8/10/2019 TBE222
1/8
PACKAGE
TITLE:TA
S.No. UNITS
1.0 GENERAL
?
?
?
?
?
?
?
?
?
2.0
2.1
?
barg 75 and Full Vacuum
C Minus(-50)/60
To S-A00-1351-001 ?
To S-A00-1351-001 ?
To S-A00-1351-001 ?
To S-A00-1351-001 ?
Required
2.2
m3/hr
Oil Inlet Density kg/m3
Oil Inlet Viscosity cP
Water Inlet Flowrate m3/hr
Water Inlet Density kg/m3
cP
m3/hr
kg/kmol
cP
m3/hr
m3/hr
m3/hr
ptb
kg/m3
m
2.3
C
barg
C
barg
barg
mm
mm
mm
1119.53
Gas Viscosity
Gas Outlet Flow Rate
10.03
10% of liquid flow rate
20.49
0.015 @ 88 barg
VTA
VTA
VTA
TECH
INLET SEPARATOR
ASME SEC VIII Div 1/2
SPECIFICATION REQUIREMENTS
612.3
87.71
0.244
14.64
Conformance to Process Engg.Flow Scheme-Inlet Separator
Conformance to Packaged Equipment General Design Philosophy and Specification
Provision of Documents as per SDRL
DESIGN REQUIREMENTS
Mechanical Design
Relavent P&IDs
Code
Design Pressure
Design Temperature
Wind Load design
Blast Load Design
Transportation Loading Design
All other loadings
Mechanical datasheet by Vendor
Process Design
Oil Inlet Flowrates
Design Data
Water Inlet Viscosity
Gas Inlet Flow Rate
Gas Molecular Weight
Water Outlet Flow Rate
Oil Outlet Flow Rate
Particle Loading
Particle Average Density
Particle Range
5 to 64
2000
10 to 150
Operating Temprature
Operating Pressure
Design Temprature (Min / Max)
Design Pressure (Min / Max)
Test Pressure
Cone Height
S-A00-135A-001
Number of Liners
Diameter (ID)
Cylinder Height
-15 to 25.5
69 to 88
-50 / 60
FV / 105
VTA
VTA
VTA
VTA
VTA
DESCRIPTION
Quotation Ref. / Date
Vessel manufacturer
Conformance to Inlet Separator Mechanical Spec.
Conformance to Pressure Vessel Gen.Design Philosophy &Spec
Conformance to Inlet Separator Datasheet
Conformance to Basic Engineering Design Data
Doc No.: 247581721.xls.ms_office 10/15/2014
8/10/2019 TBE222
2/8
PACKAGE
TITLE:TA
S.No. UNITS
TECH
INLET SEPARATOR
SPECIFICATION REQUIREMENTSDESCRIPTION
mm
mm
mm
m3
Turndown
3.0 CONSTRUCTION
Vessel Dimensions
Vessel Thickness(Shell/Head) mm
Post Weld Heat Treatment
External Painting As per Data Sheet & SpecInternal Coating Not Required
Internal clad /overlay with SS316L upto wetted height of vessel m As per Data Sheet
Anode Provision against galvanic corrosion
Provision of ext. attachments-cleats, pipe supports etc
2:1 Heads As per Data Sheet & Spec
Skirt height mm As required
Skirt ring height
4.0 MATERIALS
Vessel
Shell / Head plates
Internals/attachments SS316L
Flange Bolting SA 320 Gr.L7/SA 194 L7
Fluoro Carbon Coating for flange bolts As per datasheet
Nozzle Flange SA350 Gr LF2
Nozzle Pipe SA333 Gr 6
Pipe fittings SA420 WPL 6
External attachments SA 516 Gr. 70 N
Nozzle Gaskets SS316L SWSF
Cladding on nozzles and flanges upto wetted height SS316L
Vessel shall meet NACE MR0175 & ISO 15156 As per Data Sheet & Spec
Anode requirements As per Data Sheet & Spec
4.2 Vessel Internals
Design & Supply of Vessel Internals
Assembly of Internals
All
inte
rnal
5.0 GUARANTEE
Mechanical Guarantee As per Data Sheet & Spec
6.0 QUALITY REQUIREMENTS
Material Certification As per datasheet
As per Data Sheet & Spec
Required by Vessel Fabricator
To be Confirmed by Vessel Vendor
/Internals Vendor
SA 516 Gr. 70 N or Equivalent to suit Minus(-)50 Design Temperature
As per data sheet
As per code and datasheet
Not Required by Vessel Fabricator
By Vendor
ID 1800:4700 L T/T
Wall Thickness Head
Corrosion Allowance
Joint Efficiency
Insulation Thickness
Vessel Orientation
Normal Liquid Volume
VTA
VTA
VTA
N/A
Vertical
VTA
Note 10
Doc No.: 247581721.xls.ms_office 10/15/2014
8/10/2019 TBE222
3/8
PACKAGE
TITLE:TA
S.No. UNITS
TECHN
INLET SEPARATOR
SPECIFICATION REQUIREMENTSDESCRIPTION
Welding,Testing & NDE As per Data Sheet & Spec
Hydro Test As per Data Sheet, Spec and Code
Third Party Inspection By SUPPLIER ?
Quality Systems Required ?
ASME Code Stamp Requirements Required
PMI for Vessel Cladding Required ?
100% RT As per Data Sheet & Spec ?
UT As per Data Sheet, Spec and Code ?
MT &PT As per Data Sheet & Spec ?
Impact Test for materials AS per Code ?
7.0 WEIGHT DATA
Empty Weight kg Vendor to specify
Operating Weight kg Vendor to specify ?
Hydrotest Weight kg Vendor to specify
8.0 SPARES
Supply of Start-up &Commissioning Spares As per Data Sheet & Spec ?
List of 2 years Spares As per Data Sheet & Spec ?
9.0
10.0 DEVIATIONS
Vendor to bringout all deviations specifically
11.0 EXPERIENCE RECORD
12.0 OVERALL TECHNICAL ACCEPTABILITY
13.0 TECHNICAL RANKING
Deviations if any
Doc No.: 247581721.xls.ms_office 10/15/2014
8/10/2019 TBE222
4/8
PACKAGE
TITLE:TAG NUMBE
S.No. UNITS
TECHNICAL
INLET SEPARATOR
SPECIFICATION REQUIREMENTSDESCRIPTION
REMARKS :
Doc No.: 247581721.xls.ms_office 10/15/2014
8/10/2019 TBE222
5/8
JGC AND SHI
12P002 - PETRONAS FLNG 2 PROJEC
Offshore Malaysia
Acceptable / Included
Not Acceptable
Requires Further Clarification
76 / FV
EM1402 Rev. 2
ASME SEC VIII Div 1
eProcess
To be confirmed
To be confirmed
eProcess
To be confirmed
To be confirmed
To be confirmed
-50 / 70
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
To be confirmed
Doc No.: 247581721.xls.ms_office 10/15/2014
8/10/2019 TBE222
6/8
JGC AND SHI
12P002 - PETRONAS FLNG 2 PROJECT
Offshore Malaysia
Acceptable / Included
Not Acceptable
Requires Further Clarification
eProcess
Yes
50 / 52
To be confirmed
To be Confirmed
To be confirmed
To be Confirmed
To be Confirmed
Yes
To be Confirmed
To be Confirmed
To be Confirmed
To be Confirmed
To be Confirmed
To be Confirmed
Not Provided
1800 : 4600
SA105 ASME B16.5
SA516 70N Clad 316L Plate
To be Confirmed
To be Confirmed
To be confirmed
2:1 SE Head
500
EN 10204 Type 3.1 / EN 10204 Typ
18 mth delivery / 12 mth after commis
Doc No.: 247581721.xls.ms_office 10/15/2014
8/10/2019 TBE222
7/8
JGC AND SHI
12P002 - PETRONAS FLNG 2 PROJE
Offshore Malaysia
Acceptable / Included
Not Acceptable
Requires Further Clarification
eProcess
Not Provided
Not Provided
To be confirmed
Yes
Not Provided
Yes
23,400
Not Provided
Confirmed
To be confirmed
Confirmed
To be confirmed
To be confirmed
To be confirmed
Not Provided
Doc No.: 247581721.xls.ms_office 10/15/2014
8/10/2019 TBE222
8/8
JGC AND SHI
12P002 - PETRONAS FLNG 2 P
Offshore Malaysia
Acceptable / Included
Not Acceptable
Requires Further Clarification
eProcess
Doc No : 247581721 xls ms office 10/15/2014