Page 1: Task  10.3 5 T HTS  Dipole Magnet  Design and Construction

CEA | 17/05/2013

www.cea.frwww.cea.fr

TASK 10.35 T HTS DIPOLE MAGNET DESIGN AND CONSTRUCTION

17/05/2013

Pre-kick off meeting WP 10 | Maria DURANTE

| PAGE 1

Page 2: Task  10.3 5 T HTS  Dipole Magnet  Design and Construction

CEA | 17/05/2013

TASK 10.3 OBJECTIVES

Subtask 10.3.1 HTS accelerator magnet design Explore magnet concepts suitable for HTS cable and ribbon based conductors providing magnetic field of accelerator quality in view of the 20 T HE-LHC dipole.

Subtask 10.3.2 Bi2212 magnet developments Design and manufacture a prototype magnet using Bi2212 cable. This prototype will be intended to manage the wind and react manufacturing operation and to determine the highest stress allowable on such a cable.

Subtask 10.3.3 YBCO magnet developments Design and manufacture an accelerator like prototype magnet using YBCO tape based conductor and having an operating current of at least 5 kA.

| PAGE 2

Page 3: Task  10.3 5 T HTS  Dipole Magnet  Design and Construction

CEA | 23/04/2013

PARTICIPANTS (FROM BUDGET FILES)

| PAGE 3

Beneficiary short name (all costs in €) Person-Months Consumable and

prototype direct costsTravel direct

costs

CERN 24 150 000 12 000

CEA 34 150 000 8 000

INPG 19 12 000 4 000

INFN 4   2 000

TUT 10   10 000

DTI 8 20 000 4 000

Total: 99 332 000 40 000

Page 4: Task  10.3 5 T HTS  Dipole Magnet  Design and Construction

CEA | 17/05/2013

PARTICIPANTS

| PAGE 4

Institute Contact for Task 10.3

CERN

CEA Maria Durante

INPG Pascal Tixador

INFN Giovanni Volpini

TUT Antti Stenvall

DTI Nikolaj Zangenberg

Page 5: Task  10.3 5 T HTS  Dipole Magnet  Design and Construction

CEA | 17/05/2013

TASK 10.3 DELIVERABLE AND MILESTONES

EuCARD² Deliverable and milestonesD10.1 Conceptual study of HTS accelerator magnets (report) M18MS64 YBCO magnet design report M18MS68 Technical and economical comparison YBCO/Bi2212 magnets M36

Internal milestones proposalInputs for magnet HTS design M3

HTS dipole constraintsBi2212 conductor objectivesYBCO conductor objectives

HTS magnet design M24HTS magnet built M38

D10.4 for task 10.4 : Magnet Cold test M44

| PAGE 5

Page 6: Task  10.3 5 T HTS  Dipole Magnet  Design and Construction

CEA | 17/05/2013

SCHEDULE

| PAGE 6

Page 7: Task  10.3 5 T HTS  Dipole Magnet  Design and Construction

CEA | 17/05/2013

PARTICPANTS

| PAGE 7

Nom de la tâche Institute Participants

HTS magnet constrains CERN Gijs de Rijk ?

Bi2212 conductor objectives CERN ?

YBCO conductor objectives CERN ?

5 T dipole magnet design CEA M. Durante, Ph.Fazilleau

CERN

INPG

TUT Antti Stenvall

INFN

DTI

Components and tooling procurement CEA;CERN

YBCO magnet manufacturing CEA;CERN

Bi2212 magnet manufacturing CERN;CEA

Stand alone HTS magnet testing INFN;CERN;CEA;INPG

Page 8: Task  10.3 5 T HTS  Dipole Magnet  Design and Construction

CEA | 17/05/2013

DSM

IRFU

SACM

| PAGE 8

Commissariat à l’énergie atomique et aux énergies alternatives

Centre de Saclay | 91191 Gif-sur-Yvette Cedex

T. +33 (0)1 69 08 71 27 | F. +33 (0)1 69 08 69 49

Etablissement public à caractère industriel et commercial | RCS Paris B 775 685 019