TCM Update, January 2012 Tore Amundsen Managing Director
Foto: Søren Rysgaard / Galathea
? < 2°C
• CCS expected to cut 25 % of emissions • Contribution from 2030
TCM is the world’s largest
facility for testing and
improving CO2 capture.
Knowledge gained will prepare
the ground for CO2 capture
initiatives to combat climate
change.
Building the
Biggest!
TCM – Highlights
2006 2007 2008 2009 2010 2011 2012 2016
• State and Statoil agreed to build test centre
• Agreement to start planning and engineering
• Planning completed and preparatory work starting
• Parliament approved project
• TCM Partnership established
• Sasol joined partnership
• Plant start-up early 2012
• Initial five year test period
• Test, verify and demonstrate
CO2 capture technology owned
and marketed by vendors
• Reduce cost, technical,
environmental and financial
risks
• Encourage the development of
market for CO2 capture
technology
• Aim at international deployment
Test
Ambitions
75.12% 20% 2.44% 2.44%
Other potential partners to be invited
Our Owners
Company Meeting
Managing Director
Technology Manager Operations Manager
Technology Committee
(Partners reps.)
TCM Project Manager
Statoil
How we’re
organized
Power Plant
Amine
plant
Chilled Ammonia
plant
Admin
complex
Electrical
substation
Utilities
Future
technologies
Seawater
Piperacks
Refinery’s
cracker
Plant Layout
Power plant
Mongstad
Refinery
Project
office rig
Aerial photo 28.04.2011
TCM
TCM located next to
Statoil’s refinery
Area Philosophy
Amine plant Prefabricate modules
Site-build of foundations
Slip-form concrete structure
Chilled Ammonia plant Stick-build at site
Site-build of foundations
Slip-form concrete structure
Utilities and infrastructure Prefabricate modules
Prefabricate concrete
elements
Construction
Philosophy
Structural steel tons 2 966
Piping tons 1 174
Electrical cables m 236 965
Instrument cables m 201 029
Cable terminations no's 7 424
Junction Boxes no's 616
Instruments no's 3 904
Equipment tons 1 148
Purchased items no's 8 160(utility only)
Total TCM
Facts and
Figures
Plot the size of
11 soccer fields
Alstom and Aker
• Discharge permit granted
• No negative HSE impact
• Many studies performed
• University of Oslo, SINTEF,
CSIRO, Climate and Pollution
Agency (Klif), Nilu, MIT etc
was involved
The Amine Issue
How is CO2
captured?
Total capacity 100 ktonnes CO2 per year
Combined Heat
& Power plant
(CHP)
CO2 12.9%
CO2 3.5%
Chilled Ammonia
Treated
exhaust
Treated
exhaust
Residue
Catalytic
Cracker (RCC)
Amine CO
2
CO
2
Mobile Test Unit
Test concept
• Determine emissions and discharges from the test facilities
• Verify safe and stable continuous operation
• Determine design limits
• Minimise energy demand
• Identify and assess critical equipment
• Develop control philosophy and train advanced control system
• Develop and validate modelling tools
• Measure and compare overall test results against reference cases
• Assess cost efficiencies
• Establish cost models
Test Objectives
Three Operations
Rooms
Administration
complex
Become a globally
recognized centre
of competence on
CO2 capture
US Energy Minister
Steven Chu visit
3000 visitors to TCM so far….
Ban Ki Moon visit
Abu Dhabi invite
• Receive visitors to TCM
• Cooperate with R&D organisations and other
projects
• Participate in CCS conferences and present papers
• Keep outside world updated on status through
website
• Good communication with media and NGOs
• Subject to vendor confidentiality agreements
Knowledge
Sharing