DESCRIPTION

Team JHK. Project TIC. Personnel. Supreme Commander Jarrod Marsh. Personnel. Mistress of Money, Transactions, and Work No One Else Wants to Do Hallie Baer. Personnel. Minister of Paperwork, Bureaucratic Nonsense, and Design Review Koren Smith. PDR Presentation. Team JHK - PowerPoint PPT Presentation

Citation preview

Page 1: Team JHK

Team JHK

Project TIC

Page 2: Team JHK

Personnel

Supreme Commander

Jarrod Marsh

Page 3: Team JHK

Personnel

Mistress of Money, Transactions, and Work No One Else Wants to Do

Hallie Baer

Page 4: Team JHK

Personnel

Minister of Paperwork, Bureaucratic Nonsense, and Design Review

Koren Smith

Page 5: Team JHK

PDR Presentation

Team JHK

Experiment TIC

February 27, 2003

Page 6: Team JHK

Science Objective

Our goal is to learn if IR radiation is dependent on temperature or altitude in the upper atmosphere. We are also going to study temperature as a function of altitude during ascent.

Page 7: Team JHK

Payload Design

The payload will be constructed out of a BASIC Stamp and be connected to an infrared sensor and a thermistor. The sensors will be interfaced to the BASIC Stamp through an ADC channel. A timing chip will also be included to coordinate the data with GPS data taken by the balloon systems. There will be a camera facing the side of the box that will take pictures at certain intervals.

Page 8: Team JHK

Fabrication and Testing

The first step will be to design the circuitry for the sensors and chips. While waiting for the parts to be delivered over the next several weeks, we will finish mounting all the basic components of the circuit. When the ADC, RTC, and sensors arrive, we will begin testing with an oscilloscope before we mount the chips. The final test will to suspend the payload above a surface and determine if the readings taken match the actual data.

Page 9: Team JHK

Fabrication Test List

• Circuitry– Design – Construction and Testing

• Testing– ADC

• Attach power source

• Input simulated data

• Use oscilloscope to measure from output pin

Page 10: Team JHK

Fabrication Test List (cont.)

– RTC• Attach power source

• Send command to begin transmitting time

• Use Basic Stamp to interpret signal

Page 11: Team JHK

Mission Operations

The payload will be launched and tracked from the ground. Upon recovery the EEPROM will be downloaded and the data converted to temperatures and light intensities to determine if a correlation exists between the two.

Page 12: Team JHK

Weight Budget

Item Weight

CanSat 85gThermistor 10gSensor 300gCamera 30gMemory Chip 50gWarming Device 100g Total Weight 575g

Page 13: Team JHK

Data Analysis

Temperature and IR light intensity will be measured every ten seconds during the flight. All data will be stored on board and recovered with the payload. Software needs to be developed to convert voltages from the sensors to temperature and IR light intensity.

Page 14: Team JHK

Power Budget

Still waiting on specs for some parts

Page 15: Team JHK

Master Budget

Item Estimated CostInfrared Sensor $200 Thermistor $20Digital Camera $40 Warming Device $20 Memory Chip $20 ADC Chip $5

$305

Page 16: Team JHK

TimelinePDR 2 days Mon 2/24/03 Tue 2/25/03Build PDR Presentation 3 days Tue 2/25/03 Thu 2/27/03PDR Presentation 0 days Thu 2/27/03 Thu 2/27/03Mardi Gras BreakBegin Construction Design 5 days Mon 3/3/03 Fri 3/7/03Receive and Install Sensors 5 days Mon 3/10/03 Fri 3/14/03Install Power/ Begin Testing 5 days Mon 3/17/03 Fri 3/21/03Work on CDR 4 days Mon 3/24/03 Thu 3/27/03CDR Due 0 days Thu 3/27/03 Thu 3/27/03Work on Interface 5 days Mon 3/31/03 Fri 4/4/03Testing/ Begin Calibration 5 days Mon 4/7/03 Fri 4/11/03Construction of Box 5 days Mon 4/14/03 Fri 4/18/03Begin Preparation for Flight5 days Mon 4/21/03 Fri 4/25/03Work on FRR 4 days Mon 4/28/03 Thu 5/1/03FRR Due 0 days Thu 5/1/03 Thu 5/1/03Preparation for flight 5 days Mon 5/5/03 Fri 5/9/03Final Exams 5 days Mon 5/12/03 Fri 5/16/03Flight Operations 5 days Mon 5/19/03 Fri 5/23/03

Page 17: Team JHK

WBS

See Handouts

Page 18: Team JHK

Credits

1.    Online Source: National Institute of Water and Atmospheric Research (NIWA), February 16, 2003, http://www.niwa.co.nz/edu/students/faq/layers

2.      Online Source: Online Journey through Astronomy, February 16, 2003, http://csep10/phys/utk/edu/astr161/lect/earth/atmosphere.html

3.      Online Source: NASA Website, February 16, 2003, http://liftoff.msfc.nasa.gov/academy/space/atmosphere/html

4.      Online Source: Earth Zone Website: Absorption, Radiation, & Greenhouse, February 23, 2003, http://207.10.97.102/earthzone/lessons/07meteor/greenhouse.html

5.      Online Source: University of Chicago, February 23, 2003, http://geosci.uchicago.edu/~archer/EnvChem/Labs/modtran.lite.html

6.      Online Source: Caltech University, February 23, 2003, http://www.ipac.caltech.edu/Outreach/Edu/infrared.html

7.      Online Source: Seiko Instruments, February 23, 2003, http://www.sih.com.hk.html

8.      Catalog Source: Edmund Industrial Optics, Optics and Optical Instruments Catalog, 2002, p. 191

Online Source: US Sensor Corporation, February 23, 2003, http://www.ussensor.com/products/precintr.html

Page 19: Team JHK

And of course…

Thanks to the JHK team for putting up with me…