Learning OutcomeUpon completion of this lesson, the student will be able to:

• Explain the four common stages of team formation and growth.

• As assigned by the Instructor, participate as a contributing team member on an RPT Student team.

• Demonstrate the use of the SLAPPS mnemonic to exercise situational awareness.

Page 3: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Learning OutcomeUpon completion of this lesson, the student will be able to:

• Demonstrate the proper use of the 3 part communication model including the use of the phonetic alphabet and numeric communication.

• Demonstrate the proper use of the STAR acrostic to exercise self-checking.

Page 4: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Outline

• Explanation of the Practical Exercise• TEAM Selections• Communication Gear• Scenario Set-Up• Section 1 – TEAM• Section 2 – Communications – Procedures• Section 3 – Review and Report Back

Page 5: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Explanation

• The class will be separated into teams. The minimum number is two with the maximum and preferred number set at four. No five person teams.

• After team selection, the groups should form up, review the Student Guide up to but not including Section 1.

Page 6: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Explanation

• All teams will start Section 1 at the same time and will not go to Section 2 until directed by the Instructor.

• The teams will start and complete Sections 1-3 when directed by the Instructor.

• The different sections are designed to exercise the dynamics of teamwork, communications, and human performance improvement tools.

Page 7: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Scenario Set-Up

• Competition for the TOP Notch Team• Is your team collaborative?• Is it synergistic in decision making skills?• Does it demonstrate a good grasp of the three-part

communication model?• Does it demonstrate a creative and dynamic approach to

problem solving?• Does it demonstrate proficiency in using SLLAPS, STAR,

and procedure use and adherence?• Let’s find out!

Page 8: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

TEAM Selection

Page 9: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Communication Gear

Page 10: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Wireless Telex Unit

Page 11: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Headset

Page 12: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Belt Pack

Page 13: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Section 1 - TEAM

• Follow the directions in the Student Guide• Be prepared to start the three minute report

backs when you hear the alarm.

Page 14: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Section 2 – Communications, Procedures

• Immediately following the completion of Section 1 – the Instructor will provide a “Pre-Job Briefing” on the task at hand.

• Each team is allowed 25 minutes to complete Section 2.

• Two four person teams and one two person team are permitted in the RCA at any one time.

• The two person team will not use radio communication – but both will be in the RCA at the same time.

Page 15: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Section 2 – Communications, Procedures

• The instructor will start the clock for each set of teams as soon as possible after the briefing.

• The outside reader is responsible for keeping track of the time for their team.

• The inside team is required to exit upon the receipt of an alarm.

Page 16: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Section 3 – Review and Report Back

• After the completion of the RCA time for Section 2, teams should return to the staging point and complete the Student Guide Section 3 steps 1-5.

• The last teams exiting will be given 10 minutes to complete the Student Guide steps 1-5.

Page 17: TEAM, Communications, Procedures Radiological Safety and Response RPT-243-PE-1

Section 3 – Review and Report Back

• Steps 6 and 7 of Section 3 will start when the instructor indicates the last teams have completed steps 1-5.

• In the event the lab period time has expired, the steps will be deferred to the next lab period as directed by the instructor.