5 9/16"
5'-2 1/8"
1'-0 7/8"
8'-3
1/4
"
1'-10 3/4"
7'-0
1/2
"
2'-1 3/8"
5'-0 5/8"
3'-10"
4'-11 7/8"
7'-11"
3'-0 3/8"
7'-0
1/2
"
5'-0 5/8"
8'-3 1/4"
1'-5 1/16"
6'-5
1/2
"
6'-9
1/2
"
2'-9 1/16"
4'-1 1/16"
7'-0
1/2
"
4'-11 1/8"
7'-0
1/2
"
10 5/8"
1'-3 1/4"
ADDRESS: [STREET]SPOKANE, WA [ZIP CODE]
CONTACT:
TODD BEYREUTHER, P.E.
EN CITY
05/12/2017
DRAWN BY:
11/15/2016
CONSULTANTS:
DESCRIPTION
2
100% CD SET CHANGES 2100% CD SET CHANGES 1
06/23/2017
KATERRA INC.WSU ENVIRONMENTAL HEALTH & SAFETY
100% CD SETFINAL CHECKSET02/17/2017
CHECKED BY:
8 7 6 5 4 3
04/24/2017
1
80% DD SET
DATEMARK
SHEET TITLE:
LOT NUMBER:
CLIENT:U.S. DEPARTMENT OF ENERGY
SOLAR DECATHLON 2017WWW.SOLARDECATHLON.GOV
LOT #107
D
A
B
C
8/4/
2017
9:0
6
TEAM NAME:
A5
A5
WALL ASSEMBLY 02
SCALE: 1/2"=1'-0" SCALE: 1/2"=1'-0"
A2
SCALE: 1/2"=1'-0"A4
A4SCALE: 1/2"=1'-0"
TINYHOME BATHROOM MODULEB1
WALL ASSEMBLY 01SCALE: 1/2"=1'-0"
WALL ASSEMBLY 03
SCALE: 1/2"=1'-0"
WALL ASSEMBLY 04
FLOOR ASSEMBLY 01
SCALE: N/A
A2WALL ASSEMBLY 05
S-504
TINYHOME BATHROOM MODULE
STRUCTURAL DETAILSDGSA
WALL ASSEMBLY 06WALL ASSEMBLY 05WALL ASSEMBLY 09
WALL ASSEMBLY TYPE 01WALL ASSEMBLY TYPE 08
DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)3/4" PLYWOOD (2 SHEETS)
3/4" PLYWOOD
3/4" PLYWOOD
DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)
3/4" PLYWOOD3/4" PLYWOOD (2 SHEETS)
DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)3/4" PLYWOOD
3/4" PLYWOOD
DOUGLAS FIR 1-1/2" x 3-1/2" (TYP) DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)3/4" PLYWOOD
DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)
3/4" PLYWOOD
DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)
DOUGLAS FIR 1-1/2" x 3-1/2" (TYP)
6'-1 1/8"
1'-5 11/16"
2'-11 5/16"
4'-5"
5'-8 7/8"
7'-0
1/2
"
6'-9
1/2
"
7'-0
1/2
"
6'-5
1/2
"
2'-1 15/16"
2'-5 7/16"
3'-0 1/8"
10 3/16"
3'-3 5/8"
3'-9 13/16"
7'-0
1/2
"
2'-5"
7'-0
1/2
"
6'-5
1/2
"
1'-0 7/8"
2'-1 1/2"
2'-5"
7'-0
1/2
"
6'-5
1/2
"
1'-0 5/8"
2'-1 1/2"2'-1 1/2"
1'-0 5/8"
3'-1 5/16"
2'-5"
7'-0
1/2
"
6'-5
1/2
"
6'-0 3/8"
1'-4 1/2"
1'-8"
7'-0
1/2
"
7'-0
1/2
"
1'-4 1/2"
1'-8"
6'-9
1/2
"
1'-3"
2'-9 15/16"
2'-1
1 3/
4"
10'-2
1/2
"
7'-0
1/2
"2
1/4"
2'-2 3/16"
2'-6 15/16"
2'-11 7/16"
7'-0
1/2
"
6'-5
1/2
"
7'-0
1/2
"
1'-4 1/2"
1'-8 3/4"
6'-9
1/2
"
1'-3"
WALL ASSEMBLY TYPE 03
WALL ASSEMBLY TYPE 01WALL ASSEMBLY TYPE 02
WALL ASSEMBLY TYPE 09WALL ASSEMBLY TYPE 05
WALL ASSEMBLY TYPE 04
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
CLIENT:
TEAM NAME:
LOT #107
6
D
1
06/23/2017
8
8/7/
2017
2:0
6
WSU ENVIRONMENTAL HEALTH & SAFETY
B
5
KATERRA INC.
TODD BEYREUTHER, P.E.
DESCRIPTION
ADDRESS:
MARK
SHEET TITLE:
LOT NUMBER:
7 3
100% CD SET CHANGES 1100% CD SET
4
C
A
FINAL CHECKSET
100% CD SET CHANGES 2
DATE
02/17/2017
CONSULTANTS:
80% DD SET
[STREET]SPOKANE, WA [ZIP CODE]
CHECKED BY:
EN CITY
2
CONTACT:
11/15/2016
DRAWN BY:
04/24/201705/12/2017
WALL ASSEMBLY 05WALL ASSEMBLY 01SCALE: 1/2" = 1'
A6
WALL ASSEMBLY 08SCALE: 1/2" = 1'
C8
SCALE: N/A
SCALE: 1/2" = 1'
A8
SCALE: N/A
CLOSET MODULE AXON NW
CLOSET MODULE AXON SE
A4 A3 A2
C2
C5A6SCALE: 1/2" = 1' SCALE: 1/2" = 1'
WALL ASSEMBLY 07WALL ASSEMBLY 06
WALL ASSEMBLY 09C4
SCALE: 1/2" = 1'
SCALE: 1/2" = 1'WALL ASSEMBLY 04WALL ASSEMBLY 03
SCALE: 1/2" = 1'WALL ASSEMBLY 02
A5SCALE: 1/2" = 1'
S-505
TINYHOME CLOSET MODULE
STRUCTURAL DETAILSDGSA
NOTE:· AFTER CURED, REMOVE 2X4 EDGE &INSTALL HARDI PANELEDGE FINISH?(OR WE CAN JUST USE A PLYWOOD +HARDI PANEL PERIMETER?).
SHIM AS REQUIREDTO ACHIEVE LEVEL SURFACE
3-1/2" FLOWABLE FILL W/ 100 PSIBEARING STRENGTH AFTER
3HR CURE TIME
1-1/2" x 3-1/2"SPIKE & NAIL
VAPOR BARRIERSTAPLED TO FORM
10 MIL VAPOR BARRIER
30" PTYP.
3-1/2" FLOWABLE FILL10 MIL VAPOR BARRIERTOOLED CONTROL JOINT
C2S-506
SIM
TOOLED CONTROL JOINT
10 MIL VAPOR BARRIERWRAP TO FORMWORK
3-1/2" FLOWABLE FILL1-1/2" x 3-1/2" FORMWORK
PENCIL ROD ANCHOR- TO BE DRIVEN THROUGH
AFTER FLOWABLE FILL HAS CURED
SCALE: 1"=1'-0"
SCALE: 1"=1'-0"
C2FLOWABLE FORMWORK CONNECTION
FLOWABLE FILL
FLOWABLE FILL @ EDGE
B2SCALE: 1"=1'-0"
A2
WSU ENVIRONMENTAL HEALTH & SAFETY
80% DD SET
KATERRA INC.
06/23/2017
TODD BEYREUTHER, P.E.
4
100% CD SET CHANGES 1
56
CONSULTANTS:
3 2 1
100% CD SET CHANGES 2
DESCRIPTIONDATEMARK
7
8/7/
2017
2:4
2
C
8
B
A
CHECKED BY:
D
LOT #107
02/17/2017
TEAM NAME:
ADDRESS:
CONTACT:
EN CITY
[STREET]SPOKANE, WA [ZIP CODE]
U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2017
WWW.SOLARDECATHLON.GOV
CLIENT:
11/15/2016
DRAWN BY:
04/24/201705/12/2017
FINAL CHECKSET
LOT NUMBER:
SHEET TITLE:
100% CD SET
S-506
FLOWABLE FILL DETAILS
BK XX
12'-4 1/2"11'-9 3/4"
15'-1
1 1/
2"
6'-11 3/4"11 3/4"
3'-1
1 7/
8"
9'-11 1/4"
11 3/4"12'-9 1/2"
3'-1
1 7/
8"
41'-11 1/2