    PACKAGE

    TITLE:TA

    S.No. UNITS

    1.0 GENERAL

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    ?

    2.0

    2.1

    ?

    barg 75 and Full Vacuum

    C Minus(-50)/60

    To S-A00-1351-001 ?

    To S-A00-1351-001 ?

    To S-A00-1351-001 ?

    To S-A00-1351-001 ?

    Required

    2.2

    m3/hr

    Oil Inlet Density kg/m3

    Oil Inlet Viscosity cP

    Water Inlet Flowrate m3/hr

    Water Inlet Density kg/m3

    cP

    m3/hr

    kg/kmol

    cP

    m3/hr

    m3/hr

    m3/hr

    ptb

    kg/m3

    m

    2.3

    C

    barg

    C

    barg

    barg

    mm

    mm

    mm

    1119.53

    Gas Viscosity

    Gas Outlet Flow Rate

    10.03

    10% of liquid flow rate

    20.49

    0.015 @ 88 barg

    VTA

    VTA

    VTA

    TECH

    INLET SEPARATOR

    ASME SEC VIII Div 1/2

    SPECIFICATION REQUIREMENTS

    612.3

    87.71

    0.244

    14.64

    Conformance to Process Engg.Flow Scheme-Inlet Separator

    Conformance to Packaged Equipment General Design Philosophy and Specification

    Provision of Documents as per SDRL

    DESIGN REQUIREMENTS

    Mechanical Design

    Relavent P&IDs

    Code

    Design Pressure

    Design Temperature

    Wind Load design

    Blast Load Design

    Transportation Loading Design

    All other loadings

    Mechanical datasheet by Vendor

    Process Design

    Oil Inlet Flowrates

    Design Data

    Water Inlet Viscosity

    Gas Inlet Flow Rate

    Gas Molecular Weight

    Water Outlet Flow Rate

    Oil Outlet Flow Rate

    Particle Loading

    Particle Average Density

    Particle Range

    5 to 64

    2000

    10 to 150

    Operating Temprature

    Operating Pressure

    Design Temprature (Min / Max)

    Design Pressure (Min / Max)

    Test Pressure

    Cone Height

    S-A00-135A-001

    Number of Liners

    Diameter (ID)

    Cylinder Height

    -15 to 25.5

    69 to 88

    -50 / 60

    FV / 105

    VTA

    VTA

    VTA

    VTA

    VTA

    DESCRIPTION

    Quotation Ref. / Date

    Vessel manufacturer

    Conformance to Inlet Separator Mechanical Spec.

    Conformance to Pressure Vessel Gen.Design Philosophy &Spec

    Conformance to Inlet Separator Datasheet

    Conformance to Basic Engineering Design Data

    Doc No.: 247581721.xls.ms_office 10/15/2014

  • 8/10/2019 TBE222

    2/8

    PACKAGE

    TITLE:TA

    S.No. UNITS

    TECH

    INLET SEPARATOR

    SPECIFICATION REQUIREMENTSDESCRIPTION

    mm

    mm

    mm

    m3

    Turndown

    3.0 CONSTRUCTION

    Vessel Dimensions

    Vessel Thickness(Shell/Head) mm

    Post Weld Heat Treatment

    External Painting As per Data Sheet & SpecInternal Coating Not Required

    Internal clad /overlay with SS316L upto wetted height of vessel m As per Data Sheet

    Anode Provision against galvanic corrosion

    Provision of ext. attachments-cleats, pipe supports etc

    2:1 Heads As per Data Sheet & Spec

    Skirt height mm As required

    Skirt ring height

    4.0 MATERIALS

    Vessel

    Shell / Head plates

    Internals/attachments SS316L

    Flange Bolting SA 320 Gr.L7/SA 194 L7

    Fluoro Carbon Coating for flange bolts As per datasheet

    Nozzle Flange SA350 Gr LF2

    Nozzle Pipe SA333 Gr 6

    Pipe fittings SA420 WPL 6

    External attachments SA 516 Gr. 70 N

    Nozzle Gaskets SS316L SWSF

    Cladding on nozzles and flanges upto wetted height SS316L

    Vessel shall meet NACE MR0175 & ISO 15156 As per Data Sheet & Spec

    Anode requirements As per Data Sheet & Spec

    4.2 Vessel Internals

    Design & Supply of Vessel Internals

    Assembly of Internals

    All

    inte

    rnal

    5.0 GUARANTEE

    Mechanical Guarantee As per Data Sheet & Spec

    6.0 QUALITY REQUIREMENTS

    Material Certification As per datasheet

    As per Data Sheet & Spec

    Required by Vessel Fabricator

    To be Confirmed by Vessel Vendor

    /Internals Vendor

    SA 516 Gr. 70 N or Equivalent to suit Minus(-)50 Design Temperature

    As per data sheet

    As per code and datasheet

    Not Required by Vessel Fabricator

    By Vendor

    ID 1800:4700 L T/T

    Wall Thickness Head

    Corrosion Allowance

    Joint Efficiency

    Insulation Thickness

    Vessel Orientation

    Normal Liquid Volume

    VTA

    VTA

    VTA

    N/A

    Vertical

    VTA

    Note 10

    Doc No.: 247581721.xls.ms_office 10/15/2014

  • 8/10/2019 TBE222

    3/8

    PACKAGE

    TITLE:TA

    S.No. UNITS

    TECHN

    INLET SEPARATOR

    SPECIFICATION REQUIREMENTSDESCRIPTION

    Welding,Testing & NDE As per Data Sheet & Spec

    Hydro Test As per Data Sheet, Spec and Code

    Third Party Inspection By SUPPLIER ?

    Quality Systems Required ?

    ASME Code Stamp Requirements Required

    PMI for Vessel Cladding Required ?

    100% RT As per Data Sheet & Spec ?

    UT As per Data Sheet, Spec and Code ?

    MT &PT As per Data Sheet & Spec ?

    Impact Test for materials AS per Code ?

    7.0 WEIGHT DATA

    Empty Weight kg Vendor to specify

    Operating Weight kg Vendor to specify ?

    Hydrotest Weight kg Vendor to specify

    8.0 SPARES

    Supply of Start-up &Commissioning Spares As per Data Sheet & Spec ?

    List of 2 years Spares As per Data Sheet & Spec ?

    9.0

    10.0 DEVIATIONS

    Vendor to bringout all deviations specifically

    11.0 EXPERIENCE RECORD

    12.0 OVERALL TECHNICAL ACCEPTABILITY

    13.0 TECHNICAL RANKING

    Deviations if any

    Doc No.: 247581721.xls.ms_office 10/15/2014

  • 8/10/2019 TBE222

    4/8

    PACKAGE

    TITLE:TAG NUMBE

    S.No. UNITS

    TECHNICAL

    INLET SEPARATOR

    SPECIFICATION REQUIREMENTSDESCRIPTION

    REMARKS :

    Doc No.: 247581721.xls.ms_office 10/15/2014

  • 8/10/2019 TBE222

    5/8

    JGC AND SHI

    12P002 - PETRONAS FLNG 2 PROJEC

    Offshore Malaysia

    Acceptable / Included

    Not Acceptable

    Requires Further Clarification

    76 / FV

    EM1402 Rev. 2

    ASME SEC VIII Div 1

    eProcess

    To be confirmed

    To be confirmed

    eProcess

    To be confirmed

    To be confirmed

    To be confirmed

    -50 / 70

    To be confirmed

    To be confirmed

    To be confirmed

    To be confirmed

    To be confirmed

    To be confirmed

    To be confirmed

    To be confirmed

    Doc No.: 247581721.xls.ms_office 10/15/2014

  • 8/10/2019 TBE222

    6/8

    JGC AND SHI

    12P002 - PETRONAS FLNG 2 PROJECT

    Offshore Malaysia

    Acceptable / Included

    Not Acceptable

    Requires Further Clarification

    eProcess

    Yes

    50 / 52

    To be confirmed

    To be Confirmed

    To be confirmed

    To be Confirmed

    To be Confirmed

    Yes

    To be Confirmed

    To be Confirmed

    To be Confirmed

    To be Confirmed

    To be Confirmed

    To be Confirmed

    Not Provided

    1800 : 4600

    SA105 ASME B16.5

    SA516 70N Clad 316L Plate

    To be Confirmed

    To be Confirmed

    To be confirmed

    2:1 SE Head

    500

    EN 10204 Type 3.1 / EN 10204 Typ

    18 mth delivery / 12 mth after commis

    Doc No.: 247581721.xls.ms_office 10/15/2014

  • 8/10/2019 TBE222

    7/8

    JGC AND SHI

    12P002 - PETRONAS FLNG 2 PROJE

    Offshore Malaysia

    Acceptable / Included

    Not Acceptable

    Requires Further Clarification

    eProcess

    Not Provided

    Not Provided

    To be confirmed

    Yes

    Not Provided

    Yes

    23,400

    Not Provided

    Confirmed

    To be confirmed

    Confirmed

    To be confirmed

    To be confirmed

    To be confirmed

    Not Provided

    Doc No.: 247581721.xls.ms_office 10/15/2014

  • 8/10/2019 TBE222

    8/8

    JGC AND SHI

    12P002 - PETRONAS FLNG 2 P

    Offshore Malaysia

    Acceptable / Included

    Not Acceptable

    Requires Further Clarification

    eProcess

    Doc No : 247581721 xls ms office 10/15/2014