8
Tasks and time scale T. Tsuboyama (KEK)

Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business

Embed Size (px)

Citation preview

Page 1: Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business

Tasks and time scale

T. Tsuboyama (KEK)

Page 2: Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business

DSSD production

• Test production by Micron and SINTEF (Talk by M. Valentan)

• HPK decided to restart DSSD business.– The first sample comes in 1.5 years

• Mass production– Sensor characterization.– Quality control

Page 3: Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business

Readout• APV25 hybrid– Origami (C. Irmler) and Normal– Production– Quality control --- Test

• Repeater– Location should be decided. (Not yet clear)– Mechanical and Electric design– Mass production

• Backend– COPPER/FINNESSE – Mass production

• DAQ software– Slow control

Page 4: Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business

Mechanics• Discussion with KEK engineering group has

started.• Support– Joint work with IR/DEPFET/Strip design is necessary– Connection to CDC/IR/DEPFET– Design: Cooling of normal hybrids – Construction

• Ladder production– Design– Assembly procedure– Storage– Booking and testing

• Ladder mount scheme and procedure

Page 5: Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business

Infrastructures• Monitor– Radiation and Beam abort– Temperature

• Cooling– Chiller/coolant – tubing– Special consideration of Origami cooling tubes

• Cables– Power supply / signal / control /

• Power supply: – 3 times larger system than the present SVD

• Krakow and Prague groups are designing power supply system common to SVD and DEPFET

Page 6: Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business

System integration• Definition of Integration strategy.• Online software

– Cluster finding and time reconstruction– Calibration– Performance monitor

• Data quality monitor• Quality assurance monitor

• Test with source /laser (?)• Debugging hardware and software• Calibration• Cosmic ray test• Commissioning Pixel + SVD should be done together.

Page 7: Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business

Offline Software• Hara san is now working for overall computing and

has not time to contribute to SVD • Calibration / Database• Alignment– For physics study, much better svd/pixel alignment and

reliable tracking (CDC+SVD+PIXEL) is necessary• Simulations– A GEAN4 version is reported by Drasal (Prague)– Detector optimization

• Tracking– CDC track extrapolation– Evaluation of SVD only tracking A. Moll (MPI)– New alignment efforts A. Moll (MPI)

Page 8: Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business

Schedule

Japan Fiscal Year 2009 2010 2011 2012 2013 2014

DSSD prototyping

DSSD production

Ladder/Structure design

Support production

Ladder production

FADC production

DAQ preparation

Ladder mount

System test

Installation