TCPP- STRUCTURAL - OFFSHORE JOBCARDS MANHOURS SUMMARY Job Description Type of Work SUB-TOTALMHR PF PW IT IF EL NDT RG MW SF SW SCAFF P INSUL FW OTH Installationof 2nosof Lower bearingplatesat Bridgefixedendat TPPPlatform HOTWORK 52.52 0.00 0.00 0.00 0.00 0.00 2.50 2.00 0.00 4.36 20.00 0.00 1.30 0.00 22.36 0.00 Installation of 2 nos of Lower bearing plates at Bridge fixed end at TPP Platform Total Installationof 2nosof Lower bearingplatesat Bridgeslidingendat TCPPPlatform HOTWORK 61.28 0.00 0.00 0.00 0.00 0.00 3.00 2.00 0.00 4.36 24.00 0.00 1.56 0.00 26.36 0.00 Installation of 2 nos of Lower bearing plates at Bridge sliding end at TCPP Platform Total Installationof 4nos. W10X26I-beam, gratingsandhandrailsfor Stairwayno. 3&4belowHelideck. HOTWORK 126.52 0.00 0.00 0.00 0.00 0.00 5.04 6.00 0.00 13.20 32.00 12.00 13.08 0.00 45.20 0.00 Installation of 4 nos. W10 X 26 I-beam, gratings and handrails for Stairway no. 3 & 4 below Helideck. Total Installationof 5Sectionsof Monorail MR06(10MT) belowProd.deckbetweencolumn2&3. HOTWORK 580.66 0.00 0.00 0.00 0.00 0.00 28.36 182.00 0.00 76.02 98.60 0.00 21.06 0.00 174.62 0.00 Installation of 5 Sections of Monorail MR06 (10 MT) below Prod.deck between column 2 & 3. Total Installationof BridgeRampno. 1at TPPandBridgeRampno. 2at TCPP HOTWORK 26.76 0.00 0.00 0.00 0.00 0.00 0.00 8.40 0.00 2.00 9.28 0.00 2.08 0.00 5.00 0.00 Installation of Bridge Ramp no. 1 at TPP and Bridge Ramp no. 2 at TCPP Total Installationof Intermoduledeckplatesat Maindeckbetweencolumn2&3. HOTWORK 779.00 0.00 0.00 0.00 0.00 0.00 6.00 42.00 0.00 53.38 ####### 96.00 32.24 0.00 301.38 0.00 Installation of Intermodule deck plates at Main deck between column 2 & 3. Total Installationof IntermoduleGratings&Handrailsat Cellar deckbetweencolumn2&3. HOTWORK 388.20 0.00 0.00 0.00 0.00 0.00 2.00 50.00 0.00 47.10 78.50 72.00 13.00 0.00 125.60 0.00 Installation of Intermodule Gratings & Handrails at Cellar deck between column 2 & 3. Total Installationof IntermoduleGratings&handrailsat Productiondeckbetweencolumn2&3. HOTWORK 305.80 0.00 0.00 0.00 0.00 0.00 2.00 45.00 0.00 31.40 62.80 60.00 10.40 0.00 94.20 0.00 Installation of Intermodule Gratings & handrails at Production deck between column 2 & 3. Total Installationof safetynettingat Helideck HOTWORK 51.24 0.00 0.00 0.00 0.00 0.00 1.60 5.00 0.00 0.00 6.40 30.00 1.84 0.00 6.40 0.00 Installation of safety netting at Helideck Total Provision for removal of bridge chord to make required clearance on safety route where necessary incase Bridge set out point is nearer to the Platform.(Field to Verify) HOTWORK 35.71 0.00 0.00 0.00 0.00 0.00 1.00 2.00 0.00 16.14 0.00 0.00 2.00 0.00 14.57 0.00 Provision for removal of bridge chord to make required clearance on safety route where necessary incase Bridge set out point is nearer to the Platform.(Field to Verify) Total (blank) (blank) (blank) (blank) (blank) (blank) (blank) (blank) (blank) (blank) (blank) (blank) (blank) (blank) (blank) (blank) (blank) (blank (blank) Total Grand Total  (REV. A) BG EXPLORATION AND PRODUCTION INDIA LTD. NRPOD Tapti Expansion Project. CONSTRUCTION / HOOK UP WORKS Filename: 238450671.xls.ms_office Page1of3

Tcpp-structural Jobcard Monitoring Sheets as of 05 Dec 2006

Embed Size (px)

DESCRIPTION

Job cards monitoring

Citation preview

NRPOD HUC TCPP STRUCTURAL JOB CARD MONITORING

PIVOTTCPP- STRUCTURAL - OFFSHORE JOBCARDS MANHOURS SUMMARYBG EXPLORATION AND PRODUCTION INDIA LTD.NRPOD Tapti Expansion Project.CONSTRUCTION / HOOK UP WORKS(REV. A)Report Printed on July 6, 2004 at 11:05 AMJob DescriptionType of WorkSUB-TOTAL MHRPFPWITIFELNDTRGMWSFSWSCAFFPINSULFWOTHWGT (%)Actual (%)STATUSInstallation of 2 nos of Lower bearing plates at Bridge fixed end at TPP PlatformHOTWORK52.520.000.000.000.000.002.502.000.004.3620.000.001.300.0022.360.002.110.00IncompleteInstallation of 2 nos of Lower bearing plates at Bridge fixed end at TPP Platform TotalInstallation of 2 nos of Lower bearing plates at Bridge sliding end at TCPP PlatformHOTWORK61.280.000.000.000.000.003.002.000.004.3624.000.001.560.0026.360.002.460.00IncompleteInstallation of 2 nos of Lower bearing plates at Bridge sliding end at TCPP Platform TotalInstallation of 4 nos. W10 X 26 I-beam, gratings and handrails for Stairway no. 3 & 4 below Helideck.HOTWORK126.520.000.000.000.000.005.046.000.0013.2032.0012.0013.080.0045.200.005.090.00IncompleteInstallation of 4 nos. W10 X 26 I-beam, gratings and handrails for Stairway no. 3 & 4 below Helideck. TotalInstallation of 5 Sections of Monorail MR06 (10 MT) below Prod.deck between column 2 & 3.HOTWORK580.660.000.000.000.000.0028.36182.000.0076.0298.600.0021.060.00174.620.0023.350.00IncompleteInstallation of 5 Sections of Monorail MR06 (10 MT) below Prod.deck between column 2 & 3. TotalInstallation of Bridge Ramp no. 1 at TPP and Bridge Ramp no. 2 at TCPPHOTWORK26.760.000.000.000.000.000.008.400.002.009.280.002.080.005.000.001.080.00IncompleteInstallation of Bridge Ramp no. 1 at TPP and Bridge Ramp no. 2 at TCPP TotalInstallation of Intermodule deck plates at Main deck between column 2 & 3.HOTWORK779.000.000.000.000.000.006.0042.000.0053.38248.0096.0032.240.00301.380.0031.330.00IncompleteInstallation of Intermodule deck plates at Main deck between column 2 & 3. TotalInstallation of Intermodule Gratings & Handrails at Cellar deck between column 2 & 3.HOTWORK388.200.000.000.000.000.002.0050.000.0047.1078.5072.0013.000.00125.600.0015.610.00IncompleteInstallation of Intermodule Gratings & Handrails at Cellar deck between column 2 & 3. TotalInstallation of Intermodule Gratings & handrails at Production deck between column 2 & 3.HOTWORK305.800.000.000.000.000.002.0045.000.0031.4062.8060.0010.400.0094.200.0012.300.00IncompleteInstallation of Intermodule Gratings & handrails at Production deck between column 2 & 3. TotalInstallation of safety netting at HelideckHOTWORK51.240.000.000.000.000.001.605.000.000.006.4030.001.840.006.400.002.060.00IncompleteInstallation of safety netting at Helideck TotalProvision for removal of bridge chord to make required clearance on safety route where necessary incase Bridge set out point is nearer to the Platform.(Field to Verify)HOTWORK35.710.000.000.000.000.001.002.000.0016.140.000.002.000.0014.570.001.440.00IncompleteProvision for removal of bridge chord to make required clearance on safety route where necessary incase Bridge set out point is nearer to the Platform.(Field to Verify) Total(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank)(blank) TotalGrand Total

&LFilename: &F&CPage &P of &N

DATABG EXPLORATION AND PRODUCTION INDIA LTD.NRPOD Tapti Expansion Project.CONSTRUCTION / HOOK UP WORKSTCPP- STRUCTURAL - OFFSHORE JOBCARDS MANHOURS SUMMARYReport Printed on July 6, 2004 at 11:05 AMJobcard IDDisciplineAreaLocationSequence No.Job DescriptionDrawing No.JHA Ref. No.Type of WorkWork PhaseSUB-TOTAL MHRPFPWITIFELNDTRGMWPINSULSFSWSCAFFFWOTHWGT (%)Actual (%)STATUSBUDGET MANHOURSS-JC-001.xlsSTMDINTERMOD001Installation of Intermodule deck plates at Main deck between column 2 & 3.BGEP-RWKL-T102-TCP-ST-04-0170 REV. D1, ST-04-10-0050 REV. D1HOTWORK1779.000.000.000.000.000.006.0042.000.0032.240.0053.38248.0096.00301.380.0013.400Incomplete984S-JC-002.xlsSTPDINTERMOD002Installation of Intermodule Gratings & handrails at Production deck between column 2 & 3.BGEP-RWKL-T102-TCP-ST-04-0180 REV. D2, ST-04-10-0060 REV. D4HOTWORK1305.800.000.000.000.000.002.0045.000.0010.400.0031.4062.8060.0094.200.005.260Incomplete386S-JC-003.xlsSTCDINTERMOD003Installation of Intermodule Gratings, deck plates & Handrails at Cellar deck between column 2 & 3.BGEP-RWKL-T102-TCP-ST-04-0190 REV. D3, ST-04-10-0070 REV. D7HOTWORK1554.120.000.000.000.000.0011.0050.000.0027.560.0053.38143.4072.00196.780.009.530Incomplete700S-JC-004.xlsSTHDWEST004Installation of safety netting at HelideckBGEP-RWKL-T102-TCP-ST-04-10-0420 REV. D1, ST-04-10-0421 REV. D0HOTWORK151.240.000.000.000.000.001.605.000.001.840.000.006.4030.006.400.000.880Incomplete65S-JC-005.xlsSTHDWEST005Installation of 4 nos. W10 X 26 I-beam, gratings and handrails for Stairway no. 3 & 4 below Helideck.BGEP-RWKL-T102-TCP-ST-04-10-0430 REV. D0, ST-04-10-0431, 0432, 0433 & 0434 REV. DOHOTWORK1126.520.000.000.000.000.005.046.000.0013.080.0013.2032.0012.0045.200.002.180Incomplete160S-JC-006.xlsSTPDINTERMOD006Installation of 5 Sections of Monorail MR06 (10 MT) below Prod.deck between column 2 & 3.BGEP-RWKL-T102-TCP-ST-04-10-0487 REV. D3HOTWORK1774.660.000.000.000.000.0028.36316.000.0021.060.0076.0298.6060.00174.620.0013.320Incomplete979S-JC-007.xlsSTBRWALKWAY007Installation of Bridge Ramp no. 1 at TPP and Bridge Ramp no. 2 at TCPPBGEP-RWKL-T102-TCP-ST-04-10-0330 REV. D3HOTWORK131.040.000.000.000.000.000.006.400.002.080.002.009.280.0011.280.000.530Incomplete39S-JC-008.xlsSTBRWEST008Installation of 2 nos of Lower bearing plates at Bridge sliding end at TCPP PlatformBGEP-RWKL-T102-TCP-ST-04-10-00350 REV. D1HOTWORK162.780.000.000.000.000.004.502.000.001.560.004.3624.000.0026.360.001.080Incomplete79S-JC-009.xlsSTBRWEST009Provision for removal of bridge chord to make required clearance on safety route where necessary incase Bridge set out point is nearer to the Platform.(Field to Verify)BGEP-RWKL-T102-TCP-ST-04-10-00350 REV. D1HOTWORK135.710.000.000.000.000.001.002.000.002.000.0016.140.000.0014.570.000.610Incomplete45S-JC-010.xlsSTBRWEST010Installation of 2 nos of Lower bearing plates at Bridge fixed end at TPP PlatformBGEP-RWKL-T102-TCP-ST-04-10-0350 REV. D1HOTWORK153.770.000.000.000.000.003.752.000.001.300.004.3620.000.0022.360.000.920Incomplete68S-JC-011.xlsSTCDWEST011Removal of 7 nos. of temporary wedges at Cellar deck firewallBGEP-RWKL-T102-TCP-ST-04-10-0250 REV. DOCOLDWORK12.000.000.000.000.000.000.002.000.000.000.000.000.000.000.000.000.030Incomplete3S-JC-012.xlsSTPDWEST012Removal of 5 nos. of temporary wedges at Production deck firewallBGEP-RWKL-T102-TCP-ST-04-10-0251 REV. D2COLDWORK12.000.000.000.000.000.000.002.000.000.000.000.000.000.000.000.000.030Incomplete3S-JC-013.xlsSTMDEAST013Removal of 4 nos. of temporary bumpers at Module1 Main deck & Compression Module 1.BGEP-RWKL-T102-TCP-ST-04-10-0810 REV. D0, ST-04-10-0811 REV. D0, SOLAR TURBINES DWG. 78091-1400-S049 REV. 0, 7809-1400-S338 REV. 0HOTWORK1289.700.000.000.000.000.000.0032.000.0037.500.0088.100.0044.0088.100.004.980Incomplete366S-JC-014.xlsSTHDWEST014Skidding of Helideck outboard to final positionBGEP-RWKL-T102-TCP-ST-04-10-0440 REV. D0, ST-04-10-0441 REV. D0HOTWORK11141.000.000.000.000.000.008.00296.000.0040.000.0072.0064.00525.00136.000.0019.620Incomplete1441S-JC-015.xlsSTSCDINTERMOD015Installation of Intermodule Gratings and Handrails at Sub-cellar deck between column 2 & 3.BGEP-RWKL-T102-TCP-ST-04-0195 REV. D2HOTWORK128.460.000.000.000.000.001.005.000.001.040.003.141.5712.004.710.000.490Incomplete36S-JC-016.xlsSTCDNORTH/SOUTH016Installation of Swing ropes at cellar deck to boatlanding at Norh & South side of platformBGEP-RWKL-T102-TCP-ST-04-10-0260 REV. D0COLDWORK18.000.000.000.000.000.000.008.000.000.000.000.000.000.000.000.000.140Incomplete10S-JC-017.xlsSTBRENDS017Removal of bridge installation guides on bridge ends at TCPP / TPP.BGEP-RWKL-T102-TCP-ST-04-0200 REV. D0, ST-04-10-0381 REV. D1HOTWORK142.060.000.000.000.000.000.005.500.008.000.0014.280.000.0014.280.000.720Incomplete53S-JC-018.xlsSTMDWEST018Post installation work at Exchaust Stack tower like provision of walkway, grating, touch-up painting etcBGEP-RWKL-T102-TCP-ST-04-0228 REV. D2, ST-04-10-0229 REV. D2, ST-04-10-0236 REV. D1, ST-04-10-0262 REV. D0HOTWORK1138.000.000.000.000.000.000.0028.000.0048.000.008.008.0030.0016.000.002.370Incomplete174S-JC-019.xlsSTCDSOUTH019Installation of Relocated 35 Men Survival Capsule Davit (3.016 MT) & Capsule (6.804 MT) at south side of TCPP Cellar deck.PL-3401.01 R REV. D0,PL-3401.02 R REV. DO, LD-3600 R REV. D0, SS3600 R REV. D0, 8678.1 R REV. D0, 8678.2 R REV. D0, 8678.3 R REV. D0,HOTWORK1376.000.000.000.000.000.008.00112.000.0020.000.0013.0072.0066.0085.000.006.470Incomplete475S-JC-020.xlsSTMDEAST020Installation of walkway between Stair tower no 3 and Solar compressor Module at East North of main deck.SOLAR TURBINES DRWG. NO. 78091-1500-M021 REV. 3, BGEP-RWKL-T102-TCP-ST-04-10-0224 REV. D2, ST-04-10-0225 REV. D2HOTWORK1149.720.000.000.000.000.003.0028.000.006.000.0021.8618.0033.0039.860.002.570Incomplete189S-JC-021.xlsSTMDEAST/WEST021Installation of stair case from Compression Module to Stair tower no 4 East side and Main deck West side of Compression Module.SOLAR TURBINES DRWG. NO. 78091-1500-M021 REV. 3, BGEP-RWKL-T102-TCP-ST-04-10-0226 REV. D1, ST-04-10-0227 REV. D2HOTWORK1121.960.000.000.000.000.004.006.000.008.000.0022.4824.0011.0046.480.002.100Incomplete154S-JC-022.xlsSTALLPLFT022Surface preparation & coating of all exposed metal parts at Sea deck jacket legs, Boatlanding Frame, Staircase, walkway frame, cellar deck inter mod. Bumper location & Maindeck padeyes location.BGEP-RWKL-T102-TCPP-ST-04-10-1090 REV. D3, ST-04-10-1204 REV. D2, ST-04-10-1201 REV. D2, ST-04-10-1170 REV. D1, ST-04-10-1180 REV. D0, ST-04-10-0211 REV. D0, ST-04-10-0212 REV. D0., ST-04-10-0160 REV. D0., ST-04-10-0161 REV. D0.COLD WORK5349.000.000.000.000.000.000.008.000.00165.000.000.000.00176.000.000.006.000Incomplete441S-JC-023.xlsSTMDEAST023Installation of Top portion of Stair Tower no. 4 & W18 x 35 at East side of Main DeckBGEP-RWKL-T102-TCP-PI-01-10-0001 REV. D1, ST-04-10-0050 REV. D1, BGEP-FFCM-T102-TCP-03-00-0001 REV.D, ST-04-10-0227 REV. D2, ST-04-10-0226 REV. D1, ST-04-10-0130 REV. D2, ST-04-10-0013 REV. D0, ST-04-10-0235 REV. D0, ST-04-10-0150 REV. D0HOTWORK1242.930.000.000.000.000.004.0024.000.008.000.0011.6826.78132.0036.460.004.180Incomplete307S-JC-024.xlsSTMDMOD. 1024NDT & Touch-up painting of welding connections between Compression Module 1 & Main deck.BGEP-RWKL-T102-ST-04-10-0050 REV. D1, ST-04-10-0130 REV. D2, ST-04-10-0810 REV. D0, ST-04-10-0812 REV. D0, SOLAR TURBINES DWG. 78091-1400-S102 REV. 0, S103 REV. 0, S203 REV. 1, S048 REV. 0, S231 REV. 0HOTWORK1150.000.000.000.000.000.0012.002.000.0016.000.000.000.00120.000.000.002.580Incomplete1895815.470000010310350471050985914791360010007346LEGEND:PF = PIPE FITTER, PW = PIE WELDER, IT = INSTRUMENT TECHNICIAN, IF = INSTRUMENT FITTER, = EL = ELECTRICIAN, NDT = NDT TECHNICIAN, RG = RIGGER, MW = MILLWRIGHT, P = PAINTER, INSUL = INSULATOR, SF = STRUCTURAL FITTER, SW = STRUCTURAL WELDER, SCAFF = SCAFFOLDER, FW = FIREWATCH, OTH = OTHERSSD = SEADECK, SCD = SUB-CELLAR DECK, CD = CELLAR DECK , PD = PRODUCTION DECK, MD = MAIN DECK, BR = BRIDGE5617 as of 28 dec

&LFilename: &F&CPage &P of &NS-JC-001.xlsS-JC-002.xlsS-JC-003.xlsS-JC-004.xlsS-JC-005.xlsS-JC-006.xlsS-JC-007.xlsS-JC-008.xlsS-JC-009.xlsS-JC-010.xlsS-JC-011.xlsS-JC-012.xlsS-JC-013.xlsS-JC-014.xlsS-JC-015.xlsS-JC-016.xlsS-JC-017.xlsS-JC-018.xlsS-JC-019.xlsS-JC-020.xlsS-JC-021.xlsS-JC-022.xlsS-JC-023.xlsS-JC-024.xls