1
Segment Segment Programmed Configuration (2000-2010) Planned/Regional Vision Configuration (2010-2025) Major Programmed Highway Projects (Committed Funding) f Map Number/Source Document Code/Project Name Major Planned Highway Projects (RTP Track 1) ff Map Number/Source Document Code/Project Name Major Planned, Concept Projects (Blueprint/CTP/CMP/ TCCR-TOPS/Other) fff Map Number/Source Document Code/Project Name Legend Rail/Transit/Bike Project Highway/Road Project Regional Express Bus Project A B C D E F G H I E D C B A Location Description Segment Vehicle Hours of Delay * Existing Lanes (2000) AM PM Post Mile Limits SM 92 0.0 R7.30 R12.14 R18.8 ALA 92 0.0 6.39 8.21 SR-1 to SR-35 I-280 to US-101 I-880 to SR-238 F G H I 2C 2C 4F 6F 4-6F 4F 4-5F (1H) 6C NA 5.19 13.93 R2.59 SR-35 to I-280 US-101 to End of SM Bridge End of SM Br. to ALA/SM Line ALA/SM Line to Toll Plaza Toll Plaza to I-880 SR-238 to I-580 Segment Highway Operational Concept Configuration (2025) % ADT Growth Forecast (2000-2020)** Draft E D C B A F G H I 2-3C (1TCL) 2-3C (1TCL) 6F 6F 6F 6F 6F (1H) 6C TBD 50% 60% 30% 30% 30% 30% 30% 30% 10% 24_1 / A: Widen SR-92 between SR-1 and Half Moon Bay city limits 24_2 / A: Widen San Mateo-Hayward Bridge (under construction): widen low-rise trestle and eastern approach from I-880 from 4-6 lanes with shoulders, extend existing westbound HOV lane 1 mile west along eastern approach from I-880, construct new ped/bicycle overcrossing 24_4 / A: Route 92 westbound slow-vehicle lane between SR-35 and I-280 24_8 / A: I-880/SR-92 I/C improvements in Hayward 24_20 / A: Construct bicycle lanes and adjacent sidewalks, and install median landscaping - SR 92/Main Street. 24_21 / A: Chess Drive/SR-92 ramp improvement - widen Foster City Blvd. off-ramp from WB Rt. 92 and add an EB lane on Chess Blvd. btw off-ramp and Foster City Blvd. 24_13 / E: SR-92 from US-101 to I-280: add WB passing lane 24_18 / E: Express Bus Service (San Mateo Bridge Corridor) 24_19 / D: San Mateo-Hillsdale/Hayward Park Caltrain Station, Phase 1 24_3 / A: Realign SR-92 and widen shoulders from Half Moon Bay City limits to Pilarcitos Creek 24_5 / E: New combined Clawiter/Whitesell/SR-92 I/C with new connector Whitesell from Hesperian north to Hesperian south 24_6 / I: New Park & Ride lot at Industrial Blvd. 24_7 / E: I-880/SR-92 reliever route (Clawiter) 24_9 / E: Widen SR-92 between US-101 and I-280 from 4 to 6 lanes 24_10 / E: Widen SR-92 from (4-6 lanes or 6-8 lanes) from US-101 I/C to I-280 I/C 24_11 / I: Aux lanes btw W. Hillsdale Blvd and DeAnza Blvd 24_12 / E: SR-92 improvements, includes uphill passing lane from US-101 to I-280 24_14 / I: Aux lanes btw SR-82 I/C and Alameda 24_15 / I: Modify SR-92/El Camino Real (SR-82) I/C 24_16 / I: Aux lanes btw Foster City Blvd and Mariners Island Blvd 24_17 / E: San Mateo-Hayward Bridge: add HOV/Transit lanes to bridge beyond current improvements (concept under evaluation in Bay Crossings Study) 24_22 / C10: San Mateo Bridge Corridor TMS Elements in SM County (not shown on map) 24_23 / C10: San Mateo Bridge Corridor Fiber Elements in SM County (not shown on map) 24_24 / C10: San Mateo Bridge Corridor TMS Elements in Alameda County (not shown on map) 24_25 / C10: San Mateo Bridge Corridor Fiber Elements in Alameda County (not shown on map) A B C D E F G H I 10.41 Legend Congestion Bottleneck Gateway Project Code Legend Proj. # / A: Project Description Example: 5-2 / A: San Pablo I/C 5-2: Project Number A: Source Document Code (highest planning document; see source document code legend) Sources of Operating Condition Information: * Caltrans Highway Congestion Report (1998) ** MTC BAYCAST 2000. ADT Growth % is 2000 to 2020. H High Occupancy Lane Classification F Freeway E Expressway C Conventional TCL Truck Climbing Lane M# # of Metering Locations R HOV - Reversible Sources of Plans and Program Document Information: f 2002 STIP, SHOPP, 2001 TIP, MTC RTP (2001) Committed ff MTC RTP (2001) Track 1 (unprogrammed ) fff MTC Blueprint (2000), County CMPs, Traffic Operational Strategies (TOPS) MAP LEGEND U.S. Highway California State Highway Interstate Highway Source Document Code A: TIP B: STIP C: SHOPP C10: 10-yr SHOPP Plan D: Local E: 2001 RTP F: 2000 Blueprint G: County CTP/CMP I: TCCR-TOPS J: Construction K: Permits T: TCRP DISTRICT 4 Transportation Planning/Traffic Operations FOR INFORMATION PURPOSES ONLY 7/29/02 TCCR CORRIDOR #24: MTC 2001 RTP Corridor Name: STATE ROUTE 92 - SAN MATEO BRIDGE CORRIDOR (San Mateo SR-1 to Alameda SR-238) Transbay

TCCR CORRIDOR #24: STATE ROUTE 92 - SAN … Project Regional Express Bus ... Chess Drive/SR-92 ramp improvement - widen Foster City Blvd. off-ramp from WB Rt. 92 and add an EB lane

  • Upload
    doxuyen

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Segment

Segment

Programmed Configuration(2000-2010)

Planned/Regional VisionConfiguration (2010-2025)

Major Programmed Highway Projects (Committed Funding) fMap Number/Source Document Code/Project Name

Major Planned Highway Projects (RTP Track 1) ffMap Number/Source Document Code/Project Name

Major Planned, Concept Projects (Blueprint/CTP/CMP/ TCCR-TOPS/Other) fffMap Number/Source Document Code/Project Name

Legend

Rail/Transit/Bike Project

Highway/Road Project

Regional Express BusProject

A B C D E F G H I

EDCBA

Location Description

Segment

Vehicle Hours ofDelay *

Existing Lanes (2000)AMPM

Post Mile Limits SM 920.0

R7.30 R12.14 R18.8 ALA 920.0

6.39 8.21

SR-1 to SR-35 I-280 to US-101 I-880 toSR-238

F G H I

2C 2C 4F 6F 4-6F 4F 4-5F (1H) 6C NA

5.19 13.93 R2.59

SR-35 to I-280 US-101 to Endof SM Bridge

End of SM Br.to ALA/SM Line

ALA/SM Lineto Toll Plaza

Toll Plazato I-880

SR-238to I-580

SegmentHighway Operational

Concept Configuration (2025)% ADT Growth Forecast

(2000-2020)**

DraftEDCBA F G H I

2-3C(1TCL)

2-3C(1TCL) 6F 6F 6F 6F 6F

(1H) 6C TBD

50% 60% 30% 30% 30% 30% 30% 30% 10%

24_1 / A: Widen SR-92 between SR-1 and Half Moon Bay city limits24_2 / A: Widen San Mateo-Hayward Bridge (under construction): widen low-rise trestle and eastern approach from I-880 from 4-6 lanes with shoulders, extend existing westbound HOV lane 1 mile west along eastern approach from I-880, construct new ped/bicycle overcrossing24_4 / A: Route 92 westbound slow-vehicle lane between SR-35 and I-28024_8 / A: I-880/SR-92 I/C improvements in Hayward24_20 / A: Construct bicycle lanes and adjacent sidewalks, and install median landscaping - SR 92/Main Street.24_21 / A: Chess Drive/SR-92 ramp improvement - widen Foster City Blvd. off-ramp from WB Rt. 92 and add an EB lane on Chess Blvd. btw off-ramp and Foster City Blvd.

24_13 / E: SR-92 from US-101 to I-280: add WB passing lane24_18 / E: Express Bus Service (San Mateo Bridge Corridor)24_19 / D: San Mateo-Hillsdale/Hayward Park Caltrain Station, Phase 1

24_3 / A: Realign SR-92 and widen shoulders from Half Moon Bay City limits to Pilarcitos Creek24_5 / E: New combined Clawiter/Whitesell/SR-92 I/C with new connector Whitesell from Hesperian north to Hesperian south24_6 / I: New Park & Ride lot at Industrial Blvd.24_7 / E: I-880/SR-92 reliever route (Clawiter)24_9 / E: Widen SR-92 between US-101 and I-280 from 4 to 6 lanes24_10 / E: Widen SR-92 from (4-6 lanes or 6-8 lanes) from US-101 I/C to I-280 I/C24_11 / I: Aux lanes btw W. Hillsdale Blvd and DeAnza Blvd24_12 / E: SR-92 improvements, includes uphill passing lane from US-101 to I-28024_14 / I: Aux lanes btw SR-82 I/C and Alameda24_15 / I: Modify SR-92/El Camino Real (SR-82) I/C24_16 / I: Aux lanes btw Foster City Blvd and Mariners Island Blvd24_17 / E: San Mateo-Hayward Bridge: add HOV/Transit lanes to bridge beyond current improvements (concept under evaluation in Bay Crossings Study)24_22 / C10: San Mateo Bridge Corridor TMS Elements in SM County (not shown on map)24_23 / C10: San Mateo Bridge Corridor Fiber Elements in SM County (not shown on map)24_24 / C10: San Mateo Bridge Corridor TMS Elements in Alameda County (not shown on map)24_25 / C10: San Mateo Bridge Corridor Fiber Elements in Alameda County (not shown on map)

A B C D E F G H I

10.41

Legend

CongestionBottleneck

Gateway

Project Code LegendProj. # / A: Project Description Example: 5-2 / A: San Pablo I/C5-2: Project NumberA: Source Document Code (highest planning document; see source document code legend)

Sources of Operating Condition Information:* Caltrans Highway Congestion Report (1998)** MTC BAYCAST 2000. ADT Growth % is 2000 to 2020.

H High Occupancy

Lane Classification F Freeway E Expressway C Conventional

TCL Truck Climbing LaneM# # of Metering Locations

R HOV - Reversible

Sources of Plans and Program Document Information:f 2002 STIP, SHOPP, 2001 TIP, MTC RTP (2001) Committedff MTC RTP (2001) Track 1 (unprogrammed )fff MTC Blueprint (2000), County CMPs, Traffic Operational Strategies (TOPS)

MAP LEGENDU.S. HighwayCalifornia State Highway

Interstate Highway

Source Document CodeA: TIPB: STIPC: SHOPPC10: 10-yr SHOPP PlanD: LocalE: 2001 RTP

F: 2000 BlueprintG: County CTP/CMPI: TCCR-TOPS

J: ConstructionK: PermitsT: TCRP

DISTRICT 4Transportation Planning/Traffic OperationsFOR INFORMATION PURPOSES ONLY 7/29/02

TCCR CORRIDOR #24:MTC 2001 RTP Corridor Name:

STATE ROUTE 92 - SAN MATEO BRIDGE CORRIDOR (San Mateo SR-1 to Alameda SR-238)Transbay