25
1 Mid-term meeting, 7-8 April 2011, VKI VAL idation and I mprovement of A irframe N oise prediction T ools (ACP8-GA-2009-233680) WP 4 – Improvements of Numerical CAA Approaches Task 4.1 – Improvements of source modelling Compiled by: M.Shur, M.Strelets (NTS)

Task 4.1 objectives Partners involved and allocated efforts

  • Upload
    ariane

  • View
    21

  • Download
    0

Embed Size (px)

DESCRIPTION

VAL idation and I mprovement of A irframe N oise prediction T ools (ACP8-GA-2009-233680) WP 4 – Improvements of Numerical CAA Approaches Task 4.1 – Improvements of source modelling Compiled by: M.Shur, M.Strelets (NTS). Task 4.1 objectives Partners involved and allocated efforts - PowerPoint PPT Presentation

Citation preview

Page 1: Task 4.1 objectives  Partners involved and allocated efforts

1Mid-term meeting, 7-8 April 2011, VKI

VALidation and Improvement of Airframe Noise prediction Tools(ACP8-GA-2009-233680)

WP 4 – Improvements of Numerical CAA Approaches

Task 4.1 – Improvements of source modelling

Compiled by: M.Shur, M.Strelets (NTS)

Page 2: Task 4.1 objectives  Partners involved and allocated efforts

2Mid-term meeting, 7-8 April 2011, VKI

• Task 4.1 objectives

• Partners involved and allocated efforts

• Main directions of work (according to DoW)

• Overview of partners’ contributions

OUTLINEOUTLINE

Page 3: Task 4.1 objectives  Partners involved and allocated efforts

3Mid-term meeting, 7-8 April 2011, VKI

Task ObjectivesTask Objectives

• General WP-4 objective: Development of improved simulation approaches and enhanced algorithms for AFN prediction

Within envisioned avenues of improvements identified in VALIANT DoW

Based on the weak points of the state-of-the-art tools discovered by Partners in the course of WP3

• In particular, Task 4.1 deals with improvements in the area of

Turbulent Noise Source ModellingTurbulent Noise Source Modelling

• These include both: Approaches to turbulence simulation (Sub-Task 4.1.1) Higher order schemes (Sub-Task 4.1.2)

Page 4: Task 4.1 objectives  Partners involved and allocated efforts

4Mid-term meeting, 7-8 April 2011, VKI

Partners and Allocated EffortsPartners and Allocated Efforts

Partner1

VKI2

IMM4

TUB5

ONERA8

DLR9

CIMNE10

NTS11

NUM

P-M (total DoW) 7.0 11.5 10.0 5.5 9.0 7.5 9.0 2.0

P-M (18 months, DoW)

4.5 7.5 5.5 2.0 4.5 4.0 2.0 ?

P-M (18 months, fact)

? ? ? ? ? ? 8.0 ?

Contribution

• All “numerical teams”, except for LMS (8 Partners), are involved

• Green – ProvidedGreen – Provided• Red – Not provided Red – Not provided

• Deliverables: D21 – Intermediate report (month 21 – May 2011) D31 – Final report (month 30 – February 2012)

Page 5: Task 4.1 objectives  Partners involved and allocated efforts

5Mid-term meeting, 7-8 April 2011, VKI

Main Directions of Partners’ Work (DoW)Main Directions of Partners’ Work (DoW)• VKIVKI

Extension of steady higher order space discretization Residual Distribution Schemes developed by VKI earlier on time-dependent computations on unstructured grids, to cope with CAA problems

• IMMIMM Enhancement of in-house codes by implementation of:

- Kinetically consistent formulations of turbulence-resolving approaches (better representation of near-wall turbulence)- Higher-order approximations on unstructured grids

• TUBTUB Improvement of hybrid RANS-LES approaches implemented in in-house code

- “DDES-type” methods – reducing inaccuracies associated with the so-called “grey area” (may be important for gap turbulence interaction test case)- “WMLES-type methods” – removing minor “log-layer mismatch” predicted by the IDDES within the code

Page 6: Task 4.1 objectives  Partners involved and allocated efforts

6Mid-term meeting, 7-8 April 2011, VKI

Main Directions of Work - 2Main Directions of Work - 2• ONERAONERA

Development of improved methods of creating turbulent fluctuations at the upstream boundary of LES domain within 2-stage RANS-NLDE approach (important for wing-flap test case)

- Techniques will be based on Synthetic Eddy Method of Jarrin et al.: expected to produce more realistic turbulence since it allows to reproduce both 1st- and 2nd-order moments

• NTSNTS Work on same issue, in the framework of Embedded IDDES

- Enhancement of earlier developed turbulence-recycling procedure- Development of new efficient generator of “synthetic turbulence” at RANS-LES interface (more flexible and user-friendly than recycling)

• DLRDLR Extending of stochastic approach to noise generation to the case of mean flows supporting self-sustained large-scale oscillations (important for slat-wing and gap turbulence test cases)

Page 7: Task 4.1 objectives  Partners involved and allocated efforts

7Mid-term meeting, 7-8 April 2011, VKI

Main Directions of Work – 3 Main Directions of Work – 3 • CIMNECIMNE

Extension of SGS-modelling developed by CIMNE earlier for stabilization of the FE formulations to simulation of turbulence

• NUMECANUMECA Validation of promising techniques of acceleration of LES-based computations on broadband noise prediction problems Extension of capabilities of LEE solver for acoustic propagation based on high order Discontinuous Galerkin formulation

Page 8: Task 4.1 objectives  Partners involved and allocated efforts

8Mid-term meeting, 7-8 April 2011, VKI

OVERVIEWOVERVIEW

of Partners Contributionsof Partners Contributions

• VKIVKI• IMMIMM• TUBTUB• ONERAONERA

• DLRDLR• CIMNECIMNE• NTSNTS• NUMECANUMECA

Page 9: Task 4.1 objectives  Partners involved and allocated efforts

9Mid-term meeting, 7-8 April 2011, VKI

Summary of VKI Contribution (1/2)

“Title if applicable”, authors

Page 10: Task 4.1 objectives  Partners involved and allocated efforts

10Mid-term meeting, 7-8 April 2011, VKI

Summary of VKI Contribution (2/2)

Page 11: Task 4.1 objectives  Partners involved and allocated efforts

11Mid-term meeting, 7-8 April 2011, VKI

Summary of IMM Contribution (1/2)

“Title if applicable”, authors

Page 12: Task 4.1 objectives  Partners involved and allocated efforts

12Mid-term meeting, 7-8 April 2011, VKI

Summary of IMM Contribution (2/2)

Page 13: Task 4.1 objectives  Partners involved and allocated efforts

13Mid-term meeting, 7-8 April 2011, VKI

Summary of TUB Contribution (1/2)

“Title if applicable”, authors

Page 14: Task 4.1 objectives  Partners involved and allocated efforts

14Mid-term meeting, 7-8 April 2011, VKI

Summary of TUB Contribution (2/2)

Page 15: Task 4.1 objectives  Partners involved and allocated efforts

15Mid-term meeting, 7-8 April 2011, VKI

Summary of ONERA Contribution (1/2)

“Title if applicable”, authors

Page 16: Task 4.1 objectives  Partners involved and allocated efforts

16Mid-term meeting, 7-8 April 2011, VKI

Summary of ONERA Contribution (2/2)

Page 17: Task 4.1 objectives  Partners involved and allocated efforts

17Mid-term meeting, 7-8 April 2011, VKI

Summary of DLR Contribution (1/2)

“Title if applicable”, authors

Page 18: Task 4.1 objectives  Partners involved and allocated efforts

18Mid-term meeting, 7-8 April 2011, VKI

Summary of DLR Contribution (2/2)

Page 19: Task 4.1 objectives  Partners involved and allocated efforts

19Mid-term meeting, 7-8 April 2011, VKI

Summary of CIMNE Contribution (1/2)

“Title if applicable”, authors

Page 20: Task 4.1 objectives  Partners involved and allocated efforts

20Mid-term meeting, 7-8 April 2011, VKI

Summary of CIMNE Contribution (2/2)

Page 21: Task 4.1 objectives  Partners involved and allocated efforts

21Mid-term meeting, 7-8 April 2011, VKI

Summary of NTS Contribution (1/2)

“Title if applicable”, authors

Page 22: Task 4.1 objectives  Partners involved and allocated efforts

22Mid-term meeting, 7-8 April 2011, VKI

Summary of NTS Contribution (2/2)

Page 23: Task 4.1 objectives  Partners involved and allocated efforts

23Mid-term meeting, 7-8 April 2011, VKI

Summary of NUMECA Contribution (1/2)

“Title if applicable”, authors

Page 24: Task 4.1 objectives  Partners involved and allocated efforts

24Mid-term meeting, 7-8 April 2011, VKI

Summary of NUMECA Contribution (2/2)

Page 25: Task 4.1 objectives  Partners involved and allocated efforts

25Mid-term meeting, 7-8 April 2011, VKI

Concluding RemarksConcluding Remarks